ibc-2012 /asce 7-10 · 2016. 6. 2. · turning vanes flexible duct connection d.g. m.d. f.d....
TRANSCRIPT
-
DESIGN CONDITIONS
INDOOR: 75F DB / 50% RH
OUTDOOR: 95F DB / 80F WBSUMMER
OUTDOOR: 25F DBWINTER
INDOOR: 70F DB / 50% RH
HVAC LEGEND
AUTOMATIC BALANCING CONTROL VALVE
SIDEWALL REGISTER
LINEAR SIDEWALL REGISTER
S.R.
L.S.R.
DOOR GRILLE
MANUAL DAMPER
FIRE DAMPER
TURNING VANES
FLEXIBLE DUCT CONNECTION
D.G.
M.D.
F.D.
DIRECTION OF PIPING FLOW
PIPE CAP
DRAIN VALVE W/ HOSE CONNECTION
AUTOMATIC AIR VENT
BASKET STRAINER
RELIEF VALVE
RINSE VALVE
FLANGE CONNECTION
FLANGED JOINT
ELBOW UP
ELBOW DOWN
TEE UP
TEE DOWN
ELBOW SIDE
TEE SIDE
BUTTERFLY VALVE
BALL VALVE
CIRCUIT SETTER/BALANCING VALVE
PIPE WITH HEAT TRACING
INSULATION AND JACKET
SSOLENOID VALVE
SWING CHECK VALVE
PLUG VALVE
CIRCUIT SENSOR
BACKFLOW PREVENTER
PRESSURE REDUCING VALVE
UNION
ECCENTRIC REDUCER/INCREASER
CONCENTRIC REDUCER/INCREASER
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
WAFER CHECK VALVE
END SUCTION PUMP
DOUBLE SUCTION PUMP
WYE STRAINER
WYE STRAINER W/BLOWDOWN BALL VALVE WITH HOSECONNECTION
GATE VALVE
RETURN/EXHAUST/OUTSIDE AIR DUCT
M
CIRCUIT SETTER
TRIPLE DUTY VALVE
SUPPLY AIR DUCT
EQUIPMENT CLEARANCE
VARIABLE VOLUME TERMINAL UNITVAV
MOTORIZEDBUTTERFLY VALVE
BALL VALVE
ROOF TOP UNIT
MOTORIZED DAMPER
M
THERMOSTAT
HUMIDISTAT
SMOKE DETECTOR (DUCT MOUNTED)
CARBON DIOXIDE SENSOR (DUCT MOUNTED)
AIR TERMINAL DIFFUSER(CEILING MOUNTED)
AIR TERMINAL RETURNGRILLE (CEILING MOUNTED)
PREINSULATED FLEXIBLE DUCT
CONNECTION TO EXISTING SYSTEM
SD
CD
AIR TERMINAL EXHAUSTGRILLE (CEILING MOUNTED)
AIR TERMINAL TAG, X=TYPE MARK, Y=CFM
AIR TERMINAL ROUND CONE DIFFUSER
THERMOSTAT (DUCT MOUNTED)
HUMIDISTAT (DUCT MOUNTED)
XY
H
H
T
T
M
MECHANICAL COMPONENT IMPORTANCE FACTOR (Ip) DESIGNATION
IBC-2012 /ASCE 7-10
SEISMIC AND WIND REQUIREMENTSFOR MECHANICAL SYSTEMS
COMPONENT IMPORTANCE FACTOR (Ip)
Ip = 1.0 Ip = 1.5
RESTRAIN IF TOTAL WEIGHT OF DUCTS
ON TRAPEZE > 10 LBS/FT44
RESTRAIN IF TOTAL WEIGHT OF DUCTS
ON TRAPEZE > 10 LBS/FTMULTIPLE DUCTS ON TRAPEZE
5- 6 SQ.FT. AND LARGER
RESTRAIN IF ANY PIPE
ON TRAPEZE > 1"
RESTRAIN IF TOTAL WEIGHT OF PIPES
ON TRAPEZE > 10 LBS/FT
4
4
4
4 RESTRAIN ALL
RESTRAIN IF ANY PIPE
ON TRAPEZE > 3"
RESTRAIN IF TOTAL WEIGHT OF PIPES
ON TRAPEZE > 10 LBS/FT
RESTRAIN ALL
SUSPENDED PIPE ON TRAPEZE
SUSPENDED NON DUCTILE PIPING
(CAST IRON, PLASTIC, CERAMIC)
NOTES:
1. EQUIPMENT 20 LBS. OR LESS IS EXEMPT IF FLEXIBLE CONNECTIONS ARE PROVIDED BETWEEN THE COMPONENT AND ASSOCIATEDDUCTWORK, PIPING, AND CONDUIT.
2. RESTRAINTS ARE NOT REQUIRED IF THE COMPONENT WEIGHS 400 LBS. OR LESS, IS MOUNTED AT 4 FT. OR LESS ABOVE A FLOOR,AND HAS FLEXIBLE CONNECTIONS BETWEEN THE COMPONENT AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT.
3. FLEXIBLE CONNECTIONS REQUIRED FOR PIPE CONNECTIONS ONLY.4. RESTRAINT IS NOT REQUIRED IF THE PIPING / DUCTWORK IS SUPPORTED BY HANGERS AND EACH HANGER IN THE PIPING RUN IS 12 IN.
OR LESS IN LENGTH FROM THE TOP OF THE PIPE TO THE SUPPORTING STRUCTURE. WHERE PIPES ARE SUPPORTED ON A TRAPEZE,THE TRAPEZE SHALL BE SUPPORTED BY HANGERS HAVING A LENGTH OF 12 IN. OR LESS. WHERE ROD HANGERS ARE USED, THEYSHALL BE EQUIPPED WITH SWIVELS, EYE NUTS OR OTHER DEVICES TO PREVENT BENDING IN THE ROD.
5. ALL DUCTWORK , REGARDLESS OF SIZE, DESIGNED TO CARRY TOXIC, HIGHLY TOXIC, OR EXPLOSIVE GASES OR USED FOR SMOKECONTROL MUST BE RESTRAINED.
6. COMPONENT CERTIFICATION MUST BE SUPPLIED BY THE EQUIPMENT MANUFACTURER AT TIME OF SUBMITTAL FOR REVIEW BYENGINEER OF RECORD.
A. PER SECTION 301.15 OF THE 2012 EDITION OF THE INTERNATIONAL MECHANICAL CODE, MECHANICAL EQUIPMENT, APPLIANCESAND SUPPORTS (INCLUDING ROOF CURBS & ROOF RAILS) EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TO RESISTTHE WIND PRESSURES DETERMINED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. WHERE SEISMIC RESTRAINTIS REQUIRED, THE MORE DEMANDING FORCE OF WIND AND SEISMIC MUST BE USED. SEE SEISMIC INFORMATION CONTAINED INTHE STRUCTURAL DRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN CATEGORY.
B. SEE EQUIPMENT SCHEDULES AND DETAILS FOR SPECIFIC COMPONENT IMPORTANCE FACTOR DESIGNATIONS.C. USE APPLICABLE TABLE BELOW TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH MECHANICAL COMPONENT.D. FOR ALL COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENT SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED
BY A REGISTERED DESIGN PROFESSIONAL. SUBMITTALS MUST INCLUDE STAMPED AND SIGNED DRAWINGS AND CALCULATIONS.E. WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR THE INSTALLATION OF EQUIPMENT UNDER THIS
CONTRACT MUST BE DESIGNED BY THE SEISMIC ENGINEER. DO NOT POUR ANY HOUSEKEEPING PADS PRIOR TO THE RECEIPTOF THE SEISMIC SUBMITTAL.
F. SEISMIC RESTRAINTS FOR PIPING AND DUCTWORK MUST BE SHOWN ON LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINTLOCATIONS ALONG WITH ACCOMPANYING DETAILS AND CALCULATIONS.
NOTES
1.51.0
6REQUIRED6NOT REQUIREDCOMPONENT CERTIFICATION
(SEE NOTE 6)
6 SQ.FT. AND LARGERDUCTWORK
4>1"4>3"SUSPENDED DUCTILE PIPING
(STEEL, ALUMINUM, COPPER, ETC.)
-RESTRAIN ALL1RESTRAIN ALLNOT INLINE W/
DUCT/PIPE
3RESTRAIN IF >75 LBS
PROVIDE FLEX. CONN.3RESTRAIN IF >75 LBS
PROVIDE FLEX. CONN.INLINE W/ DUCT
SUSPENDED
EQUIPMENT
-RESTRAIN ALL1RESTRAIN ALLCOMPONENT SUPPORTS
-RESTRAIN ALL1, 2RESTRAIN ALLWALL MOUNTED
-RESTRAIN ALL1, 2RESTRAIN ALLFLOOR MOUNTED
-RESTRAIN ALL1RESTRAIN ALLROOF MOUNTED
SEISMIC RESTRAINT
REQUIREMENTNOTES
SEISMIC RESTRAINT
REQUIREMENTCOMPONENT IDENTIFICATION
SEISMIC DESIGN CATEGORIES D,E,F
ALL HVAC COMPONENTS EXCEPT AS NOTED IN Ip=1.5
GENERAL HVAC NOTES
THE DRAWINGS SHOW THE GENERAL ARRANGEMENT AND LOCATION OF EQUIPMENT, DUCTWORK, PIPING, ETC. THE CONTRACTORSHALL BE RESPONSIBLE FOR COORDINATING THE MECHANICAL INSTALLATION W/ THE STRUCTURE AND OTHER TRADES AND SHALLPROVIDE ADDITIONAL OFFSETS AND FITTINGS AS NECESSARY.
COORDINATE WORK WITH OFFICE OF STATE ENGINEER (OSE). OSE SHALL ISSUE THE BUILDING / CONSTRUCTION PERMIT DIRECTLYTO THE OWNER, AND THE OWNER WILL PAY FOR INITIAL INSPECTIONS.
PROVIDE OWNER WITH CERTIFICATES OF FINAL INSPECTION AND ACCEPTANCE FROM OSE.
THE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS SHALL COMPLY WITH THE 2012 VERSION OF THE INTERNATIONALMECHANICAL CODE, NFPA 90A, AND LOCAL CODE OFFICIAL REQUIREMENTS. IN THE EVENT OF A CONFLICT BETWEEN CODES, THEMOST STRINGENT SHALL ALWAYS GOVERN.
DUCT DIMENSIONS ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
THE CONTRACTOR SHALL CHECK AND VERIFY ALL CLEARANCES PRIOR TO FABRICATION OR INSTALLATION OF EQUIPMENT,DUCTWORK, AND PIPING SYSTEMS. WHERE CONDITIONS REQUIRE A CHANGE IN DUCT OR PIPE ROUTING, NOTIFY THE ARCHITECTFOR AN ACCEPTABLE ALTERNATIVE METHOD. AVOID ROUTING DUCTWORK DIRECTLY OVER LIGHT FIXTURES, DIFFUSERS, ANDOTHER CEILING MTD. DEVICES. LOCATE ALL MECHANICAL EQUIPMENT SO THAT FILTERS AND COMPONENTS REQUIRING ACCESS(SERVICE AND MAINTENANCE) ARE FULLY ACCESSIBLE.
PROVIDE CURVED RADIUS ELBOW AT FIRST SUPPLY & RETURN FITTING FOR ALL HVAC UNITS. PROVIDE TURNING VANES IN ALL 90DEGREE ELBOWS IN ALL RECTANGULAR SUPPLY/RETURN/EXHAUST DUCT SYSTEMS. ANY OFFSETS REQUIRED IN DUCT SYSTEMSSHALL BE INSTALLED PER SMACNA 2005 2ND EDITION MANUAL . SHARP ANGLED TRANSITIONS OR OFFSETS 'WILL NOT BEALLOWED'. PROVIDE DUCT ACCESS DOORS AT LOCATIONS SPECIFIED.
INSTALL ALL DUCT MOUNTED DEVICES (DAMPERS, ACCESS DOORS, ETC.) AND PIPING SPECIALTIES IN EASILY ACCESSIBLELOCATIONS. ADVISE THE ARCHITECT IN ADVANCE OF INSTALLATION IF ACCESS WILL BE HINDERED SO AN ALTERNATE LOCATIONCAN BE SELECTED.
ALL DUCT TAKE-OFFS SHALL BE INSTALLED AS SHOWN BY DETAILS ON THE PLANS WITH A MANUAL BALANCING DAMPER AT EVERYTAKE-OFF. WHERE DUCT RUN-OUT SIZE IS NOT SHOWN PROVIDE DUCT SAME SIZE AS GRILLE NECK SIZE. PRE-INSULATED FLEXIBLEDUCT MAY BE USED FOR FINAL CONNECTION TO SUPPLY GRILLES (MAX. LENGTH 5').
ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONSWITH PRESCRIBED CLEARANCES FOR SERVICE AND MAINTENANCE. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IFRECOMMENDED CLEARANCES ARE NOT POSSIBLE BEFORE INSTALLING EQUIPMENT.
ALL ROTATING MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH VIBRATION ISOLATION. PROVIDE FLEXIBLE NEOPRENE DUCTCONNECTORS BETWEEN DUCTWORK AND ISOLATED MECHANICAL EQUIPMENT.
THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS OF FIRE RATED WALLS/FLOORS/CEILINGS BY DUCTWORK, PIPING, ETC.,WITH U.L. LISTED FIRE STOPPING ASSEMBLY TO MAINTAIN FIRE RATING OF THE BARRIER. REFER TO ARCHITECTURAL PLANS FORRATED ASSEMBLY LOCATIONS. SUBMIT UL LISTED ASSEMBLY MANUFACTURER INSTALLATION INSTRUCTIONS DURING SUBMITTALPHASE FOR REVIEW BY ENGINEER OF RECORD, AND INSTALL ASSEMBLY PER MANUFACTURER RECOMMENDATIONS.
SEISMIC PROTECTION OF EQUIPMENT, DUCTWORK, PIPING AND UTILITIES SHALL BE PROVIDED IN ACCORDANCE WITH SECTION 16 OFTHE INTERNATIONAL BUILDING CODE, 2012 EDITION. ALL SEISMIC RESTRAINT AND BRACING SHALL BE SUBSTANTIATED BYMANUFACTURER'S SUBMITTALS PER THE SPECIFICATIONS. FOR ADDITIONAL INFORMATION, SEE 'SEISMIC AND WIND REQUIREMENTSFOR MECHANICAL SYSTEMS' ON THIS SHEET. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF SEISMICBRACING DEVICES WITH THE OWNER'S SEISMIC SPECIAL INSPECTOR. PROVIDE A MINIMUM OF SEVEN DAYS ADVANCE NOTICE OFINSTALLATION.
BALANCE ALL AIR DISTRIBUTION DEVICES, EXHAUST FANS, AND OUTSIDE AIR QUANTITIES AS SCHEDULED OR SHOWN ON THEDRAWINGS. PROVIDE MARKERS AT ALL DAMPER LOCATIONS SHOWING FULL OPEN/CLOSED POSITIONS AND DAMPER SETTING FORREQUIRED AIRFLOW. PROVIDE FINAL TEST AND BALANCE REPORT ALONG W/ SCHEMATIC DRAWINGS SHOWING DIFFUSER LOCATIONW/ DESIGN AND ACTUAL CFM. THE DIFFUSER TAGS ON THE DRAWINGS SHALL CORRESPOND TO THE DIFFUSER TAGS ON THEREPORT. THIS REPORT SHALL BE SUBMITTED BEFORE THE FINAL INSPECTION IS PERFORMED. SEE SPECIFICATIONS FOR FURTHERINFORMATION.
ALL CONTROL WIRING, CONDUIT AND CONTROLS ACCESSORIES NECESSARY TO IMPLEMENT THE OUTLINED SEQUENCES OFOPERATION SHALL BE PROVIDED BY THE CONTROLS CONTRACTOR.
WIND LOAD PROTECTION OF ROOF MOUNTED EQUIPMENT AND DUCTWORK SHALL BE PROVIDED IN ACCORDANCE WITH SECTION 16OF THE INTERNATIONAL BUILDING CODE, 2012 EDITION. ALL WIND LOAD RESTRAINT AND BRACING SHALL BE SUBSTANTIATED BYMANUFACTURER'S SUBMITTALS PER THE SPECIFICATIONS.
ALL EXPOSED PIPING AND DUCTWORK SHALL BE PAINTED. COORDINATE W/ ARCHITECTURAL PLANS/SPECIFICATIONS FOR EXPOSEDLOCATIONS AND PAINTING REQUIREMENTS.
SEE ARCHITECTURAL DOCUMENTS FOR ROOF PENETRATION AND FLASHING REQUIREMENTS.
WHERE "APPROXIMATELY" IS USED TO DEFINE INSTALLATION LOCATIONS, CONTRACTOR SHALL COORDINATE WITH ALL OTHERTRADES TO VERIFY THERE ARE NO CONFLICTS PRIOR TO INSTALLATION AT DIMENSION LISTED.
FIRE DAMPERS SHALL BE INSTALLED PER MANUFACTURER'S INSTALLATION RECOMMENDATIONS. MANUFACTURER'SRECOMMENDATIONS SHALL BE PROVIDED FOR REVIEW DURING SUBMITTAL PROCESS.
ALL ITEMS INSTALLED ABOVE THE CEILINGS SHALL BE PLENUM RATED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
DESCRIPTIONINTERNATIONAL BUILDING CODEINTERNATIONAL ENERGY CONSERVATION CODEINTERNATIONAL MECHANICAL CODESTANDARD FOR THE INSTALLATION AIR-CONDITIONING &VENTILATING SYSTEMSMANUAL FOR THE BALANCING & ADJUSTMENT OF AIRDISTRIBUTION SYSTEMS
CODEIBC (2012)
IECC (2009)IMC (2012)
NFPA 90A (2015)
SMACNA
MECHANICAL CODES & STANDARDS
DESCRIPTIONEXISTINGADJUSTABLEABOVE FINISHED FLOORABOVE FINISHED GRADEAIR HANDLERAIR HANDLING UNITBUILDING MANAGMENT SYSTEMBASIS OF DESIGNBOTTOM OF PIPEDOMESTIC COLD WATER SUPPLYCHEMICAL FEEDCLEANOUTCENTRAL PLANTCONDENSER WATER RETURNCONDENSER WATER SUPPLYCONDENSING UNITCHILLED WATER RETURNCHILLED WATER SUPPLYDOMESTIC COLD WATERDIRECT DIGITAL CONTROLSDIAMETERDRAINEXHAUST AIRELECTRICAL CONDUCTORELECTRICAL DUCT HEATEREXHAUST FANELECTRIC HEATERENERGY MANAGEMENT CONTROL SYSTEMFLOOR DRAINDOMESTIC HOT WATER SUPPLYHUB DRAINHEAT PUMPDOMESTIC HOW WATER RETURNHEATING HOT WATER RETURNHEATING HOT WATER SUPPLYLEAVING AIR TEMPERATURETHOUSANDS OF BTU'S PER HOURMECHANICAL CONTRACTORNATURAL GAS PIPINGNORMALLY OPENOUTSIDE AIROVER FLOWPLUMBING CONTRACTORPIPE SUPPORTRETURN AIRREFRIGERANTRELATIVE HUMIDITYREMOTE MONITORROOF TOP UNITRAIN WATERSUPPLY AIRSUPPLY FANTRIPLE DUTY VALVETYPICALUNDERGROUNDUNLESS OTHERWISE NOTEDVARIABLE FREQUENCY DRIVEVENTWITHWIRE MESH SCREEN
ABR(E)
ADJAFFAFGAH
AHUBMSBODBOP
CCHFCOCPCRCSCU
CHWRCHWSDCWDDCDIADRNEAEC
EDHEFEH
EMCSFDH
HDHPHR
HWRHWSLATMBHMCNGNOOAOFPCPSRA
REFRRHRMRTURWSASF
TDVTYPUG
UNOVFDVNTW/
WMS
ABBREVIATIONS
PARTITION PLAN LEGEND
1 HR. RATED PARTITION TO DECK
SEE SHEET A002 FOR CONSTRUCTION OF PARTITION TYPES.PARTITION KEY:
EXISTING 1 HR. RATED PARTITION TO DECK. ENSURE SEALING TIGHTTO DECK WITH APPROVED SAFING MATERIAL.
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
5/3
1/2
016 1
1:1
5:3
0 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
KTD
WDB
HVAC - NOTES& LEGENDS
M-001
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
No. Description Date
1 OSE COMMENTREVISIONS
02/18/2016
-
EXISTINGLOUVER
EXISTING EXTERIORWALL
PLENUM, SEAL ANDINSULATE BACK WITH 1"FLEXIBLE ELASTOMERICINSULATION
EXISTINGLOUVER
EXISTING EXTERIORWALL
MOTOR ACTUATEDDAMPER
INSECT SCREEN
PLENUM, SEAL AND INSULATEBACK WITH 1" FLEXIBLEELASTOMERIC INSULATION
INTAKE DUCT,SEE PLANSFOR SIZES
FACTORY BUILT CURB
ROOFING MATERIAL
HOOD COVER
COORDINATE ROOF WORK
WITH ARCHITECTURAL PLANS
AND ROOFING CONTRACTOR.
ATTACH DUCTAT ROOF CURB
SECURE HOOD TO
CURB WITH CADMIUM
PLATED STEEL SCREWS
AT EACH CORNER
INSECT SCREEN ALL
AROUND
FLASHING AND
COUNTERFLASHING
BAROMETRICRELIEF DAMPER
STUB DUCT INTORETURN PLENUMCHASE
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
5/3
1/2
016 1
1:1
5:3
5 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
KTD
WDB
HVACSCHEDULES
M-002
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
FAN COIL UNIT SCHEDULE
INDOORMARK
COOLINGMBH
SENSIBLEMBH EAT DB EAT WB LAT DB LAT WB
CHILLED WATER
MANUFACTURER MODELFLOW RATE
(GPM) EWT °F LWT °FPRESSURE DROP
AT MAX FLOWFCU-1 18.1 14.9 75°F 63°F 58°F 57°F 3.6 42°F 54°F 6.4 FT MITSUBISHI PKA-A18HA
FCU-2 18.1 14.9 75°F 63°F 58°F 57°F 3.6 42°F 54°F 6.4 FT MITSUBISHI PKA-A18HA
FCU-3 18.1 14.9 75°F 63°F 58°F 57°F 3.6 42°F 54°F 6.4 FT MITSUBISHI PKA-A18HA
FCU-4 18.1 14.9 75°F 63°F 58°F 57°F 3.6 42°F 54°F 6.4 FT MITSUBISHI PKA-A18HA
FCU-5 18.1 14.9 75°F 63°F 58°F 57°F 3.6 42°F 54°F 6.4 FT MITSUBISHI PKA-A18HA
EXHAUST FAN SCHEDULE
MARK CFM TOTAL SPNOISE
CRITERIA MANUFACTURER MODELEF-1 500 0.70 in-wg 9.1 SONES GREENHECK G-098-VG
EF-2 300 0.50 in-wg 7.6 SONES GREENHECK G-085-D
EF-3 375 0.60 in-wg 7.6 SONES GREENHECK G-090-D
LAB EXHAUST FAN SCHEDULE
MARK CFM INLET SIZE AIR P.D.
NOISECRITERIA@ INLET MANUFACTURER MODEL
LEF-1 515 5" 3" W.G. 79 dB GREENHECK VK-H-10-5
LEF-2 515 5" 3" W.G. 79 dB GREENHECK VK-H-10-5
VAV SCHEDULE
MARK INLET SIZEDESIGN
CFM
MINIMUMCOOLING
CFM
MAX AIRPD (IN.W.G.)
HEATINGCFM EAT °F LAT °F GPM EWT °F LWT °F
MAX COILPD (FT) MANUFACTURER MODEL
VAV-100 10" 925 310 0.3 505 55.0 95.0 1.5 150 120 1.93 TRANE VCWF10
VAV-101C 6" 425 140 0.3 140 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-102 8" 800 265 0.3 265 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
VAV-102C 4" 110 35 0.3 50 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-104 8" 800 265 0.3 265 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
VAV-105 6" 470 155 0.3 155 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-107 8" 650 215 0.3 215 55.0 95.0 0.50 150 120 0.67 TRANE VCWF08
VAV-108 5" 325 110 0.3 110 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-109 8" 540 180 0.3 220 55.0 95.0 1.0 150 120 0.50 TRANE VCWF08
VAV-110 6" 475 160 0.3 160 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-111 6" 440 145 0.3 155 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-112 10" 950 315 0.3 315 55.0 95.0 1.0 150 120 0.73 TRANE VCWF10
VAV-113 8" 875 290 0.3 420 55.0 95.0 1.5 150 120 0.92 TRANE VCWF08
VAV-114A 5" 260 85 0.3 105 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-114B 8" 500 165 0.3 235 55.0 95.0 1.0 150 120 0.51 TRANE VCWF08
VAV-117 8" 850 285 0.3 285 55.0 95.0 1.0 150 120 0.68 TRANE VCWF08
VAV-119 5" 270 90 0.3 115 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-120 5" 250 85 0.3 85 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-121 6" 485 160 0.3 245 55.0 95.0 1.0 150 120 0.51 TRANE VCWF06
VAV-122 8" 850 285 0.3 285 55.0 95.0 1.0 150 120 0.68 TRANE VCWF08
VAV-123A 4" 85 30 0.3 30 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-123B 8" 790 265 0.3 360 55.0 95.0 1.0 150 120 1.28 TRANE VCWF08
VAV-123C 4" 175 60 0.3 60 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-124 8" 810 270 0.3 340 55.0 95.0 1.0 150 120 0.90 TRANE VCWF08
VAV-125 10" 930 930 0.3 930 55.0 95.0 3.0 150 120 8.0 TRANE VCWF10
VAV-126 5" 290 95 0.3 235 55.0 95.0 1.0 150 120 0.50 TRANE VCWF05
VAV-201A 8" 600 200 0.3 200 55.0 95.0 1.0 150 120 0.50 TRANE VCWF06
VAV-201B 8" 600 200 0.3 205 55.0 95.0 1.0 150 120 0.50 TRANE VCWF06
VAV-202 4" 210 70 0.3 70 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-205A 8" 575 190 0.3 215 55.0 95.0 1.0 150 120 0.51 TRANE VCWF08
VAV-205B 5" 265 90 0.3 135 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-206 8" 550 185 0.3 205 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
VAV-207A 8" 675 225 0.3 225 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
VAV-207B 4" 95 30 0.3 65 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-207C 8" 500 165 0.3 200 55.0 95.0 1.0 150 120 0.51 TRANE VCWF08
VAV-207D 8" 525 175 0.3 235 55.0 95.0 1.0 150 120 0.51 TRANE VCWF08
VAV-207E 4" 95 30 0.3 65 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-208 8" 530 175 0.3 205 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
VAV-210A 4" 160 55 0.3 55 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-210B 6" 440 145 0.3 190 55.0 95.0 1.0 150 120 0.50 TRANE VCWF06
VAV-210C 6" 475 160 0.3 185 55.0 95.0 1.0 150 120 0.51 TRANE VCWF06
VAV-211 5" 275 90 0.3 105 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-215 6" 425 140 0.3 175 55.0 95.0 1.0 150 120 0.50 TRANE VCWF05
VAV-216A 8" 650 215 0.3 215 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
VAV-216B 5" 300 100 0.3 120 55.0 95.0 0.50 150 120 0.50 TRANE VCWF05
VAV-216C 6" 350 115 0.3 115 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-217A 6" 425 140 0.3 150 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-217B 4" 200 65 0.3 65 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-217C 8" 525 175 0.3 225 55.0 95.0 1.0 150 120 0.51 TRANE VCWF08
VAV-217D 6" 385 130 0.3 130 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-218A 8" 525 175 0.3 175 55.0 95.0 0.50 150 120 0.50 TRANE VCWF08
VAV-218B 4" 190 65 0.3 65 55.0 95.0 0.50 150 120 0.50 TRANE VCWF04
VAV-218C 6" 425 140 0.3 225 55.0 95.0 1.0 150 120 0.51 TRANE VCWF06
VAV-218D 6" 475 160 0.3 160 55.0 95.0 0.50 150 120 0.50 TRANE VCWF06
VAV-218E 6" 350 115 0.3 165 55.0 95.0 0.50 150 120 0.51 TRANE VCWF06
VAV-218F 8" 525 175 0.3 200 55.0 95.0 1.0 150 120 0.51 TRANE VCWF08
VAV-218G 8" 615 205 0.3 275 55.0 95.0 1.0 150 120 0.58 TRANE VCWF08
VAV-218H 6" 445 150 0.3 185 55.0 95.0 1.0 150 120 0.51 TRANE VCWF06
VAV-219 8" 820 275 0.3 275 55.0 95.0 1.0 150 120 0.67 TRANE VCWF08
AIR HANDLING UNIT SCHEDULE
MARK
AIR CAPACITY
EXTERNALSTATIC
TOTALSTATIC
COOLING COIL PREHEAT COIL
MANUFACTURER MODELDESIGN
CFMMAX OA
CFMMIN OA
CFM TOTAL MBHSENSIBLE
MBH EAT DB EAT WB LAT DB LAT WB GPM EWT LWT COIL PDSENSIBLE
MBH EAT DB LAT DB EWT LWT GPM COIL WPD(E) AH-1 9100 1700 535 3 4.5 374 258 80.0 °F 67.0 °F 54.3 °F 53.6 °F 62 42.0 °F 54.0 °F 2.80 FT 100 40.0 °F 55.0 °F 150.0 °F 120.0 °F 8 6.91 TRANE MCCB
(E) AH-2 9100 1400 625 3 4.5 386 266 80.0 °F 67.0 °F 53.5 °F 53.1°F 64 42.0 °F 54.0 °F 4.2 FT 100 40.0 °F 55.0 °F 150.0 °F 120.0 °F 3 8.26 TRANE MCCB
(E) AH-4 10330 3140 1400 2.3 3 516 309 82.0 °F 70.0 °F 55.0 °F 54.4 °F 86 42.0 °F 54.0 °F 16.4 FT 75 25.0 °F 40.0 °F 150.0 °F 120.0 °F 5 3.82 TRANE CSOA017
PUMP SCHEDULE
MARK GPMPUMPHEAD MOTOR HP RPM TYPE VFD MANUFACTURER MODEL
BP-1 25 30' 2/5 3250 IN-LINE NO BELL & GOSSETT PL-55
BP-2 25 30' 2/5 3250 IN-LINE NO BELL & GOSSETT PL-55
CWP-1 215 80' 7.5 1750 END SUCTION YES BELL & GOSSETT E1510 MODEL 2BD
CWP-2 215 80' 7.5 1750 END SUCTION YES BELL & GOSSETT E1510 MODEL 2BD
HWP-1 60 60' 5 1750 END SUCTION YES BELL & GOSSETT E1510
HWP-2 60 60' 5 1750 END SUCTION YES BELL & GOSSETT E1510
BOILER SCHEDULE
MARK CAPACITYFLOWRATE
FLUID TEMPERATURE
MANUFACTURER MODELENTERING LEAVINGB-1 399000 BTUH 21 GPM 120 150 LOCHINVAR KBN400
B-2 399000 BTUH 21 GPM 120 150 LOCHINVAR KBN400
AIR DISTRIBUTION SCHEDULE
MARK DESCRIPTIONFACE SIZE
HFACE SIZE
W NECK SIZE MANUFACTURER MODELSupply Air
PD106 SQUARE PLAQUE 12" 12" 6" PRICE ASPD
PD206 SQUARE PLAQUE 24" 24" 6" PRICE ASPD
PD208 SQUARE PLAQUE 24" 24" PRICE ASPD
PD210 SQUARE PLAQUE 24" 24" PRICE ASPD
PD212 SQUARE PLAQUE 24" 24" PRICE ASPD
SDS50 LINEAR SLOT DIFFUSER 4' LONG 2 SLOT 6" PRICE SDS50 WITH SDB1FACTORY PLENUM
SDS75 LINEAR SLOT DIFFUSER 4' LONG 2 SLOT 6" PRICE SDS75 WITH SDB1FACTORY PLENUM
SWS1 LOUVERED SIDEWALL 6" 12" 10" PRICE 620DAL
SWS2 LOUVERED SIDEWALL 4" 10" 6" PRICE 620DAL
Return Air
LF222 PRICE 630DAL
SDR75 LINEAR SLOT RETURN 4' LONG 2 SLOT NONE PRICE SDR75
Exhaust Air
LF111 LOUVERED FACEEXHAUST
12" 12" 10"x10" PRICE 630DAL
LF222 LOUVERED FACEEXHAUST
24" 24" 22"x22" PRICE 630DAL
NOTES:
1.2.
SEE ELECTRICAL EQUIPMENT CONNECTION SCHEDULE FOR VOLTAGE INFORMATION.SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
NOTES:
1.2.3.
SEE ELECTRICAL EQUIPMENT CONNECTION SCHEDULE FOR VOLTAGE INFORMATION.SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.EXHAUST FANS SHALL OPERATE ON TIMECLOCK DURING HOURS OF OPERATION.
NOTES:
1.2.3.4.5.
SEE ELECTRICAL EQUIPMENT CONNECTION SCHEDULE FOR VOLTAGE INFORMATION.SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.SEISMIC VIBRATION ISOLATION CURB SHALL BE PROVIDED WITH EACH FAN.LAB EXHAUST FANS SHALL OPERATE CONTINUALLY.PROVIDE WITH BACNET INTERFACE FOR MONITORING BY CONTROLS SYSTEM.
NOTES:
1.2.3.
SEE ELECTRICAL EQUIPMENT CONNECTION SCHEDULE FOR VOLTAGE INFORMATION.SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.INLET DUCT SHALL BE SAME SIZE AS LISTED VAV TERMINAL INLET.
NOTES:
1. UNITS INDICATED ABOVE ARE EXISTING TO REMAIN.2. SEE ELECTRICAL DRAWINGS FOR VOLTAGE INFORMATION.3. TEST AND BALANCE CONTRACTOR SHALL MEASURE AND RECORD CHILLED AND HYDRONIC HEATING WATER FLOW TO UNITS PRIOR TO START OF RENOVATION FOR COMPARISON AT CONCLUSION OF WORK.4. CONTRACTOR SHALL PROVIDE AND INSTALL THE FOLLOWING FOR THE EXISTING AIR HANDLERS:
NOTES:
1. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF ALL CEILING MOUNTED AIR DISTRIBUTION DEVICES.2. COORDINATE MOUNTING TYPE AND ACCESSORIES WITH ARCHITECTURAL CEILING GRID.3. COORDINATE AIR DISTRIBUTION LOCATIONS WITH ALL OTHER TRADES.4. ALL AIR DISTRIBUTION SHALL BE ALUMINUM CONSTRUCTION WITH BAKED ENAMEL "OFF-WHITE" FINISH.5. SURFACE MOUNTED AIR DISTRIBUTION DEVICES SHALL BE MOUNTED WITHOUT VISIBLE FASTENERS.6. ALL CEILING DIFFUSERS SHALL BE 4-WAY BLOW.
AIR SEPARATOR SCHEDULE
MARKSYSTEM
CONNECTION GPM
PRESSUREDROP AT MAX
FLOW MANUFACTURER MODELAS-1 HOT WATER 60 1.8 FT BELL & GOSSETT RL-3
AS-2 CHILLED WATER 160 4.4 FT BELL & GOSSETT RL-4
EXPANSION TANK SCHEDULE
MARK SYSTEMTANK VOLUME
(GALLONS)
ACCEPTANCEVOLUME
(GALLONS) MANUFACTURER MODELET-1 HOT WATER 44.0 34.0 BELL & GOSSETT HFT-90V
ET-2 CHILLED WATER 30.0 30.0 BELL & GOSSETT ATF-12
NOTES:
1. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
NOTES:
1. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
NOTES:
1. SEE ELECTRICAL EQUIPMENT CONNECTION SCHEDULE FOR VOLTAGE INFORMATION.2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.3. PROVIDE WITH CONDENSATE NEUTRALIZER KIT FOR DISCHARGE INTO FLOOR DRAIN.4. PROVIDE WITH MANUFACTURER PROVIDED CONCENTRIC VENT KIT FOR DIRECT VENT INTAKE AND FLUE
PENETRATIONS THROUGH WALL.5. PROVIDE WITH FACTORY MOUNTED CONTROL PANEL WITH INTEGRAL SEQUENCES TO CONTROL BOILER,
BOILER PUMP, EMERGENCY SHUTOFF, ETC. PANEL SHALL BE BACNET COMPLIANT FOR CONNECTION BYCONTROLS SYSTEM.
GRAVITY VENTILATOR SCHEDULE
MARK CFM MANUFACTURER MODELGV-1 4600 GREENHECK FGR
GV-2 3000 GREENHECK FGR
NOTES:
1. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.2. REFER TO ELECTRICAL DRAWINGS FOR VOLTAGE INFORMATION.3. PROVIDE UNIT HEATERS WITH FIELD INSTALLED DISCONNECT
SWITCH.
No. Description Date
1 OSE COMMENTREVISIONS
02/18/2016
UNIT HEATER SCHEDULE
MARK TOTAL KW MANUFACTURER MODELUH-1 1.8 MARKEL 5600
UH-2 1.8 MARKEL 5600
NOT TO SCALEM-002
1 INTAKE LOUVER CAP INSTALLATION DETAIL
NOT TO SCALEM-002
2 INTAKE LOUVER INSTALLATION DETAIL
NOT TO SCALEM-002
3 GRAVITY VENTILATOR INSTALLATION DETAIL
NOTES:
1. ALUMINUM CONSTRUCTION WITH ALUMINUM INSECT SCREEN.
a. NEW FILTERS PRIOR TO FINAL COMPLETION.b. INSTALL COMPONENTS AND CONTROLS NECESSARY FOR DEMAND CONTROL VENTILATION INCLUDING CO2 SENSORS. SEE SCHEMATIC FOR ADDITIONAL INFORMATION.c. REHEAT COILS SHALL BE REMOVED FROM UNITS, PIPE PENETRATIONS AND UNIT CASING SHALL BE SEALED.d. INSTALL MOTORIZED DAMPERS IN OUTSIDE AIR AND RETURN AIR STREAMS.e. INSTALL COMPONENTS AND CONTROLS NECESSARY FOR DRY BULB ECONOMIZER CONTROL.f. INSTALL DUCT MOUNTED SMOKE DETECTORS IN SUPPLY AND RETURN DUCTS.g. PROVIDE AND INSTALL EBTRON GTx116-P+ OUTSIDE AIR MONITORING STATIONS, FIELD INSTALL IN THE UNIT INTAKE HOODS OR DUCT AS APPROPRIATE.h. FAN MOTORS SHALL BE REPLACED WITH INVERTER DUTY TYPE, ALLOWING VARIABLE SPEED OPERATION. VERIFY SIZE AND HP TO BE INSTALLED IN EXISTING CABINETi. (E) AH-4 COOLING COIL SHALL BE REPLACED WITH TRANE DUWB40, 8-ROW, UW, DELTA FLO E COIL MATCHING CAPACITIES INDICATED ABOVE, SIZED TO FIT IN EXISTING AIR HANDLER. FIELD VERIFY BEFORE ORDERING.j. (E) AH-1 COOLING COIL SHALL BE REPLACED WITH TRANE DW0B48, 6-ROW, W, PRIMA-FLO E COIL MATCHING CAPACITIES INDICATED ABOVE, SIZED TO FIT IN EXISTING AIR HANDLER. FIELD VERIFY BEFORE ORDERING.k. (E) AH-2 COOLING COIL SHALL BE REPLACED WITH TRANE DW0B36, 6-ROW, W, PRIMA-FLO E COIL MATCHING CAPACITIES INDICATED ABOVE, SIZED TO FIT IN EXISTING AIR HANDLER. FIELD VERIFY BEFORE ORDERING.
NOTES:
1. SEE ELECTRICAL EQUIPMENT CONNECTION SCHEDULE FOR VOLTAGE INFORMATION.2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.3. VFD'S SHALL BE FURNISHED BY CONTROL'S CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR.4. HWP AND CWP PUMP MOTORS SHALL BE INVERTER DUTY RATED.
-
NOTES:
H = FAN STATIC PRESSURE (IN. W.C.) + 1"3.
J"
ACCESSIBLE FOR CLEANING.
2. "RUNNING" TYPE TRAPS SHALL BE UNACCEPTABLE.
1. LOCATE TRAPS SO AS TO BE
PIPE FULL SIZE OFUNIT DRAIN
H"
UNIT CASING
SCREWED CAP
OPEN END (VENT)
J = H/2 (MINIMUM)
45° "Y" TEE
2-WAY 45° "Y" TEE
90° CONICAL TEE
90° TEE WITH 45° TAKE-OFF
DIRECTIONOF AIRFLOW
DIRECTIONOF AIRFLOW
1-1/2 D
D
1-1/2 D
D
BRANCH DUCT
BRANCH DUCT
BRANCH DUCT
TRUNK
DUCT
TRUNK DUCT
DIRECTION OF
AIR FLOW
DIRECTIONOF AIRFLOW
BRANCH DUCT
TRUNK
DUCT TRUNK
DUCT
ROUND METAL BRANCH DUCTSAME SIZE AS VAV CONNECTIONUNLESS NOTED OTHERWISE
HANGER RODS ORSTRAPS UP TOSTRUCTURE
AIR TERMINAL UNIT
HOT WATER COIL
TAKE-OFF FITTING
EXISTING SUPPLYAIR TRUNK
4'-0"(MIN & MAX)STRAIGHT RUN OR ASDICTATED BY MANUFACTURER'S WRITTENINSTALLATION INSTRUCTIONS.
5 FT
7
6 8 10
9 1110 12
1312 14 16
1614 17 19
864 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SIDE VIEW TRAPEZE HANGER FOR UPTO 1000 LB. UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD& INSERT FOR ALL PIPING (8" MIN.)
BAND
1-5/8" 12 GAUGECHANNEL OR2"x2"x1/4" ANGLE
1/2" DIA. HANGER RODSWITH 36" MAX. SPACINGON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELDAT HANGER
PROVIDE HIGHCOMPRESSIVE STRENGTHINSULATION (9 PSF MIN.DENSITY) UNDERINSULATION SHIELD
INSULATION (VAPORBARRIER TYPE ISREQUIRED FOR LOWTEMPERATURE PIPE)
THREADED HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
FT.
FT.
1" MAX.
NOTES:SEE SPECIFICATIONS FORDETAILED HANGER REQUIREMENTS
NOTES:
OTHER OBSTACLE
DUCT SEALANT
DUCT CLAMP
FLEXIBLE DUCTWORK
SUSPENDED CEILING
DUCTWORK OR
SLAB
FLAT OVAL CONNECTION
SQUARE CEILING
DIFFUSER
SUPPLY AIRPLENUM
1. THIS DETAIL SHALL APPLY TO CEILING OUTLETS AND INLETS THAT ARE LOCATEDBELOW DUCTWORK OR OTHER OBSTACLES WHERE CLEARANCES ARE MINIMAL.
2. THE SIZE OF THE SUPPLY AIR PLENUM SHALL BE A MINIMUM OF 1" LARGER IN HEIGHTAND WIDTH THAN THE FLAT OVAL DUCTWORK CONNECTION.
3. THE SUPPLY AIR PLENUM IS REQUIRED TO BE INSULATED. THE PLENUM/DIFFUSERCONNECTION SHALL BE SEALED WITH AN APPROVED DUCTWORK SEALANT.
4. PROVIDE A ROUND TO FLAT OVAL TRANSITION SECTION OF DUCTWORK AS REQUIRED.5. THE FOLLOWING SCHEDULE SHALL BE USED FOR ROUND TO FLAT OVAL DUCTWORK
SIZE EQUIVALENTS:
ROUND (INCHES) FLAT OVAL (HxW INCHES)
3x11, 4x9, 5x84x15, 5x12, 6x116x15, 7x13, 8x11, 9x127x20, 8x17, 9x15, 10x139x20, 10x18, 11x17, 12x1510x23, 8x30, 6x4410x30, 12x26, 14x2212x32, 14x28, 16x2412x38, 14x32, 18x3014x38, 16x34, 18x3016x38, 18x34, 20x32
68101214161820222426
NOTES:
MANUAL
3. SPIN-IN FITTINGS WITH INTEGRAL SCOOP AND DAMPER SHALL ONLY BE USED ON LOW PRESSURE DUCT.2. TAKE-OFFS IN MEDIUM PRESSURE DUCT SHALL HAVE AN OVERSIZED INTAKE.
1. CONTRACTOR MAY SUBSTITUTE A MANUFACTURED FITTING FOR THE DETAILED TAKE-OFF ABOVE.
ELEVATION
1" MIN
ROUND BRANCHDUCT
PLAN
DAMPER
RECTANGULAR
BRANCH DUCT
1" MIN
ELEVATION
PLAN
6"
DAMPER
60°
6"
MAIN DUCT
AIRFLOW
MAIN DUCT
SUPPLY
RETURN OR EXHAUST
45°
MANUAL
6"
4. FITTINGS SHALL BE SCREWED TO THE TRUNK DUCT AND SEALED WITH MASTIC. MASTIC TAPE IS NOT ACCEPTABLE, SEE SPECIFICATIONS.5. IF VAV BOX IS LOCATED IN BRANCH DUCT, BALANCE DAMPER SHALL NOT BE INSTALLED IN TAKOFF FROM MAIN TRUNK DUCT.
NOTES:
RETURN AIR BOX SHALL BE MINIMUM 12" HIGH. RETURN DUCT MAYTAP INTO THE SIDE OF THE BOX A MINIMUM OF 6" ABOVE GRILLE.
NYLONCLAMP
NYLON CLAMP
DUCT WRAP OVERENTIRE DIFFUSER
LAY-IN CEILINGSUPPLY DIFFUSER
PREINSULATEDFLEX. DUCT
DUCT WRAP (TYP.)
OPPOSED BLADEDAMPER
NYLON CLAMP
LAY-IN RETURNAIR GRILLE
RETURN AIRBOX W/LINER
NYLON CLAMP
PREINSULATEDFLEX. DUCT
DUCT WRAP (TYP.)
MANUAL DAMPER
ROUND METAL DUCT
TAKE-OFF FITTING
SUPPLY DUCTW/ WRAP
METAL COLLAR
RETURN DUCTW/ WRAP
INSTALL NYLON CLAMPS ON INNER FLEX DUCT LINER AND OUTER JACKET. TAPE ENDS OFPREINSULATED FLEX. DUCT AT THE DIFFUSER AND THE BRANCH DUCT CONNECTION.
RETURN AIR BOX SHALL BE MINIMUM 12" HIGH. RETURN DUCT MAY TAP INTO THE SIDE OFTHE BOX A MINIMUM OF 6" ABOVE GRILLE.
1.
2.
MANUAL DAMPER
PROVIDE YOUNG REGULATOR REMOTE DAMPER CONTROLLER FOR EACH DIFFUSER AND GRILLELOCATED IN AREAS WITH INACCESSIBLE CEILINGS. LOCATE CONTROLLER IN A CONCEALED,ACCESSIBLE LOCATION.
3.
MOTOR ACCESS AND AIRENTRAINMENT OPENING
BOLTED ANDGASKETEDACCESS PANEL
ISOLATIONDAMPER
LIFT LUG
DRAIN HOLE1"COUPLING
SEISMIC/WIND LOADAND VIBRATION ISOLATIONENGINEERED ROOF CURB
WEATHERHOODAND DAMPER
ACTUATOR COVERWITH BIRDSCREEN
DRAIN CONNECTION1"COUPLING
ROOF LINE
BYPASSDAMPER
PRIMARYAIR
BYPASS AIR
CHEMICAL RESISTANTFLEXIBLE CONNECTOR
TRANSITION ASREQUIRED
WELDED STAINLESSSTEEL EXHAUST DUCTFROM ASSOCIATEDFUME HOOD, SEEDRAWINGS
MECHANICALLY FASTEN ROOFCURB TO STRUCTURE PERSEISMIC RECOMMENDATIONS
LOCATE AIRFLOWMONITORINGSTATION CLOSE TO LABHOOD AS INDICATEDON HVAC PLANS,ACCESSIBLE FROMABOVE LAB CEILING
PROVIDE SEISMIC BRACING ASRECOMMENDED BY SEISMICENGINEER. SEE SEISMICCHART, M001, FOR MOREINFORMATION.
SUPPLY WATER
G
BOILER PUMPASSEMBLY SEEDETAIL (TYP)
6" CONCRETE PAD, TYP.
GROUND JOINT UNION
B-1
THERMOMETER TYP.
G
3"
B-2
FROMSYSTEM
RETURN WATER
3"
2"
CHECKVALVE (TYP)
LOW WATER CUT-OFF
SWITCH, TYP.
PRESSURE TEMPERATURE
GAUGE TYP.
STRAINER TYP.
FOR CONT.
SEE PLUMBING PLANS.
6" DIRT LEG,(TYP)
PIPE RELIEF VALVE
DISCHARGE FULL SIZE
TO FLOOR DRAIN,
TYP.
SHUTOFF VALVE(TYP)
PVC GASVENT THRU SIDEWALL,TYP. SEE PLANS.
P&T
P&T
NOTES:
1. FOR ACTUAL SIZES AND LOCATIONS OF PIPING AND OTHER CONNECTIONS TO THE BOILER, SEE APPROPRIATE DIMENSIONAL DRAWING.2. SHELL DRAIN VALVE AND CONDENSATE DRAIN TRAP SHOULD BE ARRANGED TO PERMIT THE FLUIDS TO DRAIN FREELY, BY GRAVITY, TO A CONVENIENT FLOOR DRAIN. RELIEF VALVE SHOULD BE PIPED VERTICALLY TO A HEIGHT 18"ABOVE FLOOR.3. LOCATE WATER INLET AND OUTLET FITTINGS (i.e. UNIONS, ELBOWS, ETC.) A MINIMUM OF 6" FROM BOILER FITTINGS TO PREVENT INTERFERENCE WITH REMOVAL OF BOILER PANELS AND COVERS. ALL PIPING AND ELECTRICCONNECTIONS (SERVICE SWITCHES, CONDUIT BOXES) SHOULD LIKEWISE BE 6" AWAY FROM SIDE PANELS.4. REFRENCE PLUMBING DOCUMENTS FOR NATURAL GAS PIPING DIAMETER, ROUTING AND REQUIREMENTS. COORDINATE WITH PC.
MAX LENGTH OF 12"
MANUAL GAS SHUTOFF VALVE W/1/8" NPT PLUGGED TAPPING, TYP.
GAS PRESSUREREGULATOR TOMAINTAIN 4" WC,(TYP).
TO PUMP SUCTION
2"
NOTES:
1. CHEMICAL SHOT FEEDER SHALL BE 2'-0" AFF MIN.
2. SEE SPECIFICATIONS FOR FURTHER INFORMATION.COORDINATE WITH CHEMICAL TREATMENT PROVIDER.
3/4" PIPING ROUTED TO WATERLOOP. CONNECT TODISCHARGE SIDE OF PUMPS.
3/4" PIPING ROUTED TO WATERLOOP. CONNECT TO SUCTION SIDEOF PUMPS UPSTREAM OF AIRSEPERATOR.
CHECK VALVE
BALL VALVE(TYP.)
1/2" DRAINVALVE
FINISHED FLOOR
HOSE CONNECTION
CHEMICAL SHOT FEEDER
MANUFACTURER'S STANDARDSUPPORT LEG, BOLTED DOWNTO FLOOR (TYPICAL 3X)
MULTIPORT PRESSUREINDICATOR (4-PORT)
1/4" O.D. COPPER TUBINGW/ COMP. FITTINGS
DRAIN: TERMINATENEAR F.D.TRANSITION TO LINE
SIZE AS INDICATED ONPLANS DIRECTLY OFFCONNECTION TO PUMP(TYPICAL)
TO SYSTEM
WHERE REQ'D AN ADDITIONAL PUMP SUPPORTBRACKET MAY BE PROVIDED. PUMP SUPPORTSMUST BE INSTALLED IN SUCH A WAY AS TO NOTCREATE ANY STRESSES ON PUMP COMPONENTS.PUMP SUPPORTS SHALL NOT BE SO RIGIDLYMOUNTED THAT IT LIMITS THE PUMPS ABILITY TOMOVE WITH PIPE EXPANSION MOVEMENT.
VERTICAL INLINE PUMP
9" INDUSTRIAL THERMOMETER W 3/4"NPT COPPER WELL
INSTALLER IS RESPONSIBLE FORINSTALLING AND SUPPORTING THEVERTICAL INLINE PUMP PER THEMANUFACTURER'S RECOMMENDEDINSTALLATION INSTRUCTIONS.
TRIPLE DUTY VALVE
DOUBLE SPHERE EPDMFLEXIBLE PIPECONNECTOR (TYPICAL)
FROM SYSTEM
PIPE HANGERS (SPRING
& NEOPRENE TYPE)
STRAINER (LINE SIZE) W/HOSE ENDED BLOWDOWNVALVE / DRAIN
ISOLATION VALVE
SPRING TYPE PIPEHANGERS, SECURETO STRUCTURE
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
5/3
1/2
016 1
1:1
5:3
7 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
KTD
WDB
HVAC DETAILS
M-003
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
NOT TO SCALEM-003
6 CONDENSATE DRAIN TRAP INSTALLATION DETAIL
NOT TO SCALEM-003
1 ROUND DUCT BRANCH TAKE OFF DETAIL
NOT TO SCALEM-003
7 TYPICAL VAV INSTALLATION DETAIL
NOT TO SCALEM-003
4 MECHANICAL PIPE SUPPORT DETAIL
NOT TO SCALEM-003
5 CEILING DIFFUSER/GRILLE & DUCT OBSTRUCTION DETAIL
NOT TO SCALEM-003
2 TYPICAL DUCT TAKE OFF INSTALLATION DETAILNOT TO SCALE
M-003
3 TYPICAL DIFFUSER/GRILLE INSTALLATION DETAIL
NOT TO SCALEM-003
10 LAB EXHAUST FAN INSTALLATION DETAILNOT TO SCALE
M-003
9 BOILER PIPING DETAILNOT TO SCALEM-003
8 CHEMICAL TREATMENT INSTALLATION DETAIL
No. Description Date
1 OSE COMMENTREVISIONS
02/18/2016
NOT TO SCALEM-003
11 PUMP_INLINE PUMP DETAIL
-
NOTES:
24" DIA. MIN.
GRADE
1. COVER WITH LANDSCAPE AFTER INSPECTION IS COMPLETED.
CONDENSATE DRAIN LINE
HOLE IN GROUND24" DIAMETER MIN.BY 24" DEEP MIN.FILLED WITH CRUSHEDSTONE 1/2" TO1 1/2" SIZE.
2. CONTRACTOR SHALL VERIFY THAT THE PRIMARY CONDENSATE DRAIN LINE IS IN WORKINGORDER BY RUNNING WATER DOWN THRU THE DRAIN LINE FROM THE POINT OF THE COILCONNECTION.
3. DRAIN LINE SHALL TERMINATE 6" ABOVE FINISHED GRADE OVER TOP OF THE DRAIN PIT.
TABLE 4-1 RECTANGULAR DUCT HANGERS MINIMUM SIZE
1-1/2"X16GA.
1-1/2"X16GA.
3/4"-3000 LBS.5/8"-2000 LBS.1/2"-1250 LBS.
1/4"-270 LBS.3/8"-680 LBS.
1-1/2 " X 16 GA. - 1100 LBS.
1" X 22 GA. - 260 LBS.1" X 20 GA. - 320 LBS.
1" X 16 GA. - 700 LBS.1" X 18 GA. - 420 LBS.
1-1/2" X 16 GA. -TWO 3/8" DIA.PLACE FASTENERS IN SERIES, NOT SIDE BY SIDE.
1" X 16 GA. - TWO 1/4" DIA.1" X 18,20,22 GA. - TWO #10 OR ONE 1/4" BOLT
WIRE OR ROD (DIA.)STRAP
SINGLE HANGER MAXIMUM ALLOWABLE LOADWHEN STRAPS ARE LAP JOINEDUSE THESE MINIMUM FASTENERS
SPECIAL ANALYSIS REQUIRED
1/4"
1/4"
1" X 18 GA.
1" X 16 GA.
1" X 20 GA.
1" X 22 GA.
12 GA. (.106")1" X 22 GA.
1/4"1" X 22 GA.
3/8"
3/8"3/8"
3/8"
3/8"
1" X 22 GA.
3/8"
1/4"
1" X 22 GA. 12 GA. (.106")
1" X 20 GA.
1" X 18 GA.
1" X 16 GA.
1" X 16 GA.
3/8"1" X 16 GA.
3/8"
1/2"
1" X 18 GA.
1/2"
1/4"1" X 20 GA.
10 GA. (.135")1" X 22 GA.
1/2"
1-1/2"X16GA.
NOT GIVEN
1-1/2"X16GA.
1" X 16 GA.
1" X 18 GA.
WIRE/RODSTRAPWIRE/RODSTRAPWIRE/RODSTRAPWIRE/RODSTRAP
PAIR AT 4FT. SPACINGPAIR AT 5 FT. SPACINGPAIR AT 8 FT. SPACINGPAIR AT 10 FT. SPACING
P/2= 192"
P/2=193" UP
1/2"P/2= 168"
P/2= 30"10 GA. (.135")1" X 22 GA.
P/2= 72" 3/8"
1/2"P/2= 120"
P/2= 96" 3/8"
HANGERSTRAPS
60" MAX.
SCREWS
SCREWS MAY BEOMITTED IF HANGER LOOPS
1" MIN.
MAXIMUMHALF OF
DUCTPERIMETER
INTEGRAL 1" 14 GAUGEGALVANIZED LIPPED STEELMOUNTING CHANNEL
PIPE CLAMP. SIZEAS REQUIRED
REFER TO PLANS FORQUANTITY & SIZE OF PIPES
GALVANIZEDTHREADED ROD, (TYP)
UV-INHIBITED RUBBER BLOCK,LENGTH AS REQUIRED
LOCKING SQUAREWASHER & LOCKNUT
NOTE:
1. NO ROOFING PENETRATIONS SHALL BE REQUIRED.
LINING (1 PCF DENSITY)1" INTERIOR ACOUSTICAL
LAY-INRETURN REGISTER
CEILING T-BAR
DUCT SIZE SAMEAS TERMINAL
CEILING TILE
16"
OR OTHER OBSTRUCTIONSTO CLEAR LIGHTS, PIPING3" OR HEIGHT REQUIRED
CONNECTION
2'-0" (MIN)
RETURN GRILLEDEPTH SAME AS
22 GAUGE (MIN)SHEETMETAL
SKIN
CEILING TILE
SUPPORT FROM STRUCTURE
WITH SHEETMETAL STRAPS
(TYP)
DUCT IS OPEN TO
ABOVE CEILING
PLENUM SPACE
BUILT UP ROOFING
SECURE ROOF RAIL TO STRUCTURE
PER SEISMIC SUBMITTAL
PRESSURE TREATED WOOD NAILER.
ROOF RAIL SHALL EXTEND
8" MINIMUM ABOVE FINISHED ROOF.
SUPPORTED EQUIPMENT
SECURE ROOFTOP
EQUIPMENT TO RAIL PER
SUBMITTAL REQUIREMENTS.
ROOF RAIL SHALL BE CERTIFIED BY SEISMIC ENGINEER.
ROOF RAIL SHALL BE SEISMIC / WIND RATED
DRAIN VALVE
TO DDC CONTROL SYSTEM
WATER COIL
ISOLATION VALVE
(TYP.)
MOTORIZED MODULATING
2-WAY CONTROL VALVE (BY
CONTROLS CONTRACTOR)
AUTOMATIC FLOW CONTROLSVALVE WITH TEST PORTS
FITTING WITH PRESSURE/
TEMPERATURE TEST PLUG
(TYPICAL)
STRAINER
W/BLOWDOWN
VALVE & CAP
PROVIDE BYPASS LINE WITHVALVE FOR FLUSHING SYSTEM.VALVE SHALL BE CLOSED ANDHANDLE REMOVED ATCONCLUSION OF FLUSHING
NOTE:INSTALL AN ISOLATION VALVE AT EACHCONNECTION TO COIL FOR MULTIPLECOIL CONNECTIONS
FLEXIBLE CONNECTIONS
790-100
107A
PRESSURE RELIEF VALVE
AIR VENT
SUCTION
TO PUMP
FROM SYSTEM
TAG
1
1
MANUF
B&G
B&G
MODEL
NUMBERDESCRIPTION
LOW CAPACITYAIR VENT
PRESSURE GAUGEW/NEEDLE VALVE
AIR CHARGING VALVE -PRESSURIZE DRY TANKEQUAL TO FILL VALVEPRESSURE
EXPANSIONTANK
RELIEF VALVE - (WHENNOT PROVIDED ON HEATTRANSFER DEVICE) PIPEDTO FLOOR DRAIN
DRAIN BALL VALVE W/HOSE CONNECTION
UNDERSLUNG CONNECTION CREATESTHERMAL TRAP (12" MIN. DROP)
SYSTEM CONNECTION -(CONNECT TO SIDE ORBOTTOM OF MAIN HEADER)
BRACKET SUPPORTS WITHOVERHEAD SUPPORTS
SHUT-OFF VALVES
FLANGEDCONNECTION
(TYPICAL)
AIR SEPARATOR
TIE IN MAKE-UP WATER LINEFROM DOMESTIC WATERSERVICE AND PRESSUREREDUCING VALVE
BLOWDOWN & DRAIN VALVEWITH HOSE CONNECTION
3/4
" C
6" THICK
CLEARANCE
1" OPERATING
CONCRETE PAD
FILL BASE WITH 3500 PSICONCRETE
EQUIPMENT ANCHORBOLT TEMPLATE
CHANNEL PERIMETERFRAME
ISOLATOR SUPPORT CLIP
STABLE SPRING ISOLATOR
HOOKS AND REINFORCINGAS REQUIRED
CONTINUOUS THREADED ROD
HEIGHT ADJUST
LATERAL ADJUST SPACER BRACKET
STEEL SLIDE CHANNEL
DUCT SLIDE ASSEMBLY
SUPPORT BRACKET(WELDED TO CHANNEL)
LAG BOLT
RECTANGULAR DUCT SUPPORT
PROVIDE STRAPS AS NEEDED BYWIND CALCULATIONS
WIND RATED ROOF RAIL
GALVANIZEDSUPPLY/RETURN DUCT
2"x18 GA DUCT STRAP
SEE ARCHITECTURALDRAWINGS FOR FLASHINGREQUIREMENTS
1.5" PHENOLIC FOAMINSULATION 2.5 LB./CU. FT.
ALUMINUM JACKET OVERLAPSEAMS BY 6"
NOTES:1. MULTIPLE DUCTS MAY BE SUPPORTED BY SINGLE RAIL.2. STRAP DUCT/INSULATION ASSEMBLY TO TUBE SUPPORT PER WIND LOAD ENGINEERING CALCULATIONS.3. ENCLOSE ASSEMBLY WITH ALUMINUM JACKET. SECURE JACKET WITH STAINLESS STEEL SCREWS. LOCATE
LONGITUDINAL SEAMS ALONG THE BOTTOM OF THE DUCT ASSEMBLY. CAULK ALL JOINTS WITH CLEAR SILICONE CAULK.
ELECTRIC CONDUIT
BACK DRAFT DAMPER
VIBRATION ISOLATOR
ROOF CRICKET
NONFUSEDDISCONNECT SWITCH
SECURE FAN TO CURBWITH CADMIUM PLATEDSTEEL SCREWS AT EACHCORNER
FOAM RUBBER GASKETAPPLIED TOUNDERSIDE OF FANCURB CAP
SEISMIC / WIND CURB TO MATCHROOF SLOPE. INSTALL CURBIN ACCORDANCE WITHINSTRUCTIONS.
ATTACH DUCT TO ROOF CURB WITHGALVANIZED SCREWS 6" ON CENTERS
STEEL SUPPORTS
NOTE:
1. COORDINATE ROOF WORK WITH ARCHITECTURAL PLANS AND ROOFINGCONTRACTOR.
2. COORDINATE ROOF SLOPE WITH ARCHITECTURAL PLANS AND FIELD VERIFY.3. BACKDRAFT DAMPERS SHALL BE INSTALLED SUCH THAT DAMPERS OPEN ONLY ONCE
FAN IS ENERGIZED.
ROOF DECK
FLASHING AND COUNTER FLASHING
1" OPER.
CLEARANCE.
TO SYSTEM
FROM SYSTEM
PIPE HANGERS(SPRING &NEOPRENE TYPE)
ISOLATION VALVE
WAFER STYLE SWING CHECK VALVE
9" INDUSTRIAL THERMOMETERW/ 3/4" NPT COPPER WELL
1/4" O.D. COPPER TUBINGW/COMP. FITTINGS
SUCTION DIFFUSER WITH STRAINER
FIELD FABRICATED SUPPORT LEG
DRAIN: TERMINATE NEAR F.D.
CONCRETE INERTIA VIBRATIONPUMP BASE W/ SPRING ISOLATORS
6" THICK CONCRETE HOUSEKEEPING PAD W/ CHAMFEREDEDGES TO EXTEND 6" PAST ALLSIDES OF PUMP BASE.
FINISH FLOOR
GROUTABLE FABRICATEDSTEEL BASE PLATE
BASE MOUNTED ENDSUCTION PUMP (LONGCOUPLED)
OSHA/ANSI COUPLER GUARD
MULTIPORT PRESSUREINDICATOR (4-PORT)
ISOLATION VAVE(BUTTERFLY VALVE TYP.)
DOUBLE SPHERE EPDM FLEXIBLEPIPE CONNECTOR (TYPICAL)
TRANSITION TO LINE SIZE ASINDICATED ON PLANS DIRECTLY OFFCONNECTION TO PUMP (TYPICAL)
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
5/3
1/2
016 1
1:1
5:3
9 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
KTD
WDB
HVAC DETAILS
M-004
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
NOT TO SCALEM-004
1 DRAIN PIT DETAILNOT TO SCALE
M-004
2 SUPPORT DETAIL
NOT TO SCALEM-004
10 ROOF PIPING SUPPORT DETAIL
NOT TO SCALEM-004
6 RETURN REGISTER INSTALLATION DETAIL
NOT TO SCALEM-004
11 ROOF RAIL DETAILNOT TO SCALE
M-004
8 AHU & VAV COIL PIPING DETAIL
NOT TO SCALEM-004
5 AIR SEPARATOR AND EXPANSION TANK PIPING DETAIL
NOT TO SCALEM-004
9 INERTIA BASE DETAIL
NOT TO SCALEM-004
3 ROOF MOUNTED DUCT SUPPORT/INSULATION DETAIL
No. Description Date
1 OSE COMMENTREVISIONS
02/18/2016
SCALE: NOT TO SCALEM-004
7 ROOF EXHAUST FAN INSTALLATION DETAIL
NOT TO SCALEM-004
4 END SUCTION PUMP DETAIL
-
T
T P
P CHS
CHR
M
TS
VAV POINTS LISTAHU POINTS LIST
LEGEND SEQUENCE OF OPERATION: VARIABLE AIR VOLUME (VAV)TERMINAL UNITS
SEQUENCE OF OPERATION: AIR HANDLING UNIT
VAV BOX WITH HOT WATER REHEAT COIL:
A DEDICATED UNIT MOUNTED VAV CONTROLLER WILL CONTROL EACH UNIT.
UNOCCUPIED MODE :
NIGHT SET-BACK OPERATION:
IN UNOCCUPIED MODE THE PRIMARY AIR DAMPER WILL REMAIN CLOSED. UPON A DROP IN SPACE
TEMPERATURE BELOW NIGHT LOW LIMIT SETPOINT (ADJ.), THE VAV CONTROLLER WILL REQUEST AHU FAN
OPERATION. UPON PROOF OF AHU OPERATION, VAV HEATING SHALL BE ENABLED AND VAV BOX PRIMARY AIR
DAMPER SHALL MODULATE OPEN TO MAINTAIN HEATING CFM SETPOINT (ADJ.) AND HEATING SHALL BE
ADJUSTED AS REQUIRED TO MAINTAIN THE SPACE NIGHT LOW LIMIT SETPOINT. ON A RISE IN SPACE
TEMPERATURE, THE REVERSE WILL OCCUR
AFTER HOURS OPERATION:
EACH VAV ZONE MAY BE OVERRIDDEN INTO OCCUPIED MODE. DURING AFTER HOURS OPERATION, VAV BOX
SHALL MAINTAIN OCCUPIED HEATING AND COOLING SETPOINTS.
OCCUPIED MODE :
IN OCCUPIED MODE, THE PRIMARY AIR DAMPER WILL BE ENABLED TO MODULATE TO MAINTAIN MINIMUM
COOLING CFM SETPOINT (ADJ.). WHEN THE SPACE TEMPERATURE RISES ABOVE THE COOLING SETPOINT (ADJ.),
THE PRIMARY AIR DAMPER WILL MODULATE OPEN TOWARDS MAXIMUM AIRFLOW SETPOINT (ADJ.). THE
CONTROLLER WILL COMPARE THE COOLING SETPOINT WITH THE SPACE TEMPERATURE AND DETERMINE THE
DESIRED AIRFLOW QUANTITY BETWEEN MAXIMUM AND MINIMUM AIRFLOW SETTINGS. ON A FALL IN SPACE
TEMPERATURE, THE PRIMARY AIR DAMPER WILL MODULATE CLOSED TO MAINTAIN MINIMUM COOLING CFM
SETPOINT. IF SPACE TEMPERATURE CONTINUES TO FALL BELOW SPACE HEATING SETPOINT (ADJ.), THE
PRIMARY AIR DAMPER SHALL MODULATE TO MAINTAIN HEATING CFM SETPOINT (ADJ.) AND THE HOT WATER RE-HEAT
COIL WILL BE INDEXED AS REQUIRED TO MAINTAIN HEATING SETPOINT. ON A RISE IN SPACE TEMPERATURE,
THE REVERSE WILL OCCUR
VAV AIR HANDLING UNIT
PROVIDE UNIT WITH A MICROPROCESSOR BASED PROGRAMMABLE CONTROLLER CAPABLE OF
STANDALONE OPERATION OR AS DIRECTED BY THE ENERGY MANAGEMENT SYSTEM (EMS). THE UNIT MOUNTED
CONTROLLER SHALL MONITOR AND CONTROL THE UNIT. THE CONTROLLER SHALL HAVE A HUMAN INTERFACE
PANEL CONSISTING OF 2-LINE LCD DISPLAY SCREEN AND A MULTI-BUTTON KEYPAD FOR MONITORING, SETTING,
EDITING, AND CONTROLLING THE UNIT.
SUPPLY FAN CONTROL (GENERAL) : THE SUPPLY FAN WILL BE CONTROLLED THROUGH A HAND-OFF-AUTO
(H-O-A) SWITCH INTEGRAL WITH THE VARIABLE FREQUENCY DRIVE (VFD). WHEN THE SWITCH IS IN THE
"AUTO" POSITION, THE SUPPLY FAN WILL BE STARTED AND STOPPED AND FAN SPEED WILL BE CONTROLLED
THROUGH THE EMS. WHEN THE SWITCH IS IN THE "HAND" POSITION, THE SUPPLY FAN WILL RUN AND THE
FAN SPEED WILL BE CONTROLLED THROUGH A MANUAL SPEED ADJUSTMENT INTEGRAL TO THE VFD. WHEN
THE SWITCH IS IN THE "OFF" POSITION, THE SUPPLY FAN AND DRIVE WILL REMAIN OFF. WHEN THE STARTING
CIRCUIT IS ACTIVATED BY THE EMS OR BY PLACING THE SELECTOR SWITCH IN "HAND" POSITION, THE VFD
WILL START UNLOADED AND WILL RAMP UP TO SPEED AS PROGRAMMED INTO THE VFD'S SAFETY CIRCUIT.
UNOCCUPIED MODE : IN UNOCCUPIED MODE, UNIT SUPPLY FANS WILL BE INDEXED OFF AND WILL
REMAIN OFF UNTIL THE START OF AN OCCUPIED CYCLE OR A CALL FROM THE VAV ZONES FOR NIGHT SET-UP
OR SET-BACK OPERATION. THE OUTSIDE AIR CONTROL DAMPER WILL REMAIN CLOSED TO OUTSIDE AIR DURING
UNOCCUPIED, NIGHT SET-UP AND SET-BACK OPERATION. DURING NIGHT SET-BACK OPERATION THE
DISCHARGE AIR TEMPERATURE SHALL BE SET AT 60 DEGREES F (ADJ.). ALL FURTHER SPACE HEATING SHALL
BE ACCOMPLISHED LOCALLY WITH THE VAV BOX REHEAT. UPON A CALL FOR NIGHT SET-UP OPERATION,
DISCHARGE AIR TEMPERATURE CONTROL SHALL BE AS DURING OCCUPIED MODE.
AFTER HOURS OPERATION : UPON A CALL FOR AFTER HOURS OPERATION FROM VAV ZONES, AHU SHALL
OPERATE IN THE OCCUPIED MODE FOR 4 HOURS.
OCCUPIED MODE : IN OCCUPIED MODE, THE SUPPLY FAN WILL BE ENABLED TO RUN THROUGH THE VARIABLE
FREQUENCY DRIVE (VFD); WILL RUN CONTINUOUSLY AND; THE OUTSIDE AIR CONTROL DAMPER WILL BE ENABLED.
OUTSIDE AIR DAMPER CONTROL : OUTSIDE AIRFLOW SHALL BE MONITORED BY THE AIRFLOW
MONITORING STATION. IN OCCUPIED MODE, THE OUTSIDE AIR DAMPER WILL BE MODULATED TO MAINTAIN
RETURN AIR CO2 SETPOINT AS SENSED BY THE DUCT MOUNTED CO2 MONITOR. WHEN THE CO2 SENSOR
SENSES A CO2 CONCENTRATION OF 400 PPM, THE OUTDOOR AIR DAMPER SHALL BE AT THE MINIMUM
POSITION. AS CO2 CONCENTRATION LEVELS RISE, THE DAMPER SHALL MODULATE OPEN. THE DAMPER SHALL
BE AT THE FULL OPEN POSITION WHEN CO2 LEVELS EQUAL 1100 PPM. MINIMUM OUTSIDE AIR DAMPER
POSITION SHALL BE ESTABLISHED DURING SYSTEM AIR BALANCE.
DISCHARGE AIR TEMPERATURE CONTROL (RESET PROGRAM) : DISCHARGE AIR TEMPERATURE FROM THE UNIT WILL
BE RESET IN ACCORDANCE WITH THE RESET SCHEDULE. THE CONTROLLER WILL MODULATE FLOW OF
CHILLED WATER TO MAINTAIN THE TEMPERATURE OF THE AIR LEAVING THE COIL AT THE SETPOINT DETERMINED BY
THE RESET SCHEDULE. DISCHARGE AIR TEMPERATURE SETPOINT WILL VARY BETWEEN A MINIMUM OF 50° F
(ADJ.) AND A MAXIMUM OF 60° F (ADJ.). RESET OF DISCHARGE AIR SETPOINT SHALL BE BASED UPON
COOLING DEMAND FROM VAV ZONES ASSOCIATED WITH EACH AHU.
SUPPLY DUCT STATIC PRESSURE CONTROL : THE SUPPLY FAN VFD WILL BE MODULATED TO MAINTAIN THE
SUPPLY DUCT STATIC PRESSURE SETPOINT AS SENSED BY DUCT STATIC PRESSURE SENSOR LOCATED
DOWNSTREAM IN THE SUPPLY MAIN. UPON STARTUP, THE VFD WILL BE IN THE "UNLOADED" POSITION. THE
VFD SPEED WILL BE ADJUSTED THROUGH A CONTROL LOOP IN RESPONSE TO THE DUCT STATIC PRESSURE
SETPOINT. AS THE DUCT STATIC PRESSURE RISES ABOVE SETPOINT, THE FAN SPEED WILL BE REDUCED
THROUGH THE VFD SPEED SIGNAL CONTROLLER DOWN TO THE PROGRAMMED MINIMUM SPEED (ADJ.). AS THE
STATIC PRESSURE INCREASES ABOVE THE ACTIVE SETPOINT, THE FAN SPEED WILL BE INCREASED. DUCT
STATIC PRESSURE SETPOINT SHALL RESET BETWEEN AN ADJUSTABLE MINIMUM AND MAXIMUM SETPOINT. RESET
OF STATIC PRESSURE SETPOINT SHALL BE BASED UPON AIRFLOW DEMANDS FROM VAV ZONES. IF THE FAN
SPEED IS AT 100 PERCENT AND THE SUPPLY DUCT STATIC PRESSURE IS STILL BELOW SETPOINT, THE
DISCHARGE AIR TEMPERATURE RESET CONTROL LOOP WILL BE OVERRIDDEN TO DECREASE THE ACTIVE
DISCHARGE AIR TEMPERATURE SETOINT UNTIL THE STATIC PRESSURE SETPOINT IS SATISFIED.
MORNING WARM-UP CYCLE : IN THE MORNING WARM-UP CYCLE, THE AHU SUPPLY FAN SHALL START, THE
OUTSIDE AIR DAMPERS WILL REMAIN CLOSED, AND UNIT COOLING SHALL BE DISABLED. ALL BUILDING HEATING
WILL BE ACCOMPLISHED LOCALLLY AT THE REHEAT VAV TERMINAL UNITS. MORNING WARM-UP CYCLE SHALL
BE INITIATATED FROM VAV ZONES AS REQUIRED. AN ADJUSTABLE MINIMUM NUMBER OF VAV ZONES SHALL
REQUIRE MORNING WARM-UP BEFORE AHU SHALL BE STARTED.
MORNING COOL-DOWN CYCLE : IN THE MORNING COOL-DOWN CYCLE, THE AHU SUPPLY FAN START, OUTSIDE
AIR DAMPERS WILL REMAIN CLOSED, AND UNIT COOLING SHALL BE ENABLED. MORNING COOL-DOWN CYCLE
SHALL BE INITIATATED FROM VAV ZONES AS REQUIRED. AN ADJUSTABLE MINIMUM NUMBER OF VAV ZONES
SHALL REQUIRE MORNING COOL-DOWN BEFORE AHU SHALL BE STARTED. DISCHARGE AIR TEMPERATURE
CONTROL SHALL BE AS IN OCCUPIED MODE.
SENSORS : A DRY CONTACT FROM THE VFD CONTROLLER WILL PROVIDE FAN STATUS FOR UNIT SUPPLY FAN.
AN ALARM WILL BE INITIATED WHENEVER THE FAN COMMAND AND STATUS DO NOT MATCH. A FAULT CONTACT
WILL BE INPUT TO THE CONTROLLER TO INDICATE AN INTERNAL PROBLEM WITH THE SUPPLY FAN VFD. A
DUCT TEMPERATURE SENSOR DOWNSTREAM OF THE COOLING COIL SECTION WILL MONITOR SUPPLY AIR
TEMPERATURE FROM THE UNIT. A DUCT TEMPERATURE SENSOR IN THE MIXED AIR STREAM WILL MONITOR THE
MIXED AIR CONDITION UPSTREAM OF THE COIL.
SAFETIES: UPON A SIGNAL FROM THE DUCT-MOUTNED SMOKE DETECTOR, THE SUPPLY FAN WILL BE DE-ENERGIZED (HARDWIRED INTERLOCK), THE OUTSIDE AIR DAMPER WILL BE CLOSED, AN ALARM WILL BE DISPLAYEDAT THE OPERATOR'S WORKSTATION, AND THE FIRE ALARM SHALL BE ACTIVATED.
RETURNAHU
AIR
CHILLEDWATER
COOLINGCOIL
MIXINGBOX
M
M
FILTER
VFD
FANC
EMCS
OUTSIDE
P
M
SUPPLYAHU
EMCS
SPACE
T
ENERGY MANAGEMENT CONTROL SYSTEM UNIT CONTROLLER
MOTORIZED ACTUATOR
EMCS
M
TEMPERATURE SENSOR
CURRENT SWITCHC
T
T
VAV
BOX
FLOW RING SENSOR(BY VAV BOX MANUFACTURER)
VARIABLE FREQUENCY DRIVEVFD
HOT WATERREHEAT COIL
CO2 SENSORO
T
LOCATE 2/3OF THE WAYDOWN THELENGTH OFDUCT.
O
FIRE ALARMPANEL
PRESSURE SENSORP
T
STATIONAIR MONITORING
AI-1 AIR FLOW SENSOR
AI-2 SPACE TEMP SENSOR
AI-3 DAMPER POSITION
AI-4 SPACE CO2 SENSOR (SEE DRAWINGS FOR LOCATIONS)
AI-5 MINIMUM CFM
AI-6 MAXIMUM CFM
AO-1 DAMPER CONTROL
DO-1 ELECTRIC HEAT (AHU-2)
DI-1 AHU FAN STATUS (CURRENT)
AI-2 DISCHARGE AIR TEMP
AI-3 DUCT STATIC PRESSURE
DI-2 FIRE ALARM PANEL CONTACT
AI-1 MIXED AIR TEMP
AO-5 VARIABLE FREQUENCY DRIVE
DO-1 START/STOP AHU
AO-1 DISCHARGE STATIC PRESSURE SETPOINT
AO-2 SUPPLY AIR TEMP SETPOINT
AO-3 OA MOTORIZED DAMPER
AO-4 RA MOTORIZED DAMPER
AI-4 OUTDOOR AIR FLOWRATE (CFM)
HWS
HWR
M
HOTWATER
PRE-HEATCOIL
M
ECONOMIZER: THE CONTROLLER SHALL MEASURE THE RETURN AND OUTDOOR AIR DRY BULB TEMPERATUREREADINGS, AND SHALL MODULATE THE ECONOMIZER DAMPERS IN SEQUENCE TO MAINTAIN A SETPOINT THATHAS LOWER OR EQUAL TEMPERATURE THAN THE SUPPLY AIR SETPOINT. THE OUTSIDE AIR DAMPERS SHALLMAINTAIN A MINIMUM POSITION AS INDICATED ON THE EQUIPMENT SCHEDULE.
THE ECONOMIZER SHALL BE ENABLED WHENEVER ALL OF THE FOLLOWING CONDITIONS HAVE BEEN MET:OUTSIDE AIR TEMPERATURE IN LESS THAN 55°F, OUTSIDE AIR TEMPERATURE IS LESS THAN THE RETURN AIRTEMPERATURE, AND THE SUPPLY FAN STATUS IS ON.
THE OUTSIDE AIR INTAKE DAMPER SHALL CLOSE WHENEVER ANY OF THE FOLLOWING OCCURS: THEFREEZESTAT IS ON, OR THE SUPPLY FAN STATUS IS OFF. THE OUTSIDE AND EXHAUST AIR DAMPERS SHALLCLOSE, AND THE RETURN AIR DAMPER SHALL OPEN WHEN THE UNIT IS OFF.
BAROMETRIC DAMPER SHALL BE SET DURING TEST AND BALANCING TO OPEN WHEN BUILDING BECOMESPRESSURIZED DURING ECONOMIZER MODE.
FREEZE STATF
F
FREEZESTAT
T
AMBIENT
HOT WATER RE-HEAT COILSHALL BE DISCONECTED,REMOVED, AND SEALED
FAN MOTOR SHALL BEREPLACED WITH INVERTERDUTY, ALLOWING VARIABLESPEED OPERATION. VERIFYSIZE AND HP TO BEINSTALLED IN EXISTINGCABINET
EXISTING AIR HANDLER
RELIEFAHU
DUCT MOUNTED SMOKE DETECTORS
BAROMETRIC DAMPER
S
FIRE ALARMPANEL
ADDITIONAL POINTS MONITORED BY THE BMS:• WATER HEATER WH-1, ALARM AND MONITORING• CIRCULATING PUMP HWC-1, CONTROL AND MONITORING• ELEVATOR SUMP PUMP SP-1, ALARM AND MONITORING
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
5/3
1/2
016 1
1:1
5:4
0 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
WDB
MAU
HVACCONTROLSDIAGRAMS
M-005
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
NOT TO SCALEM-005
1 AHU SCHEMATIC DIAGRAM AND SEQUENCE OF OPERATION
No. Description Date
1 OSE COMMENTREVISIONS
02/18/2016
-
3/4
"-D
RN
4"-
HW
S
M
M
VFD---
VFD---
M
0-100
AFV
0-100
HDSS
HDSS
INSIDEOUTSIDE
BY MCBY PC
SEE PLUMBING PLANS1"-DCW
B&G
MODEL 7
(SET @ 45
PSIG)
1"-NC BYPASS
0-100HIGH
CAPACITY
AIR VENT
0-100
LOW CAPACITY
AIR VENT
HDSS
B&G
MODEL 1170-75
(SET @ 75 PSIG)
FLEX-HOSE CO.
MODEL NNS
(TYP THIS DWG)
3/4"-DRN
SS FD
3"-
HW
S
HWP-1
HOT WATER PUMP
(OPERATING)
0-100
CMI
PSD
3"-
HW
S
SS
PIPE ALL PSD DRAINS TO
FLOOR DRAIN LOCATED AT
EACH PUMP (TYPICAL)
FD
3"-
HW
S
HWP-2
HOT WATER PUMP
(STANDBY)
0-100
CMI
PSD
3"-
HW
S
SS FD
3/4
"-C
HF
HOT WATER
SHOT FEEDER
(5 GALLONS)
HSF-1
8" COMBUSTION
AIR INTAKE (TYP)
8" FLUE
GAS
EXHAUST
0-100
0-100
1-1
/2"-
DR
N
1-1
/2"-
DR
N
BY BOILER
MANUFACTURER.
AFV
12"
(MAX)
3/4
"-D
RN
EXPANSION TANK
3"-HWS
2"-GAS
(PROVIDE MIN. 10' LENGTH
BETWEEN PRV & BOILER-TYP)
3"-HWR
2"-
HW
R
2"-
HW
S
3"-HWR
BOILER
CIRCULATING
PUMP BP-2
BOILER
CONTROL
PANEL
BCP-2
3"-HWS
BOILER
(LAG)
B-2
BOILER
CIRCULATING
PUMP BP-1
NORTH WALL INSIDEOUTSIDE
8" FLUE
GAS
EXHAUST
SLEEVE &
LINK SEAL
8" COMBUSTION
AIR INTAKE (TYP)
3/4
"-D
RN
EARTHQUAKE VALVE
BY BOILERMANUFACTURER
BY BOILERMFR. PROVIDEBACNET I/FACETO BMS
TO LOCAL DDC PANEL
OUTSIDE ABV GRADE
OA TEMPRESET
BOILER EMERGENCY
SHUTDOWN SWITCHBOILER
CONTROL
PANEL
BCP-1
1"-
DR
N
1-1
/2"-
DR
N
1-1
/2"-
DR
N2"-GAS
2"-
HW
R
2"-
HW
S
BOILER
(LEAD)
B-1
3"-HWS
3/4"-CHF
3"-HWS
INSIDE
OUTSIDE BELOW
GRADE
OUTSIDE
IN-LINE AIR
SEPARATOR
NATURAL GAS DISTRIBUTION
GAS PIPING, SEE PLUMBING
D
FSTI
TI
PI
PITIPI
FSTIPI
PRV
PRV
ES
TT
RV
PRV
RV
PI PI
PIPRV
PI
AAVAAV
RVTE
TT
TERMINAL UNIT HOTWATER COIL TYPICAL THISDRAWING
PIPE ALL INDICATED DRAINSTO HUB DRAIN (SEE PLANS)
CONTROLS CONTRACTOR SHALLPROVIDE DIFFERENTIAL PRESSURETRANSMITTER IN SYSTEM DISTRIBUTIONPIPING APPROX. 2/3 DISTANCE OF THELONGEST PIPE RUN.
AH
U P
RE
-HE
AT
CO
IL
GENERAL NOTES:1. THE WORK FOR THE HVAC CONTROLS SYSTEM WILL BEPERFORMED BY SIEMENS BUILDING TECHNOLOGIES UNDER DIRECTCONTRACT WITH COASTAL CAROLINA UNIVERSITY.
2. SEE SPECIFICATION SECTION 23 09 23 FOR DELINEATION OF WORK.
3. PROVIDE INSULATION AND JACKETING ON ALL EQUIPMENT.
BYPASS WITH PRESSURERELIEF VALVE SET TO 35% OFMAXIMUM PUMP FLOW (ADJ.).
M
VA
V R
E-H
EA
T C
OIL
MM
1"-
CW
S
3/4
"-D
RN
1"-DCW
1"-NC BYPASS
4"-
CH
WS
4"-
CH
WS
1"-
DR
N
CWP-1
CHILLED
WATER PUMP
(OPERATING)SS
PSD
FD
3/4
"-D
RN
0-100
FLEX-HOSE CO.
MODEL NNS
(TYP THIS DWG)
B&G
MODEL 7
(SET @ 45
PSIG)
B&G
MODEL 1170-75
(SET @ 75 PSIG)
HIGH
CAPACITY
AIR VENT
SEE PLUMBING PLANS
HDPIPE ALL PSD
DRAINS TO
FLOOR DRAIN
LOCATED AT
EACH PUMP
TYP.
SS
M M
LOW CAPACITY
AIR VENT
EXPANSION TANK0-100
3/4
"-D
RN
4"CHWR
4"CHWS4"CHWS
4"CHWS
BY PC BY MC
CWP-2
CHILLED
WATER PUMP
(STANDBY)
4"-
CH
WS
4"-
CH
WS
PSD
FD
CMI
VFD---
SS
CMI
VFD---
0-100
0-100
3/4"-DRN
D
RV
TT TTFE
BTU METER
T3
1/2" CIRCUIT SETTER BYPASS TO ALLOWMINIMUM FLOW AT ALL TIMES TO ALLOWT3 TEMPERATURE READING
NORMALLY CLOSED BYPASS
DP
40ºF 56ºF
CHWSFROMCAMPUSCEP
CHWRBACK TOCAMPUSCEP
T IN=42ºF
T OUT=54ºF
OUTSIDE INSIDE
FULL SIZE BYPASS
CONTROLS TOLOCAL DDCCONTROLLER
DDC
BUILDING LOOP DP TOCAMPUS CEP FOR MAINDISTRIBUTION UFDCONTROL
PRV PI
AAV
PI
AAV
PI PI
TO LOCAL DDC CONTROL PANEL
PIPE ALL INDICATED DRAINSTO HUB DRAIN (SEE PLANS)
CONTROL VALVE
TO LOCAL DDC PANEL
TYP.
CH
ILLE
D W
AT
ER
CO
IL
AH
U-3
CH
ILLE
D
WA
TE
R C
OIL
INLINE AIRSEPARATOR
M
BYPASS WITH PRESSURERELIEF VALVE SET TO 35% OFMAXIMUM PUMP FLOW (ADJ.).
CONTROLS CONTRACTOR SHALLPROVIDE DIFFERENTIAL PRESSURETRANSMITTER IN SYSTEM DISTRIBUTIONPIPING APPROX. 2/3 DISTANCE OF THELONGEST PIPE RUN.
CHILLED WATER AND HEATING HOT WATER SEQUENCE OF OPERATIONS:
CHILLED WATER:
THE CHILLED WATER SYSTEM PUMPS SHALL BE ENERGIZED THROUGH THE DDC CONTROLLER VIAOCCUPIED/UNOCCUPIED MODE THROUGH THE BUILDING ECMS. THE CHILLED WATER PUMPS AREREDUNDANT AND SHOULD NOT OPERATE AT THE SAME TIME. THE ECMS SHALL SCHEDULE/ROTATE THEPRIMARY PUMP AND STAND-BY PUMP ON A MONTHLY BASIS TO EQUALIZE RUN TIME HOURS.
THE CHILLED WATER PUMP SPEED SHALL BE CONTROLLED THROUGH THE VFD BASED ON THEDIFFERENTIAL PRESSURE SENSOR LOCATED IN THE CHILLED WATER DISTRIBUTION SYSTEM.
IN THE EVENT OF THE PRIMARY CHILLED WATER PUMP FAILURE THE ECMS SHALL ENERGIZE THE STAND-BYCHILLED WATER PUMP AND GENERATE AN ALARM AT THE OPERATOR'S WORKSTATION. THE CHILLEDWATER PUMPS SHALL PROVIDE PROOF OF OPERATION AT THE OPERATOR'S WORKSTATION THROUGH THEUSE OF A CURRENT SWITCH.
HOT WATER:
THE HOT WATER SYSTEM PUMPS AND BOILERS SHALL BE ENERGIZED TO PROVIDE HEATING TO SUPPLYAIR TERMINAL UNITS (VAVS) REHEAT COILS, FAN-COIL UNIT HEATING COILS, UNIT HEATER HEATING COILSAND AIR HANDLING UNIT PREHEAT COILS.
THE ECMS SYSTEM SHALL INTERFACE TO THE BOILER SYSTEM CONTROL UTILZING BACNET. THE ECMSSHALL ENABLE THE BOILER SYSTEM CONTROLLER. THE BOILER SYSTEM CONTROLLER SHALL CONTROLRESPECTIVE BOILER CIRCULATION PUMPS AND ALSO SHALL PROVIDE STAGING OF THE HEATING BASED ONBUILDING HOT WATER SUPPLY TEMPERATURE. A CONTROL VALVE LOCATED ON THE RETURN LINE OFEACH BOILER SHALL BE INTERLINKED WITH THE BOILER STAGING TO ISOLATE THE BOILER NOT INOPERATION (LAG BOILER). OUTDOOR TEMPERATURE RESET SCHEDULE SHALL BE CONTROLLED THROUGHTHE ECMS. THE ECMS SHALL MONITOR THE SYSTEM BOILER ALARMS AND RELAY/GENERATE ANY AND ALLSYSTEM ALARMS AT THE OPERATOR'S WORKSTATION.
THE SECONDARY BUILDING HOT WATER PUMPS SHALL BE CONTROLLED THROUGH THE ECMS. THE ECMSSHALL ROTATE THE PRIMARY AND STAND-BY HOT WATER PUMPS ON A MONTHLY BASIS TO EQUALIZE RUN-TIME HOURS. IN THE EVENT OF THE PRIMARY HOT WATER PUMP FAILURE THE ECMS SHALL ENERGIZE THESTAND-BY HOT WATER PUMP AND GENERATE AN ALARM AT THE OPERATOR'S WORKSTATION. THE HOTWATER PUMPS SHALL PROVIDE PROOF OF OPERATION AT THE OPERATOR'S WORKSTATION THROUGH THEUSE OF A CURRENT SWITCH.
THE HOT WATER PUMP SPEED SHALL BE CONTROLLED THROUGH THE VFD BASED ON THE DIFFERENTIALPRESSURE SENSOR LOCATED IN THE CHILLED WATER DISTRIBUTION SYSTEM.
A BOILER EMERGENCY SHUTDOWN SWITCH SHALL BE LOCATED AT EACH ENTRANCE TO THE MECHANICALSPACE ROOM.
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
5/3
1/2
016 1
1:1
5:4
1 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
WDB
MAU
HVACCONTROLSDIAGRAMS
M-006
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
NOT TO SCALEM-006
1 HEATING HOT WATER SYSTEM FLOW DIAGRAM
NOT TO SCALEM-006
2 CHILLED WATER SYSTEM FLOW DIAGRAM
No. Description Date
-
1
(E) AH-1
(E) AH-2
(E) AH-4
1
1
2
3
4
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
0
N
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
8 16 24 32
SCALE: 1/8" = 1'-0"5/31/2
016 1
1:1
5:4
2 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
KTD
WDB
ROOF HVACDEMO PLAN
M-031
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"M-031
1 ROOF HVAC DEMO PLAN
1
DEMOLITION KEYED NOTES
EXISTING AIR HANDLING UNITS AH-1, AH-2 AND AH-4 SHALL REMAIN. ALL ASSOCIATEDDUCT AND ACCESSORIES SHALL BE DEMOLISHED.
EXISTING EXHAUST FAN TO BE DEMOLISHED. (TYP.)
EXISTING ROOFTOP HVAC EQUIPMENT TO BE DEMOLISHED. (TYP.)
EXISTING DUCTWORK TO BE DEMOLISHED. (TYP.)
GENERAL DEMOLITION NOTES
1. UNLESS NOTED OTHERWISE, ALL EXISTING ROOFTOP EQUIPMENT, INCLUDINGMAKE-UP AIR UNITS, EXHAUST FANS, AIR-HANDLING UNITS, AND CONDENSINGUNITS, AND ALL ASSOCIATED DUCTWORK, CURBS AND ACCESSORIES SHALL BEDEMOLISHED. ALL EXISTING OPENINGS NOT BEING REUSED SHALL BE REPAIRED TOMATCH EXISTING ROOF.
2. WHILE ONLY THE ROOF PLAN IS INDICATED ABOVE, EXCEPT NOTED OTHERWISE,ALL MECHANICAL COMPONENTS ON THE FIRST AND SECOND FLOOR PLANS SHALLBE REMOVED. REFERENCE EXISTING ARCHITECTURAL FLOOR PLANS.
3. WHERE ROOFTOP EQUIPMENT IS BEING DEMOLISHED, CONTRACTOR SHALLPROVIDE MOISTURE-TIGHT SEALS ON CURBS AND ANY OTHER ROOFPENETRATIONS.
4. (2) FIRST FLOOR CHILLED WATER PUMPS AND ASSOCIATED VIBRATION ISOLATIONBASES SHALL BE SALVAGED AND TURNED OVER TO THE OWNER.
2
3
4
NOT TO SCALEM-031
2 EXISTING ROOF EQUIPMENT - 1
NOT TO SCALEM-031
3 EXISTING ROOF EQUIPMENT - 2
NOT TO SCALEM-031
4 EXISTING ROOF EQUIPMENT - 3
No. Description Date
-
DN
DN
DN
DN
UP
DN
DN
GENERALCLASSROOM 1
102
GENERALCLASSROOM 2
104
PHYS. LAB &CREATE STORAGE
120
MECH. PUMP ROOM
126
PHYSICSENGINEERING
DESIGN RESEARCHLAB
124
PHYSICS FTFACULTY OFFICE 1
123D
PHYSICS FTFACULTY OFFICE 2
123E
PHYSICS FTFACULTY OFFICE 3
123F
PHYSICS FTFACULTY OFFICE 4
123A
PHYSICS FTFACULTY OFFICE 5
123B
PHYSICS FTFACULTY OFFICE 6
123C
PHYSICSTUTORING
CENTER/OFFICESUITE
123
PHYS. SCALE UP 1
122
PHYS. SCALE UP 2
117
PHYS. TEACH PREP
116
PHYS. SCALE UP 3
112
PHYS.ELECTRONICS/
HARDWARE LAB
113
PHYS. MACHINESHOP
109
PHYS COMP.RESEARCH
111
PHYSICS FTFACULTY OFFICE 7
121C
PHYSICS FTFACULTY OFFICE
10
114D
PHYSICS FTFACULTY OFFICE 8
121B
PHYSICS FTFACULTY OFFICE
11
114C
SHARED CONF.
108
PHYSICS OFFICESUITE
114
PHYSICS FTFACULTY OFFICE 9
121A
PHYSICS FTFACULTY OFFICE
13
114A
SHARED ADJUCTOFFICES
110
MEN'S TLT
105
SHARED MEETINGROOM
107
JAN.
103
UNISEX ADA TLT
106
UNISEX ADA TLT
118
WOMEN'S TLT
119
DATA
115
STAIR 1A
ST1A
STAIR 1B
ST1B
NORTH ENTRY
100
SOUTH ENTRY
102C
CORR.
101C.A
PHYS. ADV LAB /MAT. RESEARCH
125
PHYSICS OFFICESUITE
121
PHYSICS FTFACULTY OFFICE
12
114B
VENDING
127
ELEC.
101
MENS TLTVESTIBULE
105.A
PHYSICSMAIL/COPY/FILE
STORAGE
128
ELEVATOR
100E
36"x18"
24"x14" 24"x14"
12"x
12"
16"x
12"
18"x
12"
1
1
1
1
1
1
1 12"x8"
18"x10"
22"x12"
16"x10"12"x8"
1
20"x14"
20"x10" 10"x10"
1
1
16"x10"
118"x10"16"x10"
1
1
16"x8" 10"x8"
3
175
PD208
75
PD206
165
PD208
175
PD208
145
PD208
85
PD206
145
PD208
125
PD208
380
PD210
140
PD208
90
PD206
85
PD206
405
PD212
405
PD212
425
PD212
425
PD212
425
PD212
425
PD212
425
PD212
425
PD212
400
PD212
400
PD212
400
PD212
400
PD212
75
PD206
75
PD206
325
PD210
180
PD208
160
PD208
160
PD208
140
PD208
120
PD208
105
PD206
130
PD208
35
PD106
465
PD212
465
PD212
430
PD212
445
PD212
440
PD212
75
PD206
325
PD210
325
PD210
135
SWS2
135
SWS2
4
290
SWS1
125
PD208ELEV. MACHINE
ROOM
101.A
B-2
B-1
HWP-1
HWP-2
CWP-1
CWP-2
250
LF222
75
LF222
50
LF222
200
LF222
50
LF111
FCU-1
FCU-2
FCU-3
VAV-124
VAV-123C
VAV-123B
VAV-123A
VAV-121
VAV-120
VAV-126
VAV-100
VAV-105
VA
V-1
07
VAV-108
VAV-109
VAV-110
VAV-111VAV-104
VAV-102VAV-125
VAV-122 VAV-117
VAV-112
VAV-113
VAV-114B
VAV-114A
VAV-119VAV-102C
100
PD206
WATER HEATER MANUFACTURER'SCONCENTRIC VENT KIT. INSTALL AT 13'-4" AFG.
WH-1
4" WH FLUE ANDAIR INTAKE
85
LF222
145
LF222
125
LF222
380
LF222
85
LF222
90
LF222
140
LF222
810
LF222
650
LF222
75
LF222
440
LF222
875
LF222
820
LF222
75
LF222
820
LF222820
LF222
100
LF222
775
LF222
775
LF222
180
LF222
160
LF222
160
LF222
140
LF222
225
LF222
175
LF222
75
LF222
165
LF222
175
LF222
145
LF222
5
400
LF222
485
LF222
FUME HOODS
10"ø
6"ø
12"ø
14"ø
8"ø
12"ø
24"x
12"
14"ø
12"ø
10"ø
10"ø10"ø
10"ø
24"x
12"
14"ø
8"ø
16"x
12"
14"ø
12"x
12"
14"ø
14"ø 14"ø
14"ø
20"x14" 20"x20"16"x12"
14"ø
14"ø
14"ø
16"ø
12"ø
325
LF222
8"ø
135
SWS2
135
SWS2
100
SDS50
100
SDS50
100
SDS50
100
SDS50
100
SDS50
100
SDS50
100
SDS50
100
SDS50
BP-1
BP-2
6
50"x14"
1
50"x14"
1
10"ø
12"ø
8"ø
10"ø
10"ø
10"ø
12"ø
10"ø
50"x20"
8"ø
10"ø
110
SDS50
165
SDS75
160
SDS75
165
SDR75
160
SDR75
7
8"ø
10"ø10"ø
12"ø
8"ø
T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
TTTT
T T
T
T
T
395
PD212
T
VAV-101C
425
PD212 12"ø
FD
DDC
ET-1
ET-2
50"x14"
50"x14"
1
1
20"x12"
1
20"x12"
6"ø(TYP)
6"ø(TYP)
2
COMM.
115A
FD
FD
FD
20"x50"
12"x12"
100
LF222
18"x
12"
12"ø
8
1. CONTRACTOR SHALL COORDINATE WITH THE OWNER TO PROVIDE A METHODOF MARKING THE CEILING GRID TO INDICATE THE LOCATION OF THE VAV BOX.AN EXAMPLE WOULD BE A SMALL BLUE DOT ON THE CEILING GRID.
2. ALL COMPONENTS INSTALLED ABOVE THE CEILING SHALL BE PLENUM RATED.3. ALL RETURN GRILLES AND TRANSFER BOOTS SHALL BE PROVIDED WITH
MANUAL DAMPERS FOR BALANCING.
AM
ILI
LW
BAD E N
I
A
II
R
L L
DG
No.
TU
D
SIS
RE
TE
AA
30241RE
GE
ER
INEN
L
RCAHOR
P
SEF
OLN
S IOIN
OCERTI FICAT
EO F A U
T H
ORI ZATION
S
OUTH
CAROLINA
CONSULTING
ENGINEERS
DWG, INC.
No.C03649
0
N
CHECKED BY:
DRAWN BY:
DATE:
PROJECT:
REVISIONS:
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
1
A
2 3 4 5 6
B
C
D
E
COPYRIGHT 2015 ALL RIGHTS RESERVEDPRINTED OR ELECTRONIC DRAWINGS ANDDOCUMENTATION MAY NOT BE REPRODUCEDIN ANY FORM WITHOUT WRITTEN PERMISSIONFROM LS3P ASSOCIATES LTD.
WWW.LS3P.COM
TEL. 843.577.4444 FAX 843.722.4789
205 1/2 KING ST. CHARLESTON SC 29401
H17-9548-PD
8 16 24 32
SCALE: 1/8" = 1'-0"5/31/2
016 1
1:1
5:4
7 A
M
C:\
Users
\mg
allag
her\
Do
cu
men
ts\M
EP
_C
CU
Sm
ith
Scie
nce B
uild
ing
_2015_M
GA
LL
AG
HE
R@
DW
GIN
C.C
OM
.rvt
11257
05/31/16
KTD
WDB
FIRST FLOORHVACDUCTWORKPLAN
M-101
SCIENCE BUILDINGRENOVATION
BID CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"M-101
1 FIRST FLOOR HVAC DUCTWORK PLAN
KEYED NOTES
1 PROVIDE TRANSFER OPENING IN WALL ABOVE CEILING ACCORDING TO SIZESHOWN ON DRAWINGS. PROVIDE A SHORT DUCT INTO SPACE WITH 90° FITTING TOLIMIT NOISE.
CONDENSATE ROUTED THROUGH NEUTRALIZER KIT TO FLOOR DRAIN.
AIR FLOW MONITORS ON LAB HOOD EXHAUST SHALL BE PROVIDED ANDINSTALLED BY CMI. FIRE CAULK SHALL BE PROVIDED WHERE LAB EXHAUST DUCTPENETRATES UP INTO CHASE.
DUCT IN MACHINE ROOM SHALL BE EXPOSED DOUBLE WALL. COORDINATE WITHARCHITECTURAL DRAWINGS FOR DUCT PAINTING COLOR.
INSTALL CONDENSING BOILER FLUE AND AIR INTAKE PER MANUFACTURER'SINSTALLATION INSTRUCTION AND RECOMMENDATIONS.
PROVIDE 20"x36" TRANSFER DUCT THROUGH SECOND FLOOR FOR TRANSFER OFRETURN AIR WITH FIRE DAMPERS.
DUCT IN SOUTH ENTRY AREA WILL BE PARTIALLY EXPOSED ABOVE FLOATINGCEILING. CONTRACTOR SHALL PAINT DUCT IN THIS AREA TO MATCHCEILING/STRUCTURE COLOR ABOVE.
PROVIDE BACKDRAFT DAMPER THAT ONLY ALLOWS AIR INTO THE LAB.
2
3
4
5
6
7
GENERAL NOTES
No. Description Date
1 OSE COMMENTREVISIONS
02/18/2016
3 OSE COMMENTS 04/15/2016
GENERAL NOTES
8
-
UP
DN
MATH CLASSROOM
206
WOMEN'S TLT
214
MATH RESEARCHLAB
208
MATH STUDENT
207
LECTURE OFFICE 1
207B
PSYCH. FTFACULTY OFFICE
10
217A
MEN'S TLT
204
TENURE OFFICE 7
205BLECTURE OFFICE 5
218N
PSYCH. OFFICESUITE
210
PSYCH. CHAIRSOFFICE
210B
PSYCH. FTFACULTY OFFICE 3
217K
UNISEX ADA TLT
213
STAIR 2A
ST2A
STAIR 2B
ST2B
ADMIN OFFICE
218Q
ELEC.
203JAN.
201
MATH CHAIR
218P
LAB MONITOR
216H
WAITING
211
VIDEO GAMING
216G
INTERVIEW ROOM
211A
OBSERVATIONROOM
211B
OBSERV. VIEWING
216I
VIDEO PRESENT/CONF.
216F
OBSERVATIONROOM
216E
PHYSIOLOGICALROOM
216C
TESTING
216B
TESTING
216A
PSYCH. FTFACULTY OFFICE 9
217B
STOR.
216D
DATA
212
PSYCHOLOGYSUITE
216
GENERALCLASSROOM 3
219
TENURE OFFICE 5
207F
TENURE OFFICE 4
207E
LECTURE OFFICE 2
207G
TENURE OFFICE 2
207C
TENURE OFFICE 1
207A
TENURE OFFICE 6
207H
LECTURE OFFICE 4
205A
TENURE OFFICE 8
218O
LECTURE OFFICE 3
205C
PSYCH. FTFACULTY OFFICE
12
210D
PSYCH. FTFACULTY OFFICE
13
210C
PSYCH. FTFACULTY OFFICE
14
217F
PSYCH. FTFACULTY OFFICE
11
210E
PSYCH. FTFACULTY OFFICE
15
217H
TENURE OFFICE 9
218J
TENURE OFFICE 12
218E
TENURE OFFICE 13
218C
PSYCH. FTFACULTY OFFICE 1
217I
MATH STUDENTSUITE
218
PSYCH. FTFACULTY OFFICE 8
217D
PSYCH. FTFACULTY OFFICE 6
217E
PSYCH. FTFACULTY OFFICE 7
217C
TENURE OFFICE 3
207D
PSYCH. MAIL/COPY/STOR. ROOM
215
LECTURE OFFICE 6
218M
LECTURE OFFICE 7
218L
PSYCH. FTFACULTY OFFICE 2
217J
PSYCH. FTFACULTY OFFICE 4
217L
PSYCH. FTFACULTY OFFICE 5
217M
TENURE OFFICE 11
218F
LECTURE OFFICE 8
218I
LECTURE OFFICE 9
218G
LECTURE OFFICE10
218D
TENURE OFFICE 14
218B
TENURE OFFICE 15
218A
TENURE OFFICE 10
218H
MATH OFFICESUITE
218C
ADMIN OFF
210A
MATH MAIL/COPYROOM
202
CORR.
201C.A
SECURE STOR.
218K
PSYCH. OFFICESUITE
217C
OFFICES
205
STORAGE
211B.1 STORAGE
211A.1
PSYCH. FTFACULTY OFFICE
16
217G
PSYCH. STUDENTRECORDS
215A
12"x
1