iaea international atomic energy agency international peer review on evaluation of nuclear power...
TRANSCRIPT
IAEAInternational Atomic Energy Agency
International peer review on evaluation of nuclear power infrastructure
A. Cardoso
Department of Technical Cooperation
IAEA 2
IAEA Integrated Nuclear Infrastructure Review Missions
Objective
• Assess the national infrastructure development status
• Provide assistance
Scope
19 infrastructure issues
IAEA 3
IAEA Integrated Nuclear Infrastructure Review Missions
• Holistic peer review
• Upon request by the Member State
• Multidisciplinary international experts
• Led by IAEA staff
IAEA 4
IAEA Integrated Nuclear Infrastructure Review Missions
Types of review missions
A.- Preliminary First evaluation mission looks at the whole situation2 - 4 persons x 1 week
B.- Follow-up Successive evaluations along development programme2 – 4 persons x 1 week
C.- Before bid invitation At the end of phase 26 - 8 persons x 2 weeks
IAEA 5
IAEA Integrated Nuclear Infrastructure Review Missions
Before bid invitation
Comprehensive external review mission
• Achievement of Milestone 2 is a key stage
• Demonstrate readiness to construct first NPP
• Enhance national & international confidence
• Able to hold commercial discussions with potential suppliers
IAEA 6
IAEA Integrated Nuclear Infrastructure Review Missions
Arrangements by Member State
• Request through official channel as part of a TC project
• Provide advance information
• Previous self-assessment advisable
• Assign interacting host personnel & local trainees
• Logistic arrangements: working space, communications, local transportation, translators
IAEA 7
IAEA Integrated Nuclear Infrastructure Review Missions
Performance of review
• Written material
• Interviews
• Direct observations
• Visits
• Responses to recommendations from previous missions
IAEA 8
Conduct of the review mission
Entrance meeting
Performance review
Preliminary report
Exit meeting
Draft report
Final report
Counterpart
Counterpart
Counterpart
IAEA 9
Conduct of the review mission
Outcome
• Evaluation of development status for each infrastructure issue
No actions neededMinor actions neededSignificant actions needed
• Suggestions for action plan