Page 1: iAAR_team 03

// GROUP 3 //processdocumentation

Page 2: iAAR_team 03

// groupmembers //

Michael NørskovKristoffer CodamJacob BastrupSigurd RubinNicolai HendeLærke TolstrupMarie HvidSimone Brink

Page 3: iAAR_team 03

// site //

Page 4: iAAR_team 03

// instantaarhus concept-idea//

// The idea was to create an inflatable structure that would move in relation to weather. The soultions was then to attach cylinders to a dome structure. When the cylinders are inflated they will sway in the wind giving the stucture life. Also these cylinders will create a play with light seen from the inside of the dome giving the per-son a phenomelogical experience. //

Page 5: iAAR_team 03

// sketch of the idea //

Page 6: iAAR_team 03

// construction //

Page 7: iAAR_team 03

// construction //

1234

.4

1153

.7

291.44

80.6

260.47

61.5

145.72

3.06

35.2

3281

.5

300.

0028

1.58

83.8

132.81

177.49

216.44

260.47

280.85

292.46

294.97

288.31

272.67

248.48

73.0

606.

33

268.39

497.

43

299.35

233.12

128.82

64.7

24.9

4.05

283.69

1103

.7

173.52

94.2

43.2

12.9

13 m

6 m

Page 8: iAAR_team 03

// process //

// When the concept was clear, we drew the inflatable structure in rhino in order to maximize the use of the material given. We uses the command “unroll” to get everything down in 2d. It was then easy to mark everything up with a template and starte cutting and clipsing. //

Page 9: iAAR_team 03

// process //

Page 10: iAAR_team 03

// process //