i‐75 express lanes
TRANSCRIPT
• So we had a new Road– A new Type of Road
• Variable tolling (ok, not really new)• Reversible (ok, that’s REALLY new to us)
– Being built via design build– Underway as I walked in the door– Lots of balls in the air– Lots more needed to be tossed– Involves LOTS of different people with different organizations
John L. Hibbard, PEOperations Division Director
Georgia Department of [email protected]
404‐631‐1401