i5northcoast resume
DESCRIPTION
i5northcoast ResumeTRANSCRIPT
Project Name Contract # Owner Contact Reference Description Start Date Completion Date Contract Value
Imperial Hwy 12-056224 Eric Dickson John Nowak 4/12 $737,806.00
Santee 11-2T0114 John Hurtzig John Sanger 10/11 $1,945,864.00
210/15 Hwy 08-472224 Fred Alipanah John Simpson 5/12 $1,946,295.00
HWY 99 06-0L3904 Peter Mullaly Pete Mullaly 9/13 4/15 $112,269.00
Emergency Project 08-1f0804 John Simpson John Simpson 3/14 $1,857,440.00
Emergency Project 08-1G2504 John Ashton John Simpson $275,000.00
Ave Vista Hermosa 12-0F96C4 Steve Kinally John Nowak 11/14 $1,890,161.00
Ave. Pico 12-0F96A4 Andrew Chuah John Nowak 3/15 $1,190,274.00
Boulder Bridge $109,980.00
Van Burean 12/13 $598,195.00
Costal Dunes 4/30 $254,969.00
Pepper Ave $147,940.00
HWY PLANTING INSTALL IRRIGATION SYS IN ORANGE COUNTY IN YORBA LINDA AND ANAHEIM ON ROUTE 90 FROM 0.6 MILE EAST OF
KELLOGG DRIVE UNDERCROSSING TO LA PALMA AVENUE 2ORA0090 0118 0125
PLANTING,IRRIGATION,EROSION CONTROL IN SAN DIEGO COUNTY IN SANTEE FROM FORESTER CREEK BRIDGE TO MAGNOLIA AVENUE
UNDERCROSSING 2SD 0052 0155 0173
REPLACE HEADS, VALVES, INSTALL CONTROLLERS IN SAN BERNARDINO AND RIVERSIDE COUNTY ON ROUTE 15, 40, 71 AND 91 IN VARIOUS LOCATIONS DIR'S ORDER EMERGENCY F.A. 2SBD0015 0000
0751