i-70 mountain corridor interpretive plan november 2013 · you to guidance on the css website that...

51
1 I-70 Mountain Corridor Interpretive Plan November 2013

Upload: others

Post on 05-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

1

I-70 Mountain Corridor

Interpretive Plan

November 2013

Page 2: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

1

I-70 Mountain Corridor Interpretive Plan

Prepared for:

Colorado Department of Transportation

Prepared by:

CH2M HILL

In association with:

THK Associates, Inc. Pat Noyes & Associates

November 2013

Page 3: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

1

Contents I‐70 Mountain Corridor Interpretive Plan ............................................................................................... 1 

Introduction ............................................................................................................................................... 1 How to Use this Plan .................................................................................................................................. 2 Guidance .................................................................................................................................................... 4 Corridor Branding Program ........................................................................................................................ 4 I‐70 Interpretive Opportunities Map ......................................................................................................... 5 

Audiences ............................................................................................................................................... 7 Interpretive Exhibits ................................................................................................................................. 12 

Interpretive Signage Design Guidelines ............................................................................................... 12 

Appendix........................................................................................................................................... A‐1 

How and why the Plan was Developed ................................................................................................... A‐1 Who was Involved ................................................................................................................................... A‐1 Vision & Goals for the Plan ..................................................................................................................... A‐2 

Methodology ....................................................................................................................................... A‐2 

Attachment 1 PLT Meeting Agenda ................................................................................................... A1‐1 

Project Leadership Team Meeting ........................................................................................................ A1‐1 AGENDA ............................................................................................................................................ A1‐1 

Attachment 2 Stakeholder Meeting Agendas .................................................................................... A2‐1 

I‐70 Mountain Corridor Interpretive Plan ............................................................................................. A2‐1 Stakeholder Agenda .......................................................................................................................... A2‐1 

I‐70 Mountain Corridor Interpretive Plan ............................................................................................. A2‐2 Stakeholder Agenda .......................................................................................................................... A2‐2 Elements of the Plan ......................................................................................................................... A2‐2 Break into County Groups ................................................................................................................. A2‐2 Return to Large Group ...................................................................................................................... A2‐2 

I‐70 Mountain Corridor Interpretive Plan ............................................................................................. A2‐4 Stakeholder Meeting #2 .................................................................................................................... A2‐4 General notes from group ................................................................................................................. A2‐4 Clear Creek County ............................................................................................................................ A2‐4 Jefferson County ............................................................................................................................... A2‐4 Ski Country ........................................................................................................................................ A2‐5 Summit County.................................................................................................................................. A2‐6 

I‐70 Mountain Corridor Interpretive Plan ............................................................................................. A2‐8 Stakeholder Agenda .......................................................................................................................... A2‐8 

Attachment 3 Summary of Reviewed Existing Interpretive Plans and Example Interpretive Plans ...... A3‐1 

Attachment 4 Corridor Context Map ................................................................................................. A4‐1 

 

 

 

Page 4: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

1

I-70 Mountain Corridor Interpretive Plan Introduction The I‐70 Mountain Corridor Programmatic Environmental Impact Statement (PEIS) Section 106 Programmatic Agreement (2008) stipulates that the Federal Highway Administration (FHWA) and Colorado Department of Transportation (CDOT) will develop design guidelines, define a historic context of the corridor, and develop an interpretation plan.  The I‐70 Mountain Corridor Context Sensitive Solutions (CSS) Guidance provides design guidance and the historic context; the Interpretive Plan is intended to guide interpretive activities and mitigation identified for projects developed through the Tier 2 environmental process on the corridor.  The Section 106 Programmatic Agreement (106 PA) committed to brand a heritage corridor, develop interpretive planning based on the historic context and identify possible interpretative efforts. 

Interpretive planning connects visitors, recreationists, tourists and guests with ideas, resources and opportunities for engagement and learning.  The following vision for this document was developed in collaboration with the Section 106 consulting parties, agencies and community representatives along the corridor: 

The Interpretive Plan is the framework for consistent and timeless efforts focused on understanding, appreciating, and honoring the historic and other unique features of the I‐70 Mountain Corridor.  These efforts build community and provide quality visitor experiences that support tourism. 

The purpose of the plan is to support the following features that are part of the interpretive vision for the I‐70 Mountain Corridor: 

Collaboration 

Decision‐making 

Communication 

Marketing 

Funding 

This document includes a process to support corridor partners in identifying opportunities for interpretation, strategies, and techniques to enhance visitor experiences before, during, and after coming to the corridor.  These strategies are intended to brand the corridor and increase visitors’ appreciation of, and sensitivity to, corridor resources. 

The scope of this plan is focused on the I‐70 Mountain Corridor from C‐470 to Glenwood Springs.  At the corridor level, it is focused on a consistent approach to interpretative activities, which will select, develop, and implement interpretive materials in conjunction with specific project mitigation or outreach activities. 

The development of this plan followed the I‐70 CSS 6‐Step Process and engaged a multi‐disciplinary team.  The Appendix to this report provides the organizations invited and the meeting materials.  

Page 5: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

2

How to Use this Plan Interpretation and education provide informational, interpretive, and educational materials, programs, media and facilities to enhance visitor experience.  For projects on the I‐70 Mountain Corridor, CDOT, FHWA, and the consulting parties to the 106 PA are committed to a collaborative approach to developing interpretive applications in conjunction with projects on I‐70 and within the corridor. 

The corridor stakeholders developed this plan for use on Tier 2 projects in the I‐70 Mountain Corridor.  They also envisioned that communities and agencies in the Mountain Corridor would use this plan as a resource in the development of interpretive materials and applications to enhance visitors’ sense of coordinated education and information.  CDOT will use this plan to guide their interpretive activities developed to mitigate potential impacts from projects. 

If CDOT, in consultation with corridor stakeholders, determines that mitigation requirements could be met through interpretation, it will follow the guidance in this plan to identify and develop interpretive applications.  In determining whether mitigation can be addressed through interpretation, it is important to consider historic, manmade, natural and visual resources for impacts and potential interpretation. The planning steps are shown in Figure 1. 

If interpretation is being considered in response to historic properties or effects, CDOT will work with the consulting parties and the National Park Service to develop and agree upon appropriate interpretation.  

FIGURE 1 Flow Chart for Planning 

 

Determine if mitigation could be

met through interpretation

Review the CSS Guidance, establish

an Issues Task Force or work with

the consulting parties

Involve representatives from multiple

disciplines

Review contextual analysis and project

context

Review priorities in the Interpretive Plan

Conduct inventories

Identify strategies and techniques

Document process and

recommendations

Page 6: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

3

A checklist (Figure 2) was developed to help guide the interpretive planning process on the I‐70 Mountain Corridor.  These activities may occur sequentially or concurrently and are consistent with the I‐70 Mountain Corridor CSS decision‐making process.  The hyperlinks in this document (words distinguished by blue underlined text, a form of inter‐document connection) will take you to guidance on the CSS website that can be used to support the planning process.  

FIGURE 2 Checklist to Guide Interpretive Planning Process 

If interpretation is being developed as part of a project, review the CSS Guidance and establish an Issues Task Force that includes community representatives and parties to the Section 106 PA Follow the CSS Guidance on establishing an Issues Task Force Review Context Statement, Core Values, and Interactive Maps on the

CSS website In the Interactive Maps, input the mile post limits of the project, then

print a report of the potentially affected resources Identify whether the project lies in an Area of Special Attention

Take a multidisciplinary approach by involving representatives from all of the disciplines that may be interested in or affected by your project. The type of mitigation should also direct the representatives involved. Consider the following disciplines: Engineering Planning Environmen tal Operations Maintenance Public involvement Public relations/government affairs Landscape architecture Parks and open space Historic Economic Planning/community development Other project-related disciplines

Review contextual analysis and project context Review Context Maps Review existing plans, agreements, and commitments Review photos in the photo gallery

Review priorities in the Interpretive Plan Determine applicable interpretive themes Identify audiences

Conduct inventories Inventory resources to support interpretative activities Review map of Opportunities for Interpretation Inventory cultural, environmental and historic resources for interpretation

Identify strategies and techniques for implementation Review matrix of techniques and audiences Apply the priorities to the full range of techniques Review interpretive exhibit guidance

Document process and recommendations

Page 7: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

GuiThe oand dvisito

Each drivesinterpconsis

CorA stroalongschemreliabcommprogrwww

Branddesigntriangcreatethree DestinI‐70 Meleme

AmercorridWild aMoun

Detai

idance verarching iniverse naturars and reside

line of text prs the focus anpretive systemstent and coo

rridor Bong brand len the I‐70 Moume, and themble informatiomunication, inam has been .byways.org. 

ding for the I‐nated I‐70 mogular polygone the backdrocolor‐coded nation (Blue),Mountain Corents of the co

rica’s Mountador, the ecoloand Close, anntain Corridor

led themes fo

America’s 

SkReOuPrM

Colorado R

MTimAg

nterpretive thal and manmants through i

TThe

rovides a taglnd priorities fm.  The frameordinated app

randingnds credibilityuntain Corridmes for interpron can be founcluding intersuccessfully  

70 Mountainountain corrids represent top for the I‐70taglines. The, Colorado Roridor Connectorridor. 

ain Destinatioogical aspectsnd the significr Connects Yo

or each taglin

Mountain De

ki Industry esort Tourismutdoor Recreae‐History ountain Com

Rockies Wild a

ining mber griculture 

eme for the Iade resourcesnterpretation

America’s mThe Colorado Re I‐70 Mounta

ine discussedor interpretaework provideplications.   

Progray to unfamiliaor. Consistenretation buildnd. This branrpretive signalaunched by A

 Corridor willdor identifierhe peaks of t0 Mountain Cse taglines,  Aockies Wild ants You (Gold)

on represents of the corridcance of transou.  

ne include:  

estination 

m ation 

munities  

and Close 

I‐70 Mountais along I‐70 thn. 

mountain destRockies, wild ain Corridor co

d further in thtion and the fes the basis fo

am r locations ant use of the ads recognitionding programge, brochureAmerica’s Byw

l be compriser, in which twhe Rocky MoCorridor title, America’s Mond Close (Greerepresent sig

s the importador are repressportation in 

n Corridor rehat provide o

tination, and close, onnects you.

he next sectioframework foor corridor br

nd attracts visapproved idenn and signifiesm can be appls, pamphletsway; which m

ed of the wo blue ountains and and the ountain en), and The gnificant 

ance of tourissented in the the corridor 

flects the uniopportunities 

on. The overaor organizing randing and g

sitors to comntifier, selects to the publiied to multips, and websitemay be found

m and recreatheme Coloris represente

ique characteto engage 

ll theme an guidance for 

munities ted color ic where ple forms of es.  A similar  at 

ation to the rado Rockies ed by The I‐70

4

er 

Page 8: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

5

Electric Power Generation Climate and Weather Ecosystems Watershed Geology  Wildlife 

The I‐70 Mountain Corridor Connects You 

Road Transportation Air Transportation Railroad Transportation 

For more information, see the graphic explaining the branding program and its elements. 

I-70 Interpretive Opportunities Map When mitigation through interpretation has been determined appropriate and stakeholders have been invited to participate, consider the following: 

The audience(s) you wish to reach through the interpretation 

The subject and location opportunities available within the project area  

The techniques that best reflect the themes and resources as well as effectively communicate with your target audiences 

The topics (audiences, opportunities, and techniques) are expanded to provide information, ideas, resources, and options that are effective and appropriate in meeting your interpretive goals.  

The I‐70 Mountain Corridor Opportunities for Interpretation Map Figure 3, or view a full‐scale map  is intended to be used as a reference for the many communities located in the I‐70 Mountain Corridor. Information on the map was obtained via stakeholder input along with readily available promotional and historical information. The location of possible interpretive sites listed on the map is approximate and is not intended to be comprehensive of the myriad interpretive opportunities possible along the corridor. The map is intended to be used as starting point for additional research by communities or agencies beginning an interpretive program so they may be aware of possible interpretive opportunities identified as significant by the public. The map is not intended to be accessed by the public directly, nor is it intended for way finding. 

The map is intended and designed to be used in conjunction with the I‐70 Mountain Corridor Branding Program detailed in the previous section. Topics for interpretation fall into the themes and categories designated within the Branding Program. The topics are organized in the map legend by tagline (America’s Mountain Destination, Colorado Rockies Wild and Close, The I‐70 Mountain Corridor Connects You) and by location of sites along the corridor—at the bottom of the map. 

Page 10: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

7

Audiences Interpretive planning must be done in the context of whom the audience is, as well as what information is to be conveyed.  The I‐70 Mountain Corridor is America’s mountain destination and attracts visitors from around the world to enjoy the scenic beauty, unique history, accessible alpine and subalpine outdoor recreation, and friendly communities.  These visitors come from other continents, states or nearby communities to enjoy and appreciate the unique resources offered in the corridor. 

Each project will identify the applicable target audience(s) for interpretation for that project, understanding the specific mitigation objectives and interpretive opportunities in the area of the project.  Potential audiences: 

I‐70 auto travelers 

Bicyclists and pedestrians 

Recreational visitors 

Historic or eco‐tourists 

Local communities 

School and education groups 

Each of the potential audiences is discussed in more detail. 

I-70 Auto Travelers The majority of visitors to the I‐70 Mountain Corridor are auto travelers who are traveling to destinations within or beyond the corridor.  Although the mode of travel is the same among auto travelers, they represent a diverse group with a potentially broad range of interests, travel purpose, and available time.  It is important to focus on the common travel mode to develop recommendations for this audience.  Interpretation of features visible from the roadway through techniques easily accessible from the roadway or conveniently located at common travel stop locations such as rest areas, visitor centers, or service centers will serve this audience most effectively. 

Bicyclists and Pedestrians Bicyclists and pedestrians in the I‐70 Mountain Corridor move through the corridor more slowly than motorized travel.  Opportunities to interact more personally with the cultural and natural resources near trails, bikeways, or trailheads are generally more localized to the immediate or accessible points of interest.  Bicyclists and pedestrians include destination‐oriented visitors to the corridor, as well as corridor residents who are using the bike and pedestrian facilities. 

Recreational Visitors Recreational visitors include visitors traveling to the many ski resorts and national forest destinations in the corridor, as well as corridor residents enjoying the recreational opportunities nearby.  Recreational visitors in general are destination oriented and opportunities to provide interpretation to these visitors are at the destinations themselves.  These include visitor centers, trailheads, resorts, and other points of entry into the recreational destination. 

Historic or Eco-tourists Historic and eco‐tourism is increasing and these visitors are interested in communities and locations that offer unique insights into history and natural, ecological features.  In general, these visitors are interested in more detailed information and educational opportunities at points of interest and are often destination oriented in their travel.  They are more willing to go 

Page 11: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

8

to specific locations and spend time delving into the history and interpretive details of their destination. 

Local Communities Although most of the audiences identified in this plan are visitors from outside the corridor, the unique features, recreational opportunities, and important history along the I‐70 Mountain Corridor attracts local visitors to other communities and to points of interest within the corridor.  Many of these visitors are contained within one of the other audiences and may be considered auto travelers, bicycle or pedestrian, recreational, historic/ eco‐tourists, or education groups. 

School and Education Groups Educational groups, like historic or eco‐tourists, are generally focused on specific destinations and interested in more in‐depth information and interpretation.  School and education groups can be local or visiting from outside the corridor or state.  They range in age and respond well to exciting, accessible, and interactive interpretive techniques. 

Each of the potential target audiences can be communicated with effectively through different techniques and at different points in their journey.  Some may be interested in obtaining information prior to visiting the corridor, while others may want to learn about things they observe while traveling through the corridor or even after returning home.  Knowing the target audience and the focal resources provides the starting point for identifying appropriate techniques for interpretation. 

Identifying Techniques for Application The actual determination of interpretive techniques and material should reflect the applicable themes and specific resources for interpretation, as well as effective approaches to convey information to the target audiences.  Specific themes, opportunities for interpretation, and the target audiences for interpretive materials provide the starting point for identifying specific applications and techniques during the planning process.  A matrix illustrated in Figure 4 provides a tool for determining appropriate and applicable techniques for use with individual projects.   

Page 12: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

9

FIGURE 4 

Technique Target Audience I-70 Auto

Travelers Bicyclists and Pedestrians

Recreational Visitors

Historic or Eco-tourists

Local Communities

Schools and Education Groups

Existing Examples

Interpretive Exhibit

X X X X X X

Includes boards to complex, multi-media displays. Can be static, dynamic or interactive.

Brochure

X X X http://www.coloradobirdingtrail.com/

Typically folded, single-page publication that provides information about a topic or site. Pamphlet or Booklet

X X X

http://www.nxtbook.com/nxtbooks/weaver/co-byways08/ http://www.coloradodot.info/travel/scenic-byways/north-central/guanella-pass/ScenicByway-GuanellaPassBrochure/at_download/file

Multipage publication that provides more detailed educational information than a brochure, can include multiple topics or sites, and includes text, photos and graphics

Website

X X X X X X http://www.co.clear-creek.co.us/index.aspx?NID=508 Provides information that can be downloaded or viewed on the web. Can

include multi-media, maps, interactive options, and detailed information. Smartphone App

X X X X X X

http://www.tagwhat.com/ https://itunes.apple.com/us/app/cdot-mobile/id542826138?mt=8 http://www.flickr.com/photos/ddotphotos/sets/72157629672779113/ http://www.youtube.com/watch?v=9gbxGPaVb8k

Information can be developed for delivery through Smartphone apps like Tagwhat, Google Maps, or corridor-specific interpretive app or QR codes to online information. Video

X X X X X X

http://www.coloradodot.info/travel/scenic-byways/north-central/guanella-pass/ScenicByway-GuanellaPassVideo http://wildlife.state.co.us/NewsMedia/Videos/Pages/mountainlionsafety.aspx

Information videos can provide theme-focused, site-specific, or corridor-wide information available through the web.

Newsletter

X X X http://www.historicgeorgetown.org/Newsletters.html One-page to multi-page publication developed for targeted audiences or

targeted topics. Can be hardcopy or electronic.

Poster

X X X http://www.coloradodot.info/projects/contextsensitivesolutions/docs/css/i‐70‐brochure‐imaginethepossibilities.pdf  Single page, large graphic displays providing information or interpretation of

a single topic or site. Map

X X X X X X http://www.coloradodot.info/projects/contextsensitivesolutions/docs/aesthetics/aesthetics-context-maps/vcm-sheet-1.pdf http://www.coloradofrontrange.com/

Graphic representation of locations, segments, or the corridor to convey information and facilitate navigation.

Educational Activities

X X http://na.fs.fed.us/ceredirect/jfr/ http://wildlife.state.co.us/Education/TeacherResources/HighSchoolModules/Pages/HSModules.aspx

Structured educational opportunities facilitated by an interpreter. Can be customized to the focus and interest of a group.

Roving Interpreter

X X X X X X

https://www-static.bouldercolorado.gov/docs/interpretation-1-201305101131.pdf

Site-based interpretation provided by an interpreter who roves the area to provide information and answer questions.

Local TV Stations

X X X X X X

http://www.summitnews.com/ Local broadcast and government stations provide features and information

that support interpretation

Page 13: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

The techntechniqueconsidere(such as infor reachigroups, omoving th

CDOT hasshould beinterpretathe Moun

M

C

Is

C

The followI‐70 Mounare provid

InterpretInterpretidynamic, the corridthis plan. interpreti

FIGURE 5 

niques in the es should be ced to reach visnterpretive dng all audienr historic andhrough the co

s developed se met for appation as a mitntain Corridor

Meets CDOT’s 

an be provide

s provided at 

an be mainta

wing techniquntain Corridoded above in 

tive Exhibit ve exhibits caor interactivedor branding aStandard signve displays a

matrix are croconsidered tositors in the cisplays or Smces.  Another eco‐tourist gorridor. 

pecific guidanlications on Ctigation, the fr: 

project objec

ed within eas

focal points w

ined with low

ues provide a r or the use oFigure 4. 

an range frome.  Interpretivand themes, wn formats havlong I‐70 are 

oss‐referenceo provide infocorridor, the tmartphone appr example is egroups, more

nce for severaCDOT projectsfollowing crite

ctives 

y access to I‐

within the com

w ongoing cos

description aof CDOT fund

m boards to cove exhibits in while reflective been deveshown in Figu

ed with the taormation.  Fortechniques thps that can beeducational aeffectively th

al of the techs in the corrideria should be

70 

mmunity, suc

sts or maintai

and guidanceing for interp

omplex, multthe I‐70 Moung the formaeloped for useure 5. 

arget audiencr example, if hat provide loe accessed wctivities targehan drivers o

hniques as wedor.  On CDOTe used to sele

ch as welcom

ined by other

 specific to thpretation.  Exa

ti‐media displuntain Corridoat, color, and e in the moun

ces to indicateinterpretatioocation‐specifwhile in the coet school andr recreationa

ell as general T projects thaect interpreti

e centers or m

rs 

he technique amples availa

lays.  They caor should be csystem identntain corridor

10

e which n is being fic informatioorridor) are usd education l visitors that

criteria that at implementve technique

museums 

application inable on the w

an be static, consistent witifier providedr.  Existing 

on seful 

t are 

t es on 

n the eb 

ith d in 

Page 14: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

11

Brochure Brochures are generally one page, two‐sided and folded to a format less than 8.5 by 11 inches.  They provide a brief topical or site overview.  Brochures in the I‐70 Mountain Corridor should be consistent with the corridor branding and themes, and reflect the format, color and system identifier provided in this plan. Brochures developed with CDOT funding must be approved by the CDOT Office of Public Information. 

Pamphlet or Booklet Multiple page publications are developed to provide more in‐depth educational information than a brochure.  They may cover multiple topics or sites and include text, photos, and graphics. Publications should be consistent with the corridor branding and themes, and reflect the format, color and system identifier provided in this plan.  Pamphlets or booklets developed with CDOT funding must be approved by the CDOT Office of Public Information. 

Website Websites provide information that can be downloaded or viewed on the internet.  Information on websites may include multi‐media applications, maps, interactive options, and detailed information.  The first step in considering a website for interpretation on the I‐70 Mountain Corridor is to determine the party responsible for hosting and maintaining the site.  Materials provided on the CDOT website must conform to CDOT website requirements and be maintained by CDOT personnel (contact CDOT’s Office of Public Information for current requirements and format information).  If a website is to be hosted by another agency or organization, careful consideration should be given to developing a plan for implementation and maintenance to ensure that the information is current and the site contains functional links.    

Smartphone App Information can be developed for delivery through Smartphone apps, like Tagwhat or Google Maps.  A corridor‐specific interpretive app or the use of QR codes can be used to link users to online information. 

Video Information videos can provide theme‐focused, site‐specific, or corridor‐wide information available through the web, visitor centers, or interactive displays.  Videos developed in the I‐70 Mountain Corridor should be consistent with the corridor branding and themes and reflect the format, color and system identifier provided in this plan.  Videos should limited to five minutes in length.  Videos developed with CDOT funding may not promote private enterprise, should address cultural and natural resources, and must be approved by the CDOT Office of Public Information. 

Newsletter Newsletters are a one‐page to multi‐page publication developed for targeted audiences or on targeted topics. They can be hardcopy or electronically distributed. A newsletter addresses current events as they relate to cultural and natural resource interpretation and should be consistent with the corridor branding and themes and reflect the format, color, and system identifier provided in this plan.  Newsletters developed with CDOT funding must be approved by the CDOT Office of Public Information. 

Poster Posters are single page, large graphic displays that provide information or interpretation of a single topic or site.  They are optimally eye‐catching and graphically oriented. Typically, posters focus on a single theme and should be consistent with the corridor branding and themes and reflect the format, color, and system identifier provided in this plan.  Posters developed with CDOT funding must be approved by the CDOT Office of Public Information. 

Page 15: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

12

Map Maps are graphical representations of locations, segments, or the entire corridor developed to convey information and facilitate navigation to points of interest. Maps can be static hardcopy or can be fully interactive, clickable web‐based applications.  Interpretive maps developed for the I‐70 Mountain Corridor should be consistent with the corridor branding and themes and reflect the format, color and system identifier provided in this plan.  Maps developed with CDOT funding must be approved by the Office of Public Information. 

Educational Activities Educational activities include structured educational opportunities facilitated by an interpreter or can be internet based and self‐directed.  The activities can be customized to the focus and interest of a group. 

Roving Interpreter Roving interpreters provide site‐based interpretation and are available in the area to offer information and answer questions.  Roving interpreters present an opportunity to customize and personalize information to meet the visitors’ specific needs and interests. 

Local Television (TV) Stations Local broadcast TV stations and government stations provide features and information that support interpretation.  Coordination with local TV stations to provide timely information and feature sites of interest or interpretive videos can provide an additional medium for the dissemination of information on cultural and natural resources. 

Interpretive Exhibits Interpretive Signage Design Guidelines To maintain quality and consistency of Interpretive Signage throughout the corridor a qualified professional should be consulted for design, layout and production of interpretive signage and related promotional materials. 

Signage Layout Guidelines Overall signage design has been provided for each category of interpretation in order to maintain a consistent image throughout the corridor. Overall sign design follows the tagline approach for the I‐70 Mountain Corridor Interpretive Plan.  These are suggestions and are available for use when designing sign layout. Should the examples not be used, the basic format of a white silhouette representing the category or topic for interpretation should be maintained. Additionally, the five color overall scheme of royal blue, light blue, dark turquoise, yellow‐green, and gold should be used for continuity. The specific colors and corresponding RGB/CMYK numbers are listed below. 

TABLE 1 Sign Guidelines Colors 

Use  Color  RGB Color  CMYK Color 

Accent Color  Royal Blue  0‐95‐150  95‐64‐17‐2 

Accent Color  Light Blue  180‐210‐230  28‐8‐4‐0 

Theme Color  Dark Turquoise  100‐170‐150  63‐15‐47‐1 

Theme Color  Yellow‐Green  110‐150‐55  62‐23‐100‐5 

Theme Color  Gold  185‐180‐75  30‐20‐87‐1 

 

Page 16: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

13

It is advisable that sign panels maintain the 24 inches high by 36 inches wide design format provided. When laying out text, consider the “3‐30‐3” rule. Three seconds to hook a visitor, 30 seconds once they are hooked and 3 minutes if they are interested in the topic.  

Accessibility Accessibility of interpretive signage is essential to a successful interpretive program. It is important to consider Americans with Disabilities (ADA) and the Architectural Barriers Act (ABA) guidelines. 

The universal design standards specified by the National Park Service (NPS), Rocky Mountain Region Center for Design and Interpretation are a great source of information. 

It is important to protect the resource and natural settings that made it significant in the first place while ensuring access to specified locations.  The NPS Center for Design & Interpretation suggests possible methods to achieve accessibility, these include: alternative formats (i.e. links to audio files via smart phones or tablets), ADA accessible routes to signage, multiple display formats (oral, visual, tactile), low gloss and high contrast panels with sans serif, large format font, and a mounting height of 24 to 30 inches with a viewing angle of 30 to 45 degrees. 

Panel Mounting Options Panel mounting structures can vary widely. In order to maintain consistency and achieve the high level of accessibility required of interpretive signage, products similar to those used by the National Park Service are suggested. Due to the varied nature of sign locations and surfaces on which they may be mounted (i.e., turf, rock, pavement etc.) along the corridor, some flexibility in mounting options, panel angle orientation and number of panels may be necessary. Panels similar to those used by the National Park Service are simple and do not detract from the location of interpretation. For larger sites, with many topics for interpretation, a multi‐panel option may be required. There are a number of products available which can be customized to achieve this goal. An internet search for “interpretive sign manufacturers” will provide many supplier options.  

Interpretation opportunities are intended to supplement the resource that makes the site significant; therefore non‐competing colors and materials should be considered in accordance with the I‐70 Mountain Corridor Aesthetic Guidance Design. All vertical elements are specified in this document to be Forest Service Brown (Federal Standard 595B Color 20059) or similar.  

 

Page 17: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

FIGURE 6 Examples oMulti Pane

 

National P 

  

of Sign Mountel Options 

arks Service Sig

ts 

gn Mounts 

14

 

Page 18: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A-1

Appendix The development of this plan followed the I‐70 CSS 6‐Step Process and engaged a multi‐disciplinary 

team.  This appendix provides the organizations invited and the meeting materials.  

How and why the Plan was Developed The I‐70 Mountain Corridor Programmatic Environmental Impact Statement (PEIS) Section 106 Programmatic Agreement directed CDOT and the consulting parties to develop design guidelines, define the historic context of the corridor, and plan for historic interpretation for historic and cultural resources. These guidelines would ensure current and future enhancements and mitigations are consistent throughout the I‐70 Mountain Corridor and are in agreement with the goals of the Section 106 PA consulting parties and the local municipalities.  

Who was Involved A project team was formed to establish the project goals and outcome. The project team met at regular intervals during the six‐steps of the plan.  

Project Team Members included:  

David Singer/CDOT  Lisa Schoch/CDOT 

Jim Bemelen/CDOT  Belinda Arbogast/CDOT 

Dan Jepson/CDOT  Mary Jo Vobejda/CH2M HILL 

Pat Noyes/Pat Noyes & Associates  Kevin Shanks/THK Associates 

   

The I‐70 Mountain Corridor Section 106 Consulting Parties were invited to be a part of the Project Leadership Team (PLT). Attendees included representatives from: 

Clear Creek County  Town of Georgetown 

Clear Creek County Archives   

Colorado State Historic Preservation Office (SHPO)  Colorado Department of Transportation 

Federal Highway Administration  National Parks Service 

The PLT and all the I‐70 Mountain Corridor CSS stakeholders received an invitation to the stakeholder meetings.  Additional parties suggested by the PLT and stakeholders were contacted regarding their interest in participating in the development of the Interpretive Plan. Stakeholder representatives who attended the meetings included: 

Clear Creek County  Town of Georgetown 

Clear Creek County Archives  Historic Georgetown 

Clear Creek County Economic Development  US Forest Service 

Colorado State Historic Preservation Office (SHPO)  US Fish & Wildlife Service 

Colorado Parks & Wildlife  Colorado Department of Transportation 

History Colorado  National Parks Service 

Federal Highway Administration  Idaho Springs Historical Society 

Idaho Springs   Colorado Ski Country USA 

Jefferson County Open Space  Summit County 

Page 19: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A-2

I‐70 Coalition  Town of Silverthorne 

ECO‐Resolutions  Town of Silver Plume 

Town of Frisco  I‐70 AGS PLT 

Breckenridge Heritage Alliance  Eagle County 

Interested Citizens   

Vision & Goals for the Plan The Interpretive Plan will be used for areas of historical significance and other unique features identified during the Tier 2 environmental process for CDOT projects on the I‐70 Mountain Corridor. The Plan also provides the opportunity for corridor partners to use the same interpretative techniques for projects adjacent to the corridor.   

The Plan outlines the process and techniques that will ensure consistency of interpretive sites along corridor. Having a consistent approach will increase visitor recognition and appreciation for these special areas on and adjacent to the I‐70 Mountain Corridor.  

The Plan Vision drafted by the PLT was further refined by agencies and community representatives at the first Stakeholder Meeting.   

The Interpretive Plan is the framework for consistent and timeless efforts focused on understanding, appreciating, and honoring the historic and other unique features of the I‐70 Mountain Corridor.  These efforts build community and provide quality visitor experiences that support tourism. 

The goals for the plan are to: 

Be used by corridor stakeholders 

Be user friendly 

Provide processes for future decision making 

Provide clear strategies 

Help fulfill mitigation requirements 

Provide a method to amend the Plan  

Methodology The Plan followed the Context Sensitive Solutions (CSS) six‐step process.  

PLT members met on December 12, 2012.  Agenda items included endorsing the process, defining the desired outcomes, drafting the vision and confirming stakeholders to be included in the process (Attachment 1). 

Three stakeholder meetings were held during the development of the plan. Agendas are included in Attachment #2. 

Stakeholder’s meetings were held on January 7, 2013, March 13, 2013 and July 17, 2013. 

At the first two meetings, attendees reviewed a number of successful interpretive plans (Attachment 3) and the I‐70 Mountain Corridor Context Map (Attachment 4) or view a full scale map. These were used to discuss, debate, and agree on opportunities for interpretive sites  

Page 20: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A-3

The Stakeholders discussed the different types of audiences who would visit the interpretive sites and what techniques would work best for each audience.  Several branding concepts and themes were presented at these meetings.  

The final meeting on July 17 reviewed the process used to develop the Plan, presented the outline of the Plan and graphics for comment.  

It was agreed the Interpretive Plan and associated materials would be included on the I‐70 CSS website. 

Page 21: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ATTACHMENT 1 

PLT Meeting Agenda

Page 22: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A1-1

Project Leadership Team Meeting December 17, 2012 

1:00 p.m. to 3:00 p.m. 

AGENDA 1. Schedule for Upcoming Meetings: 

Date  Time  Location  Description/Purpose 

PLT /Consulting Parties Mtg   Dec. 17th  1:00 – 3:00 

Mountain Residency  Kick Off the PLT/ describe the process 

PLT/ Stakeholder Mtg  Jan. 7th  1:00 – 3:00 

Silverthorne Pavilion   Kick Off 

3 Geographic Stakeholder/ PLT Mtgs 

Feb. 11th  9:00 – 4:00 

TBD  Brainstorm methods for interpretation 

3 Geographic Stakeholder / PLT Mtgs 

~March    Review proposed plan elements 

Wrap up Stakeholder Mtg  ~June    Present the plan 

 

2. Summary of Programmatic Agreement  

3. Present Project process and schedule 

4. Discuss the PLT roles and responsibilities 

5. Guidance for Interpretive Planning 

6. Determine the Vision for the Interpretive Plan 

7. Confirm the Stakeholder list/agenda/breakout by county boundaries 

8. Discuss the method for theme development for the stakeholder meeting 

Page 23: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A1-2

 

Team Definitions 

Project Team – David Singer, Lisa Schoch, Jim Bemelen, Belinda Arbogast, Dan Jepson, Mary Jo Vobejda, Pat Noyes,  Kevin Shanks,  

Project Leadership Team – Team includes the Project Team and the consulting parties. This group will discuss and endorse the project process. The consulting parties, as signers of the 106 Programmatic Agreement, will be asked to review the plan and may become the review board for future project plans using the Interpretive Plan. 

Stakeholder Team – Team includes the Project Team and representatives from the cities and counties along the corridor. This team could include representatives from the consulting parties and other interest groups along the corridor. The final make up of the team will be by stakeholders who self select to be included on the team. 

Geographic Stakeholder Teams – These teams are break out groups from the Stakeholder Team where representation focuses on a specific geographic area. Using the corridor wide goals and objectives, these teams can determine what concepts and approaches best fit their specific geographic area.  

Page 24: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

ATTACHMENT 2  

Stakeholder Meeting Agendas

Page 25: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

 ProMa ProThsigbe StaancoteaGeStagothe

I-7

Pr

Pr

Pr

Pr

Pr

    

Di

  

Ne

oject Team – ary Jo Vobejd

oject Leadersis group will dgners of the 1come the rev

akeholder Ted counties alonsulting partiam will be theeographic Staakeholder Teaals and objeceir specific co

70 Mou

esent Guidan

esent the Pla

esent the pro

esent the geo

esent Plan Ele

    

scuss brandin

What tIdeas o

ext Steps 

David Singerda, Pat Noyes,

ship Team – Tdiscuss and e06 Programmview board fo

am – Team inong the corridies and othere stakeholderkeholder Teaam where repctives, these tounties and re

ntain CoStake

JaSilve1:00

nce for Interp

n audience, P

oject process 

ographic segm

ements 

Future procBranding thDesign GuidPrioritizatio

ng 

o brand on how to bra

Team

r, Lisa Schoch,, Kevin Shank

Team includendorse the p

matic Agreemor future proje

ncludes the Pdor. This team interest grours who self seams – These tpresentation teams can detesources.  

orridor eholder Aganuary 7, 201erthorne Pavi0 p.m. – 3:00 p

retive Plannin

Project Vision

and schedule

ments to be u

ess for decisie corridor/ thdelines for Intn of the them

nd  

m Definitions

, Jim Bemelenks 

s the Project roject procesent, will be aect plans usin

roject Team am could incluups along theelect to be incteams are brefocuses on cotermine what

Interpregenda 13 ilion p.m. 

ng 

n and Goals 

used to develo

on making he themes / tterpretation pmes 

n, Belinda Arb

Team and thss. The consusked to revieng the Interpr

and represende represente Corridor. Thcluded on theeak out groupounties. Usint concepts an

etive Pla

op the Plan 

the locations projects 

bogast, Dan J

he Consulting lting parties, ew the Plan anretive Plan.  

ntatives from tation from the final make e team.  ps from the g the Corridond approache

an

Jepson, 

Parties. as nd may 

the cities he up of the 

or wide es best fit 

A2-1

Page 26: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A2-2

I-70 Mountain Corridor Interpretive Plan Stakeholder Agenda

March 13, 2013 9:30 a.m. to 12:00 p.m. 

Elements of the Plan Elements of the Plan Branding for the corridor Process for future users

Guidance and resources Themes Audiences Techniques Partnerships  

Branding and How it will be used 

Handout 

Process Checklist  Handout 

Break into County Groups Discuss Themes – What is important in your county? 

Discuss Location – Location(s) that exemplify this theme? 

Discuss Best Place for Interpretation

 

Themes 

Physical Location for a resource or 

event  Best Place for Interpretation 

    CDOT criteria for selection of mitigation 

    Meets CDOT Mission 

Easy access to I‐70 

Focal points within the community (i.e. Welcome Centers/Museums) 

Low ongoing maintenance or agreement by other to maintain 

     

Return to Large Group Review matrix of audiences and techniques    Handout 

  What themes resonate with the broadest audiences?   

Wrap up 

  Report out by counties   Report out concerning Scenic Byways   Endorsement:      How will you endorse/approve/adopt this plan     Are we on the right track for this plan?     Twin Tunnels Interpretive Planning     Next Meeting 

Page 27: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

A2-3

 

Our Vision The Interpretive Plan is the framework for consistent and timeless efforts focused on understanding, appreciating, and honoring the historic and other unique features of the I-70 Mountain Corridor.

Our Goals for the Plan:

Be used by corridor stakeholders

Support tourism Be user friendly Provide processes for future

decision making Provide clear strategies Help fulfill mitigation

requirements Provide a method to amend

the Plan  

Page 28: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

GeneraConcern

Si

C

W

N

C

R

A

A

W

Id

C

A

A

Clear CThemes

H

M

R

H

Tr

A

B

Fo

G

W

C

N

Physical V

Tr

H

JeffersoGatewayThemes e

La

I-70

al notes frns - ign clutter 

onsistency (c

Will not impac

ot in the righ

olorful Histor

eal mountain

merica’s Mou

merica’s mou

Who is the aud

dentify a proc

onsistency & 

udience for c

dd/clarify str

Creek Cou for Interpreeadwaters 

Mining 

ecreation: bik

eritage touris

ransportation

uto‐tourism 

irding 

orests (health

eology 

Wildlife viewin

ommunity de

atural ecosys

Locations isitor Centers

railheads – G

ighway exits 

on Countyy to the Roestablished 

ariat Loop – in

0 Moun

rom group

olor, shape, m

ct past efforts

ht‐of‐way for t

ry 

n destination 

untain destin

untains 

dience? Touri

cess 

flexibility 

checklists – ad

ategies and t

unty etation:

king, fishing, 

sm 

n (evaluation 

h and manage

ng (Big Horn S

evelopment 

stems 

for Interpres ‐ Idaho Sprin

reenway, USF

– Bakerville, 

y ckies

ndividual site

tain CoStakehold

Ma

p

message) 

traveling pub

ation 

ists versus loc

dd PM, PLT to

echniques fo

hiking, rafting

of trails to In

ement) 

Sheep) 

etation: ngs, Georgeto

FS 

Dumont, Dow

es, has unique

rridor Inder Meetirch 13, 2013

blic in a movin

cals 

o checklists 

r mitigation

g, skiing, 14e

terstate) 

own, USFS 

wnieville, Floy

e characterist

nterpretng #2

ng car 

rs, camping, O

yd Hill 

tics 

ive Plan

OHV 

A2

n

-4

Page 29: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

Jest

D

B

Recreatio

Ed

Paleo/Din

Po

Geology T

R

Visual The

To

Historical 

B

Physical L

P

La

Pa

Lo

D

R

B

H

B

Je

O

Ski CouHistoric T

C

V

Lo

Tr

Interactio

Sk

View shed

B

Tourism/R

Expanded

effco Open Sptory. Among t

enver Mount

uffalo Overlo

nal Themes 

ducational pr

nosaur Theme

otential histo

Theme 

ed Rocks & H

eme 

olls, transitio

 

uffalo Bill, ho

Location for In

icture Bridge 

ariat Loop 

ark‐n‐Ride 

ookout Moun

inosaur Ridge

ed Rocks 

uffalo Overlo

umphries 

uffalo Bill Mu

effco Mounta

Open Park at H

untry heme 

amp Hale – 1

ail – 50 years

oveland/Tunn

ransportation

on with USFS 

ki industry an

d/Visual 

etter view fro

Recreation 

d to year‐roun

pace – has ovthe first entit

tain Parks (10

ook 

rograms withi

e  

oric district an

Hogback, cany

n from city to

omesteads, se

nterpretation

ntain 

ook 

useum 

in Parks close

Heritage Squa

10th Mountain

nel ‐75 years 

n creating the

nd governmen

om top of lift 

nd activities (

erall themes ies to set asid

00 years old)

in Open Spac

nd geological 

yons 

o mountains

ettlement of W

e to the I‐70 c

are 

n Division 

e ski industry

nt resource m

– unique per

bike, hike, fis

geared to indde land. 

e Program 

park 

West, Mount 

corridor 

management

rspective of I‐

h) 

dividual sites.

 Vernon, earl

‐70 

. Jeffco Open 

ly capital of C

A2

Space is a un

Colorado 

-5

nique 

Page 30: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

SummitThemes fo

C

W

H

Sk

R

W

Su

W

En

O

M

H

G

Physical L

Ei

CR

B

M

10

Ea

Sk

R

W

‒ ‒ ‒ ‒ ‒

Locations

St

U

Fr

C

t County or Interpretat

ontinental Di

Watershed 

istory  

ki areas 

ecreation – g

Wilderness 

ummer acces

Wildlife 

nvironment 

Open Space  

Majestic moun

ighest elevat

reatest peop

Location for In

isenhower/Jo

olorado Rivereservoir, Sna

reckenridge, 

Mining – Mont

0 Mile Canyo

arly agricultu

kiing – Arapa

ecreation Are

Trails & bik

Forests 

Rivers, Lak

Ski areas 

Wilderness – E

Views Ute Pass RLake DillonUS 6 up toTen Mile C

 to provide in

tate visitor ce

SFS in Silvert

risco Visitor C

opper Mount

tion: 

vide 

gold medal fis

ss  

ntain views 

ion 

le 

nterpretation

ohnson Tunne

r headwaterske River, Stra

Frisco, Dillon

tezuma, St. Jo

n & railroad (

re and ranchi

hoe Basin & D

eas 

ke paths 

kes, ponds 

Eagles Nest – 

Road – Gore Rn  Arapahoe BaCanyon 

nterpretation 

enter in Silver

horne 

Center 

tain Resort 

hing, Colorad

 

el 

 – Lake Dillonaight Creek, O

 (old & new) 

ohn’s, Climax

(Denver‐Frisc

ing history 

Dillon ski jum

look at map f

Range 

asin 

rthorne outle

do River, Whit

n, Blue River, Old Dillon Res

Dillon cemet

, Henderson

co) 

p historic 

for location 

t mall 

te River Natio

Ten Mile Reservoir 

tery 

onal Forest 

servoir, Green

A2

n Mountain 

-6

Page 31: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

Fr

Sc

Sc

B

Sn

V

Tr

To

Li

Si

So

risco Historic 

cenic Overloo

cenic overloo

lue River Trai

nake River Tr

ail Pass Trail 

railheads nor

own halls 

ibraries 

ilverthorne Pa

oldiers Canyo

Park 

ok – east and 

ok on US6 sou

il 

ail 

rth and south 

avilion  

on – Exit 196 p

westbound I

uth of Dillon

of I‐70 at Fris

pullout 

‐70 near Frisc

sco Main Stre

 

co 

eet exit  

A2-7

Page 32: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

9:00 –

9:15 –

9:30 –

10:00

 

 

I-7

– 9:15  

– 9:30 

– 10:00 

0 – 11:00 

 

70 Mou

Welcom

Review

Present

Refresh

ntain CoStake

JSilve9:00 

me, thank you

w the process 

t Outline of t

hments and O

orridor eholder AgJuly 17, 2013erthorne Pavia.m. – 11:00 

u, and introdu

used to deve

he plan, com

Open House R

Interpregenda 3 ilion a.m. 

uctions 

elop the plan

ment period,

Review of Ma

etive Pla

, and final rep

terials 

an

port info 

A2-8

Page 33: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

The Infor cofocuseand houniquCorrid

 

Originnterpretive Plnsistent and ed on understonoring the he features of dor.  

Our Goal

Be used by

Support to

Be user frie

Provide prodecision m

Provide cle

Help fulfill requireme

Provide a mPlan  

nal Vision an is the framtimeless effotanding, apprhistoric and othe I‐70 Mou

s for the Plan

y corridor stak

ourism 

endly 

ocesses for fumaking 

ear strategies

mitigation nts 

method to am

 IntVisHo  

Gu   

 Ap        

         

mework orts reciating, ther untain 

keholders 

uture 

 

mend the 

Outline of t

roduction sion for the Pw to use this

Process Checklist 

idance Branding aAudiences Opportunit

pendix Resources 

County ListContext maList and Su

Plan DevelopWhy and hGoals for tWho was i

 

 

The IntconsisteundersthistoricMountacommuexperie

the Interpret

lan s plan 

and Themes and Techniquesties for Interpreta

t of opportunitiesap mmary of other in

pment  how this plan was dhe process nvolved? 

Reerpretive Plaent and timetanding, apprc and other uain Corridor. unity and provences that sup

Goals for t

Be used by c

Be user frien

Provide promaking 

Provide clea

Help fulfill m

Provide a m

tive Plan 

tion 

nterpretive plans

developed 

 

evised Visionn is the frameless efforts foreciating, andnique featureThese effortsvide quality vpport tourismthe Interpret

corridor stake

ndly 

cesses for fut

ar strategies 

mitigation req

method to ame

n ework for ocused on d honoring thes of the I‐70 s build visitor m. tive Plan 

eholders 

ture decision 

quirements 

end the Plan 

A2-9

 

Page 34: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

Summmary oPlans

of Rev and E

viewed Examp

Existiple Inte

ng Interpretiv

ATTACHM

erpretive Pla

MENT 3 

ive ans

Page 35: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NClear CrManagemStudy SCCC andStudy A

As such,administ108,277 The purpCreek Chow to mKey Poi

Seven orecommerecommeregulatioresource Option 1granted, Option 2developmOption 3

Option 4of preserOption 5

informatOption 6technicaOption 7

Relevan

The projsuch as streams,Review Andrew

 

 

fExistingInteame

reek County Cment Plan ponsor d Colorado H

Area and Purp

, the CRMP ptered by the Uacres, repres

pose of the County Board o

manage its cunts of Study

ptions are preended by the end achieving

ons. Instead, tes through vo

1: Conduct adto expand kn

2: Create ecoment. 3: Encourage4: Promote edrving the coun5: Assign CRion on cultura6: Establish pl support.

7: Do nothing

nce to the I-7

ect area of thIdaho Spring, mountains aby Strosnider

erpretivePla

Cultural Reso

istorical Sociepose of Stud

planning univeU.S. Forest Sesenting 42.6%lear Creek Coof Commissioltural resourc

y

esented for thSteering Com

g any of thesethe Steering Cluntary meas

dditional cultunowledge aboonomic benefi

e historic presducation and nty’s tangibleMP oversight

al resources cpartnerships to

; continue the

0 Mountain C

he Clear Crees, Georgetow

and foothills, a

 

ansintheI‐70

urces

ety dy

erse within Clervice and all

% of the countounty, Culturaoners (the Coces for the ben

he County’s cmmittee as ine managemenCommittee reures in coope

ural resourcesout cultural reit through her

ervation so thoutreach to e links to that ht and integratican be used foo help achiev

e County’s pre

Corridor

k County CRwn, and Silverall makeup th

0MountainCLink to http://wwcreek.coStudy DDec. 20

ear Creek Co municipal lanty, are includeal Resources unty) and thenefit of prese

onsideration. dicated belownt options thr

ecommends theration with th

s inventory ansources in Cl

ritage tourism

hat more of theducate the phistory. ion to the Plaor planning. e the purpose

esent policies

MP falls underplume. These character o

Review 11/14/20

CorridorStudy

ww.co.clear-o.us/DocumenDate 10

ounty was defnds subject toed in the CRMManagemen

e citizens of Cnt and future

Options 1 anw. The Steerinrough county hat the Counthe citizens.

nd research, wlear Creek Co

m to encourage

he county’s cupublic about th

anning Depart

es of CRMP a

s and practice

er key areas fse historic citieof the I-70 cor

date 012

ntCenter/Hom

fined by excluo municipal laMP Project Arnt Plan (CRMPClear Creek C

generations.

nd 5 are specng Committeeordinances oty manage its

where landowounty. e historic pres

ultural resourche county’s h

tment so that

and to identify

es

found in the I-es, along withrridor on its ea

A3

me/View/992

uding all fedeand control. Area. P), is to provid

County with gu

cifically e does not

or other s cultural

wner permissi

servation and

ces may be pistory and the

y sources of f

-70 Mountainh the surroundastern face.

3-1

 

ral lands A total of

de the Clear uidance on

ion is

d economic

protected. e importance

funding and

n Corridor ding rivers,,

Page 36: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NEagle Ar

Study SECC & EStudy A

The EagTown of Brush Cralong theThe Visio“Eagle wstrategiecommun Key Poi

Historicculturalcultural

A. Iden tdesig

B. Con sUse

C. As ddesig

Historicpreserva

A. Incl uB. PublC. Wo rk

the THistoric

incentiv

A. Utili zB. Dev eC. Assis

incenRelevan

While nopromotinrepresenReview Andrew

 

fExistingInteame rea Communi

ponsor ECPC

Area and Purp

gle Area CommEagle, as wereek and Ebye Eagle Riveron of Eagle:

will continue toes that will enhnity and the qu

nts of Study

c Preservatioly significantassets.

tify, documengnation. sider amendinRegulations tetermined apgn of new dev

c Preservatioation throug

ude interestedicize communk with and enTown’s Visitorc Preservatio

ve programs

ze informationelop effective st eligible prontives (for exa

nce to the I-7

ot a true interpng its cultural nts a historic lby Strosnider

erpretivePla

ity Plan

pose of Stud

munity Plan cell as unincorpy Creek whichr and Interstat

o be a high quhance the Touality and cha

y

n Policy 1.1 t properties

nt and work to

ng the Town oto strengthen

ppropriate andvelopment. n Policy 1.2 h community

d community mnity preservathance the resr Center. n Policy 1.3

to preserve

n and assistanlocal sources

operty ownersample, Certifi0 Mountain C

pretive plan, tidentity in thelocation along

 

ansintheI‐70

dy

covers an exteporated landsh extend southte 70 east an

uality livable cown’s unique iaracter of the

Support effoand structur

o preserve his

of Eagle Land historic pres

d desirable, e

Work to impy awareness

members in thtion events, issources of the

Support effo

the Town’s c

nce provided s of preservats to obtain loced Local GovCorridor

the Eagle Plae face of a rapg I-70, worthy

0MountainCLink to http://wws/AdopteStudy DJuly 201

ensive area ws surrounding h and north od west of tow

community thidentity, its ecsurrounding

orts to documres to preven

storic sites an

d Use and Deervation efforncourage the

prove commus and outreac

he establishmssues, and infe Eagle Coun

orts to secur

cultural herit

by state and tion funding a

cal, state, andvernment stat

n shows howpidly growing y of inclusion o

Review 11/16/20

CorridorStudy

ww.eaglecouned_Master_P

Date 10

which includesthe Town bo

of town are incwn.

hrough the impconomic vitalirural lands.”

ment pre-hisnt the degrad

nd structures t

evelopment Orts. e use of histor

unication, edch programs

ment and attaformation. nty Historical

re funding an

tage.

national presand financial i federal prese

tus).

w a town alongpopulation ofof any plans tdate

012

nty.us/PlanninPlans/

s the incorpooundaries. Thecluded, as are

plementation ity, its sense o

storic, historidation and lo

through local

Ordinance and

ric features to

ducation, ands.

inment of hist

Society, inclu

nd develop fi

servation ageincentives. ervation fund

g the I-70 corf new residenthat the Moun

A3

ng/Adopted_M

rated lands we entire draine significant a

of of

ical, architecoss of signifi

, state and na

d Eagle Coun

o influence the

d advocacy f

toric preserva

uding its site a

inancial

ncies and org

ing and finan

rridor goes abnts. Eagle itsentain Corridor

-2

 

Master_Plan

within the ages of both

acreages

ctural or icant

ational

ty’s Land

e physical

for historic

ation goals.

adjacent to

ganizations.

cial

bout elf r produces.

Page 37: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NEdwards

Study SEagle CoCounty PStudy A

The Edwsouth, thjust pastpublic laCordillerThe Edwand devematerials Key Poi

19. GoaresidentsObjectiv

Objectivthe ForeObjectivrecognizan EagleObjectivresourceObjectivlinking toObjectivComprehthat acco• promot• develop• establis• promot• establis• addresRelevan

The Edwin detail.plans in Review Andrew

 

 

fExistingInteame

s Area Comm

ponsor ounty PlanninPlanning Divis

Area and Purp

wards area cohe east end oft the entrancends (Bureau

ra Valley Clubwards Area Coelopers with as are meant t

nts of Study

l: Historical as and touristsve. 19.1 Ident

ve. 19.2 Presst Service tha

ve. 19.3 Recozing the signife County Regve. 19.4 Publes owned withve. 19.5 Publourism to the ve. 19.7 Enhahensive Cultuomplish the fote cultural leap strategic plash mechanismte cultural edush strategies s “Art in Publ

nce to the I-7

wards Plan is The Plan prareas along tby Strosnider

erpretivePla

munity Plan

ng Commissiosion pose of Stud

ommunity is df Singletree to

e to Squaw Crof Land Mana

b, Squaw Creommunity Plaa vision of theo provide gui

y

nd cultural res. tification of R

ervation of Rat preserves aognition of Rficant historic gistry of Historicly Owned R

hin the Edwaric Educationhistoric resouancement of ural Plan that ollowing: dership; ans for financms for the proucation to resdesigned to pic Places”, as0 Mountain C

designed to srovides an exathe I-70 Moun

 

ansintheI‐70

on, Eagle

dy

efined as thoo the north, areek. The lanagement or Nek Drainage,

an will providee Edwards aredance in land

esources in th

Resources. LResources. Eand provides

Resources. Cresources locric Places. Resources. Irds Planning An Programs. urces located Culture. Cooshould, at a m

cial support ofovision of adesidents, especprovide suitabs it relates to tCorridor

scrutinize certample of howntain Corridor

0MountainCLink to http://wws/AdopteStudy DJan. 200

se lands comnd continuingds within this

National Foresand access p

e the communea supported d use planning

e Edwards ar

Locate and evEstablish an Haccess to arc

Coordinate witcated within th

dentify, preseArea. Develop a prwithin the Ed

operate with ominimum, out

f the arts and equate culturacially those ofble working ethe Land Use

tain unincorpow smaller comr.

Review 11/16/20

CorridorStudy

ww.eaglecouned_Master_P

Date 03

mmencing at thg west to the p East/West co

st), including tpoints to publnity, elected aby the sentim

g and capital

rea are protec

valuate sites Historic Presecheological ath the Eagle Che Edwards P

erve and prot

rogram for expdwards Plannother Eagle Vtline the estab

culture; al facilities; f school age;environments e Regulations

orated areas mmunity plans

date 012

nty.us/PlanninPlans/

he east end opoint where I-orridor extendthe Lake Creelic land. and appointedment of its locimprovement

cted and inte

of historical servation progrnd historic reCounty HistorPlanning Area

tect archeolog

panding publing Area.

Valley Commublishment of p

for artists; ans.

within the Eas are organize

A3

ng/Adopted_M

of Arrowhead -70 crosses Hd north and soek Valley, Co

d officials, lancal residents. ts.

rpreted for fut

significance.ram in coordinsources. rical Society ina through the

gical and histo

ic awareness

unities to initiaprograms and

nd

agle County Med to supplem

-3

 

Master_Plan

on the Highway 6 outh to

ordillera, the

ndowners, These

ture

nation with

n officially creation of

oric

s of and

ate a d procedures

Master Plan ment master

Page 38: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NGeorgeto

Study SColoradoGeorgetoStudy A

Georgetomountainfall areas

The towndevelopmhistoric ppreserve Key Poi

Strategie

Design Sdrainagenegativeremain uimprovemand paviroads arcases, a

Promotethe bounprotect thadditionathe distrimarkers and shou

Public Etown, ab

Relevan

This is aare now GeorgetoReview Andrew

fExistingInteame own Compreh

ponsor o Historical Sown, Departm

Area and Purp

own lies alonn valley, the ps. Georgetow

n and the privment and redpreservation aed.

nts of Study

es:

Standards- Ese and bridges ely impact Geounpaved or arments are maing), and that e paved, alte gravel road m

e Historic Resndaries of the he Town’s moal property taxict should be and descripti

uld be design

ducation- Conbout the signif

nce to the I-7

scenic and hbeing threateown seeks toby Strosnider

erpretivePla

hensive Plan

ociety, Town ment of Local pose of Stud

g the I-70 Mophysical conswn is connect

vate sector shevelopment. and makes sp

y

stablish a set to ensure the

orgetown’s unre surfaced inade without in

landscape imrnatives to asmay be more

ources- AcquGeorgetown/

ountain backdx levy and maprotected. Aions of the ar

ned to protect

ntinue to eduficance of the

0 Mountain C

historic town rened by incre preserve one

ansintheI‐70

of Affairs

dy

ountain Corridtraints arounded to Park Co

hould use the The Preserv

pecific recomm

of design stae Town’s infranique historic

n a manner thnstalling a stomprovements sphalt should

appropriate t

uire privately h/Silver Plumedrop. Funds fatching grantsdditional trailsea. New trailsignificant hi

cate the publir preservatio

Corridor

right off of I-70asing traffic ae of I-70’s mo

0MountainCLink to http://wwsivePlanStudy DMay 23,

dor about 50 md the town incounty by way

historic charaation Plan, anmendations to

andards for neastructure invc character. Tat preserves rm-sewer sysare consistenbe analyzed to the charact

held mining ce National Hisfor the acquiss from lottery s along RS 24ls within the dstorical resou

ic about the pn, about the p

0. Its historicand inadequatost important

Review 11/27/20

CorridorStudy

ww.town.georn/zoom/defauDate 2000

miles to the eclude steep sof Guanella P

acter of the ton element of to ensure the

ew infrastructvestments furtThese standatheir gravel a

stem (since thnt with the towat the time eater of the neig

claims outsidestoric District isition of the pfunds. Recre

477 roads shdistrict shouldurces.

presence of hpreservation

cal mining roote improvemehistorical aredate

012

rgetown.co.usult.htm

ast of Denveslopes, floodpPass.

own as the bathe comprehehistoric integ

ture, such as ther historic prds should re

appearance, this would genwn’s existing ach road musghborhood.

e the corporatin order to co

private lands ceational and could be deve

d connect to th

historical resoprocess, and

ots as a gatewents. This plaas.

A3

s/Georgetown

r. Located inlain, and mud

asis for the deensive plan, arity of George

streets walkwpreservation aequire that unphat drainage

nerally requirelandscaping.

st be repaved

te boundariesonsolidate owncould be genecultural resouloped with hishe existing tra

urce in and a how to beco

way into the man shows how

-4

 

nComprehen

a high dslide/rock

esign of new addresses etown is

ways, and do not paved roads

e curb, gutter Where

d. In some

s but within nership and erated by an urces within storical ail system

around the me involved.

mountains w

Page 39: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NGuanellaCorridor Study SCDOT &Study A

The BywHighwashrublaByway lportion Wilderncan be f

Mission“RecognScenic aproper mrecreati

Key Poi

The visioresourcethe Bywa

• Pr ov• Assis

the B• Em p

quali• Pr om

shap• Pr ov

of de• Pr ov

the s• Inc lu

throu• D eve

manRelevan

Located This old preserve Review Andrew

fExistingInteame

a Pass ScenicManagemenponsor

& CCCCTB Area and Purp

way is locatedy 285 at Grannd, and alpineleading to Guof the Bywayess is situatefound just we

nizing the uniand Historic Bmanagementonal resourcents of Study

on for this Bywe managemenay.

vide visitor orist users in deByway and fophasize the sigities.

mote understaping the physivide different detail. vide interpretivsurrounding laude multi-sensughout the Byelop interpretiagement bas

nce to the I-7

about 50 milelogging and m

ed Victorian to

by Strosnider

erpretivePla

c and Historict Strategy

pose of Stud

d 40 miles sont (Figure 1). e tundra of th

uanella Pass lsouth of the

ed just east ofest of the Gua

que scenic qByway, the Co, preservationes for visitors

y

way is to fostent that protect

entation to theveloping andrm a personagnificance of

anding of the ical environmdepths of info

ve and educaandscape, ansory interpretyway corridorive messagesed upon on-g0 Mountain C

es west of Demining area flowns, George

ansintheI‐70

c Byway

dy

uthwest of DeThe Byway ru

he Rocky Mouies in Clear Cpass lies in Pf Guanella Paanella Pass R

ualities, fragilorridor Managn, and interpre, residents, a

er conservatiots and enhanc

e landscape understandin

al commitmenthe National

natural enviroent and how

ormation so vi

ational facilitied have minimive informatio. s to reflect chgoing monitorCorridor

enver, this bywlanked by Moetown and Silv

0MountainCLink to http://wwcentral/gStudy DDec. 200

enver and is auns north/souuntains in nortCreek CountyPark County aass Road, andoad summit.

e ecosystemsgement Strateetation of the nd future gen

on values andces natural re

and informating an apprec

nt to appropriaHistoric Land

onment as anthey can contsitors can lea

es that are conmal impacts onon and recogn

anges in maning and evalu

way connectsounts Bierstadver Plume.

Review 11/6/201

CorridorStudy

ww.coloradodguanella-passDate 01

accessed by uth and traverrth central Coy and within thand within thed Square Top

s, and historicegy is coopernatural, cultu

nerations.”

d develop appesources. The

on on safety iation for the ate managemdmark District

n ecosystem atribute in the

arn about a va

nsistent in then the ecosystnize users wit

nagement goauation.

s I-70 at Geordt and Evans

date 12

dot.info/travel/s

Interstate 70 rses about 24lorado. The n

he Arapaho Ne Pike Nationap Mountain Inv

c significanceratively develural, historica

preciation ande following go

awareness anatural and c

ment and proteand other his

and recognizefuture. ariety of subje

emes and destem. th specialized

als, objective

rgetown to Hiboasts two o

A3

/scenic-byway

at Georgetow4 miles of forenorthern portioNational Foresal Forest. Mouventoried Roa

e of the Guanoped to ensul, archeologic

d support for oals were esta

and user ethiccultural resouection of the rstorical and c

e the role hum

ects to their d

sign, visually

d access need

s, and day-to

ghway 285 atf the state's b

-5

ys/north-

wn and US est, on of the st. The unt Evans adless Area

ella Pass re the

cal, and

land ablished for

cs. rces along resources. ultural

mans had in

desired level

blend with

ds

o-day

t Grant. best-

Page 40: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

ReviewofStudy NJeffersonUpdate Study SJeffersonStudy A

JeffersonMountainLocated a north-sThe planin the corecommeslope, anKey Poi

Goals PreserveBalance RecogniPreserverecognizPreserverecogniz

PoliciesA. Gene1. Use

resto2. Pro v

Land3. A list

collebe minter

Relevan

Jeffersonmetropoincentiviz Review Andrew

 

fExistingInteame n County Com

ponsor n County

Area and Purp

n County is nns. Known ason the far we

south axis. n will focus onommunity planendations andnd Visual Resnts of Study

e the County’sdevelopmentze the particue, reuse, rehazing their socie, reuse, rehazing their soci

s (for Educatioeral education an

oration, and invide educationdmark. ting of agenci

ections, and omaintained by

ested partiesnce to the I-7

n County sits litan area of Dze the applica

by Strosnider

erpretivePla

mprehensive

pose of Stud

estled betwees the Gatewayestern edge o

n land use recns that are dud developmensources will by

s Historic Rest with the presular importancabilitate, or enal and econo

abilitate, or enal and econo

on Goals)

nd incentives interpretation onal informatio

ies, non-profitther entities athe County a. 0 Mountain C

at the EasterDenver. It is nation of educa

 

ansintheI‐70

Master Plan

dy

en the Mile Hy to the Rockif the metropo

commendatiouplicated in thnt constraintse evaluated.

sources. servation andce of Historic nhance Histormic significan

nhance Histormic significan

in lieu of strinof the Countyn to landown

t organizationand organizatas an educatio

Corridor

rn end of the necessary to ational interes

0MountainCLink to https://w1.htm Study DNov. 8, 2

igh City of Deies, Jeffersonolitan area, Je

ns and other e CMP will be

s such as WildThis will be a

d integration oDistricts.

ric Resourcesnce for the Coric Resourcesnce for the Co

ngent regulatoy’s Historic Reers about fina

ns, historical stion involved ional resource

I-70 Mountainunderstand h

sts for its histo

Review 11/27/20

CorridorStudy

www.co.jeffers

Date 2012

enver, Coloran County has efferson Coun

issues specife removed. Ddfire, Wildlife,a multi-year pr

of significant H

s that provide ounty’s futures that provide ounty’s future

ory control to esources. ancial benefits

societies, histin archaeolog

e for owners o

n Corridor. Ahow this densorical resourc

date 012

son.co.us/pla

ado and the ma tremendou

nty literally str

fic to their plaDuring these u, Geologic Haroject.

Historic Reso

a link to the Ce.

a link to the Ce.

encourage th

s for the Pres

tory museumsgy and/or Histof Cultural Re

At this juncturesely populatedces.

A3

nning/plannin

magnificent Ros uniquenessraddles the fo

an area. Goalsupdates, geneazards and co

ources.

County’s heri

County’s heri

he Preservatio

servation of a

s, libraries witoric Preserva

esources and

e, the corridord area intends

-6

 

ng_T59_R17

ocky s about it. oothills, with

s or Policies eral density onstraints,

itage while

itage while

on,

historic

th history ation should other

r meets the s to

Page 41: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NLariat LoManagem

Study SColoradoStudy A

The Lari12 by 12U.S. 6 anPurposeThe purpconsistethat will bKey Poi

Preservelogos, sigraphic sUtilize thOrientatiLoop wilTourist Slodging. as locatiWaysidestop andExisting experienLariat LoInterpretcharacteExperieninformatunique eLittle LooaugmentRelevan

The Lariinto the mLariat LoBuffalo O

Review Andrew

fExistingInteame

oop Scenic & ment Plan

ponsor o Scenic Byw

Area

at Loop Moun2.5 mile regionnd U.S. 285, e of the Studpose of the Lant message tbe collectivelynts of Study

e and Protect gnage, and wsystems he different typion Sites is a l be available

Sites are existInstead of creons for these

es will be roadd experience iInterpretive S

nces. These soop. tive Sites are eristics of the ntial Sites areion. The inter

experience onops are side tt and provide

nce to the I-7

at Loop runs mountain corroop will directOverlook, whi

by Strosnider

erpretivePla

Historic Bywa

ways Commiss

ntain Gatewayn includes thethe three mai

dy ariat Loop Intehe theme) thay used by all

y

the natural rewaysides alon

pes of sites toplace where

e. Orientation ting towns or eating separa services.

dside pull-offsimportant or sSites along ansites often hav

resource areindividual pla places where

rpretative expn a particular trips off of thevariety to the

0 Mountain C

concurrently ridor from mely influence uch both proje

ansintheI‐70

ay Corridor

sion

y Heritage Are seat of Jeffein gateways t

erpretive Planat underlies amembers of t

esources, indng the corridor

o engage usewayfinding, insites will provplaces that a

ate visitor ame

s that are locaspecial elemend adjacent tove high resou

as where inteace. e the visitor eerience will bLariat site.

e primary scene main scenicCorridor

with I-70 alonetropolitan Deusers along I-7ects share.

0MountainCLink to http://wwcentral/laloop/LarStudy DJan 200

rea is a 150 serson County to Colorado’s

n is to create all of the Lariathe Lariat Loo

dividual propers. Connect u

ers: nterpretive anvide the most

already providenities, for ex

ated along theents of the Looo the Lariat Lource value of t

erpretive infor

experience wibe provided pr

nic routes. Litc tours.

ng its northweenver. The int70, particularl

Review 11/6/201

CorridorStudy

ww.coloradodariat-riatLoopScenDate 2

square mile ary government

front range m

an interpretivat Loop's interop Heritage A

erties and sceusers to the lo

nd introductort extensive amde basic facilitxample restroo

e scenic corridop. oop already ptheir own and

rmation will be

ll take precedrimarily by ori

ttle Loops will

estern boundaterpretive plaly at the visito

date 12

dot.info/travel/

icAndHistoric

rea in central and encompa

mountains.

ve strategy thrpretive strate

Alliance.

enic routes. Idoop through o

ry informationmount of interties such as goms, the tour

dors to allow

provide interpd make strong

e integrated w

dence over prienting visitor

l provide inter

ary. It sharesans and recomor centers at D

A3

/scenic-byway

cBywayRepor

Jefferson Coasses portion

at will conveyegies and act

entify the Loooral histories,

n regarding thrpretive informgas, food, resrist sites will b

visitors an op

retive informag contributions

with the physi

roviding interprs toward a sp

rpretive expe

s the eastern mmendations Dinosaur Ridg

-7

 

ys/north-

rt.pdf

ounty. The ns of I-70,

y a ivities, and

op through media, and

e entire mation. strooms and be identified

pportunity to

ation and s to the

ical

pretive pecific,

riences to

entrance taken by the ge and

Page 42: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NMount EManagem

Study SCDOT &Study A

The MouSprings Venjoymeand prespromotioKey Poi

This InteStrategyinformavisitors. to includexperienStrategyof multi-National managemStrategybehavioland admresourceStrategyThis goathe agenpersonalStrategybe a highvisitor ceconcesssuch as word-of mmaterialsprovidedRelevan

The Bywthe DenvByway ispeaks thReview Pat Noye

fExistingInteame vans Scenic ment Plan

ponsor & CCCTB Area and Purp

unt Evans SceVisitor Cente

ent of the Mouservation of thon of related snts of Study

erpretive Many 1. Provide ation. The lowIn order to take pedestrians

ncing the Bywy 2. Instill an-agency manHistoric Distr

ment of Denvy 3. Instill un

or toward theministered by es exist on lany 4. Present aal can be acconcies managinl interpretive sy 5. Provide qh priority for tenter staff andionaires). Thiemployees ofmouth adverts are wasted d elsewhere ance to the I-7

way is locatedver metropolits easily acceshat stand abovby es

erpretivePla

and Historic B

pose of Stud

enic and Histor and Heritag

unt Evans Scehe corridor byscenic and cuy

agement Planall visitors d

wer Byway feake full advants and bicyclis

way by some m understand

nagement. Mrict designatiover Mountain nderstandinge resources b

the USFS annd managed ba positive anomplished thrng the Bywayservices (brocquality custohe agencies ad all employes commitmenf gas stationstising, the visiif a visitor’s o

along the Byw0 Mountain C

in Clear Creetan area – Cossible via I-70ve 14,000 fee

ansintheI‐70

Byway Corrid

dy

oric Byway tae Museum toenic and Histoy providing theultural attractio

n (IMP) adoptriving the By

atures numerotage of the ret visiting Idah

means other ting of the management p

on, visitor servParks propert

g and apprecby the visitornd Denver Moby these two nd professionrough the direy and Byway vchures, mapsomer serviceand individuaes and volunt

nt to customes, restaurantstor’s total Byw

overall Bywayway. Corridor

ek County. It olorado’s mos0. The Front Ret: Mount Eva

0MountainC

or Study AClear Crhttp://wwcentral/mCMP/at_Study D

akes travelerso the summit ooric Byway the visitor with aons througho

ts the followinyway the oppous sites that sources of th

ho Springs, bithan a personanagement p

practices and vices and touty and concesiation of the rs. Significantountain Parksagencies, annal image of

ect interactionvisitors. The ds, guides, tapees to all visitoals responsibleteers of the Ur service mus, motels, etc. way experieny experience i

is unique amst populous reRange’s mounans, Long’s Pe

Review 10/23/20

CorridorAuthor & Linkreek County Tww.coloradodmount-evans/_download/file

Date

s from downtoof Mount Evahrough the ena safe and enut Clear Cree

ng interpretiveportunity to tt facilitate the e lower Bywacyclists on Hinal passengepractices of complexities

urism, managssions, and ronatural resot opportunitie. Opportunitied at locations

f the managinns that occur bdesired imagees, etc.) provors. Providine for interpret

USFS and Dest also extendIn order to atce must be es negative du

mong byways iegion, comprisntain backdroeak, and Pikedate

012

k to Study Tourism Boardot.info/travel//ScenicBywaye

own Idaho Spns. It providehancement, p

njoyable expeek County.

e strategies fotake advantadisseminatio

ay, this goal sighway 103, ar vehicle. the agenciesaffecting the ement of Natoadway main

ources, and ees for meetinges to interprets in and arounng resource between the se must also bvided to visitorg high-qualityting the Bywanver Mountai

d to private settract return vnjoyable. Aw

ue to poor cus

in that it is onsed of over 2

op is dominatee’s Peak.

A3

rd (CCCTB) &/scenic-bywayy-MtEvans-

prings at the Ides for the furtprotection, interience and th

or the byway:age of orienton of informatishould also beand other visi

s and the colower Bywayional Forest l

ntenance. encourage pg this goal exist the Byway’snd Idaho Spriagencies to

staff (and volube conveyed brs. y customer seay for visitors,n Parks (inclu

ector service pvisitors and beard-winning istomer servic

nly a half-hour2 million peoped by three m

-8

 

& CDOT ys/north-

daho her use and terpretation hrough the

tation and ion to e interpreted itors

mplexities y include and,

positive st on historic ngs. the visitor. unteers) of by the non-

ervice must , including uding providers, enefit from nterpretive

ce being

r drive from le. The

mountain

Page 43: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

ReviewofStudy NThe PowPlan to AStudy SHistory CHistoric Study A

This planOver thecome to our statepast throcontinueKey Poi

This planopportunAction Aover the preservaGOAL A• The

irrep

GOAL B• The

lever

GOAL C• The

GOAL D• The

GOAL E• The

GOAL F• The

Colo

Relevan

The I-70provisionthe StateReview Andrew

 

fExistingInteame

wer of HeritagAdvance Presponsor

Colorado, OffiPreservation

Area and Purp

n is designed e next five yea

include the ce’s rich placesough stewardse to educate bnts of Study

n seeks to monities to demo

Agenda is organext five yea

ation in ColoraA: Preservingongoing idenlaceable histo

B: Strengthenbuilding of thrage assets

C: Shaping thpromotion an

D: Publicizingdocumenting

E: Weaving Peducation of

F: Advancingprovision of h

orado’s histori

nce to the I-7

Corridor fallsns that the stae Historic Preby Strosnider

erpretivePla

e and Place: servation in C

ice of Archae pose of Stud

for every histars, the underconcept of hists and heritageship of our his

both children ay

otivate and emonstrate the manized around

ars. They are ado: g the Places tification, docoric and cultu

ning and Cone capacity of

he Preservatind messaging

g the Benefit and sharing

Preservation students and

g Preservatiohistoric preserc and cultura

0 Mountain C

s under the puate plan recomservation offi

 

ansintheI‐70

A 2020 ActioColorado

ology and

dy

toric and culturstanding for toric preservae. Preservatiostoric and culand adults ali

mpower peopmyriad benefitd six goals deordered to ref

that Matter cumentation, eural resources

nnecting thepreservation

ion Messageg of historic pr

ts of Preservof the benefit

Throughout citizens of al

on Practicesrvation technil resources

Corridor

urview of this mmends for hcer.

0MountainC

on Link to http://wwpreservaStudy DNov. 20

ural site in Coevery citizen ation through on advocates ltural resourceke and engag

ple to value hets of sharing aevised to guidflect a logical

evaluation, prs

Colorado Prpartners and

e reservation’s

vation ts of historic p

Education ll ages about

ical outreach

state plan. Ahistorical and

Review 11/14/20

CorridorStudy

ww.historycoloation-plan

Date 10

olorado. of what consthe appreciatshare the obes. Through tge all in civic

eritage and hiand preservinde statewide, progression

rotection, and

reservation Nd networks sta

mission and v

preservation

their shared

to assist in d

Any interpretivarchaeologic

date 012

orado.org/arc

stitutes a bettetion of and em

bligation to cetheir efforts, presponsibility

istoric placesng the stories regional, andin advancing

d interpretatio

Network atewide to nu

vision to all ci

heritage

efining, descr

ve plans adopcal sites as the

A3

chaeologists/s

er Colorado wmotional connlebrate the stpreservation py

by enhancingtherein embo

d local preserv the practice

on of Colorado

rture local lea

itizens

ribing, and pr

pted should aese will be en

-9

 

state-

will inherently nection to tories of the partners will

g odied. The vation efforts of

o’s

aders and

reserving

allow for nforced by

Page 44: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

ReviewofStudy NSummit Study SBOCC Study A

Summit areas, nuvisitors aThis CouCompreha future cultural refforts to Key Poi

Goal A. recognizCounty’

Policy/Acand sitesHistoricahistoricaPolicy/Acresourceone or m2.1 In c

an2.2 D e2.3 Pr e

prathe

Policy/AcPolicy/Acproperty Relevan

In additiocounty’s a study iReview Andrew

fExistingInteame County Compponsor

Area and Purp

County is a bumerous riveand locals alikuntywide hensive Plan that is likely tresources, it io educate visi

nts of Study

Identify, prozing that thes past and s

ction 1. Deves of local, statal Society, andl and cultural ction 2. Workes. Where impmore of the folcorporate histd open areas

esign new deveserve historiactical to retae developmenction 3. Devection 4. Wherowners, resid

nce to the I-7

on to residingmethods andnto how comby Strosnider

erpretivePla

prehensive Pl

pose of Stud

beautiful tourisrs and streamke to enjoy th

is intended too be more livs the intent otors and resid

y

otect, and enhe historic strushould contin

lop a comprete, and nationd Colorado Hresources ar

k cooperativelypacts cannot llowing: toric structures. velopment to ic structures ain historic strunt or within thlop incentives

rever possibledents, and vis0 Mountain C

g within the I-7d ability to impmunity and co

ansintheI‐70

lan

dy

st destination ms, and scenie outdoors.

o provide the ely and popuf this Plan to dents about th

hance the imuctures, archnue to define

ehensive invennal historical sistorical Soci

re important toy with propertbe entirely av

es into new de

fit with historiand sites in thuctures in thee Basin. s to encourage and approprsitors informaCorridor

70 Mountain Cplement interpounty organiz

0MountainCLink to http://wwStudy DOct. 5, 2

located 75 mc mountain p

vision and gulous than ourpromote the he area’s hist

mportant histheological sie the future.

ntory of the Csignificance). ety, this inveno preserve. ty owners to avoided, these

evelopment, i

ical architectuheir existing loeir original loc

ge the preservriate, promoteation about the

Corridor, the Spretative actszations will wo

Review Nov. 16,

CorridorStudy

ww.co.summiDate 2009

miles east of Deaks the cou

uidance for hor past. Given tprotection of tory.

torical and cites, and cult

County’s histoIn conjunctio

ntory should b

avoid develop should be m

ncluding the

ural themes.ocation when

cation, relocat

vation of histoe educationale County’s ric

Summit Plan s and measurork alongsidedate , 2012

t.co.us/index

Denver along nty represent

ow we will grothe significanthese resourc

ultural resoutural resourc

orical and culton with properbe assessed

pment impactitigated when

planning and

n possible andtion should oc

oric and cultu and interpretch local herita

also offers ares. This plane the Mountain

A3-

.aspx?nid=49

I-70. With itsts a key locat

ow and responce of the histces and enco

urces of the Cces are links

ural resourcerty owners, thto determine

ts to historic anever possible

design of tra

d practical. Wccur to anothe

ral resourcestive efforts to age.

n example of n should be en Corridor pro

10

 

95

s 4 prime ski ion for

ond to toric and ourage

County, s to the

es (structures he Summit which

and cultural e by use of

ails, parks

Where it is not er site within

s. provide

a single xamined as oject.

Page 45: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

ReviewofStudy NScenic B Study SLake, EaStudy AThe TopgeograpPlanningSummit The corrinterestsunderstaseem in for examFor manhelps to the simpKey PoiInterpret1) Per sInterpretivprovide infacility. Roving Inor rec. fachaving the

2) Non -stand

AM Radioadvice forAudio Touwould be the travelCD/Videothe area aWayside Lure BrocSelf-Guidprojects aActivity Bparents toByway Ca

RelevanThe Topcurrent astrategieto follow Review Andrew

fExistingInteame Byway Top o

ponsor agle, and Sum

Area and Purp of the Rockiehic area delin

g Region. It inCounties, as idor surround

s to the visitorand and appresharp contras

mple, may appy people, an soften the im

plest paper clints of Studytive Strategiessonal, indicatinve Center - A sndividualized re

terpreter- In thcilities, trained e visitors come

-personal, indd alone withoo Broadcast- Inr upcoming pulur- Create an asequentially keer’s companion

o - A souvenir oand preserves Exhibits- Prese

chure A marketed Byway Tou

along the bywaooklet- A techno enjoy the moards and Poste

nce to the I-7 of the Rockie

and existing ines suggested

for subsequeby Strosnider

erpretivePla

of the Rockie

mmit Countiespose of Studes Scenic andneated by the ncludes portiowell as the P

ding the Bywar and local useeciate. Manyst to the natu

pear as randounderstandin

mpact and creap, or the com

y s: ng that direct

staff trained in iesponses to qu

ose areas wheindividuals can

e to them.

dicating that thout being mannforms travelingllouts and pointaudio downloadeyed to the seln on the road. of the visit that the historic andents clear grapting tool to entir- Small bookley.

nique which aimre subtle pleas

er- Souvenirs th

0 Mountain Ces CMP has vnterpretive sitfor interpreta

ent strategies

ansintheI‐70

es CMP

s dy d Historic BywColorado De

ons of SH 24,ike/San Isabe

ay has a greater alike, but w

y elements of ral setting in w

om destructionng of the proceate an apprec

mplex technolo

one-on-one cnterpretation teestions and qu

ere visitors tendn go to visitors

he display or nned. g vehicles of upts of interest ald for purchase ected route dir

serves as added cultural herita

phics and concice people off thet designed to

ms at involving sures of the triphat act as mark

Corridor very similar gtes provides ation, attractio.

0MountainCLink to http://wwcentral/tStudy D2008

way is centralepartment of T, SH 91 and Sel, White Rivet number of hwhich may nothe “living, wowhich they ocn of the physiess by which ciation of the ogies that allo

contact with aechniques wouueries of visitor

d to congregateto explain the n

exhibit is und

pcoming sightslong with currethat enriches t

rection and wou

ed promotion aage of the regiose narrative ofhe interstate- toguide individua

children througp. keting tools tha

oals for interpa for good refn, marketing

Review 1/5/13

CorridorStudy

ww.coloradodtop-rockies/ScDate

lly located witTransportatioSH 82, passiner and Arapahhistorical and ot be obvious orking landscccur. Areas inical environmminerals wermassive hum

ow the space

another indiviuld man a facilitrs to the region

e, such as camnatural and hu

derstandable

s and physical fent weather andthe experience uld contain pro

as people shareon. f landscape feao experience thals through the

gh puzzles and

at can also fund

pretation as thference materand funding c

date

dot.info/travel/cenicByway-T

thin the Staten as the Inter

ng through poho National Fnatural featuror may requir

cape” that defn which mininent, with littlere located, m

man effort thatshuttle to fly.

dual is a elemty that tells the with tools hou

mpgrounds, sceman history of

without verba

features of the d road conditio of the visit to t

omotional inform

e their visit with

atures or signifihe “road less t

e area at a low

d coloring to en

d other Byway

he I-70 Corridrial that couldcould also pro

A3-

/scenic-bywayTopOfTheRoc

e of Colorado,r-Mountain Trortions of EagForests. res that wouldre interpretatifine this particg occurred of

e or no redeemined and proct goes into the

ment of the pr story of the By

used within or a

enic pullouts, hithe region, rat

al assistance

Byway, and cons. the region. Themation that wou

h others. Tells

icant historical raveled.” cost which help

ntertain childre

projects.

dor. The catad be emulatedove to be a go

-11

ys/south-ckies-CMP

in the ransportation le, Lake and

d be of ion to fully cular Byway f still occurs, ming value. cessed, e creation of

resentation. yway. They adjacent to the

istorical sites, ther than

and can

ontains

e download uld serve as

s the story of

events.

ps fund

n to allow

alogue of d. The ood model

Page 46: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

SummarInsert do Example Lariat LoCommissloop/Lari Mount Evhttp://wwMtEvans GuanellaGuanellahttp://wwDec2001 Peak to Phttp://wwpeak/Pea Top of thhttp://wwTopOfTh White Rivhttp://ww Clear Crecreek.co History Chttp://ww Floyd Hilcreek.co Clear Crecreek.co Clear Crecreek.co Idaho Sphttp://ww

ry Reports focuments

e Plans

oop Scenic &sion, June 2atLoopScen

vans Scenicww.coloradod

-CMP

a Pass Scena Pass Scenww.coloradod

.pdf

Peak Scenicww.coloradodaktoPeakSce

he Rockies Sww.coloradodheRockies-C

ver Nationalww.fs.usda.go

eek Greenw.us/Docume

Colorado Staww.historycol

l Gateway S.us/Docume

eek County .us/Docume

eek County .us/Docume

prings Compww.idahospri

Cultural

for selected

& Historic By006 http://ww

nicAndHistor

c Byway anddot.info/trave

ic and Histoic Byway Co

dot.info/trave

c and Historidot.info/traveenicByways

Scenic and Hdot.info/trave

CMP

Forest Travov/Internet/F

way Plan, 200entCenter/Ho

atewide Preslorado.org/a

Sub-RegionaentCenter/Ho

Cultural ResentCenter/Ho

Master PlanentCenter/Ho

prehensive Pngsco.com/p

I-70 MouResourc

d Interpretiv

yway Corridoww.coloradoricBywayRep

Historic Bywel/scenic-byw

ric Byway Committee in el/scenic-byw

c Byway Coel/scenic-bywCMP.pdf

Historic Bywael/scenic-byw

vel ManagemFSE_DOCU

05. http://wwome/View/92

servation Plarchaeologist

al Master Plaome/View/99

sources Manome/View/99

n 2030, http:/ome/View/99

Plan, 2008 pdf/ISPCom

untain Coce Interpr

ve Plans

or Managemodot.info/travport.pdf

way Corridoways/north-c

Corridor Manassociation ways/north-c

orridor Manaways/north-c

ay Corridor Mways/south-c

ment ImplemMENTS/stel

ww.co.clear-28

an, ts/state-pres

an, 2009. htt93

nagement P92

//www.co.cle92

pPlan07140

orridor retive Pla

ent Plan, Covel/scenic-by

or Managemecentral/moun

agement Stwith the US

central/guan

gement Plancentral/peak

Managemencentral/top-r

mentation Plalprdb536583

servation-pla

tp://www.co.

lan; http://ww

ear-

08.pdf

nning

olorado Bywyways/north

ent Plan, nt-evans/Sce

rategy, DeceFS.

nella-pass/G

n, k-to-

nt Plan (Amerockies/Scen

an, April 20135.pdf

an

clear-

ww.co.clear-

A3-

ways h-central/laria

enicByway-

ember 2001

uanellaCMS

ended) nicByway-

12

-

12

at-

,

S-

Page 47: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

Georgetohttp://ww Georgetohttp://pdf Town of Ahttp://ww City of BlGUIDE Thttp://ww Breckenrhttp://ww BreckenrCONSERVhttp://ww Gilpin Tra Buffalo Bhttp://wwdex.html THE EVEPOLICIEcontent/d Georgetohttp://ww Town of content/u Town of content/u Bakervillecreek.co Jeffersonhttps://ww Historic J Jefferson

own Compreww.town.geo

own Silver Pfhost.focus.n

Avon Historww.avon.org/

lack Hawk CTO PROGRAww.cityofblac

ridge Handbww.townofbre

ridge HANDBVATION DISTRww.townofbre

am Railroad

Bill Museum,ww.buffalobill

ERGREEN NES, http://wwdocuments/T

own Design ww.town.geo

Frisco Threeuploads/200

Frisco Commuploads/201

e Neighborh.us/Docume

n County Coww.co.jeffers

Jeffco Monu

n County Pla

ehensive Plargetown.co.u

Plume NRHPnps.gov/docs

ic Preservat/DocumentV

COMMUNITYAMS, ckhawk.org/m

book of Desigeckenridge.c

BOOK OF DESIRICT, eckenridge.co

d, http://www

l.org/History

NATURALISww.evergreenTENAS_Poli

Review Guirgetown.co.u

e-Mile Plan, 9/04/Plannin

munity Mast1/10/master

hood Plan, hentCenter/Ho

omprehensivson.co.us/pl

ments http:/

ace Names D

an. (on-line aus/Georgeto

P Nominations/NHLS/Tex

tion ResolutiView.aspx?D

Y RESTORA

media/EDocs

gn Standardcom/Modules

IGN STANDAR

om/Modules/

w.gilpintram.c

y%20Resear

STS AUDUBnaudubon.orciesResolut

delines, Boous/Design%

2009, http://ng1-21.pdf

ter Plan, 201r-plan.pdf

ttp://www.coome/View/99

ve Plan Updalanning/plan

//historicjeffc

Directory (Hi

access only.ownCompreh

n Form, xt/66000243.

on, ID=2229

ATION AND

s/HARC_Pro

ds for the Hiss/ShowDocu

RDS FOR THE 

/ShowDocum

com/

rch%20on%2

ON SOCIETrg/wp-ions.2002.pd

ok 1, 2 & 3, 20Review%

/www.friscog

11 http://www

o.clear-92

ate, ning_T59_R

co.wordpress

istoric) http:/

Not able to hensivePlan

.pdf

PRESERVA

ogram_Guid

storic and Coument.aspx?

TRANSITION

ment.aspx?do

20the%20Bu

TY BOARD

df

%20Commiss

gov.com/wp

w.friscogov.c

R171.htm

s.com/educa

//jeffco.us/pl

save a copyn/zoom/defau

ATION FUN

de.pdf

onservation ?documentid

 CHARACTER 

cumentid=41

uffalo%20Bi

RESOLUTIO

sion.htm

-

com/wp-

ation/monum

lacenames/

A3-

y) ult.htm

ND

Districts, d=972

AREAS OF TH

143 

ill%20Museu

ONS AND

ments/

13

HE 

um/in

Page 48: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

Jeffersonincluding BLM ColoStatemenhttp://wwwIdaho Sphttp://ww Idaho Sp Summit C70 Corridhttp://ww Summit Chttp://ww Vail Comhttp://ww Ford Parhttp://ww Vail Passhttp://ww Spanning Driving TColorado Highway CDOT-Chttp://www Draft Stahttp://ww Eagle Rivhttp://wwterms=Ea Eagle Cohttp://ww EdwardsMid-Vallehttp://ww

n County Ceg I-70) https:/

orado River Vt (DEIS) BLM

w.blm.gov/co/prings Compww.idahospri

prings Three

County 10 Mdor)

ww.co.summ

County Comww.co.summ

mprehensive ww.vailgov.co

rk Managemww.vailgov.co

s Trail Fact Sww.fs.usda.go

g Generation

Tours of Histo, CDOT

s to the Sky

HS Historicaww.coloradod

atewide Bicycww.coloradod

ver Recreatiww.eaglecouagle%20Riv

ounty Regionww.eaglecou

Area Commey Area Com

ww.eaglecou

entral Mounta//www.co.jef

alley Draft ReM, 2011 Chapt/st/en/BLM_P

prehensive Pngsco.com/p

Mile Plan, h

Mile Compreh

it.co.us/Doc

mprehensive it.co.us/inde

Master Planom/docs/dl_f

ent Plan Upom/docs/dl_f

Sheet (Natioov/recarea/w

ns: The Hist

oric Bridges

, Chapter 11

al Signing Mdot.info/prog

cle and Peddot.info/prog

ion Enhancenty.us/Plann

ver

nal Trails, nty.us/Trails

munity Plan, mmunity Plannty.us/Plann

ains Commufferson.co.us

esource Manater 3 – Affecte

Programs/landPlan, pdf/ISPCom

http://www.id

hensive Plan

umentView.

Plan Historiex.aspx?nid=

n, forms/comp

pdate, 2012 forms/Ford_

onal Scenic Twhiteriver/re

oric Bridges

s in Fremont

1 Context an

Maintenance grams/enviro

estrian Plangrams/bikepe

ement Plan, ning/Master_

s/Eagle_Vall

Wolcott Aren, Eagle Couning/Adopted

unity Plan (ps/planning/p

agement Planed Environmed_use_plannin

pPlan07140

dahosprings

n (includes O

aspx?DID=1

cal and Cult=495

rehensive_o

_Park_2012_

Trail) USFS creation/hiki

s of Colorado

County, and

nd History of

Agreement,onmental/res

n, CDOT, Aued/Bike_Ped

December, _Planning_P

ey_Regiona

ea Communiunty Master d_Master_P

page 49 is Cplanning_T59

n (DRMP)/Draent * Appending/rmp/kfo-gs

08.pdf

co.com/pdf/

Officers Gulc

155

tural Resour

open_lands_

_Update.pdf

ing/recarea/

o, CDOT

d Near Inters

f Colorado H

, 1995, sources/agre

ugust 2012 d_Plan/BikeP

2006. Projects/Eag

al_Trails_Pla

ity Plan, EagPlan

Plans/Adopte

hapter on Tr9_R13.htm

aft Environmeix O: sfo/crv.html

3MileAreaP

ch, Frisco, N

rces 

_plan-1994.p

f

/?recid=4141

state 70 We

Highway Sys

eements/016

PedStatePla

le_River_W

an/

gle Area Com

ed_Master_P

A3-

ransportatio

ental Impact

lan2008.pdf

NFS Lands &

pdf

15&actid=50

est of Denve

stem,

6MA1294.pd

an-draft

atershed_Pl

mmunity Pla

Plans/

14

n

f

& I-

0

r,

df/vie

lan/?

an,

Page 49: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

Dotsero Ahttp://ww/ Continuinstrategy http://ww/ Walking National Colorado Glenwoosprings.c Glenwoosprings.c Glenwoosprings.c Preservehttp://wwhttp://ww SH 82 Cosprings.c14%20Fi BLM - Glhttp://wwwood_sp Garfield Chttp://ww City of Gcommiss

Area Commww.eaglecou

ng our Consfor the Eagle

ww.eaglecou

Mountains S

Mining Hall

o Ski & Snow

od Springs Pco.us/temp/m

od Springs Cco.us/depart

od Springs Cco.us/depart

e America deww.preserveaww.preservea

orridor Optimco.us/departinal%20SH%

lenwood Spgww.blm.gov/pprings/rmp_r

County Comww.garfield-c

olden Historsions/historic

unity Plan, nty.us/Plann

servation Lege River Vallenty.us/Plann

Science Cen

of Fame & M

wboard Muse

Parks and Remaster.pdf

Comprehensiments/comm

Confluence Pments/comm

esignated Coamerica.govamerica.gov

mization Plaments/public

%2082%20C

gs Resourcepgdata/etc/mrod_1988.Pa

mprehensive ounty.com/b

ric Preservatc-preservatio

ning/Master_

gacy, An intee, WRNF, Eaning/Master_

nter, http://ww

Museum, htt

eum Hall of

ecreation Ma

ive Plan, 20munity/Form

Plan, 2003, hmunity/Form

ommunities v/communitiev/PAcommun

n (Glenwoodcworks/Engi

COP.pdf

e Developmemedialib/blm/ar.74829.File

Plan 2030 building-plan

tion Board, hon-board/

_Planning_P

egrated restoagle Holy Cr_Planning_P

ww.walkingm

tp://www.min

Fame http://

aster Plan, h

11, http://wws/Glenwood

http://www.cis/Confluenc

in Coloradoes.html nities.html

d Springs), Dneering/10-

ent Plan RO/co/programse.dat/GSRDR

nning/docum

http://www.c

Projects/Dots

oration, enhross Ranger

Projects/Dots

mountains.o

ninghalloffam

/www.skimu

http://www.ci

ww.ci.glenwodSpringsCom

i.glenwood-cePlan.pdf

,

December 212-

OD- 1988. s/land_use_RM.pdf

ments/Compr

cityofgolden.

sero_Area_C

hancement ar District, sero_Area_C

org/Page.asp

me.org/

useum.net/in

i.glenwood-

ood-mpPlan2011

2010 http://w

_planning/rm

rehensive-P

.net/governm

A3-

Community_

and partners

Community_

px?pid=183

ndex.php

.pdf

www.ci.glenw

mp/archives/g

lan-2030.pd

ment/boards

15

_Plan

hip

_Plan

wood-

glen

f

-

Page 50: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

CCorridoor ContATTACHM

text M

MENT 4 

Map

Page 51: I-70 Mountain Corridor Interpretive Plan November 2013 · you to guidance on the CSS website that can be used to support the planning process. FIGURE 2 Checklist to Guide Interpretive

 

 

A4-1