i-64 embankment studyfiles.cvilletomorrow.org › docs › 20100824-volkert-study.pdf · rocks llc....
TRANSCRIPT
![Page 1: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/1.jpg)
I-64 Embankment Study
Volkert, Inc. &Schnabel Engineering Consultants, Inc. for
the Rivanna Water & Sewer Authority
![Page 2: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/2.jpg)
I-64 Embankment Study
• Hydrology/ hydraulic study
• Geotechnical evaluations
• Hazardous spill risk analysis
![Page 3: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/3.jpg)
Site Location, Properties, Land Use
The Rocks LLC
City of C’ville
City of C’ville
Proposed Normal Pool
Existing Upper Dam Existing
Lower Dam
Proposed Dam
![Page 4: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/4.jpg)
I-64 Drainage Areas & Flow Paths
Proposed Normal Pool
8’x8’ Box
Proposed Ped Bridge & Boom
![Page 5: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/5.jpg)
8’ x 8’ Box Culvert Profile
683
675
683695
702
![Page 6: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/6.jpg)
• Modeled 5 hydraulic conditions for 8-ft-by-8-ft box:– Existing– Repaired – 72-in liner with full reservoir– 72-in liner with low reservoir– Blocked
• All conditions acceptable
H&H - Summary
![Page 7: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/7.jpg)
I-64 Embankment, South Side
![Page 8: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/8.jpg)
Embankment Stability Analysis
Condition Calculated Required
Proposed Normal Pool Balanced 1.55 1.5 Acceptable
100-yr Flood Unbalanced
(Culvert Clogged)1.52 1.3 Acceptable
Rapid Drawdown 1.54 1.1 Acceptable
Seismic 1.31 1.1 Acceptable
![Page 9: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/9.jpg)
Settlement
• Tendency for Heave– Resisted by > 100ft of overburden
• Predicted Settlement = 3½”– In line with previous evaluations– Occurs gradually (est. 3 yrs)– Minimal dif. settlement: gradual and uniform
![Page 10: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/10.jpg)
Geotechnical - Summary
• Modeled I-64 embankment considering:– Stability– Settlement– Seepage– Seismic
• All conditions acceptable
![Page 11: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/11.jpg)
Hazardous Spill
• Risk Mitigation analysis
• 2 steps recommended– Floating boom– Filter curtain
Boom
Curtain
Boom
![Page 12: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/12.jpg)
Conclusion
With proposed upgrades, I-64 embankment and culvert will function safely and adequately in conjunction with the proposed dam.
![Page 13: I-64 Embankment Studyfiles.cvilletomorrow.org › docs › 20100824-Volkert-Study.pdf · Rocks LLC. City of C’ville. City of C’ville. Proposed Normal Pool. Existing Upper Dam](https://reader034.vdocuments.us/reader034/viewer/2022042401/5f109a387e708231d449ea3a/html5/thumbnails/13.jpg)
QUESTIONS?