i-4 poinciana parkway connector · i-4 poinciana parkway connector project development and...

24
I - 4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial Project ID: 433693-2-22-01 ETDM No.: 13957 - Poinciana Parkway I-4 Segment

Upload: vandan

Post on 24-Apr-2018

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

I-4 Poinciana Parkway ConnectorProject Development and Environment (PD&E) Study

Presentation for:

OCX Board MeetingJanuary 14, 2014

Financial Project ID: 433693-2-22-01ETDM No.: 13957 - Poinciana Parkway I-4 Segment

Page 2: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Today’s Presentation

• Project Status

• Corridor Evaluation

Typical Section

Key Environmental Considerations

Corridors

Public and Agency Involvement

Corridor Report

• Next Steps

• Schedule

• Questions

2

Page 3: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Central

Polk

Parkway

OCX Master Plan

Osceola Pkwy Extension

Northeast

Connector

Expwy

Southport Connector

Poinciana

Parkway(Design Build)

I-4 Poinciana Parkway

Connector

Poinciana

Parkway

3

Page 4: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

I-4 Poinciana Parkway Connector Study Area

• Osceola and Polk

Counties

• FDOT Districts 1

and 5

• MetroPlan Orlando

(2030 LRTP)

• Polk TPO

• Water

Management

Districts: South Fl,

Southwest Fl

Reedy Creek

4

Page 5: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Proposed Improvement

• A new alignment

• Upgrades to existing roadways

• New or modified interchange with I-4

• Coordination with other projects

I-4 Reevaluation

Extension of ErnieCaldwell Blvd

Proposed PoincianaParkway Bridge

Central Polk Parkway

PD&E Study

SouthportConnector

PD&E Study

5

Page 6: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Study Process

6

ETDM Programming ScreenStart PD&E Study

July 2013

Purpose and Need

Corridors

Public Meeting #1December 10 & 12, 2013

Initial Alternatives Public Meeting #2

Public Meeting #3Viable Alternatives

Draft EnvironmentalDocument

Public HearingAgency/Public

Review & CommentFinal EnvironmentalDocument

Scoping Allows forPublic and AgencyInput

Agency ProjectAdvisory Group

October 30, 2013

ETDM = Efficient Transportation Decision Making

Page 7: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Project Purpose and Need

Primary Goals

Improve roadway connection from I-4 to Poinciana

Enhance mobility

Improve overall traffic operations

Promote regional system linkage

Secondary Objectives

Support economic development

Enhance safety/emergency response/evacuation

7

Page 8: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

FUTURETRANSIT

Corridor Typical Section

8

• Consistent with OCX Master Plan typical section width

• Proposed 4 lanes are expandable to 6 lanes

• Includes potential future transit

• Use 425-foot wide corridor for analysis

400’ Typical Section from OCX Master Plan

Page 9: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Key Environmental Considerations

9

Social Environmental Justice Pedestrian/Bicycle Community Cohesion

Cultural Section 106/Historic and

Cultural Resources Section 4(f)/Parks and

Recreation/Conservation

Natural Wetlands Section 7/Wildlife & Habitat

Physical Floodplains Contamination Farmlands Air/Noise Utilities/Railroad Construction Visual / Aesthetic

Secondary/ Cumulative

Page 10: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Identify Corridors

North Map

South Map

10

Page 11: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

North MapCorridor Analysis:

• Identify land suitable for alternatives development

• Avoid major constraints

• 425-ft width min.

11

Page 12: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

South MapCorridor Analysis:

• Identify land suitable for alternatives development

• Avoid major constraints

• 425-ft width min.

12

Page 13: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Six Potential Corridors

1. I-4/World Drive

2. I-4/SR 429

3. I-4/CR 532

4. I-4/CR 54

5. Central Polk

Pkwy/Ernie

Caldwell

6. Central Polk

Pkwy/Cypress

Pkwy

13

Page 14: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

14

Corridor 1 – I-4 / World Drive

Poinciana Parkway Bridge Segment

World Drive – Facing Northwest

Page 15: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

15

Corridor 2 – I-4 / SR 429

Poinciana Parkway Bridge Segment

Page 16: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

16

Corridor 3 – I-4 / CR 532

Poinciana Parkway Bridge Segment

I-4 at CR 532 – Facing North

Page 17: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

17

Corridor 4 – I-4 / CR 54

Poinciana Parkway Bridge Segment

Page 18: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

18

Corridor 5 – Central Polk Pkwy/Ernie Caldwell

PlannedCentral

Polk Pkwy

Poinciana Parkway Bridge Segment

Page 19: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

19

Poinciana Parkway Bridge Segment

Future Study

Corridor 6 – Cypress Parkway

Planned Central

Polk Pkwy

North of Cypress Pkwy. – Facing South

Page 20: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Corridor Report

• Comparative Evaluation of:

• Purpose and Need Satisfaction

• Potential Environmental Involvement

Social, Cultural, Natural, Physical

Engineering Considerations

Access to I-4 or Central Polk Parkway

Utilities

Interchange spacing

Estimated project costs

20

Page 21: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Next Steps

• Traffic studies

• Agency review corridor evaluation methodology

• Revise corridors per comments following Public

Meeting

• Evaluate revised corridors

• Prepare Alternatives Corridor Evaluation Report

• FHWA coordination

• Identify corridors for further evaluation

• Develop initial alternatives

21

Page 22: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Project Schedule

22

TODAY

Page 23: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

Contact information

Amy Sirmans, PE

FDOT Project Manager

Phone: (386) 943-5404

Toll Free: 1-800-780-7102

Email: [email protected]

Website: www.i4PoincianaConnector.com

Written comments and questions can be mailed to:

I-4 Poinciana PD&E Study

` Attention: Amy Sirmans

Florida Department of Transportation

719 S. Woodland Blvd., MS1-501

Deland, FL 32720

23

Page 24: I-4 Poinciana Parkway Connector · I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study Presentation for: OCX Board Meeting January 14, 2014 Financial

I-4 Poinciana Parkway ConnectorProject Development and Environment (PD&E) Study