Last updated: July 2020 Project Overview: Work includes replacing and realigning the existing two-way bridge at Ronald Reagan Boulevard with two separate east and westbound one-way bridges. The project will also realign Ronald Reagan Boulevard and tie-in CR 311 to connect to the new bridges. Both bridges will accommodate one travel lane, bike lane and six-foot sidewalk. Length: 1 mile Construction cost: $12.3 million Construction start: June 2019 Estimated completion: mid-2021, weather permitting Funding: Capital Area Metropolitan Planning Organization and TxDOT Project Update: Upcoming work: Bridge demolition for existing bridge. Ronald Reagan Boulevard westbound bridge abutment, drill shafts and MSE wall work. Paving and bridge slab work on Eastbound Ronald Reagan Boulevard. MSE wall work on southbound mainlanes. Set beams, columns, bent cap, abutment and back wall work on Eastbound Ronald Reagan Boulevard. Work completed: Excavation for MSE walls and drill shafts. Embankment of Ronald Reagan Boulevard complete. Drill shafts and flex base complete for the Eastbound Ronald Reagan Boulevard bridge. Completed paving on eastbound Ronald Reagan Boulevard. Completed MSE wall work on the eastbound bridge for phase 1. I-35 at Ronald Reagan Boulevard

Upload: others

Post on 11-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I -35 at Ronald Reagan Boulevard Project Overview · Project Overview: Work includes replacing and realigning the existing two-way bridge at Ronald Reagan Boulevard with two separate

Last updated: July 2020

Project Overview: Work includes replacing and realigning the existing two-way bridge at Ronald Reagan Boulevard with two separate east and westbound one-way bridges. The project will also realign Ronald Reagan Boulevard and tie-in CR 311 to connect to the new bridges. Both bridges will accommodate one travel lane, bike lane and six-foot sidewalk. Length: 1 mile Construction cost: $12.3 million Construction start: June 2019 Estimated completion: mid-2021, weather permitting Funding: Capital Area Metropolitan Planning Organization and TxDOT Project Update:

• Upcoming work: Bridge demolition for existing bridge. Ronald Reagan Boulevard westbound bridge abutment, drill shafts and MSE wall work. Paving and bridge slab work on Eastbound Ronald Reagan Boulevard. MSE wall work on southbound mainlanes. Set beams, columns, bent cap, abutment and back wall work on Eastbound Ronald Reagan Boulevard.

• Work completed: Excavation for MSE walls and drill shafts. Embankment of Ronald Reagan Boulevard complete. Drill shafts and flex base complete for the Eastbound Ronald Reagan Boulevard bridge. Completed paving on eastbound Ronald Reagan Boulevard. Completed MSE wall work on the eastbound bridge for phase 1.

I-35 at Ronald Reagan Boulevard

Page 2: I -35 at Ronald Reagan Boulevard Project Overview · Project Overview: Work includes replacing and realigning the existing two-way bridge at Ronald Reagan Boulevard with two separate

Last updated: July 2020

I-35 at Ronald Reagan Boulevard eastbound bridge columns work

Eastbound Ronald Reagan Boulevard

Page 3: I -35 at Ronald Reagan Boulevard Project Overview · Project Overview: Work includes replacing and realigning the existing two-way bridge at Ronald Reagan Boulevard with two separate

Last updated: July 2020