Presented by: The City of Dublin | May 14, 2013
Phase 1
I-270/US33 Interchange Upgrade
Location
Dublin
To US 23/SR 315
To I-70/ Hilliard
To Marysville
Economic Influence
The Problem… Congestion & Safety
33
Meets Application Criteria
• Freight
• Improves geometry of interchange ramps
• Intermodal connector
• Removes truck bottlenecks
Funding
• Phase 1 total: $91.75 million
– TRAC application request through 2016: $46 million
– Dublin match: $17.25 million
Clear environmental
60% design for full interchange
Finalize Phase 1 design
Construction
– MORPC Attributable Funding
$7 million awarded for construction
$18 million additional being considered
Recommended Phase 1 Solution
New pavement
Pavement removed
Recommended Phase 2 Solution
Phase 1 new pavement
Phase 1 pavement removed
Phase 2 new pavement
Phase 2 pavement removed