I-20 East Texas Corridor STUDY. Community Presentation. About the Study. 18-month study to be complete in December 2014 Focused on evaluating safety and capacity needs along I-20 through East Texas Work with stakeholders to identify and prioritize opportunities for improvement. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: I-20 East Texas Corridor STUDY

Community Presentation

I-20 EAST TEXAS CORRIDOR STUDY

Page 2: I-20 East Texas Corridor STUDY

About the Study

• 18-month study to be complete in December 2014

• Focused on evaluating safety and capacity needs along I-20 through East Texas

• Work with stakeholders to identify and prioritize opportunities for improvement

Page 3: I-20 East Texas Corridor STUDY

Study Area

155-mile stretch of I-20 from I-635 near Dallas to the Texas/Louisiana state line through Dallas, Kaufman, Van Zandt, Smith, Gregg and Harrison counties

3

Page 4: I-20 East Texas Corridor STUDY

Why is this study needed?

• I-20 is an important east-west connection for travel and trade in Texas

• Interstate system is aging and population and trade are increasing

• Assess current safety and capacity needs and plan for the future

• Identify rural transportation needs

4

Page 5: I-20 East Texas Corridor STUDY

What will be reviewed?

5

SAFETY CONCERN EXAMPLES

Median barriers Vertical clearance of

underpasses and bridges Interchange design Crash hotspots

CAPACITY IMPROVEMENT EXAMPLES

Additional frontage roads Additional lanes Alternate routes Freight needs Passenger rail options

Page 6: I-20 East Texas Corridor STUDY

Advisory Committee

Assist TxDOT by providing locally focused input and recommendations

Helps provide feedback to TxDOT on issues and concerns to be considered, prioritization of projects needed and possible funding alternatives

Members are made up of 21 elected officials and other key transportation stakeholders (full list on next slide)

Works closely with other key organizations to help provide accurate and well-rounded feedback

6

Page 7: I-20 East Texas Corridor STUDY

Advisory Committee Members

7

Entity Member Name TitleDallas County Clay Jenkins County JudgeKaufman County Bruce Wood County JudgeVan Zandt County Rhita Koches County JudgeSmith County Joel Baker County JudgeGregg County Bill Stoudt (Chair) County JudgeHarrison County Hugh Taylor County JudgeCity of Balch Springs Dr. Carrie Gordan MayorCity of Mesquite John Monaco MayorCity of Seagoville Harold Magill MayorCity of Forney Darren Rozell MayorCity of Terrell Hal Richards MayorCity of Canton Richard W. Lawrence MayorCity of Lindale Robert Nelson MayorCity of Tyler Martin Heines Mayor Pro TemCity of Longview Jay Dean MayorCity of Marshall Ed Smith MayorDallas Area Rapid Transit Gary C. Thomas PresidentNCTCOG MPO Michael Morris Director of TransportationNETRMA Linda Ryan Thomas Chair/Chair, RailTyler MPO Heather Nick MPO DirectorLongview MPO Karen Owen MPO Director

Page 8: I-20 East Texas Corridor STUDY

8

July 2013

• Advisory Committee Kick-off & Study Introduction

October 2013

• Advisory Committee to Identify/Review Constraints, Community Features, Concerns & Future Considerations

January 2014

• Advisory Committee to Discuss Transportation Reinvestment Zone (TRZ) Considerations

• Advisory Committee to Review & Finalize Public Outreach Tools

February 2014

• Advisory Committee to Prioritize Goals and Objectives and Identify Potential Projects

• Initial public outreach begins

March-April 2014

• Initial public outreach continues

• Advisory Committee to update on Public Outreach Activities

May 2014

• Advisory Committee to Review Summary of Public Input, Evaluate & Prioritize Projects

August 2014

• Advisory Committee to Review Draft Corridor Plan

Sept.-Oct. 2014

• Open Houses to Discuss Draft Corridor Plan with Public

November 2014

• Advisory Committee to Review Public Input Received at Open House(s) & Finalize Corridor Plan

December 2014

• Presentation to Texas Transportation Commission

• Final Corridor Study Plan Available on Project Website

Indicates Committee Meeting

Timeline of Proposed ActivitiesSTART

FINISH

Page 9: I-20 East Texas Corridor STUDY

Stay Informed

9

Website updateswww.txdot.gov/inside-txdot/projects/studies/statewide/i20-east-corridor.html

Fact SheetsEmailed to the mailing list, posted on website, available at outreach events, available at Advisory Committee member offices

Open housesCurrently planned for Fall 2014

Email notificationsSign up to join the mailing list on our website

Facebookwww.facebook.com/TxDOT

Twitter@TxDOT, @TxDOTDallasPIO, @TYLPIO, @TxDOTAtlanta

Page 10: I-20 East Texas Corridor STUDY

Questions and Comments

QUESTIONS?

Comments can also be submitted online at www.txdot.gov/inside-txdot/projects/studies/statewide/i20-east-corridor.html