Hywind roadmap, R&T and operations
Arne Eik, Gudmund Olsen and Nenad Keseric
UIB 29 January 2018
Providing offshore wind to >1M homes
Sheringham
ShoalHywind
demo
2009- 2012- 2017 2017 2022-
DudgeonDogger
Bank
Hywind
Scotland
Hywind
large scale
North / West
Europe
In operation In operation Commissioning Commissioning Consented
2.3 MW 317 MW 402 MW 30 MW 3 x 1.2 GW
* All capacity figures on 100% basis
2019
Arkona
385 MW
In construction
2024-?
Auction won
1-2 GW
Japan
US West Coast
• Deeply competitive financing, development & operations
• Leveraging our global presence & supply chain
• Ability to apply technology to reduce energy costs
Playing to
Statoil’s
strengths
Attractive
and growing
market
Europe
New York
United States
East Coast
19 januar 20184 Classification: Internal © Statoil ASA
Vast potential for floating wind
• Virtually unlimited
resources
• Standardised
foundations
• Site flexibility
• Environmental
benefits
UTILITIES BIG CITIES ISLANDS OIL AND GAS
19 januar 20186 Classification: Internal © Statoil ASA
0
20
40
60
80
100
120
140
160
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
LCOE (€/MWh)
Offshore wind NNG (UK) EA1 (UK)Horns Rev 3 (DK) Borssele 1&2 (NL) Vesterhav (DK)Kriegers Flak (DK) Borssele 3&4 (NL) Triton Knoll (UK)Hornsea 2 (UK) Moray Firth (UK) Floating
Source: BVG Associates
Cost development for floating offshore wind
Levellised cost of energy (LCOE)
Source: Statoil (left), BVG Associates (right)
Statoil’s cost roadmap for Hywind BVG Associates LCOE trajectory for
floating vs bottom fixed offshore windCapex/MW and 2030 LCOE target
19 januar 20188 Classification: Internal © Statoil ASA
Leverage three pillars for Hywind cost reduction
Extract and systemise learnings from projects
Hywind Factory- a systematic approach to Hywind industrialisation
5
Fabrication Transportation Upending Mating Tow to site Installation
1
2
Optimise Hywind
substructure
1) Low cost materials
2) Robust fabrication
processes
3) Production-friendly
design
Establish industry
standards for floating
wind
1) Mooring and anchoring
2) Cables and substations
3) Marine operations
Build on bottom fixed
industry
1) Larger turbines
2) Standardised vessels
3) Operations and
maintenance
Full-scale measurement; closing the learning gap
• Full-scale wind measurements
− Wind resource prediction method tested against full scale measurements.
− Turbulence and wake models verified with full scale measurements from Hywind Scotland .
− Analysis tools for floating turbine and wakes verified with full scale measurements and updated
− Coherence measurement at Norwegian cost
19 januar 20186 Classification: Internal © Statoil ASA
Full-scale measurement; closing the learning gap
• Floating offshore wind
− New floating wind turbine controllers tested and verified
− Improved design methods and software tools, based on result from full scale measurements on Hywind Scotland, for hull, tower and mooring system
19 januar 20187 Classification: Internal © Statoil ASA
Improved method for Assembly
• Marine operation
− Methods for heavy maintenance at various site conditions
− Assess and qualify industrialized Hywind installation methods
− Installation methods forHywind concept assemble in different water depths.
19 januar 20188 Classification: Internal © Statoil ASA
Increased lifetime, reduced cost
• Wind turbine
− Tools for advanced O&M data analysis and predictive/condition based maintenance for wind parks
− Analysis model for drive train
− Passive load reduction methods implemented in analysis software.
19 januar 20189 Classification: Internal © Statoil ASA
Corporate
DCoE
Operational
Excellence
Hywind Pilot Park(5 Siemens 6.0MW)
Dudgeon(67 Siemens 6.0MW)
Dogger Bank(up to 4.8 GW)
Sheringham Shoal(88 Siemens 3.6MW)
Empire NY(2 GW)
Hywind Demo(1 Siemens 2.3MW)
O&M data
KPI,
Knowledge
Improvements
Support
Analysis
Support &
Tools
NES NEO
10
New Energy Operations - Operational Excellence
Arkona(385MW)
Hywind
Dev.
R&T
Hywind Demo experience…
…success to be continued
6 september 201711 Classification: Restricted © Statoil ASA
• In operation from September 2009, concession to
2020 Excellent HSE record- no serious incidents!
• Hywind controllers tested and verified, further
demonstrated by Hywind Scotland
• Production 10,1 GWh in 2011Capacity factor
50,1% in 2011. Average Cap. Factor 41%
• Production: close to 65 GWh since start-up
• Production as good as or better than other 2.3 MW
Siemens wind power turbines. NORWEA prize for
the best producing wind turbine in Norway in 2011,
3rd best in 2012, 2nd best in 2014
• Experienced wind speed over 40 m/s and maximum
wave height of 19 m. Floater motions have no
negative impact on operations- in contrary
• No major issues. Same O&M as for the conventional
bottom-fixed. All technical systems are working well –
concept verified
• Valuable experience/learning still to be gathered and
used in future floating development! Digitalization
opens new possibilities! New technologies can be
tried and tested!
• Established around Hywind Demo as the first demo turbine with aim to be a “national test centre”
• All infrastructure in place, 40MW concessions
• 6 concessions for shallow 20-50 meter and 2 for deep water 200 meters
• 15MW 22kV cable (Hywind Demo 2,3 MW)
• Well functioning O&M base at Skudeneshavn
• Using local vendors “knock-on” effect on the Norwegian supply chain
• Hywind “Living laboratory”, good cooperation with Norwegian and international Universities and R&D institutions
High act iv i ty- test and use of new eff ic ient O&M solut ions
• R&D and testing of new turbine
controller for Hywind Scotland,
• HSE courses, drills,
• Weather buoys, marine and production
forecasting,
• Demo and testing of new technologies
and O&M systems
• Validate test of autonomous
drones/robotics
• Huge media interest, investor visits
• Testing of innovative vessels, equipment
and access solutions ie:
− Buksér & Berging “Buddy”
− Windcarrier “Bayard3” w/
MaXccess
− “Island Crown” w/ Uptime
− Fjellstrand / WMO “World Passat”
− A+D Vessel Motion Measurement
System
− Deepocean / “Edda Fonn” w/ ROV
− Stinger Micro- and Mini ROVs
− Umoe Mandal «Umoe Firmus»
− Rødne «Rygerkongen»
− Karmsund Shipping «Steven»
− MCS «MCS SWATH1»
Data
Business
Analyst
Analysis
Algorithms
Expertise
Intelligence
Partners &
Suppliers
Data
Scientist
Knowledge
Field
Operator
Optimized O&M
Always safe
High value
Low Carbon
Cloud Data Platform
Analytics
Digitalization-new possibilities for collaboration driving innovation and continuous improvement
Apps
14
Universities/
Analysts
This presentation, including the contents and arrangement of the contents of each individual page or the collection of the pages, are owned by Statoil. Copyright to all material including, but
not limited to, written material, photographs, drawings, images, tables and data remains the property of Statoil. All rights reserved. Any other kind of use, reproduction, translation, adaption,
arrangement, any other alteration, distribution or storage of this presentation, in whole or in part, without the prior written permission of Statoil is prohibited. The information contained in this
presentation may not be accurate, up to date or applicable to the circumstances of any particular case, despite our efforts. Statoil cannot accept any liability for any inaccuracies or omissions.
www.statoil.com
© Statoil ASA