hydrogen mobility in baden-württemberg · autostack industry project – 2020+: 37€/kw stack @...

16
Hydrogen Mobility in Baden-Württemberg © KD Busch Dr. Manuel C. Schaloske Director of Energy, Cluster Fuel Cell BW 21.03.2019

Upload: others

Post on 18-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Hydrogen Mobilityin Baden-Württemberg

© KD Busch

Dr. Manuel C. SchaloskeDirector of Energy, Cluster Fuel Cell BW21.03.2019

Page 2: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Opening of the first Hydrogen Refuelling Stations

2nd March 20129th December 2011

Page 3: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Acquisition of first vehicles in 2013

Page 4: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Handing over of the GLC F-Cell on 15th January 2019

Page 5: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Fuel cell vehicles – serial start until 2020

Quelle : Symbio

BMW 5GT FCEV; Quelle: LBST

Quelle : LBST

Quelle: LBST

SAIC 950 FCV

2013-15 1.000 Hyundai ix35 FCEV

2015-17 batch productionToyota – Honda – Hyundai[1-3.000/a]

SymbioFCell [X00 in 2017]

2018+ Daimler [max. 10.000 until 2021 ]Hyundai [>3.000/a]

2020+ Start of mass productionToyota [30.000/a]

Great Wall Motor

2024/5 mass production AUDI, BMWGM/Honda and others*)[30.000+/a] → FCEV reach price of hybrid vehicles

*) i.e. PSA/Opel, SAIC, Volvo, VW

Page 6: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Cost projections by the industry for FCEV

Source: CONCAWE/EUCAR/JRC (JEC) – 2011 | TTW APPENDIX 1 - Vehicle retail price

estimation [jec/files/documents/wtw3_ttw_appendix1_eurformat.pdf]

Source: AutoStack-Industrie, BMVI, 29.06.2017 https://www.now-

gmbh.de/content/1-aktuelles/1-presse/20170629-nip-

foerderung-deutsche-industrie-bereitet-serienproduktion-von-

brennstoffzellen-vor/now_broschuere-autostack_170628.pdf

Source: Technology Roadmap Hydrogen and Fuel Cells - Technical Annex |

https://www.iea.org/media/freepublications/technologyroadmaps/Technology

RoadmapHydrogen_Annex.pdf, June 2015

2020: halving of the 2018 prices

2025: 75% reduction of the 2018 prices

Source: Nikkei 19.01.2018

Technical progress

competitive supply industry

+ quantity effects

80 kW FC-System – JEC – 2020+50,000 units/yr → 8,400 €

Autostack Industry Project –

2020+:

37€/kW Stack @ 30.000 units/yr

→ System costs: ca. 65€/kW

80 kW FC-System 5,100 €

80 kW BZ-System – IEA – 2030> 100,000 units/yr → 4,300 US$ (3,700 €)

Page 7: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Toyota‘s Hybrid- und FCEV-sales – actual state and plans

15 million units in 2020

447

2015 2016 2017 2020

7002.000

3.000

30.000*

*) ≥ 12.000/a in Japan

Gas

olin

e-H

ybri

d-s

ales

FCEV

-sal

es

[Qu

elle

: Yu

kih

iro

So

no

da,

To

yota

Mo

tor

Euro

pe,

WES

, Oct

. 12

th, 2

01

5]

Start up analogous

to Prius

5.000 Mirai on the

streets at the moment

[100 in GER]

Toyota already holds itsEU-fleet-CO2-emission goals for 2021

Page 8: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

In total about 1.200 vs. FCEV 900 vs. BEV 200 components

Value added in Germany – Typical components in conventionaldrive trains

Page 9: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

FCEV in total about 900 Bauteile vs. BEV 200 components

Value added in Germany – Typical components in fuel cell drivetrains

Page 10: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Ramp up plans:

50 HRS until 2018

100 HRS until 2019

400 HRS until 2023

1000 HRS until 2030

Hydrogen infrastructure expansion

https://h2.live Status 11.02.19

Page 11: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Many countrys are working on the development of a publicH2-infrastructure with hydrogen refuelling stations (HRS).

GER: 400 HRS until 2023

UK: ~ 65 HRS until 2020

DK: 100 – 200 HRS until 2025

FR: 300 HRS until 2025

NL: 80 HRS until 2025

North-Italy: up to 10 HRS until 2020

California: 100 HRS until 2023

South Korea: 200 HRS until 2025

JP: 1000 HRS until 2025

Quelle: www.h2stations.org

Worldwide development of hydrogen infrastructure

Page 12: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Future supply scenario

Page 13: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Organisational structure of the cluster Fuel Cell BW

13

knowledge transfer and management

controlling & organization

internationalization

education

event/public relation

Scientific andentrepreneurial

management

PlannedProject 1

Clustermanagement e-mobil BW

Core team including Head of topics

board/ advisory council ofe-mobil BW

Advisory board Cluster

Tota

l Te

am (

all m

emb

ers

of

the

Clu

ste

rs)

Scientific andentrepreneurial

management

PlannedProject 1

transport

Scientific andentrepreneurial

management

PlannedProject 1

energy

Scientific andentrepreneurial

management

PlannedProject 1

productionH2 production& infrastructure

Page 14: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

Big Picture of the region Esslingen

Page 15: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

production at BASF

high-pressure refuellingstation Friesenheimer Insel

DHL-Streetscooterrefuelling on-site

industrial applications

• BASF: decarbonization ofproduction processes withgreen H2

heat & power generation

• real estate projects MVV• real estate and industry

projects Pfalzwerke• „cold“ local district heating• SAP-energy-headquarter• feeding into the natural gas

grid (district heating)• exemplary: WEG-projekt

(apartment-ownerassociations)

pipeline

H2 filling stationsHeidelberg andother locations

RNV depotHeidelberg

H2 filling stationse.g. Speyrer Str. Heidelberg

700 bar350 bar

logistics & mobility applications

local logistics garbage truck trucks ships trains buses cars

production at MVV

production at Pfalzwerke

MVV

Pfalzwerke

greenelectricitybiogas

350 bar350 und 700 bar

H2 train routes(Westpfalz, Weschnitz-, Nibelungenbahn)

350 bar 700 bar

TWL

production at TWL

Big Picture of the region Rhine-Neckar

Page 16: Hydrogen Mobility in Baden-Württemberg · Autostack Industry Project – 2020+: 37€/kW Stack @ 30.000 units/yr →System costs: ca. 65€/kW 80 kW FC-System 5,100 € 80 kW BZ-System

© ZSW

Thank you!

www.e-mobilbw.de