www.hydro-int.com Tel: 01353 645700 Hydro Vortex Drop Shaft Key to Undersea Sewage Line A Wastewater Case Study Project Profile Objective To convey sewage 14 metres from street level down to the existing main sewage line below the water level in the dock. Solution The Hydro Vortex Drop Shaft technology dissipates the energy of the falling liquid and protects the surrounding infrastructure from undue stresses, delivering an economical solution in terms of time, space and cost. Welsh Water’s challenge to upgrade the sewage infrastructure within the £multi-million Swansea Waterfront re-development was facilitated with an innovative Hydro Vortex Drop shaft solution. Raw sewage needed to be conveyed down a 14-metre drop in a constrained space within the former Prince of Wales Dock as part of an innovative and cost-saving solution, which enabled construction within a tight 14-week project window. As part of the £200 million development of the Swansea docks known as SA1 Swansea Waterfront, a 2-year sewage infrastructure redevelopment was undertaken by Welsh Water. “The solution recommended to Welsh Water involved installing the Hydro Vortex Drop Shaft in an existing 4-metre bore access shaft within the dock,” said Len Burgess, project engineer for Hyder Consulting. “The Hydro Vortex Drop Shaft takes the sewage 14 metres from street level down to the existing main sewage line below water level in the dock. “The Hydro Vortex Drop Shaft uses a hydrodynamic vortex to dissipate the energy of the falling liquid and protect the surrounding infrastructure from undue stresses. This solution was much more economical in terms of time, space and cost than trying to incorporate a new cascade or other alternative in the dock.” Product Profile Self-activating system No moving parts Space-saving design Avoids noise and vibration that could damage network infrastructure Find out more at: www.hydro-int.com Swansea Waterfront re-development “The Hydro Vortex Drop Shaft uses a hydrodynamic vortex to dissipate the energy of the falling liquid and protect the surrounding infrastructure from undue stresses. This solution was much more economical in terms of time, space and cost than trying to incorporate a new cascade or other alternative in the dock.” Len Burgess - Project Engineer Hyder Consulting

Upload: others

Post on 11-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hydro Vortex Drop Shaft Key to Undersea Sewage Line · Swansea Waterfront re-development “The Hydro Vortex Drop ™ Shaft uses a hydrodynamic vortex to dissipate the energy of the

www.hydro-int.com Tel: 01353 645700

Hydro Vortex Drop™ Shaft Key to Undersea Sewage LineA Wastewater Case StudyProject Profile

Objective

To convey sewage 14 metres from street level down to the existing main sewage line below the water level in the dock.

SolutionThe Hydro Vortex Drop™ Shaft technology dissipates the energy of the falling liquid and protects the surrounding infrastructure from undue stresses, delivering an economical solution in terms of time, space and cost.

Welsh Water’s challenge to upgrade the sewage infrastructure within the £multi-million Swansea Waterfront re-development was facilitated with an innovative Hydro Vortex Drop™ shaft solution.

Raw sewage needed to be conveyed down a 14-metre drop in a constrained space within the former Prince of Wales Dock as part of an innovative and cost-saving solution, which enabled construction within a tight 14-week project window.

As part of the £200 million development of the Swansea docks known as SA1 Swansea Waterfront, a 2-year sewage infrastructure redevelopment was undertaken by Welsh Water.

“The solution recommended to Welsh Water involved installing the Hydro Vortex Drop™ Shaft in an existing 4-metre bore access shaft within the dock,” said Len Burgess, project engineer for Hyder Consulting. “The Hydro Vortex Drop™ Shaft takes the sewage 14 metres from street level down to the existing main sewage line below water level in the dock.

“The Hydro Vortex Drop™ Shaft uses a hydrodynamic vortex to dissipate the energy of the falling liquid and protect the surrounding infrastructure from undue stresses. This solution was much more economical in terms of time, space and cost than trying to incorporate a new cascade or other alternative in the dock.”

Product Profile

• Self-activating system • No moving parts• Space-saving design• Avoids noise and vibration that could damage network

infrastructure

Find out more at: www.hydro-int.com

Swansea Waterfront re-development

“The Hydro Vortex Drop™ Shaft uses a hydrodynamic vortex to dissipate the energy of the falling liquid and protect

the surrounding infrastructure from undue stresses. This solution was much more economical in terms of time, space and cost than trying to incorporate a new cascade or other

alternative in the dock.”

Len Burgess - Project EngineerHyder Consulting

Page 2: Hydro Vortex Drop Shaft Key to Undersea Sewage Line · Swansea Waterfront re-development “The Hydro Vortex Drop ™ Shaft uses a hydrodynamic vortex to dissipate the energy of the

Turning Water Around...®

Wastewater SolutionsHydro International. Prickwillow Road, Ely Cambridgeshire, CB7 4TXTel: 01353 645700 Fax: 01353 645702Email: [email protected] Web: www.hydro-int.comDrop Shaft Case Study - Swansea Waterfront A1012

HX is Hydro Experience, it is the essence of Hydro; a stamp of quality and a mark of our commitment.For further information call us on: 01353 645700or visit www.hydro-int.com

Hydro Vortex Drop™ Shaft

At Swansea, the 150mm bore Hydro Vortex Drop™ shaft is designed for a maximum flow volume of 20l/s. It is sited in a 4m bore foul access shaft which had been located in the dock structure to access the sewage outflow pipeline installed following renewal of the area’s sewage infrastructure in the 1990s.

Barry Louth, Contract Manager for Alun Griffiths added: “The main sewer is now around 8 metres below the mean tide level which complicated the overall installation. The Drop™ Shaft was installed during a 14 week window within the two year sewage infrastructure project. Meticulous planning between ourselves, Hyder Consulting and Hydro together enabled successful installation.”

In addition to the supply of new equipment, Hydro’s expert service teams provide plant condition assessment and planned maintenance programmes for our wide range of water and wastewater treatment equipment through tailored Service Agreements to meet the needs of each site.

Hydro maintains a comprehensive and well-managed store of spares for all its equipment. Hydro’s customers can be assured of speedy delivery of plant, helping to reduce the time our customers need to spend sourcing replacement parts.

To enable wastewater and water treatment operators to avoid interruption to their processes during planned downtime, Hydro offers a full equipment hire service for a wide range of primary, secondary and tertiary treatment plant, which can be operated on a stand-alone basis or integrated with existing equipment.