hydro power introduction

30
Imagination at work Hydro Power Introduction GE Proprietary InformationClass III (Confidential) Export ControlledU.S. Government approval is required prior to export from the U.S., re-export from a third country, or release to a foreign national wherever located.

Upload: others

Post on 03-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Imagination at work

Hydro Power Introduction

GE Proprietary Information—Class III (Confidential)

Export Controlled—U.S. Government approval is required

prior to export from the U.S., re-export from a third

country, or release to a foreign national wherever located.

Hydro Introduction

Agenda

• Hydraulic Energy

• Hydroelectric Installation: the Dams

• Hydroelectric Installation : plant configurations

• Hydro Powerhouses

• Hydro Products

• Hydro Project Cycle

Hydro Technical Training 2 GE Internal – For distribution within GE

Hydraulic Energy

Hydraulic Energy Principle Water Cycle

Introduction to hydroelectricity

4

Evaporation

Evaporation

Precipitation

( rain, snow, … )

Lake Dam

River

Hydro Technical Training GE Internal – For distribution within GE

Hydraulic Energy

Main advantages of Hydraulic

Energy

• World’s biggest Renewable

energy

• Clean Energy

• High Availability

• High Efficiency

• Long Plant Lifetime

• Energy storage

• Provides freshwater storage,

irrigation, navigation

Hydro Technical Training 5 GE Internal – For distribution within GE

Hydraulic Energy

Main drawbacks of Hydraulic

Energy

• Initial investment

• Rainfall depending

• Ecologic impact

• Population Displacement

• Geologic risks

Hydro Technical Training 6 GE Internal – For distribution within GE

Sustainable Market Doubling of global capacity by 2050

Hydro Technical Training 7 GE Internal – For distribution within GE

Segmenting Customer Needs

8042

4819

1694

Technically feasible (TWh/y)

Economically feasible (TWh/y

Production (TWh/y)

2803

1677

676 185 89 37

1585 996

123

Source : Hydropower & Dams World Atlas 2014

• Flexibility & storage

• Retrofits

• Reliable energy

• New

1985

1051 708

1202 845 577

Hydro Technical Training 8 GE Internal – For distribution within GE

Hydroelectric Installation: the Dams

Hydroelectric Installation: The Dams 4 main types of Dams

Hydro Technical Training 10

Embankment dam

Arch dam

Buttresses dam

Gravity dam

GE Internal – For distribution within GE

Hydro Installation: Plant configurations

Hydro Installation configurations

Run of river Power Plants

• Characteristics:

– Small head between upstream and

downstream levels

• Operation:

– Continuous operation, base load

– Production depends on water flow

available on the river

– Energy production higher in summer

than in winter

Hydro Technical Training 12

Ex: Beauharnois, Canada (28

Francis, 10 Propellers – head 24 m)

GE Internal – For distribution within GE

Hydro Installation configurations

Sluice operation power plants

Characteristics:

– The power house is located at the

bottom of the dam

• Operation:

– Discontinuous operation

– Production depends on water level

and capacity of the dam

– Available energy can be predicted

by dam level management and

yearly water provided by the river

Hydro Technical Training 13

Itaipu (20 Vertical Francis

700 MW –118 m)

GE Internal – For distribution within GE

Hydro Installation configurations

Reservoir Power Plants (PSP or

some Francis)

• Characteristics:

– High head

– High pressure

– Underground powerhouse

• Operation:

– When power is needed (peak

season demand)

Hydro Technical Training 14

Nant de Drance (PSP, 150 MW, 390

m)

Monteynard

(Francis, 90 MW, 120

m)

GE Internal – For distribution within GE

Hydro powerhouses

Hydro Powerhouses

House type : External building Run of river: Beauharnois, Canada – High head: Malgovert, France

Hydro Technical Training 16 GE Internal – For distribution within GE

Hydro Powerhouses

House type : Bottom of the dam (three gorges, China) Turbine head = height of the dam

17 Hydro Technical Training GE Internal – For distribution within GE

Hydro Powerhouses

House type: underground (Nant de Drance, Switzerland) Well fitted for pump turbines (High submergence)

18 Hydro Technical Training GE Internal – For distribution within GE

Hydro Powerhouses

House type : pit (Le Cheylas, France) Specific for pump turbines for same reasons as underground

19 Hydro Technical Training GE Internal – For distribution within GE

Hydro Products

GE’s product Scope The complete range of Hydro Power Plant equipment

21

1

3 2

4

8

9

7

10

GE Hydro solutions

Products available from GE-

EM

Third parties

1. Turbine

2. Generator

3. Control System

4. Hydro Mechanical

5. Automation, control & protection

6. Cranes

7. Medium voltage switchgear

8. Power transformer

9. High voltage switchgear

10.Transmission line

Hydro Technical Training GE Internal – For distribution within GE

6

5

Hydro Products Turbines & Generators

Bulb Kaplan Francis Pump Turbine Pelton

Low Speed Low Speed Medium Speed Motor Generator High Speed

Hydro Technical Training 22 GE Internal – For distribution within GE

Hydro Products

• Applicable to all types of hydropower plants, provide cost reduction and operating benefits

• Governing and excitation system for maximum performance of turbines and generators

Control, Protection & Automation Systems

Hydro Technical Training 23 GE Internal – For distribution within GE

Hydro Products

• Hydropower plants and dams

− Valves, tailor-designed gates and penstocks, lifting equipment

• Irrigation dams and canals

− Flow and level control equipment, large diameter and long pipes, pumps, valves, gates

• Water supply and sewerage

− Water treatment, level & flow & pressure control equipment, pumps, pipes

• Industrial applications

− Pumps & outfitting

Hydro Mechanical Equipment

Hydro Technical Training 24 GE Internal – For distribution within GE

Hydro Products

• Engineering and supply of all electrical and mechanical subsystems required for efficient operation of the Plant.

• Our expertise in BOP covers:

− Electrical engineering / systems

− Mechanical engineering / systems

− Miscellaneous systems

Balance of Plant (BOP)

Hydro Technical Training 25 GE Internal – For distribution within GE

Hydro Project Cycle

Hydro Project Development (Typical) New/Large

6 m

12 m

6 m

18 m

4-5 y

36 m

~50 y

GE Project phases New/Large (2 units)

PPA*: Power Purchase Agreement

O&M

18 m

18 m

18 m

18 m

18 m

Conceptual Engineering

Feasibility Study

Environment impact Analysis

Permitting/Licensing

Power Purchase Agreement (PPA)

Financing

Detailed Engineering

Tendering Civil Work

Civil Work

Electro Mechanical Tendering

Electro Mechanical Execution

Operations/Maintenance

Development

~5 years

Construction

~5 years

Operatio

n

Hydro Technical Training GE Internal – For distribution within GE

Identification (Sales)

Tendering

Negotiation

Handover

Engineering

Hydraulic design

Manufacturing

Sourcing

Site Activities

Commissioning

Warranty Operations & Maintenance

GE Project phases New/Large (2 units)

1-2 y

3-4 m

6-8 m

18 m

9 m

2 m

18 m

18 m

18 m

2 m

~2 y

Signature

NTP*: Signature, Bonds, Down Payment, Permits & License…

PAC*

NTP*: Notice to proceed

PAC*: Provisional Acceptance Certificate

FAC*: Final Acceptance Certificate

FAC*

~50 y

Inquiry to Order

~12 months

Order to Remittance

~3 years Services & O&M

Hydro Technical Training GE Internal – For distribution within GE

GE Hydraulic Design Process

Step 1 • Establish a preliminary geometrical design (Theoretical)

Step 2

• Establish & optimise the turbine design using hydraulic calculations (CFD) and mechanical calculations (FEM)

Step 3 • Manufacture a scale model

Step 4 • Carryout research & development testing on the scale model

Step 5 • Carryout customer preliminary and contractual scale model testing

Step 6 • Proceed to life-size turbine manufacture

Step 7 • Collect feedback from the site for future development

Design until

customer

acceptance

Hydro Technical Training GE Internal – For distribution within GE