![Page 1: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/1.jpg)
1
Hyderabad Integrated MSW
Limited (A wholly owned subsidiary of REEL)
I n t e g ra t e d M S W M P r o j e c t o f
G H M C b e i n g i m p l e m e n te d u n d e r
P P P m o d e
![Page 2: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/2.jpg)
2
Project Background Hyderabad
• 6th largest metropolis in the country.
• Population ~7.5 million
• Area ~ 625 sq.kms
GHMC
• Formed in 2007
• 5 Zones, 18 Circles, 150 Wards,
• Present waste generation in GHMC is around 5000 TPD
Project Details
• Concession signed in February’2009.
• Duration of CA is for 25 years
• Post-Closure maintenance for another 15 years
• Project cost Rs. 727.00 Crores.
• I.E appointed from 01.09.2010
• Largest IMSW Management Project in the country
![Page 3: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/3.jpg)
3
Demographics and Waste Generation Trends for GHMC
3
38004400
50856263
73208598
10255
11960
551625
738
910
1063
1239
1488
1731
0
2000
4000
6000
8000
10000
12000
14000
16000
0
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
2009 2011 2016 2021 2026 2031 2036 2041
Construction & Demolition Waste
MSW Generated
Population
![Page 4: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/4.jpg)
4
Project Scope
Door to Door collection
Secondary collection and Transportation
Transfer station Management &
Tertiary Transportation
Processing & Disposal
of MSW
Remediation and closure of Existing
dumpsite
Initially
in East and West Zone
and
later cover the entire
GHMC area
Remediation, closure
of the existing 4
dumpsites
Upgrade 3 existing
transfer stations
and
construct 5 new transfer
stations
And transportation of
waste from
Transfer station to P&D
Facility
Initially
in East and West Zone
and
later cover the entire
GHMC area
Integrated MSW
Management Project
To establish 4 integrated
waste
P&D facilities
![Page 5: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/5.jpg)
5
Collection and Transport of Waste
• Primary Collection
• Secondary Collection
• Tertiary Collection
5
![Page 6: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/6.jpg)
6
Collection & Transportation
6
![Page 7: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/7.jpg)
7
Processing and Disposal Facility
• Total area : 353 acres
• Encroachments – 86.60 acres
• Net area available for T&D facilities is around 266.30 acres
• Dumping activities commenced from 2001 for Alwal and Kapra municipalities
• From 2004, MSW disposal from all over Hyderabad.
• At the time of taking over the site, 80,00,000 cum waste existed
• Site access provided for initiating development works: 28th October 2010
• Master Plan approved by Independent Engineer on : 21st January 2011
• Provisional Readiness Certificate issued by IE for 2000 TPD: 7th February, 2012
• Commercial Operation Date of treatment and disposal facility: 18th February, 2012
• Current processing capacity 4000 TPD
![Page 8: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/8.jpg)
8
Processing & Disposal Facility
• As per the Consent to Establish issued by APPCB, following facilities with respective capacities are provided:
8
Description Capacity
Refuse Derived Plant 2400TPD
Compost Plant 2040TPD
Bio-methanation Plant 500TPD
Recycling (Plastic, paper, Metal, Rubber) 600TPD
Landfill 735TPD
Waste to Energy 20MW subject to GO ammendment
![Page 9: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/9.jpg)
9
Processing and Disposal Facilities
Key infrastructure
• Boundary Wall – 4.2 Kms (balance
pending due to encroachments)
• Weighbridge Plaza
• (5) Weighbridges
• Internal CC roads – 7.88 km
• Storm water drain – 15.76 km
• Leachate drain – 2 kms
• Three leachate collection tanks
and four ponds
• Waste Receiving Platform – 5000
Sqm
• Pre-Sorting – 4000 Sq.m.
• Windrow – 28,125 Sq.m.
• Monsoon & packaging – 25,875
Sq.m.
• Coconut shredding Unit
• Recyclables Processing Unit
• RDF Storage facility
• Leachate Storage and Treatment
Facilities
• RDF Manufacturing Unit (under
construction)
• Waste to Energy (awaiting CFE
from APPCB)
• Scientific Landfill
![Page 10: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/10.jpg)
10 10
waste received in tipping floor 100 mm Screening
Recyclables
Removal
Windrow Composting
Primary Screening
35mm
Secondary Screens
16mm Curing
Screening
(4mm)
Rejects Rejects Gas &
Moisture Rejects
Moisture and Gaseous loss
RDF
Sand
Separation
Sand
Sanitary Landfill
C O M P O S T
Compost Operations
![Page 11: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/11.jpg)
11
Supporting infrastructure:
• Administrative Building – Laboratory, Conference & Training Facility (under construction)
• Health Centre
• Cafeteria
• Workers Change Rooms and Toilets
• Material Stores
• Maintenance Facilities for Vehicles and other mechanical equipments
• Vehicle Wash Facility
• Transformer Yards – Connected load of ~1Mw
• DG and Electrical Panel Room
Processing and Disposal Facilities Contd.
![Page 12: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/12.jpg)
12
MSW Reception and Weighment
Weighment
• 5 Weighbridges commissioned
• Weighbridges operate in 3 shifts
• Capacity of each weighbridge
capacity is 50 MT
• Registering and weighing process is
carried with the help of fully
automated software to synchronize
the data logged in different
weighbridges
![Page 13: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/13.jpg)
13
Pre-sorting and Segregation
• MSW is segregated through trommels (100mm screens) in to organics and in-organics
• 100mm acceptance material is composted using windrows composting method
• 100mm rejects material is further processed to generate Refuse Derived Fuel (Stored on HDPE lined storage area)
• Recyclables are picked by rag pickers who are integrated in the system
13 Sorted recyclables Acceptance Material Conveyor
![Page 14: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/14.jpg)
14
Windrows Composting • Impermeable platform of 28,125 sq.m. Established
• Windrow heaps formed for aerobic composting
• Windrows formation and turning in the process
• Decomposed material transferred to monsoon section with 9000sq.m of shed having 35mm and 16mm screens for further refinement (7-10 days of natural drying)
• Curing and Finishing section with 7875 sq.m. Of sheds with 4mm screens for 10-15 days cured material
14
Windrows Finished Product 16 & 35mm rejects
![Page 15: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/15.jpg)
15
Blending and Packing Section
• Blending and Packing shed built in the area of 9000 sq. mts.
![Page 16: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/16.jpg)
16
Customers for Compost
16
![Page 17: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/17.jpg)
17
RDF Storage
• RDF material is being stored in the
HDPE lined storage units build in an
area of ~3 acres
![Page 18: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/18.jpg)
18
Refuse Derived Fuel
Primary Shredder (50 TPH, 80- 90 mm)
100 MM PRESORTED / + 35 MM REJECTS
Manual Picking Station
Magnetic Separator
Solar Drying Platform (3 days)
Trommel (20TPH, 35mm)
Bailing/Loading to Truck
RDF Parameters
Specifications
Calorific Value 2800 – 3300 Kcal/Kg
Moisture Content
<20%
Ash Content <25%
Bulk Density (RDF Fluff)
350-450 Kg/cu.m
Bulk Density (RDF Bale)
600 to 700Kg/cu.m
![Page 19: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/19.jpg)
19
Customers for RDF
19
![Page 20: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/20.jpg)
20
• 1st phase constructed in an area of 5.5 Acres -
• Landfill capacity developed in modular approach.
• Extension works of the landfill for the 2nd phase is under progress in another
four acres
Landfill ready to receive Monsoon cover
Scientific landfill
![Page 21: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/21.jpg)
21
Leachate collection and Storage system
Leachate storage tanks are constructed
corners of the compost plant to store the
leachate generated in the compost plant.
The drainage system is established with
RCC drains to pass the leachate from the
plant to storage tanks.
The leachate from the landfill is collected
in the leachate collection sump of landfill
and transferred to leachate treatment
pond
Established approx. 2kms of leachate
collection network
Leachate tanks @ Compost plant
Landfill – leachate collection sump
![Page 22: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/22.jpg)
22
Leachate Aeration facility
• Aerated Ponds
• Leachate aeration facility is established
with aeration equipment and the ponds
are built with a capacity of 10000 cum
• 1 – 2657 Sqm – 5581 Cum
• 2 – 2350 Sqm – 4301 Cum
• 3 - 2805 Sqm – 6171 Cum
• 4 – 4291 Sqm – 11586 Cum
![Page 23: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/23.jpg)
23
Capacity: 150m3/day
Leachate Treatment Technology
(Reverse Osmosis Process)
![Page 24: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/24.jpg)
24
Bio-methanation Plant
24
![Page 25: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/25.jpg)
25
Bio-methanation
• Pre-treatment
• Anaerobic Digestion
• Biogas Generation
• Power generation
• Dewatering of digested residue
• Refining and Post Composting
• Thermophillic Process to enhance the biogas generation
• Less water consumption compared to mesophillic process
25
![Page 26: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/26.jpg)
26
Waste to Energy Process Flow
![Page 27: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/27.jpg)
27
Waste to Energy
• Propose to build waste-to-energy plant using the Pusher
Grate technology
• Sophisticated air pollution control (APC) system for treatment
of flue gases
• Continuous online monitoring of air emission will be included
• Reduce volume of waste up to 90% which leave only 10% of
inert / ashes need to be land filled
• The combustion process will destroy all odour-emitting
substances in the waste
• Conversion of bottom ashes into bricks or construction
materials
• Recovery of metals through magnetic separation from bottom
ashes
• Control room with PLC controlled system
![Page 28: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/28.jpg)
28
Waste to Energy
28
Waste to Energy is essentially an application of sound, proven combustion engineering principles to reduce & sanitize the residual solid waste – after recycling and bio-composting the biodegradable component of the waste – after pre sorting- to recover the energy
![Page 29: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/29.jpg)
29
Proven Grate Technology
29
• Reverse acting Reciprocating grate with inclination to allow sliding of waste on its own is selected.
• Ram Feeders to push the waste positively on to the combustion zone.
• Grabs to mix the waste to homogenize and feeding rather than Overhead silo mode of storage to avoid bridging.
![Page 30: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/30.jpg)
30
Flue Gas Distribution System
30
![Page 31: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/31.jpg)
31
Flue Gas Treatment Scheme
31
• Lime Treatment
• Activated Carbon Injection
• Bag Filter
• Ammonia Injection
![Page 32: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/32.jpg)
32
Compliant Specifications of Emissions for WtoE Projects
32
Description Value
Particulate Matter (SPM) < 50 mg/N CuM
So2 < 260 mg/N CuM
Hcl < 50 mg/N CuM
Dioxins & Furans 0.1 TEQ ng/N CuM
Nox < 450 mg/N Cu M
Stack Height 60 mtrs
![Page 33: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/33.jpg)
33
Waste Plastic Mechanical Recycling –
Process Details Waste Plastic
Collection
Grading
Grinding
Washing / Drying
Extrusion
Strand palletizer
Granules Collection
Packing (25 kgs in PP bags)
Granules Store
Grinder
Extruder
Plastic Granules
Final Product
Grinded Plastic Articles
Equipments Raw Material
![Page 34: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/34.jpg)
34
Mechanical Recycling, the most common recycling in India
• Mechanical Recycling is practical option, provided it is done in environmentally safe manner.
• As much as 60% of both industrial and urban plastic waste is recycled
• The pure grade production plastic scrap (waste) directly comes from Industry. The other post consumer plastic waste, part of MSW, is the problem area – typically picked by rag pickers at the bottom of the chain.
• The plastics waste in India is supposed to be segregated as per the Resin Codes (1-7) mentioned in the BIS guidelines (IS: 14534:1998).
Poly Ethelene Terapthalate
LDPE Others
High DensityPoly
Ethylene Poly Propylene
PVC Poly styrene
![Page 35: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/35.jpg)
35
Energy break down of a PE bottle
Potential energy saved when polymer is recovered
Data from ImpEE project at university of cmbridge
![Page 36: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/36.jpg)
36
Recyclables
Plastics recycling
![Page 37: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/37.jpg)
37
Environment Management Plan
• Mitigation of environment impact of existing operations of Processing & Disposal
• Ground water monitoring (15 inside facility and 7 in buffer zone)
• Surface water monitoring (5 Locations outside)
• Ambient Air Quality Monitoring (5 inside facility and 3 in buffer zone)
• Leachate management
• Greenbelt development
• Prevention of raw waste pile up for mitigation of odour, scavenging and putrefaction of waste
• Noise monitoring (5 Locations)
• Compliance of environment monitoring parameters with EC, CA & APPCB consent
• Environment Monitoring Data
37
![Page 38: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/38.jpg)
38
Situation at Jawaharnagar as on 28th October, 2010
Dump at Compost Plant Area
Burning of Waste
Contaminated Water Bodies
Uncontrolled flow of leachate
![Page 39: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/39.jpg)
39
Dump Capping
Dump capping works viz., profiling and soil cover are in progress
Outside view Inside
![Page 40: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/40.jpg)
40
Imliban Transfer Station (In operation since January’2013 by GHMC)
After Before
![Page 41: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/41.jpg)
41
Kukatpally Transfer Station (In operation since August’2013 by GHMC)
Before After
![Page 42: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/42.jpg)
42
Administrative Building
• Administrative building with Laboratory, Conferencing, Training & Display
Halls is under construction in the area of 2400 sq. mts
![Page 43: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/43.jpg)
43
Transformer Yard
• Transformer yard is established with 800 KVA power supply at
Material Stores. Second transformer yard with 200 KVA power
supply is established at Landfill.
![Page 44: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/44.jpg)
44
Power & Backup
Direct Power
800KVA HT
200KVA
Backup Power
320KVA
35 KVA, 15KVA,
10 KVA, 7KVA
2. Nos: 6KVA ups
systems
![Page 45: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/45.jpg)
45
Entrance Gate and Security
BEFORE AFTER
![Page 46: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/46.jpg)
46
Entrance Green Belt
BEFORE AFTER
![Page 47: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/47.jpg)
47
Road - Entrance to Weighbridge
BEFORE AFTER
![Page 48: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/48.jpg)
48
Weighbridge Plaza
BEFORE AFTER
![Page 49: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/49.jpg)
49
Road - Weighbridge to Compost
BEFORE AFTER
![Page 50: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/50.jpg)
50
Dump Capping near weighbridge
BEFORE AFTER
![Page 51: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/51.jpg)
51
Compost plant – Pre - sorting
BEFORE AFTER
![Page 52: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/52.jpg)
52
Compost Plant (Monsoon and Curing Section)
BEFORE AFTER
![Page 53: Hyderabad Integrated MSW - Savitribai Phule Pune · PDF file · 2014-03-05•Site access provided for initiating development works: 28th October ... •DG and Electrical Panel Room](https://reader035.vdocuments.us/reader035/viewer/2022062907/5aabd8a07f8b9ac55c8c5e44/html5/thumbnails/53.jpg)
53
THANK YOU 53