hybrid solutions for tall buildings

Upload: amin-saadaoui

Post on 02-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Hybrid Solutions for tall buildings

    1/154

    Hybrid Solutions for Tall Buildings

    Matthew J. EstherBEng CEng EurIng MICE MIStructE MSFE

    Senior Structural En ineer - Associate

    Farshad BerahmanBSc MSc PhDen or ruc ura ng neer

    WS Atkins Middle EastDubai, UAE

  • 8/10/2019 Hybrid Solutions for tall buildings

    2/154

    Atkins Worldwide

    688

    North America 877

    Europe

    Employees

    11 11 1

    Employees

    688 mp oyees

    2 55

    Middle East & India

    Employees1

    Employees

    We are based in over 130 offices in the UK and

    a further 70 offices worldwide.

  • 8/10/2019 Hybrid Solutions for tall buildings

    3/154

    Atkins In the Region

    ABU DHABI 406

    SHARJAH 290

    TurkeyTurkey

    KUWAIT 4

    BAHRAIN 285

    DUBAI METRO 186

    REGIONAL 52

    F&G 224

    EgyptEgypt

    OMAN 190

    INDIA 204

    Philippines 75

    AfricaAfrica

  • 8/10/2019 Hybrid Solutions for tall buildings

    4/154

    Burj Al Arab Dubai

  • 8/10/2019 Hybrid Solutions for tall buildings

    5/154

    Atkins Tall Buildings

  • 8/10/2019 Hybrid Solutions for tall buildings

    6/154

    Atkins The Tall Buildings Team

    Ranjith Chandunni

    Associate

    Robert D Scott

    Associate

    Min-Hah Chun

    Associate

    Steve Harrison

    Associate Director

    Farshad BerahmanAndrey DanchevMatthew J. Esther Karsten Veith

  • 8/10/2019 Hybrid Solutions for tall buildings

    7/154

    Dubai Metro UAE

    Full Multidisciplinary Design

    Design Coordination of Civi l Works

    Geotechnical & Site Investigations

    Construction Supervision

  • 8/10/2019 Hybrid Solutions for tall buildings

    8/154

    BWTC Bahrain

    ArchitectureCivil & Structural Engineering

    MEP Engineering, Sustainable DesignConstruction Supervision

  • 8/10/2019 Hybrid Solutions for tall buildings

    9/154

    Wind DirectionEnvironmental Design

    9

    Wind Impact

    Wind Speed

    u ng orm

    Existing

    Technology

    16th July 2003

  • 8/10/2019 Hybrid Solutions for tall buildings

    10/154

    Atkins Research and Development Dubai

    Height on the 20th floor, Bur Dubai

  • 8/10/2019 Hybrid Solutions for tall buildings

    11/154

    Delivering Sustainable Solutions

    Collaboration with academia todevelop innovative anddeliverable sustainable solutions

    We continuously challenge ourc en s, emp oyees an supp ychain to deliver holisticsustainable solutions through

    Carbon Critical Design Engaging with industry on

    the Emirates Environmental

    Group (EEG)

    Member: UK Green Building Council

  • 8/10/2019 Hybrid Solutions for tall buildings

    12/154

    Introduction to Hybrid

    -

  • 8/10/2019 Hybrid Solutions for tall buildings

    13/154

    Hybrid Solutions Mega Frames

    Lar e Gravit Transfer Structure

    Coupling of Core Walls Mobilises Frame Action

    Beams

    Efficient Use of Materials

    Careful Attention to Local Load Effects

  • 8/10/2019 Hybrid Solutions for tall buildings

    14/154

    Hybrid Solutions Trump Tower

  • 8/10/2019 Hybrid Solutions for tall buildings

    15/154

    Hybrid Solutions Icon Hotel

  • 8/10/2019 Hybrid Solutions for tall buildings

    16/154

    Trum Tower & Hotel Dubai

  • 8/10/2019 Hybrid Solutions for tall buildings

    17/154

    Trump TowerVideo Clip

  • 8/10/2019 Hybrid Solutions for tall buildings

    18/154

    Trump Tower Initial Design Concept

  • 8/10/2019 Hybrid Solutions for tall buildings

    19/154

    Trump Tower Initial Design Concept

  • 8/10/2019 Hybrid Solutions for tall buildings

    20/154

  • 8/10/2019 Hybrid Solutions for tall buildings

    21/154

    Trump Tower References for Connected Towers

    Umeda Sky Building - Osaka

    La Grande Arche De La Dfense - Paris

  • 8/10/2019 Hybrid Solutions for tall buildings

    22/154

    Trump Tower General Layout Below Level 40

  • 8/10/2019 Hybrid Solutions for tall buildings

    23/154

    Trump Tower General Layout at Level 40

  • 8/10/2019 Hybrid Solutions for tall buildings

    24/154

    Trump Tower Structure & Primary Framing

  • 8/10/2019 Hybrid Solutions for tall buildings

    25/154

    Trump Tower Transfer Structure: Level 40 to 41

  • 8/10/2019 Hybrid Solutions for tall buildings

    26/154

    Trump Tower Hierarchy of Structure

    Outrigger Cantilevers from

    Coupling Trusses

    Trusses Span Continuously

    Between Outrigger and Walls.Outer Trusses Span Between

    Outrigger and Walls.

  • 8/10/2019 Hybrid Solutions for tall buildings

    27/154

    Trump Tower Transfer Structure: Level 40 to 41

  • 8/10/2019 Hybrid Solutions for tall buildings

    28/154

    Trump Tower Coupling of the Concrete Cores

    Coupling action reduces thelateral dri ft by over 70%Lateral displacement ofthe core walls uncoupled

  • 8/10/2019 Hybrid Solutions for tall buildings

    29/154

    Trump Tower Shear Transfer

    Shear Comparison

    200

    150

    ght

    External Load

    100He

    Resultant Shear in Truss

    0

    50

    -30000 -20000 -10000 0 10000 20000 30000 40000

    Shear

  • 8/10/2019 Hybrid Solutions for tall buildings

    30/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

  • 8/10/2019 Hybrid Solutions for tall buildings

    31/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

  • 8/10/2019 Hybrid Solutions for tall buildings

    32/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

  • 8/10/2019 Hybrid Solutions for tall buildings

    33/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    T T

  • 8/10/2019 Hybrid Solutions for tall buildings

    34/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    T T

  • 8/10/2019 Hybrid Solutions for tall buildings

    35/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    T T C i S

  • 8/10/2019 Hybrid Solutions for tall buildings

    36/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower C t ti S

  • 8/10/2019 Hybrid Solutions for tall buildings

    37/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower C t ti S

  • 8/10/2019 Hybrid Solutions for tall buildings

    38/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    39/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    40/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    41/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    42/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    43/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    44/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    45/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    46/154

    Trump Tower Construction Sequence

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    47/154

    p q

    Images Courtesy Tekla and Murray & Roberts

  • 8/10/2019 Hybrid Solutions for tall buildings

    48/154

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    49/154

    p q

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    50/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    51/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    52/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    53/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    54/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    55/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    56/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    57/154

    Images Courtesy Tekla and Murray & Roberts

    Trump Tower Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    58/154

    Images Courtesy Tekla and Murray & Roberts

  • 8/10/2019 Hybrid Solutions for tall buildings

    59/154

  • 8/10/2019 Hybrid Solutions for tall buildings

    60/154

    Adjustments & Phasing

    Trump Tower Elastic Shortening

  • 8/10/2019 Hybrid Solutions for tall buildings

    61/154

    64.7 mm69.5 mm

    55.3 mm

    . mm

    Vertical Movement

    Trump Tower Shortening & Deflections

  • 8/10/2019 Hybrid Solutions for tall buildings

    62/154

    r g n a o s t o n na os on ou us men

  • 8/10/2019 Hybrid Solutions for tall buildings

    63/154

    Adjustments

    Two Parts

    Column Shortening

  • 8/10/2019 Hybrid Solutions for tall buildings

    64/154

    Column shortening to be overcome by

    adjusting the length of columns

    Continuous jacking of columns during the

    construction stage

  • 8/10/2019 Hybrid Solutions for tall buildings

    65/154

    & Monitorin

    Trump Tower Long-term Shortening

  • 8/10/2019 Hybrid Solutions for tall buildings

    66/154

    42.8 61.7 104.5

    48.5

    53.9

    57.4

    53.1

    105.9

    107.0

    209.70

    191.70

    173.70

    56.3

    54.5

    48.5

    42.6

    104.7

    97.1

    155.70

    134.10

    .

    43.7

    36.9

    .

    32.0

    26.6

    .

    75.7

    63.5

    96.60

    116.10

    29.0

    20.7

    21.2

    14.7

    50.1

    35.4

    78.60

    60.60

    41.10

    12.3

    2.90

    8.5

    1.80

    20.7

    4.70.0

    23.10

    5.10

    Floors

    C and E

    Shrinkage

    Total

    Vertical Displacement (mm)

    Trump Tower Long-term Shortening

  • 8/10/2019 Hybrid Solutions for tall buildings

    67/154

    Trump Tower

  • 8/10/2019 Hybrid Solutions for tall buildings

    68/154

  • 8/10/2019 Hybrid Solutions for tall buildings

    69/154

    Icon Hotel Dubai

    Icon Hotel Dubai Promenade

  • 8/10/2019 Hybrid Solutions for tall buildings

    70/154

    Icon Hotel Location

  • 8/10/2019 Hybrid Solutions for tall buildings

    71/154

    Icon Hotel The Site

  • 8/10/2019 Hybrid Solutions for tall buildings

    72/154

    Icon Hotel The Facts

  • 8/10/2019 Hybrid Solutions for tall buildings

    73/154

    Key Facts

    172 Branded Service

    Apartments

    42 storey wheel

    Total built up area

    110,000 sqm

    Icon Hotel Building Geometry

    160

  • 8/10/2019 Hybrid Solutions for tall buildings

    74/154

    34th

    level-MechanicalFloor m

    Lift cores

    Sky Lift

    96m

    165m

    8th level-Mechanical

    FloorAtrium

    Elevation

    10.8m

    13.2 m

    Plan

    .

    Icon Hotel Pre-Concept

  • 8/10/2019 Hybrid Solutions for tall buildings

    75/154

    e areas w g s ear s resses:

    1. Thicken the wall - more weight andmore concrete

    -.

    favourable Architecturally

    3. Use steel plates to reinforce the highly

    stressed concrete walls - Not standard

    Punched Concrete Walls

    Icon Hotel Pre-Concept

  • 8/10/2019 Hybrid Solutions for tall buildings

    76/154

    Permanent

    Composite Trusses

    Sketches Courtesy LERA

    Peer Review LERAs Proposed Alternative

    Icon Hotel Concept Design - Functional Framing & Form Finding

  • 8/10/2019 Hybrid Solutions for tall buildings

    77/154

    Icon Hotel Pre- Construction Advisor - SAMSUNG

  • 8/10/2019 Hybrid Solutions for tall buildings

    78/154

    Images Courtesy Samsung

    Icon Hotel Preliminary Design

  • 8/10/2019 Hybrid Solutions for tall buildings

    79/154

    X

    Icon Hotel Functional Framing

  • 8/10/2019 Hybrid Solutions for tall buildings

    80/154

  • 8/10/2019 Hybrid Solutions for tall buildings

    81/154

    rav y oa a

    Icon HotelAxial Forces Under Gravity Loads

  • 8/10/2019 Hybrid Solutions for tall buildings

    82/154

    Axial Force Diagram

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    83/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    84/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    85/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    86/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    87/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    88/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    89/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    90/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    91/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    92/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    93/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    94/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    95/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    96/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    97/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    98/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    99/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    100/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    101/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    102/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    103/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    104/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    105/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    106/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    107/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    108/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    109/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    110/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    111/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    112/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    113/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    114/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    115/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    116/154

    Images Courtesy Tekla

  • 8/10/2019 Hybrid Solutions for tall buildings

    117/154

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    118/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    119/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    120/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    121/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    122/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    123/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    124/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    125/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    126/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    127/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    128/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    129/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    130/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    131/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    132/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    133/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    134/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    135/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    136/154

    Images Courtesy Tekla

    Icon Hotel Construction Sequence

  • 8/10/2019 Hybrid Solutions for tall buildings

    137/154

    Images Courtesy Tekla

    Icon Hotel Mega Frame LLRSDeformation has shear

    configuration with

    maximum inclination near

    the base

    Deformation

    has bending

    confi uration

    and story drift

    increase with

    height

  • 8/10/2019 Hybrid Solutions for tall buildings

    138/154

    Icon Hotel

  • 8/10/2019 Hybrid Solutions for tall buildings

    139/154

    Icon Hotel Hybrid Mega Frame

  • 8/10/2019 Hybrid Solutions for tall buildings

    140/154

    We used high-strength

    steels to avoid carrying

    load.

    Icon Hotel Modes of Vibration

  • 8/10/2019 Hybrid Solutions for tall buildings

    141/154

    T1 = 4.3 Sec T2 = 3.3 Sec T3 = 3.0 Sec

    Icon Hotel Specialist Studies

    Liquefaction Analysis

    Soil Improvement

  • 8/10/2019 Hybrid Solutions for tall buildings

    142/154

    Soil Improvement

    Seismic Hazard Study Wind Tunnel Study

    Floor vibration analysis

    Connections Detail Design Long Term Effect (Column Shortening)

    Performance Based Seismic Evaluation

    Icon Hotel Wind Tunnel Studies

  • 8/10/2019 Hybrid Solutions for tall buildings

    143/154

    Images & Data

    Courtesy RWDI

    n er s ory r ess an

    Icon Hotel Design of Connections

  • 8/10/2019 Hybrid Solutions for tall buildings

    144/154

  • 8/10/2019 Hybrid Solutions for tall buildings

    145/154

  • 8/10/2019 Hybrid Solutions for tall buildings

    146/154

    Icon Hotel Differential Shortening Between Inner and Outer Walls

  • 8/10/2019 Hybrid Solutions for tall buildings

    147/154

    ICON HOTEL 29th January 2009

    Icon Hotel

  • 8/10/2019 Hybrid Solutions for tall buildings

    148/154

    ICON HOTEL 29th January 2009

    Icon Hotel Performance Based Design Seismic Evaluation

  • 8/10/2019 Hybrid Solutions for tall buildings

    149/154

    Seismic Hazard Study

    Courtesy Fugro West Inc.

    Icon Hotel Performance Based Seismic Design Perform 3D

    Envelope of the concrete compression

    strain at critical locations

  • 8/10/2019 Hybrid Solutions for tall buildings

    150/154

    Coupling beams

    -Concrete compression

    strain 0.0016

    All the members remained elastic except coupling

    beams Building met the performance objectives.

    Icon Hotel Performance Based Seismic Design Usage Ratios

  • 8/10/2019 Hybrid Solutions for tall buildings

    151/154

    Icon Hotel Performance Based Seismic Design Perform 3D

    Scaled Lander 1992

    increased 4x to see the

    extreme behaviour

  • 8/10/2019 Hybrid Solutions for tall buildings

    152/154

    Conclusions

    Lar e ravit transfer structures can be used efficientl to

    mobilise frame action by coupling the core walls.

    Performance based desi n rovides valuable information for

  • 8/10/2019 Hybrid Solutions for tall buildings

    153/154

    the seismic design of geometrically complex structures which

    lie beyond the realms of established building codes.

  • 8/10/2019 Hybrid Solutions for tall buildings

    154/154

    Innovations for the future