hvac fire protection plumbing transformers/panels
TRANSCRIPT
ADVANCED
VISION MOROCCOELECTRO MECHANICAL WORKS
Delivering Innovative And Reliable Solutions
COMPANY PRESENTATION
July 2017
01INTRODUCTION
02QUICK NOTES ABOUT AVM
03LOCAL & INTERNATIONAL CERTIFICATIONS
04OUR SUBSIDIARIES
05ON-GOING PROJECTS (MOROCCO )
06MAJOR INTERNATIONAL PROJECTS
TABLE OF CONTENTS
ADVANCED VISION MOROCCO
07LOCAL & INTERNATIONAL CERTIFICATIONS
INTRODUCTION
01
ADVANCED VISION MOROCCO
ADVANCED VISION MOROCCO
Advanced Vision Morocco is one of the elite group of companies under the umbrella of ConstructionProducts Holding Company (CPC) that was established officially in Morocco in January 2014 after severalyears of services alongside the group.
It is Specialized in Design and Build of Electrical, Mechanical, Infrastructure and renewable energysystems for Industrial, Commercial, residential, hospitals projects.
CPC group was established as a holding company in Jeddah in 2005, and now has branches in the majorcities of Saudi Arabia, Morocco, Qatar, Syria, UAE, Kuwait and Africa.
Members Of
Group
ADVANCED VISION MOROCCO
Members Of
Group
Bahra Precast CompanyUnited Arab Aluminum
Company Empower Contracting Modern Time Technical
Systems Bahra Steel Company Vision Networks Co International Tube & Conduit Co.
Vision Electromechanical Company
First Vision Company AMC AREECO PREMCO Marble and Granite International Company
PREMCO Ready Mix Co
FAME AXAL Construction LtdRental Equipment
Company
Bahra Cables Company (BCC)
HUTA Foundation Works Maytas Infra Saudi Arabia
Fast finishing Contracting Co
ADVANCED VISION MOROCCO
Members Of
Group
Al Harameyn Gate SACODECO Riyadh Steel Company
Advanced VisionSystems
WARED
PREMCO United Chemical Products Roots Steel
Tatweer Building S.A.F.A.D
Polyco
Al MarasemCPC Focus Engineering
Focus Preferred Eng
Global New Material Technology
United Arab Aluminum Company Qatar
Roberts Paint Egypt
TATWEER
MGIC
Saudi Binladin Group – KSA ProjectsJAMARAAT BRIDGE Al-Faisaliyah Tower
Period : 2006-2017 Period : 1998-2000
King Abdul Aziz International Airport
Period : 1997 - 2017
Saudi Binladin Group – KSA ProjectsKING ABDUL AZIZ SPECIALIST HOSPITAL TAIF KING ABDUL AZIZ ENDOWMENT PROJECT
Period : 1998-2001 Period : 1978
TABUK AIRPORT DEVELOPMENT
Saudi Binladin Group – KSA ProjectsALHARAM ALNABAWI EXPANSION QUBA MOSQUE
Period : 1989-1993 Period : 1989-1993
HOLY MOSQUE EXPANSION
Period : 2006-2017
Saudi Binladin Group – UAE ProjectsSHK HAMDAN BIN MOHAMED SPORT COMPLEX INTERCHANGE SHEIKH ZAYED ROAD SHARJAH INTERNATIONAL AIRPORT
Period : 2010 Period : 2002 - 2003 Period : 2005 - 2009
Saudi Binladin Group – UAE ProjectsFUJAIRAH HOUSING COMPLEX AL BUHAIRA PLAZA AL MUSA TOWER
Period : 1993 - 1995 Period : 1933 - 1995 Period : 1990 - 1992
ADVANCED VISION MOROCCO
CPC Group is present and active in Africathrough numerous projects in Morocco,Egypt, and Senegal covering allconstruction fields, with a growing focuson power generation.
OUR MISSION
ADVANCED VISION MOROCCO
Our mission is to be the pioneer in designing and building projects, introducing Pre-engineered Electro –Mechanical solutions, to provide fast response, cost savings, low maintenance costs and longer operating life for all project
conditions and requirements.
With this strategy, AVM has gained its reputation as one of the leading Electro -Mechanical contractors, currently executing a number of prestigious projects in Morocco, and keeping up with the increasingly stringent international
standards.
We put at your disposal all of our know-how accumulated throughout 25 years as projects , and more than 12 years as CPC Services to ensure first class product and services
OUR STRUCTURE
CPC INTERNATIONAL
ADVANCED VISION MOROCCO
AVIA VISION INFRA VISION AFRICA
ADVANCED VISION EGYPT
VISION GARAN
Current manpower resources 67 engineers & Management staff 348 technicians & Site Staff
Current manpower resources • 12 engineers & Management staff• 120 technicians & Site Staff
Member of Casablanca Financial City (CFC)
CPC KSA
To Carry all MEPOperations in Egypt
FUTURE PROJECTS IN AFRICA
ADVANCED VISION MOROCCO
QUICK NOTES ABOUT AVM
02
ADVANCED VISION MOROCCO
ADVANCED VISION MOROCCO
Distribution of Site and Head Office Employees
Position Number
General Manager 1
Head of Departments 10
Project Managers 9
Technical Office Engineers 14
Technical Office Draftmen 12
Adimistrative & HO staff 25
Mechanical Site Engineers 7
Electrical Site Engineers 9
LC Site Engineers 3
BMS Site Engineers 3
Position Number
Infrastructure & Civil Engineers 10
Mechanical Supervisors 11
Electrical Supervisors 12
LC Supervisors 5
Pipes Fitters 67
AC technicians 16
Ductman 33
Electrician 52
LC Technician 22
Welders 18
Site Adimistrative & Logistics 35
ADVANCED VISION MOROCCO
AVM Properties
THE HEAD OFFICE DUCT WORKSHOP MAIN WAREHOUSES
Head Office: office shelf A = 500 m²
16170 CASA PRINCIPAL, Etage 4, Lot 441
Lotissement Al AFFAC – CasablancaMOROCCO
Means Of ProductionAVM has established a duct factory located in Martyl – Tetouan used for the fabrication rectangular air duct ,plenum boxes , volume dampers and Fire rated Duct using a variety of innovative machinery and tools
PMV List21 - Light Utility Vehicles03 - Skidsteer loader09 - Crane/Sewage/Dump Trucks 06 - Bus 05 - Backhoe loader 03 - Crawler & wheeled Excavator01 - Telescopic Fork Lift
• Casablanca warehouses A= 1200 m²• Bouskoura warehouse A= 2400 m²• Benslimane Warehouse A= 1000 m²• Tetouan Warhouse A= 800 m²• Marrakech Warehouse A= 2000 m²
PARK VEHICLES
LOCAL & INTERNATIONAL
CERTIFICATES
03
ADVANCED VISION MOROCCO
ADVANCED VISION MOROCCO
More than any other company, Advanced Vision Morocco must be exemplary in Quality,
Health, Safety and Environment (QHSE). Being part of the CPC Group of companies, a
recognized leader in these fields and thus having these competencies in its DNA, the
Advanced Vision Morocco aims to continuously improve internal processes to better protect
the health and safety of its employees and subcontractors, while also minimizing its impact
on the environment and also to deliver added value services to its clients. Integrating new
acquisitions while efficiently contributing to the Group's business plan is a key QHSE
challenge. To address these needs, an internal network of QHSE professionals, lead by
Noureddine Manfalouti, has been widely deployed throughout our company, supported by
a central team in charge of supporting it.
Advanced Vision Morocco is proud to have a record of Zero deaths since it’s inception.
Advanced Vision Morocco had it’s ISO certification in February 2016 renewed for the year
of 2017, a testament to its tireless dedication to its goals, and the diligent efforts of all its
employees.
Quality, Health, Safety & Environment
ADVANCED VISION MOROCCO
QHSE - Site IncidentsQHSE - Site Incidents
SITENUMBER OF ACCIDENTS
2016
NUMBER OF ACCIDENTS
2017
AVM H.O 0 0
GARAN 9 3
SIEMENS 0 0
TETOUAN 5 0
DUCT FACTORY 1 0
SALMANYA 0 1
PRESTIGIA 0 0
BENSLIMANE 8 0
MAIN STORE 1 0
TOTAL ACCIDENTS 24 4
0
1
2
3
4
5
6
Janvier Fevrier Mars Avril Mai Juin
Monthly work Accident Monitoring 2017
Certificates for AVM and its IndividualsAs part of its continuous efforts to adapt with the local market, Advanced Vision Morocco has strived to have it’s business activitiesapproved by several local governmental firms.
Advanced Vision Morocco is proud to announce that the company is now Classified at level 1 allowing her to conduct HVAC, LowCurrent and Electrical works in Public sector projects.
Here is brief of AVM’s latest earned certifications:
01Classified at Level 1 to conduct HVAC,plumbing , electrical and low currentworks in Public sector projects. .
02ISO Certification: obtained OHSA 9001,14001, and 18001 certificates in 2016and then renewed in 2017 by AVMauditor Bureau Veritas.
04Listed among LYDEC (Lyonnaise desEaux de Casablanca) approvedcontractors to bid on Sewage andpotable water networks works forprojects up to 1 Millions Dhs inCasablanca.
05Enrolls two CNPP-certified engineersthat assist Advanced Vision Morocco indesigning and validating Life & Safety(fire fighting and fire alarm systems) inaccordance with Moroccan andEuropean codes.
03Listed among ONEE (OfficialNationale de l’electricite et de l’eaupotable) approved contractors toconduct Medium Voltage and Highvoltage works for projects up to 1Millions Dhs in Casablanca.
06Enrolls a list of certified welders,medium voltage supervisors,Generator supervisors, trainedplumbing supervisors, and trainedsecurity systems supervisors.
ADVANCED VISION MOROCCO
ADVANCED VISION MOROCCO
01Government Classification / Class 1
ADVANCED VISION MOROCCO
ISO Certification (Renewed for 2017)02
ADVANCED VISION MOROCCO
ONEE Certification
• Our current classification withthe government is Class B, which allows us to apply for unlimited amounts of LV (lowvoltage) government projectsand up to 10 million Dhs of MV (medium voltage) projects.
• We are currently in the processof applying for Class A, whichwould allow us to apply for unlimited amounts of both LV and MV government projects.
03
ADVANCED VISION MOROCCO
04Lydec Certification
OUR SUBSIDIARIES
04
ADVANCED VISION MOROCCO
Our Subsidiaries
ADVANCED VISION MOROCCO
A V I A
ADVANCED VISION MOROCCO
As of 2017, Vision AFRICA, along with its sistercompanies (led by Advanced Vision Morocco), areactively engaged in projects throughout Africa as a resultof the rapid expansion of business opportunities on thecontinent.
Vision AFRICA (along with its sister companies) are inthe negotiations phase for several ground-breakingprojects all across Africa. Some of the projects undernegotiation cover Equatorial Guinea, Chad, Zambia, andthe Ivory Coast, and cover many diversified projects,from airports to residential & commercial districts andMega-projects.
Vision AFRICA and its sister companies aim to makefull use of their international experience developing megaprojects in order to aid in the development and theconstruction efforts of the African continent.
Advanced Vision Africa
Advanced Vision ICAD Africa
ADVANCED VISION MOROCCO
AVIA is an emerging technology company in the world of developing Africa with a committed ambition to support and grow with the vision of Modern Africa.
AVIA is the technology provider with an aim to bring solution to every requirement in the field of ICT (Information and communication Technologies) and MEP (Mechanical, Electrical and Plumbing) divisions by spreading its wings to the domains like Aviation (Airports , Airlines, Air Navigation, Air Cargo, Ground Handling, Drones etc.), Sea Ports, Hospitals, Hotels, Stadiums, Palaces etc.
AVIA brings the expertise in the field of system designing, installation, Testing & Commissioning, Integration, Handover, ORAT (Operational Readiness & Transfer) and Operations & Maintenance with the help of specialized global partnered companies.
AVIA is more concerned and respectful in addressing the Local culture, Environmental challenges with the renewal energy options in all aspects of their approaches. AVIA serves customers with skilled SMEs (Subject Matter Experts) and Project management professionals aided by all the relevant standards like Quality, Safety, Governance, Industry organizations and Project management.
A V I A
List of Completed and On-going Projects
VICTORIA CITY –Morocco
Fire Protection, High Current, HVAC, Low
Current, Plumbing
Third Haram Extension & Service Tunnel – ShameyahProject
Fire Protection, High Current, HVAC,
Plumbing
SENEGAL AIRPORT
Airport Operations Services, Low Current
Samaa Marina –Marriott HotelTetouan – Morocco
Fire Protection, High Current, HVAC, Low
Current, Plumbing
Private Residence –Ben Sleiman –Morocco
Fire Protection, High Current, HVAC, Low
Current, Plumbing
Private Palace –Bouskoura – Morocco
Fire Protection, High Current, HVAC, Low
Current, Plumbing
ADVANCED VISION MOROCCO
List of Completed and On-going Projects
Princess NouraUniversity For Women – Riyadh, K.S.A.
Fire Protection, HVAC, Plumbing
Ministry Of Interior (MOI)
Fire Protection, High Current, Plumbing
King Tower Jeddah, K.S.A
Fire Protection, Low Current
King Fahad International Airport
Airport Operations Services, Low Current
King Abdul Aziz University Science & Technology (Kaust)
High Current, HVAC, Plumbing
King Abdul Aziz International Airport (KAIA) – Jeddah, K.S.A
Airport Operations Services, Fire Protection,
Low Current
ADVANCED VISION MOROCCO
List of Completed and On-going ProjectsKASCH Riyad
Fire Protection, Low Current
KAIA – Air Traffic Control Tower
Airport Operations Services, Fire
Protection, High Current
Internal Security Forces Camp Cpc 07b (Duhail) – Lekhwiya, Qatar
Fire Protection, High Current, HVAC,
Plumbing
Hajj Terminal King AbdulazizInternational Airport
Airport Operations Services, High
Current, HVAC, Plumbing
General Aviation Terminal
Airport Operations Services, High
Current, Plumbing
Capital Market Authority Tower (Cma)
High Current, HVAC, Low Current, Plumbing
ADVANCED VISION MOROCCO
Abraj Kudai
HVAC, Low Current
Advanced Vision Egypt
ADVANCED VISION MOROCCO
Egypt occupies a unique place as Africa’s fastest growing construction market in the continent. With avision to fulfill Egypt’s insatiable demand for innovative construction companies, our visionary parentcompany has invested significant time and effort into the creation of Advanced Vision Egypt, our latestVision creation, with an eye to serving the country’s unique construction needs.
Our team of management and staff in Egypt has started to expand at this time being encounteringexperienced MEP engineers working on promoting our company in this new market and establishing thereputation of the mother company in Egypt.
A list of the recently awarded projects for Vision Egypt, is detailed in the next page
ADVANCED VISION MOROCCO
List of Completed and On-going ProjectsBadr Small and Medium Factories
A group of small and medium factories owned by Egyptian Industrial Development Authority in aim of development of small and medium industrials and investors.
Client : Egyptian Armed Forces (Military Works Department).
Project Location: Badr City.
Project Area: 124,695 m2.
• Supply and installation of underground firefighting network.
• Supply and installation of aboveground firefighting network.
• Supply and installation of all fire hose cabinet inside factories.
• Supply and installation of all equipment located in pump room.
• Testing and commissioning of all fire fighting works.
• Training of Industrial Development Authority maintenance team for the usage of installed equipment how to use and keep in safe all our works and protect this project against fire.
Sadat Small and Medium Factories
A group of small and medium factories owned by Egyptian Industrial Development Authority in aim of development of small and medium industrials and investors.
Client : Egyptian Armed Forces (Military Works Department).
Project Location: Sadat City.
Project Area: 441,455 m2.
• Supply and installation of underground firefighting network.
• Supply and installation of aboveground firefighting network.
• Supply and installation of all fire hose cabinet inside factories.
• Supply and installation of all equipment located in pump room.
• Testing and commissioning of all fire fighting works.
• Training of Industrial Development Authority maintenance team for the usage of installed equipment how to use and keep in safe all our works and protect this project against fire.
New capital (El-Kayan 110)
An administration building consists of 24 sectors, each sector consists of three floor and each floor consists of 28 offices and 8 spaces as utilities
Client : Egyptian Armed Forces (Military Works Department)
Project Location: New capital.
Project Area: 53,737 m2..
• Installing Firefighting Networks.
• Installing Plumbing Networks.
• Installing HVAC Networks.
• Installing Power Networks.
• Installing Lighting Networks.
• Installing Light Current Networks.
• Testing and Commissioning of all Electro-Mechanical works.
ADVANCED VISION MOROCCO
Low & Medium Voltage duct banks01
Low current & Security installations 02
Chilled Water Applications03
Water supply and irrigation networks05
External lighting06
Foundations for all kinds of installations (High Mast, Solar panels, wind turbines
etc..)
08
Vision Infra
04
Road and asphalt works 07
Storm water and sewage drainage
Curbstone and pedestrian walk ways
09
Vision Infra was founded in 2015 as an infrastructure company specializing in external networks and road works. Since it was founded, Vision Infra has acquired a
vast fleet of heavy machinery and equipment required to execute any task on site. Our expertise and quality performance of fast track projects has enriched our
contacts with local authorities, suppliers and subcontractors.
Vision Infra has strived to gain certification from ISO and OHSAS as well as accreditation from the local water and electricity authority LYDEC.
Our area of expertise includes but is not limited to the following:
ADVANCED VISION MOROCCO
VISION INFRA STAFFVision Infra’s Site Staff includes more than 100 qualified personnel.
Site Staff
1 Operations Manager 1
2 Construction Manager 1
3 Civil Engineers 5
4 Supervisors 6
5 Senior Surveyors 3
6 Drivers/Heavy Equipment Operators 20
7 Technicians/Mechanics 6
8 Labor 95
Office Staff
1 Head Office Staff 9
2 Design Engineers 5
3 HR Dept. 2
4 Accounting Dept. 2
5 Contracts Dept. 2
Manpower Supply
1 3 Suppliers 250
ADVANCED VISION MOROCCO
VISION INFRA CAPABILITIES - EQUIPMENT
DESCRIPTION : Wheeled Excavator19 TonMAKE: DoosanQTY: 1
DESCRIPTION : Crawler Excavator20 Ton / 34 TonMAKE: Caterpillar/DoosanQTY: 2.
DESCRIPTION : Backhoe LoaderMAKE: JCBQTY: 2
DESCRIPTION : Skidsteer LoaderMAKE: BobcatQTY: 3
DESCRIPTION : Single DrumCompactor 17 TonMAKE: AmmannQTY: 1
DESCRIPTION : Dump TruckMAKE: MANQTY: 2
DESCRIPTION : Telescopic Fork LiftMAKE: ManitoQTY: 1
DESCRIPTION : Crane TruckMAKE: MitsubishiQTY: 1
DESCRIPTION : Sewage TruckMAKE: RenaultQTY: 1
Our vast and diverse fleet of machinery & equipment includes the following :
Heavy Machinery
DESCRIPTION : Excavator Jack MAKE: HammerSoosanQTY: 2
DESCRIPTION : Screening BucketMAKE: MB CrusherQTY: 1
DESCRIPTION : Street Sweeper MAKE: BobcatQTY: 1
DESCRIPTION : Diesel Tank w/ PumpMAKE: N/AQTY: 1
DESCRIPTION : 8 Ton Water Tank w/ PumpMAKE: N/AQTY: 1
DESCRIPTION : Coring Machine MAKE: HILTIQTY: 3
DESCRIPTION : 0.5 Ton Roll CompactorMAKE: AmmannQTY: 2
DESCRIPTION : Mobile Light PostMAKE: VariousQTY: 20
DESCRIPTION : Air Compressor w/ Jack HamerMAKE: DoosanQTY: 1
Equipment & Accessories
We have local and international connections to source any special equipment that a project might require
VISION INFRA EQUIPMENT
ADVANCED VISION MOROCCO
ADVANCED VISION MOROCCO
ONGOING VISION INFRA PROJECTS
01VICTORIA CITY PHASE 3 ZONE 7:BOUSKOURA - MOROCCO
02BUHAIRA ADMIN BLDG:BENSLIMANE - MOROCCO
06
03
0504SOLAR FARM PHASE 2:BENSLIMANE - MOROCCO
ROYAL PALACE PERIMETER SECURITY: TANGIER - MOROCCO
DRIVER’S BUILDING:BENSLIMANE - MOROCCO
VICTORIA CITY PHASE 3 ZONE 3-4-6: BOUSKOURA - MOROCCO
ADVANCED VISION MOROCCO
VICTORIA CITY PH3 ZONE 7
ADVANCED VISION MOROCCO
BUHAIRA ADMIN & DRIVER’S BLDG-BENSLIMANE
ADVANCED VISION MOROCCO
SOLAR FARM PH2-BENSLIMANE
ADVANCED VISION MOROCCO
ROYAL PALACE PERIMETER SECURITY- TANGIER
ADVANCED VISION MOROCCO
ROYAL PALACE PERIMETER SECURITY- TANGIER
ADVANCED VISION MOROCCO
VICTORIA CITY PH3 ZONE 3-4-6
ON-GOING PROJECTS(MOROCCO)
ADVANCED VISION MOROCCO
05
ADVANCED VISION MOROCCO
List of Completed and On-going Projects
Private Project Bouskoura- Casablanca –
Morocco Completed June 2014
1
6
2
7
3 4
9
Private Residence• Bensleiman – Morocco• Completed December 2015
Victoria City Infrastructure works• Bouskoura–Casablanca -
Phase 1: Completed, Phase 3: On Going, ResidentialBuildings: On Going
5
Samaa Marina Marriott Hotel• Tetouan-Morocco• On going
10
Private Project–Phase 3 • Tangier -Morocco• Completed July 2017
P1 complex project • Bensleiman - Morocco • On-hold
11 12
Siemens Wind blade Factory• Tangier–Morocco• On going
Furukawa Cables Factory• Tangier–Morocco• On going
Ritz carlton hotel• Marrakesh - Morocco • On going
Egypt embassy complex• Rabat – Morocco• Final negotiations stage
Fauricia Factory - Tangier• Tangier–Morocco• On going
8 Miscellaneous projects• Bensleiman - Morocco • On-hold
ADVANCED VISION MOROCCO
1 Private Project - Bouskoura
The Project consists of an extension to a private project located inBouskoura – Casablanca, by constructing a new building of 31,094 m2,encompassing VIP Class A and areas to meet with the requirements ofthis prestigious client .
Advanced Vision Morocco has executed the MEP works related tothis project in a record 6 months duration, and accompanied theclient during his royal visit.
Key Figures :
Start Date : December 2013Duration : 6 months Actual status : Handed overSystems Executed : - Plumbing works
- HVAC works- Fire fighting works
- Security systems works
- Low Current and BMS works- Generators installation- MEP External works
ADVANCED VISION MOROCCO
1 Private Project - BouskouraKey figures of Mechanical installation
01Preparing schedulesfor the projectmanager or the projectexecutive
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitability
05Assisting in resolution of potential claims
01Chillers : 3 x 750 tons of cooling
02Air Handling units : 32 units
03Underfloor heating covering 1500 m2
04Fire set of UL/ FM 2 electrical pumps 1000 GPM/120 PSI
05Foam and FM 200 suppression system
ADVANCED VISION MOROCCO
1 Private Project - Bouskoura
01Preparing schedulesfor the projectmanager or the projectexecutive
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitability
01Generator Sets 3 x 1400 KVA
02Transformer Sets4 x 1250 KVA
03IPTV , Fire Alarm , DATA, Telephone , MATV, WIFI
04External lighting poles 50 High Mast units
Key Figures of Electrical installation
ADVANCED VISION MOROCCO
1 Private Project - Bouskoura
ADVANCED VISION MOROCCO
12 Samaa Marina - Marriott Hotel - Tetouan
This Andalusian inspired hotel will include 190 roomsvarying from normal suites, to executive and presidentialtype suites, in addition to restaurants, fitness & healthcenters, private and main kitchens and large outdoor andindoor swimming pools.
Advanced Vision Morocco is currently executing the MEPworks related to this project and has reached a progress of95 % where the final handing over procedures has started totake place, allowing the Hotel operator start using thehotel.
Project Key Figures :
Start Date : April 2015Duration : 24 months (excluding summer breaks )Actual status : Certified overall progress 95 %Systems Executed : - Plumbing works & MEP External Works
- HVAC and smoke management works- Fire fighting works
- Security systems works
- Low Current and BMS works- Generators and transformer installation
The Project consists of the construction of a 5-stars hotel alongside a private VIP Villa located at Sebta Road, Tetouan, Morocco. The totalbuilt-up area is 37,958 m2, including an outdoor dining area, technical rooms housing the MEP equipment, and a clubhouse.
ADVANCED VISION MOROCCO
2 Samaa Marina - Marriott Hotel - Tetouan
Key figures of Mechanical installation
01Chillers 3x 250 tonsof cooling
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecastingearningand profitabili
0501 02Fuel Fired boilers 3 x750 kw
03Air Handling units 54 units
04Fan Coil units303 units
05CRAC units14 units
01 02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
06Underfloor heating covering 1800 m2
07Fire set of NF 2 electrical pumps 1500 GPM/140 PSI
08Full sprinkleredhotel rooms and corridors
09Automatic Foam & FM 200 suppression system
Chillers 3 x 250 tons of cooling
ADVANCED VISION MOROCCO
2 Samaa Marina - Marriott Hotel - Tetouan
Key Figures of Electrical installation
01Chillers 3 x 250 tonsof cooling
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitabili
0501 02Transformer Sets 5 x 1600 KVA + 1 X 2000 kVA
03Data Center 4 rooms including active & passive equipment
04Audio Visual, Sound and IPTV systems
05Access control , CCTV & intrusion security system
0106Fire Alarm System Generator Sets
3 x 1250 KVA + 1 x 500 kVA
ADVANCED VISION MOROCCO
2 Samaa Marina - Marriott Hotel - Tetouan
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
Victoria City is a major new urban center located in Bouskoura City,designed in a natural living environment close to multiple activitycenters covering an area equaling 2,495,000 m2, minutes fromdowntown. This new concept in ultra-modern look is built on themodel of a city that strives for social diversity and sustainabledevelopment.
The project is expected to include 3200 residential apartments(Economical Type), 14,200 residential apartments (High StandardType), and around 450 villas, alongside the infrastructure networksbeing executed for the 250 hectares area.
Scope of Work :
Phase 1 : MEP External WorksPhase 3 : MEP & Infra structure works RCE5 buildings : MEP works
ADVANCED VISION MOROCCO
Victoria City – Casablanca 3
Advanced Vision Morocco was able to execute these works after being listed among the contractors list approved by
local Electricity and Water authorities, LYDEC and ONEE.
The external works are divided into 3 phases. AVM has accomplished the MEP works in Phase 1, and is currently completing the remaining works in Phase 3.
1
The MEP works among the residential RCE05 Buildings. The Project consists of 2 connected buildings, composed of 8 blocs each, housing 194 apartments.
2
The project is composed of two main packages:
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
01Preparing schedulesfor the projectmanager or the projectexecutive
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitability
01Transformer Sets31 sets
02External lighting poles466 fixtures
03Network for Telephone system9440 m
04Medium & Low Voltage networks
Key Figures Phase 1
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
Key Figures Phase 1
01Chillers 3 x 250 tonsof cooling
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitabili
0501 02PVC sewage & rainwater pipe network13,955 m
03Drainage and rainwater connection kits 2,633 units
04PVC PN16 water supply pipe network 18,950 m
05Concrete water supply pipe network 2,655 m
0106HDPE PN16 Irrigation pipe network 3,912 m
HDPE sewage & rainwater pipe network17,408 m
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
Key Figures Phase 3
01Preparing schedulesfor the projectmanager or the projectexecutive
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitability
01Transformer Sets 32 sets
02External lighting poles 677 fixtures
03Network for Telephone system 112,443 m
04Medium & Low Voltage networks
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
Key Figures Phase 3
01Preparing schedulesfor the projectmanager or the projectexecutive
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitability
05Assisting in resolution of potential claims
01HDPE sewage & rainwater pipe network 21,004 m
02Concrete sewage & rainwater pipe network 2,485 m
03Drainage and rainwater connection kits 3,034 units
04PVC PN16 water supply pipe network28,481 m
05HDPE PN16 Irrigation pipe network 11,907 m
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
Key Figures Phase 3
01Chillers 3 x 250 tonsof cooling
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitabili
0501 02Excavated volume 59,490 m3
03Curbstones16,430 ml
04Asphalt works 14,566 ml
05Manholes376 units
0106Telephone rooms 161
Backfilledvolume 53,990 m3
ADVANCED VISION MOROCCO
Victoria City - Casablanca3
Key Figures RCE 5 Buildings (194 Apartments)
01Chillers 3 x 250 tonsof cooling
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitabili
0501 02External lighting composed of garden lights.
03Low voltage distribution system
04Videophone and Telephone system
05Water supply and drainage system
0106Fire protection system based on Fire hose cabinets
Transformers sets : 2x 400 Kva
ADVANCED VISION MOROCCO
Private Project - Tangier4
The Project consists of an extension to a private project located in Tangier – by constructing new buildings covering a surface area of 22,706 m2, encompassing VIP Class A buildings, staff accommodations, power stations, chiller plants and sewage collection plants; in addition to the external network providing water supply, drainage, fire fighting, central chilled water supply, low current, as well as low and medium voltage services to all buildings.Advanced Vision Morocco has executed the MEP and Infrastructure works related to this project in a record 5 months duration and accompanied the client during the VIP visit.
Key Figures :
Start Date : February 2016Duration : 5 months Actual Status : Handed over Systems Executed : - Plumbing works
- HVAC & MEP External works- Fire fighting works
- Security systems works
- Low Current and BMS works- Generators installation
ADVANCED VISION MOROCCO
Private Project - Tangier4
Key figures of Mechanical installation
01 02Air Handling units 24 units
03Fan Coil units 101 units
04Fire set of UL/ FM 2 electrical pumps 1500 GPM/120 PSI
05Booster set composed of 5 Irrigation & 4 water supply pumps
06Foam and FM 200 suppression system 3255 Gallons
07PresinsulatedChilled water pipes (up to 300 mm )2144 m
08HDPE PN 16 pipes irrigation , water supply and fire fighting external network
Chillers4 x 320 tons
ADVANCED VISION MOROCCO
Private Project - Tangier4
Key figures of Electrical Installation:
01Medium Voltage Infrastructure
• MV loop: 1.7Km (external works)• 5No MV/LV power stations• 8No Power transformers totalizing 12.8
MVA • SCADA supervised power stations
02Emergency Power Supply
• 3No Soundproofed power station
• 6No Gensets totalizing 9.6 MVA of load
• 3No buried fuel tanks totalizing 110m3
03Low Voltage Distribution
• 12No Main Distribution Boards
• 67No Distribution Switchboards
• LV cable: 80Km main feeders (single core)
04Low Current Systems
• 21No interconnected Fire Alarm Control Panels• Two Data Center- 8 Core switch• 37No MDF/IDF• Wi-Fi coverage, IP telephony, IPTV, IP CCTV and IP Access Control• LC external network: 5Km • Conference room: Pop up screens, conference systems (wired and
wireless), video conference…• BMS : 1500 points
ADVANCED VISION MOROCCO
Private Project - Tangier4
ADVANCED VISION MOROCCO
Siemens Wind Blade Factory - Tangier5
Key Figures :
Start Date : October 2016Duration : 10 monthsActual Status : Certified overall progress 94 % Systems Executed : - Plumbing system
- HVAC system- Fire fighting System
- Process Heating system
- Compressed air system
The Project consists of a production facility occupying asurface area of 37,500 m² and located 35Km from TangierMed Port, in Tangier Automotive city, TAC, dedicated forthe fabrication of wind turbine rotor blades.
Advanced Vision Morocco is in charge of the execution ofall mechanical systems needed for the project.Using its experience in the engineering field, AVM was ableto assist in fulfilling this prestigious client’s requirements,while complying with the strict regulations of this newlyestablished free zone.
ADVANCED VISION MOROCCO
Siemens Wind Blade Factory - Tangier5
Key figures of Mechanical installation
01Preparing schedulesfor the projectmanager or the projectexecutive
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitability
05Assisting in resolution of potential claims
01Chillers 2 x1070 KW
02Heat pumps2 x 355 KW
03Boilers3x500 KW +1x1400KW
04Air handling units (4 pipes system) 65 units
05Air Compressors 3x55 KW
ADVANCED VISION MOROCCO
01Fire set of Diesel + Electric pump working 1500 GPM and 120 Psi
02Fully sprinklered network for factory through network of blacksteel pipes exceeding14,555 m
03Siphonic rainwater system using ductile iron pipes
04Aluminum compressed air network ensuring distribution among all areas of factory
Siemens Wind Blade Factory - Tangier5
Key figures of Mechanical installation
ADVANCED VISION MOROCCO
Siemens Wind Blade Factory - Tangier5
ADVANCED VISION MOROCCO
Private Residence - Benslimane6
The project consists of the construction of a VIP Villa located in Benslimane .The total built up area is 6,020 m2 distributed among 5
floors surrounded by beautiful landscape areas including an indoor heated swimming pool, gym, pantries and VIP rooms offering tremendous mountain overviews.
Advanced Vision Morocco has completed the MEP and infrastructure works related to this project.
Key Figures :
Start Date : March 2015Duration : 12 monthsActual Status : Handed over Systems Executed : Plumbing works ( inc. Solar
system)HVAC worksHeating for Swimming pools
Low Voltage worksLow current worksMEP & Infra structure worksExecution of Sewage plant
ADVANCED VISION MOROCCO
Private Residence - Benslimane6
Key figures of Mechanical installation
01Reversible DX ducted and High wall units 76 units
02Heat pumps for heating of Swimming pool 2 x 75 Kw
03Booster sets for irrigation and water supply 2 x 105 GPM@7 Bars
04Underfloor heating covered area1055 m2
ADVANCED VISION MOROCCO
Private Residence - Benslimane6
Key figures of Electrical installation
01Chillers 3 x 250 tonsof cooling
02Evaluating general conditions on a monthly basis
03Completing special studies for senior management
04Forecasting earningand profitabili
0501 02Generator350 KVA
03UPS30 KVA
04MDB – EMDB
05Off Grid Solar System for External Light
0106Connected to Solar System through on MV network loop
Transformer1250 KVA
ADVANCED VISION MOROCCO
Private Residence - Benslimane6
ADVANCED VISION MOROCCO
P1 Project - Benslimane7
The project consists of the construction of a complex composed of main Villa B01 of 22,400 m2, Power House, Helipad & Chiller building B02 of 2,400 m2, and Staff accommodation building B04 of 2,903 m2 overviewing astonishing landscape areas spread between the mountains and valleys of Benslimane Region .
Advanced Vision Morocco has executed the MEP works related to this project up to December 2014, the date when the project was put on hold by the client.
Key Figures :
Start Date : April 2014Duration : 20 monthsActual Status : On Hold – Subject to redesignSystems Executed : Plumbing works
HVAC worksHeating for Swimming poolsUnderfloor heating system Low Voltage worksLow current worksMEP & Infra structure works
ADVANCED VISION MOROCCO
P1 Project - Benslimane7
Key figures of Mechanical installation
Transformers sets : 2x 400 Kva
01 02Fan coil units131 units
03DX Air Handling units 13 units
04Duct network 7,000 m2
05Automatic Foam & CO2 suppression system 7,200 lbs
06Underfloor heating covered 3,303 m2
07Fully sprinkleredbuilding with UL/ FM fire pump operation at 1,000 GPM AND 120 PSI
Three pipes VRV system 305 tons
ADVANCED VISION MOROCCO
Miscellaneous projects- Benslimane8
The project consists of the construction of an Elevated water tanks of 800 m3 capacity and 40 m height used to distribute potable water to several buildings located in Benslimane complex .
Advanced Vision Morocco has executed the plumbing and electrical works related to this project including all galvanized steel pipes ,valves , internal & external lighting till the handing over to the local water authority
Key Figures :
Start Date : December 2016Duration : 5 monthsActual Status : CompletedSystems Executed : Plumbing works
Lighting works MEP & Infra structure worksDisinfection works
Elevated water tank
ADVANCED VISION MOROCCO
Miscellaneous projects- Benslimane8
Photovoltaic Solar plant
The project consists of the installation of an ON-GRIDPhotovoltaic plant delivering 944 Kw through 3,614panels installed around a lake, in a parking area, and onthe roof of a building.This plant has allowed great savings for the client,ensuring reduced consumption during the day .
Advanced Vision Morocco has executed the supply &installation of solar panels and support system alongsideall the relevant electrical works.
Key Figures :
Start Date : December 2015Duration : 12 months through 2 phasesActual Status : Completed
ADVANCED VISION MOROCCO
Miscellaneous projects- Benslimane8
Wind turbine 250 kW
The project consists of the installation of one ON-GRID wind turbine of 250 KWin Benslimane area and it’s connection with the medium voltage network.
Advanced Vision Morocco has executed the supply & installation of this turbinealongside support systems, and built the electrical room housing the controldevice inverters .
Key Figures :
Start Date : December 2015Duration : 1 monthActual Status : Completed
ADVANCED VISION MOROCCO
Miscellaneous projects- Benslimane8
Supply & installation of Fiber optics network exceeding 3000 m length , composed of HDPE pipes used to pull the cables ,alongside all relevant infrastructure works
1
Supply & installation of Water supply network composed HDPE PN16 pipes exceeding 2000 m length , alongside all relevant infrastructure works
2
Supply & installation of Medium Voltage network exceeding 2500 m length , and connecting several buildings network with the photovoltaic and Wind turbine plant network
3
Supply & installation of Irrigation network exceeding 2000 m length , and hooking up several green areas with the water accumulated in basin using innovative BOREHOLE pumps
4
Construction of 6 Transformer rooms , completed alongside all relevant electrical scope .
5
ADVANCED VISION MOROCCO
Miscellaneous projects- Benslimane8
Renovation of MEP systems in Farm Villa
1
Construction and MEP works of Maintenance building
2
ADVANCED VISION MOROCCO
Ritz Carlton Hotel, Jnan Ammar - Marrakech9
The Project consists of the construction of a 5-stars hotelsurrounded by Polo fields and landscaped areas occupyinga surface of 50 Hectares.
The project also includes the construction of restaurants, acigar bar, clubhouses and 85 villas .
Advanced Vision Morocco has started the execution of theMEP works related to the Villas of this project and willaccompany the client in the other phases of the project .
Key Figures :
Start Date : May 2017Duration : 12 months Systems Executed : - Plumbing works
⁻ HVAC works⁻ Fire fighting works ⁻ Security systems works⁻ Low Current and BMS works⁻ Generators installation⁻ MEP External works
ADVANCED VISION MOROCCO
9 Ritz Carlton Hotel, Jnan Ammar - Marrakech
ADVANCED VISION MOROCCO
10 Furukawa Cables Factory - Tangier
Key Figures :
Start Date : July 2017Duration : 6 monthsSystems Executed : - Plumbing works
- HVAC works- Fire fighting works
Japanese group Furukawa Electric,the world’s third largest fiber-optic
manufacturer, is moving forward with plans to establisha manufacturing facility in Tangier – Morocco, to supplythe entire African continent with cable assemblies.Furukawa will be the first major company in the field toproduce fiber optic cables in Africa.
Advanced Vision Morocco has been awarded themechanical works in this prestigious project in charge ofthe preparation of the relevant design drawings,calculation notes and execution .
ADVANCED VISION MOROCCO
10 Furukawa Cables Factory - Tangier
Site Progress as of 18 July 2017
ADVANCED VISION MOROCCO
Egyptian Embassy - Rabat11
The project consists of the construction of The EgyptianEmbassy complex, located in Rabat, and composed ofthree buildings. It is designed to ensure the largestcapacity of visitors with an emphasis on comfort andsafety.
Advanced Vision Morocco is in the final negotiationsstage with the client to conduct the MEP works in thisstrategic project with this prestigious main contractorentering the Moroccan Market, executing this projectwith Arab Contractors.
Key Figures :
Start Date : August 2017Duration : 12 monthsSystems Executed : - Plumbing works
- HVAC works- Fire fighting works- Electrical works- Low Current works- Security Works
ADVANCED VISION MOROCCO
Faurecia Factory - Kenitra12
Key Figures :
Start Date : September 2017Duration : 11 monthsScope of Work :
• HVAC system • Compressed air system • Fire fighting system • Plumbing systems• Low current systems• Low and medium voltage systems
Faurecia Automotive System Technologies is the leading manufacturer of automotive seatcovers in North Africa, and has decided to mark its presence in Morocco through athird factory of 12,800 m2, located in the Atlantic Free Zone of Kenitra – Morocco.
Faurecia will be investing 170 million dirhams into this establishement, leading to thecreation of 1,300 jobs, with a potential 500 additional employees in the future. The planthas a daily production output of 10,000 leather and fabric seat covers, in particular for thePeugeot 3008 and 5008. The level of employee training, their established expertise intextiles, and the site's state-of-the-art digital production system make Faurecia abenchmark for the industry.
Advanced Vision Morocco has been awarded the design and build scope of all MEPsystems needed for this prestigious project including the special Cooling, Compressed air,and Low voltage systems needed for the fabrication process.
MAJOR INTERNATIONAL
PROJECTS
ADVANCED VISION MOROCCO
06
ADVANCED VISION MOROCCO
Major International Projects
1
7
2
8
3
5
10
6
11 12
Princess Noura University• Reyadh – KSA• Completed
King Abdul Aziz University• Jeddah – KSA• On-going
Ministry Of Interior• Jeddah – KSA• Completed
Internal Security Forces Camp • Doha – Qatar• Completed
Third Haram Extension Service Tunnel• Mekkah - KSA• Completed
Hajj Terminal King Abdulaziz Airport • Jeddah – KSA• Completed
General Aviation Terminal• Jeddah – KSA• Completed
Capital Market Authority Tower• Reyadh – KSA• Completed
King Abdullah Specialty Children Hospital -K.S.A.U• Riyadh KSA• Completed
Prince Mohammed Bin Abdul Aziz Hospital • AlMadinah KSA• Completed
13King AbdulazizInternational Airport (Kaia P1072) • Jeddah – KSA• On-going
9 Mas’a Extension Holy Mosque• Mekkah – KSA• On-going
4 SAUDI BINLADIN GROUP – Hospitals Projects
ADVANCED VISION MOROCCO
Princess Noura University For Women -Riyadh
The project consists of a university women covering 8 million squaremeters and located north of Riyadh. The total constructed area ofapproximately 3 million square meters. The university includesadministrative buildings, 13 faculties, a 700-bed hospital, laboratories,research centers, and residential area that includes accommodation forstudents and staff, and a tram. The university's capacity is about 40 000students.
design and production of electrical and mechanical systems of 68residential buildings, 4 faculties, 2 stages, 2 school buildings, with a Metrocovering a distance of 12 km with 14 stations, two bus terminals andDepository building complex.
Project was GOLD LEED certified
Key Figures :
Beds : 700 beds Surface : 3,000,000 m²Turn key project
1
ADVANCED VISION MOROCCO
• Number of Stations : 14• Length of Routes : 11.62Km • Number of Turns : 6 turns• Fleet : 22 Trains (2 cars per train)• Capacity of the train : 110 people• Capacity of the line : 4,400 Passengers per hour per direction• Commercial speed : 24 km/h• Max speed : 60 km/h
Princess Noura University For Women -Riyadh
1
ADVANCED VISION MOROCCO
Princess Noura University For Women -Riyadh
1
ADVANCED VISION MOROCCO
Princess Noura University For Women -Riyadh
• The cooling capacity of all buildings exceeds: 21,000 tones
• More than 5,000 tons of air flow distribution ducts and 450 km of black steel pipeHydraulic
• Balancing and aerodynamics carried out by a testing agency and LEED certified test, centralized technical management
• System building with communication interface with the ventilation system, fire protection, FM 200, elevators / escalators, control panel and engine TGBT,
• protection and fire alarm tested and approved by the authority of the local civil defense
CTA : 598; VC (Frozen water): 17,927 VC Dx unit : 950 ; CRAC : 15Ventilations extraction and fresh air: 2,709Chilled water pumps : 300Hot Water Pumps : 230
FM 200 : 672 (Approximately cylinders 200 k lbs agent. integrity testing of the completed )RIA: 450Automatic fire extinguisher: 3,634Sprinkler head: 85,000
Centralized electric water heater : 102Circulating pumps : 261Immigrant pumps : 120
RMUs (13.8 Kva) : 110Transformers : 167 (500 to 1000 KVA) Panels BT : 4490
HVAC
Fire Protection
Plumbing
Transformers/Panels
Lighting: 270,00025 meters HighMast: 110Equipment: 270,000 Isolating switch: 2600
Lighting / Equipment
Inverters : 156 (20 to 60 KVa) Lighting control system: covering an area 220,000 m2 Cables BT : 33 Km Cables MT : 15 Km
Cable/Control System
1
ADVANCED VISION MOROCCO
Princess Noura University For Women -Riyadh
1
King Abdullah Specialty Children HospitalK.S.A.U – Riyadh KSA
This is the first specialist Children’s Hospital in the Kingdom ofSaudi Arabia, occupying 192,000m2, over 10 levels.
The hospital has been designed as a patient focused facility with thepatient at the center of care. The Hospital is a paperless digitalhospital with all patient files electronically maintained.
All 600 patient rooms (600 beds) are single occupancy with en-suitefacilities and dedicated family area with overnight facilities. EachPaediatric ward has dedicated classrooms, playroom and familyresource facilities.
Saudi Binladin Group has completed the design and build of thisproject delivering all MEP systems and abiding with the highestspecification required by the client
Project was GOLD LEED certified
Key Figures :
Beds : 600 beds Surface : 192,000 m²Turn key project
ADVANCED VISION MOROCCO
2
King Abdullah Specialty Children HospitalK.S.A.U – Riyadh KSA
ADVANCED VISION MOROCCO
2
Prince Mohammed Bin Abdul Aziz Hospital –AlMadinah KSA
PMBAH is the fifth National Guard Health facility in the Kingdomafter Riyadh, Jeddah, Dammam and Al Ahsa. It is a full servicedfacility with a 215 bed capacity, located at the foot of Mount Uhud onPrince Naif Road;
As the National Guard Health Affairs expands its services to covermore regions in the Kingdom of Saudi Arabia, the Holy City of AlMadinah Al Munawarah was selected as the next project in 2007.Prince Mohammad Bin Abdulaziz Hospital will provide optimalhealth services for the National Guard and their dependents and toother eligible patients during their religious visits to the holy city ofMadinah.
Key Figures :
Beds : 215 beds Surface : 100,000 m²Turn key project
ADVANCED VISION MOROCCO
3
SAUDI BINLADIN GROUP – Hospitals Projects
HOLY MOSQUE HOSPITAL Mekkah - KSA
1SIBANI CLINIC Riyadh – KSA
JUN-2003 TO AUG-2004construction of new clinic with a total building-up area of approximately 5,723 m². the construction includes the complete structural corks, architectural works & the electro-mechanical systems required for the building
PRIVATE CLINICJeddah - KSA
APR-2002 TO AUG-2003construction of new clinic with a total building-up area of approximately 3,045m² . the construction includes the complete structural corks, architectural works & the electro-mechanical systems required for the building
KING ABDUL AZIZ SPECIALIST HOSPITAL Taif – KSA
JUL-1998 TO OCT-2001construction of new complete 500 bed hospital complex along with ancillary buildings, housing complex, inclusive of all electro-mechanical system, supply of the medical equipment and associated services, the overall site development and related facilities.
ADVANCED VISION MOROCCO
4
SAUDI BINLADIN GROUP – Hospitals Projects
ACCIDENT & EMERGENCY BUILDING Riyadh – KSA
OCT-1994 TO DEC-1997 construction of four storey accident and emergency building including basement. The accident and emergency building includes a physiotherapy center. The construction includes the medical equipment installation, electro-mechanical system and overall furnishing. This is part of the armed forces hospital extension and renovation project
NEW ICU/CCU UNITJeddah - KSA
FEB 1993 TO DEC 1993construction of a new ICU/CCU unit for king khalid national guard hospital inclusive of the medical equipment’s, electro-mechanical system and overall furnishing.
CARDIAC SURGERY BUILDING Riyadh - KSA
JAN-1993 TO NOV-1994a five storey cardiac surgery building plus basement with a bed capacity of 167, inclusive of the medical equipment’s, electro-mechanical system and overall furnishing, part of the armed forces hospital extension and renovation project.
ADEN COVERNORATE GENERAL HOSPITAL Aden - YEMEN
AUG-1990 TO MAR-1992construction of the new general hospital with a 200 bed capacity and with a built up area of 20,000 m², along with the supply and installation of electro-mechanical system, medical equipment’s and other related facilities and the site development.
ADVANCED VISION MOROCCO
4
SAUDI BINLADIN GROUP – Hospitals Projects
ARMED FORCES HOSPITALRiyadh - KSA
MAR-1990 TO NOV-1992A turnkey contract for the extension and renovation of the present armed forces hospital complex inclusive of the following: a new 367 bed capacity ,10 storey plus basement VIP hospital building a 7 storey car-park adequate for 850 cars plus basement as service area. Associated building are the laundry, the dental clinic center, the primary health care, the accident & emergency and the fire station; supply and installation of the medical equipment’s and the modification to the existing; complete supply and installation of the electro-mechanical system , relocation and restoration of existing services without disruption in the normal flow pf hospital functions.
AL FALAH MILIRATY HOSPITAL Sharjah - UAE
APR-1980 TO OCT-1982 construction of a complete hospital building inclusive of the supply and installation of the electro-mechanical system, the medical equipment’s and related services, the infrastructures with complete furnishing and the site development..
ADVANCED VISION MOROCCO
4
ADVANCED VISION MOROCCO
Internal Security Forces Camp Cpc 07b (Duhail) -Lekhwiya
Main Scope of Works • Sewage water system.• Storm water drainage water system• Potable water distribution system• Irrigation network system• Fire water distribution system• Chilled water reticulation System• Communication and Security system containment and
associated low voltage network• Streets and Parking lot lighting• Tie in points to existing services
Development of the ISF Camp with total area of 250,000 m².27 Buildings of different types including 5 Barracks amongthem.
Location : Doha – Qatar (Duhail)Execution Period : 24 MonthsOwner : Internal Security Forces (ISF) - LekhwiyaConsultant : KEOMain Contractor : QD-SBGDesigner : AEB
5
ADVANCED VISION MOROCCO
Ministry Of Interior (MOI)
Ministry Of Interior (Moi) Phase1• Location : Jeddah - Qassim - Asir -
Dammam• Execution Period : 24 Months• Owner : Ministry of Interior• C.R. & Supervisor : Dar Al Handassah• Main Contractor : SBG• Designer : Saudi Diyar Consultants
Ministry Of Interior (Moi) Phase 1 Extension• Location : Jeddah – Qassim - Asir -
Dammam • Execution Period : 12 – 18 Months • Owner : Ministry of Interior • C.R. & Supervisor : Dar Al Handassah• Main Contractor : SBG • Designer : Saudi Diyar Consultants•Ministry Of Interior (Moi) Phase II • Location : Makkah - Riyadh • Execution Period : 18 Months • Owner : Ministry of Interior • Consultant : Dar Al-Handassah• Designer : Saudi Diyar• Main Contractor : SBG
Main Scope of WorksDesign and construction of the Electrical& MechanicalSystems; MV & LV Equipment and network, Operatinginternal and external Systems, lighting, power, lowcurrent, security, fire protection, plumbing, Airconditioning and building management system
Main Scope of WorksDesign and construction of the Electrical& MechanicalSystems; MV& LV Equipment and network, Operatinginternal and external Systems, lighting, power, lowcurrent, security, fire protection, plumbing, Airconditioning and building management system.
Main Scope of WorksDesign and construction of the Electrical& MechanicalSystems; MV & LV Equipment and network, Operatinginternal and external Systems, lighting, power, lowcurrent, security, fire protection, plumbing, Airconditioning and building management system.
6
ADVANCED VISION MOROCCO
Hajj Terminal King Abdulaziz International Airport
Hajj Terminal - Phase 1• Location : King Abdul Aziz Airport - Jeddah • Execution Period : 12 Month • Owner : General Aviation of Civil Authority • Consultant : ADPL • Main Contractor : SBG • Design office : Focus Engineering
Extension Of Hajj Terminal - Load Center• Location : King Abdul-Aziz Airport – Jeddah • Total Site Area : 86, 000 . 00 m2
• Execution Period : 9 Month• Owner : General Aviation of Civil Authority • Consultant : Dar Al-Handassah• Main Contractor : SBG
Hajj Terminal - Module A + B • Location : King Abdul Aziz Airport – Jeddah • Execution Period : 12 Mointh• Owner : General Aviation of Civil Authority • Consultant : Dar Al Handassah• Main Contractor : SBG
Limits of benefitsDesign and construction of a load center comprising a high-voltage substation (78 MW), a cooling plant of 15000 tonnes, supplying an air conditioning system to the East and West Hajj Terminals, including all security, security control and monitoring and Building Technical Management (GTB).
Limits of benefitsSupply, installation, supervision and coordination of electromechanical work for terminals A and B at King Abdul Aziz Airport. Including work in the fields of drawing.
Limits of benefitsDesign and construction of electrical and mechanical systems; Installation of low and medium voltage electrical equipment and the realization of their networks; Operation of the internal and external system as: air traffic management system (Apron). BHS baggage handling systems.
7
ADVANCED VISION MOROCCO
King Abdul Aziz University Science & Technology (KAUST)
Town Center - Phase I • Location : Thuwal – Jeddah
• Execution Period : 24 Months
• Owner : KAUST
• Consultant : ARAMCO
• Main Contractor : SBG
Residential & Community Building- Phase II• Location : Thuwal – North of Jeddah
• Execution Period : 18 Months
• Owner : KAUST
• Consultant : ARAMCO
• Main Contractor : SBG
Satellite Substation
• Location : Thuwal – North of Jeddah
• Execution Period : 8 Months
• Owner : KAUST
• Consultant : ARAMCO
• Main Contractor : SBG
Main Scope of Works This project is to build three (3) new satellite 13.8kvsubstations with installation of 13.8kv double – endedswitchgears for providing permanent power supply toresidential and commercial facilities of King AbdullahUniversity of Science and Technology.
Main Scope of Works Engineering, supply and installation, testing andCommissioning and start-built drawings of civil buildings,marine oceanic research enter, residential and commercialbuildings and other services buildings
Main Scope of Works Design & construction of E/M work of 2091 Villas, FireStation, Stadium, Super Markets, Schools, Clubs,Houses and many other buildings
8
ADVANCED VISION MOROCCO
Mas’a Extension Holy Mosque Makkah Phase I & II
Main Scope of Works
Design & Build the electrical and mechanical system; the HVAC, Plumbing & fire protection; lighting, power and security systems; monitoring and control system for safety operation and all electromechanical systems.
• Location : Holy Mosque – Makkah
• Execution Period : 12 Months each Phase
• Owner : Presidency of Haramain
• Consultant & Designer : Dar Al-Handassah
• Main Contractor : SBG
Design & build of E/M system of the Mass’a old & new,renovation of services areas and plant rooms
9
ADVANCED VISION MOROCCO
General Aviation Terminal
Main Scope of WorksDesign and build of the Electrical and Mechanical Systems for the following:
• General Aviation Terminal (GA) and associated Apron. • The Aviation Standards & Safety Building (ASSB). • The Dog Kennel Complex •The electro-mechanical works consists of the infrastructure networkserving all buildings the electrical systems the MV switchgears, sub-stations, MV distribution network, the external lighting systemnetwork, chilled water system, water supply system and firefightingsystem network, sewerage system and storm water system andlandscape irrigation system.
• Location : King Abdulaziz International Airport - Jeddah • Execution Period : 12 Months • Owner : General Aviation of Civil Authority • Consultant : ADPL • Main Contractor : SBG
Design & Construction of E/M work of the General AviationStandard &Safety building and the CMC Complex
10
ADVANCED VISION MOROCCO
Third Haram Extension & Service Tunnel –Shameyah Project
Main Scope of Works
1. The Electro Mechanical System and Plumbing of bathrooms and ablution areas of the third Haram extension that includes the following:
• Central Cooling Plant • HV Power Plant • Stand By electric generators • Filtration, Sterilization, DW cooling plant & pumps • Water Treatment plant • Automated Central Garbage collection • Seven Ground water reservoirs–Gray water • Plumbing for Seven Ablution & Toilets buildings
2. Service Tunnels that includes the following: • Chilled water piping • Zamzam water piping • Garbage tubes • Gray water network • Waste water network • MV cables • Ventilation System • Rain water network • Fire Fighting system
• Location : Holy Mosque – Makkah • Execution Period : 24 Months • Owner : Presidency of Haramain• Consultant : Dar Al-Handassah• Main Contractor : SBG
Construction of the E/M system & plumbing work and the ablutionarea. Services tunnel that contains the chilled water and Zamzampiping, garbage tubes, gray/waste water network, ventilation,firefighting system etc.
11
ADVANCED VISION MOROCCO
King Abdulaziz International Airport (Kaia P1072)
• Location : King AbdulAziz Airport – Jeddah • Execution Period : 2011-2015 • Owner : General Aviation of Civil Authority • Consultant : Dar Al Handassah• Main Contractor : SBG
Limits of benefits
Medium and low voltage electrical distributionequipment with control of the whole network oflighting, power, mechanical systems and transportsystems. Among the mechanical systems; Heating,Ventilation and Air Conditioning (HVAC), Plumbingand Fire Protection Systems.
Design and realization of electromechanical works.
12
ADVANCED VISION MOROCCO
Capital Market Authority Tower (CMA)
Main Scope of Works
• Electrical MV & LV Systems power distribution equipment and Control with all network for lighting, power, Mechanical systems and conveying systems.
• Mechanical Systems include Heating, Ventilation and Air Conditioning HVAC system, Plumbing and Fire Protection System.
• Location : Riyadh • Execution Period : 48 months • Owner : Capital Market Authority• Consultant : HOK Omraniah• Main Contractor : SBG
Design and build of the E/M work.
13
ADVANCED VISION MOROCCO
Capital Market Authority Tower (CMA)13
OUR CLIENTS AND CONSULTANTS
ADVANCED VISION MOROCCO
07
ADVANCED VISION MOROCCO
Our Clients
1 2 3
10
4 5
6 7 8 9
ADVANCED VISION MOROCCO
Our Consultants
1 2 3 4
6 7
5
8 9
ADVANCED VISION MOROCCO
T hank Y ou!
ADVANCED
VISION MOROCCOELECTRO MECHANICAL WORKS
16170 CASA PRINCIPALE , Etage 4 lot N°441, lotissement AL AFFAC, Casablanca MAROC
Phone: +212 522 787 474 / +212 522 786 608
Email: [email protected]