7.12 HVAC Duct Construction Standards Metal and Flexible • Third Edition
FIGURE 711 FLEXIBLE DUCT LINER INSTALLATION
E
E
A
A
B
B
D
D
B
C
LAPPED AND BUTTED CORNER
ALTERNATEFOLDEDCORNER
ALL TRANSVERSEEDGES TO BECOATED WITH
ADHESIVE EXCEPT
MAXIMUM SPACING FOR FASTENERS. ACTUAL INTERVALS ARE APPROXIMATE.
DUCTSECTION(TYPICALLY 4 FT. (1.2 m)
THE VELOCITY RATEDSIDE OF LINER MUSTFACE THE AIR FLOW
AIR FLOWSEE TYPICAL DUCT BRANCH ENTRY CONDITION IN FIG. 26.
DETAIL A
UNLESS A LOWERLEVEL IS SET BYMANUFACTUREROR LISTING
AGENCY
*
DimensionsVelocity *
A
3”
(76.2) (152)
12”
B
(102)
4”
C
(152)
6”
D
0 2500 FPM
(12.7 30.5 MPS)
OR 5 FT. (1.52 m))
3” 6” 4” 6”2501 6000 FPM
(76.2) (305) (102) (152)(0 12.7 MPS)
WHEN NOSING ISPRESENT
”A” PIN ROW MAY BE OMITTED WHEN METAL NOSING ISUSED. ”E” THEN STARTS FROM THE NOSING.
METAL NOSING MUST BE USED WHEREVER LINER IS PRECEDEDBY UNLINED METAL; OTHERWISE WHEN VELOCITY EXCEEDS4000 FPM (20.3 MPS) USE METAL NOSING ON EVERY LEADING
EDGE. NOSING MAY BE FORMED ON DUCT OR BE CHANNELOR ZEE ATTACHED BY SCREWS, RIVETS OR WELDS.
INTERIOR WIDTH OF 8” (200 mm) AND LESS DOES NOT
REQUIRE PINS.
NOTE:
METAL NOSING
CHANNEL OR ZEE
C
PLACE PINS
3” (76 mm) ALONG
EACH SIDE OF ABUTTED LONGITUDINALLINER SEAM THATIS AWAY FROM ACORNER
(457)
16”
18”
(406)
E
LINER ADHERED TOTHE DUCT WITH 90%MIN. AREA COVERAGEOF ADHESIVE