Between 2000 - 2016, there was an average population of 530,601 inhabitants with stable settlements in Hunedoara County.
Source: National Institute of Statistics
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
During 2000 - 2016, the population in HunedoaraCounty decreased by over 23%, as it was registered:
Demographic dataDemographic data:
118.282 people changing settlement 4.906 definitive emigrants
Source: National Institute of Statistics
The distribution of the number of definitive emigrants in the Jiu Valley region, in Deva, Hunedoara and the rest of the localities
Demographic dataDemographic data:
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Source: National Institute of Statistics
In the last 20 years, the average number of employees decreased from 37,808 in 1997 to
37808
30000
35000
40000
nu
mb
er
of
em
plo
ye
es
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Reduction of employees involved in the mining activity in Jiu Valley Reduction of employees involved in the mining activity in Jiu Valley
from 37,808 in 1997 to 3,022 at the end of the first semester 2018. 17943
74335095 474144934083 35523022
11533
19914
9200
16516
1733718114
23265
845912041
10742
1174014900
13364
0
5000
10000
15000
20000
25000
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
6 lu
ni 2
018year
nu
mb
er
of
em
plo
ye
es
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
S. E. Deva
Lonea
S. E. Paroşeni
PRESTSERVLivezeni
1.1. Project :Project : Exploitation of methane gas from the degassing of operational coal deposits using cogeneration Exploitation of methane gas from the degassing of operational coal deposits using cogeneration plants for electric and thermal power generation. (Coal Mine Methaneplants for electric and thermal power generation. (Coal Mine Methane--CMMCMM).).
Scope: Use of methane gas associated with Jiu Valley coal deposit in cogeneration power plants for electricity
and thermal power generation.
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Strategic projects:Strategic projects:
and thermal power generation. Increasing underground exploitation safety. GHG emission lowering
Possible partners : Petroşani University, INSEMEX Petroşani, investors
Budget – according to the feasibility study (approx. 3.940.020 euros)
Constraints : • Financing • Partnership
Project implementation: approx. 2 years.
2.2. Project: Extraction and exploitation of methane gas from nonProject: Extraction and exploitation of methane gas from non--operated coal deposits using surface operated coal deposits using surface drilling ( Coal Bed Methane drilling ( Coal Bed Methane -- CBMCBM).).
Scope : • use of methane gas coming from coal deposits as an alternative source to methane gas coming
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Strategic Strategic projects:projects:
• use of methane gas coming from coal deposits as an alternative source to methane gas coming from hydrocarbons.
• GHG emission reduction
Possible partners: Petroșani University, INSEMEX Petroșani, investors
Budget – according to the feasibility study
Constraints : • Financing • Partnership
3.3. Project: Exploitation of methane gas from closed mines (Abandoned Mine MethaneProject: Exploitation of methane gas from closed mines (Abandoned Mine Methane-- AMMAMM).).
Scope : • use of methane gas coming from coal deposits as an alternative source to methane gas coming from
hydrocarbons.
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Strategic Strategic projects:projects:
hydrocarbons. • GHG emission reduction
Possible partners: Petroșani University, INSEMEX Petroșani, investors
Budget – according to the feasibility study
Constraints : • Financing • Partnership
44. . ProjectProject: : Exploitation of the hydrological, Exploitation of the hydrological, tourist tourist and industrial potential of and industrial potential of BaleiaBaleia hydro power planthydro power plant
Scope : • Formation of a 4 ha lake;• Increasing the attractiveness of Straja and Valcan Pass resorts by integrating this objective into the
development projects of these tourist resorts.
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Strategic Strategic projects:projects:
development projects of these tourist resorts.
Possible partners: local and regional authorities, investors
Budget: almost 20 million euros
Financing source : European Funds ROP 2014-2020 - Priority Axis 7 - Diversification of Local Economies through the Sustainable Development of Tourism
Constraints : providing from the local community's own funds of a 45% contribution for the proposed project.
Financing sourceFinancing source: Priority Axis 4 : Priority Axis 4 -- Key Area of Intervention KAI 2 Key Area of Intervention KAI 2 -- “ Exploitation of Renewable “ Exploitation of Renewable Energy Energy Resources for Green Energy Resources for Green Energy Production“Production“
1.1. Capitalization of Capitalization of hydropower potential of the hydropower potential of the pool pool on on MuresMures River, belonging to the River, belonging to the DevaDeva Power Power Plant branch, Plant branch, by installing microby installing micro--hydropower hydropower plantsplants
HUNEDOARA ENERGHUNEDOARA ENERGY Y COMPLEX COMPLEX www.cenhd.rowww.cenhd.ro
Other potential projects:Other potential projects:
2.2. Photovoltaic park on the southern side Photovoltaic park on the southern side of of BejanBejan ash deposit ash deposit belonging belonging to the to the DevaDeva Power Plant Power Plant branchbranch
3.3. Use Use of the potential determined by the thermal gradient of the mining works by introducing and of the potential determined by the thermal gradient of the mining works by introducing and recirculatingrecirculating underground underground waterwater..
Financing source: “Life” Financing source: “Life” programprogram
4.4. Stabilization Stabilization of tailings dumps by of tailings dumps by planting sea buckthorn planting sea buckthorn and construction of a factory for sea and construction of a factory for sea buckthorn buckthorn complete complete processing. processing.