KEY VALUE OF HUISMAN: INNOVATIONERIC ROMEIJN, TECHNICAL MANAGER

HUISMAN EQUIPMENT

Page 2: Huisman eric romeijn

CONTENTS

What is Huisman?

Huisman Locations

Our Key Values

Innovations:

� Cranes� Cranes

� Pipe Lay Equipment

� Drilling Equipment

� Specials

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 3: Huisman eric romeijn

WHAT IS HUISMAN?

Heavy Lift Heavy Lift CranesCranes Drilling Drilling

EquipmentEquipment

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Pipe Pipe LayLay EquipmentEquipment SpecialsSpecials

Page 4: Huisman eric romeijn

WHAT IS HUISMAN?

The ship wouldn’t be there, if the equipment wouldn’t be thereThe ship wouldn’t be there, if the equipment wouldn’t be there

Strong interaction between equipment design and ship designStrong interaction between equipment design and ship design

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 5: Huisman eric romeijn

HUISMAN LOCATIONSTOTAL STAFF: 3000 FIXED AND FLEX

Sviadnov,

Headquarters

Schiedam,

Holland

Kosice,

Slovakia

Bergen, Norway

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Houston, Texas,

USA

Rio de Janeiro,

Brazil

Sviadnov,

Czech Republic

Fujian,

China

Singapore

Slovakia

Santa Catarina,

Brazil Perth,

Australia

Manufacturing

Engineering,

Service, Sales

Page 6: Huisman eric romeijn

HUISMAN PRODUCTION LOCATIONS

Schiedam-NL Sviadnov-CZ

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Schiedam-NL Sviadnov-CZ

Fujian-ChinaSanta Caterina-Brazil

Houston-US

Page 7: Huisman eric romeijn

PRODUCTION FACILITYCZECH REPUBLIC – SINCE 1997

Total area:

106.000m2

Production area:

27,000m2

Office area:

5,000m25,000m2

Maximum hoisting

capacity workshop:

120mt

Yard cranes:

2x 33mt @ 13m

25mt @ 10m

125mt @ 9m

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 8: Huisman eric romeijn

PRODUCTION FACILITYCHINA – SINCE 2007

Total area:

284.000m2

Production area:

58,000m2

Maximum hoisting

capacity workshop:

2,000mt

Quay length:Quay length:

380m

Quayside crane:

2,400mt @ 30m

Water depth:

17m

Outside crane:

100mt @ 25m

30mt @ 25m

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 9: Huisman eric romeijn

PRODUCTION FACILITYCHINA

Quay length:

380m

Quayside crane:

2,400mt @ 30m

Crane pivot above quay:

53m

Water depth:

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

17m

Page 10: Huisman eric romeijn

PRODUCTION FACILITYUSA – SINCE 2011

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 11: Huisman eric romeijn

PRODUCTION FACILITYBRAZIL, CONSTRUCTION STARTED 2012

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 12: Huisman eric romeijn

PRODUCTION FACILITYTHE NETHERLANDS – SINCE 1929

Total area:

90.000m2

Production area:

20,500m2

New production hall:

66m high, 56.5m wide

and 58.6m longand 58.6m long

Maximum hoisting

capacity workshop:

1,200mt

Quay length:

330m

Quay crane:

360mt @ 18m

35mt @ 30m

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 13: Huisman eric romeijn

PRODUCTION FACILITYTHE NETHERLANDS

66M HIGH PRODUCTION HALL

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

HUISMAN ACADEMY

Page 14: Huisman eric romeijn

OUR KEY VALUES

Deliver quality:� reliable equipment

Deliver quality:� reliable equipmentBBBB

Offering innovative solutions:� client needs instead of ordinary or regular equipment

Offering innovative solutions:� client needs instead of ordinary or regular equipmentAAAA

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Turnkey delivery of projects:� Steel structure and mechanical structures

� Drive and Control System

� Design, manufacturing, testing and service

Turnkey delivery of projects:� Steel structure and mechanical structures

� Drive and Control System

� Design, manufacturing, testing and service

CCCC

Reliable partner:� We keep our promises: time, cost, and quality

Reliable partner:� We keep our promises: time, cost, and qualityDDDD

Page 15: Huisman eric romeijn

A: Cranes Innovation 1981 Floating Crane - Taklift 4

Shaft axles of upper

block rotated, such that

the lifting tackles can be

rotated sideways.

Shaft axles of upper

block rotated, such that

the lifting tackles can be

rotated sideways.

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 16: Huisman eric romeijn

A: Cranes Innovation 1984: Mast Crane – Happy Buccaneer

Crane mast welded at

ship, such that the crane

moment does not have to

be transferred by the slew

bearing.

Advantage: Small foot

Crane mast welded at

ship, such that the crane

moment does not have to

be transferred by the slew

bearing.

Advantage: Small foot

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: Small foot

print and low centre of

gravity

Advantage: Small foot

print and low centre of

gravity

Page 17: Huisman eric romeijn

A: Cranes Innovation 1985: Heave compensation - Lorelay

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

LOAD

Passive Heave Compensation

Active

Heave Compensation

HPU

The wire rope can be

kept at a constant

tension.

The load can be kept at

a constant height.

Advantage: Better

controlled operations

The wire rope can be

kept at a constant

tension.

The load can be kept at

a constant height.

Advantage: Better

controlled operations

Page 18: Huisman eric romeijn

A: Cranes Innovation 1987: Secondary controlled heave compensation

The wire rope can be kept

at a constant tension (CT).

The load can be kept at a

constant height (AH).

Advantage: The system is

The wire rope can be kept

at a constant tension (CT).

The load can be kept at a

constant height (AH).

Advantage: The system is

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: The system is

more easy to operate

Advantage: The system is

more easy to operate

Page 19: Huisman eric romeijn

A: Cranes Innovation 1995: Ringer Crane

Crane which is easy

transportable and to erect.

Advantage: Reduced

mob/demob costs and

longer operational life.

Crane which is easy

transportable and to erect.

Advantage: Reduced

mob/demob costs and

longer operational life.

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 20: Huisman eric romeijn

A: Cranes Innovation 1996: Sheerleg crane with 2 A-frames

The ship connected two

clients; each of them had

insufficient expertise and

funding to do it on its own.

The ship connected two

clients; each of them had

insufficient expertise and

funding to do it on its own.

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 21: Huisman eric romeijn

A: Cranes Innovation 2002:Simple and reliable pedestal crane

In a difficult economic

time in 2002-2003

Huisman designed a

simple and reliable

pedestal crane.

Advantage: Cheap

In a difficult economic

time in 2002-2003

Huisman designed a

simple and reliable

pedestal crane.

Advantage: Cheap

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: Cheap

service for our clients.

Advantage: Cheap

service for our clients.

Page 22: Huisman eric romeijn

A: Cranes Innovation 2009: Segmented slew bearing

Regular bearing suppliers could not supply a

bearing.

Regular bearing suppliers could not supply a

bearing.

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 23: Huisman eric romeijn

Height above deck (m)

A: Cranes Innovation: Development since invention

140

120

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Height above deck (m)

Page 24: Huisman eric romeijn

A: Pipe Lay Innovation 1995: Straightener

Pipe lay ramp wihy

straightener, such that

less deck space is

required compared to S-

lay and less height is

required compared to J-

lay.

Pipe lay ramp wihy

straightener, such that

less deck space is

required compared to S-

lay and less height is

required compared to J-

lay.

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

lay.

Advantages:

� Less length

� Less height

lay.

Advantages:

� Less length

� Less height

Page 25: Huisman eric romeijn

A: Pipe Lay Innovation 1996: Pipe tensioner

A pipe tensioner is

designed such that the

squeeze load is well

distributed over the length

of the pipe.

Advantage: Guaranteed

A pipe tensioner is

designed such that the

squeeze load is well

distributed over the length

of the pipe.

Advantage: Guaranteed

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: Guaranteed

parallellity between the

tracks.

Advantage: Guaranteed

parallellity between the

tracks.

Page 26: Huisman eric romeijn

A: Pipe Lay Innovation 1997: Modular reel drive system

Several reels can be

stored on deck.

One reel can be

positioned such that it can

be unspooled.

Advantage: The client can

Several reels can be

stored on deck.

One reel can be

positioned such that it can

be unspooled.

Advantage: The client can

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: The client can

install the system on any

offshore support vessel.

Advantage: The client can

install the system on any

offshore support vessel.

Page 27: Huisman eric romeijn

A: Pipe Lay Innovation 2006: Retractable tensioner

The tensioner,

suspended in the pipe

lay ramp, can be

retracted to create

space for other

activities (J-lay, PLET’s,

etc.)

The tensioner,

suspended in the pipe

lay ramp, can be

retracted to create

space for other

activities (J-lay, PLET’s,

etc.)

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

etc.)

Advantage: A larger

scope of operations can

be carried out with the

same installation.

etc.)

Advantage: A larger

scope of operations can

be carried out with the

same installation.

Page 28: Huisman eric romeijn

10

12

14

Number of orders

Pipelay Orders

Flex lay

Reel lay

A: Pipe Lay Innovation: Development pipe lay systems

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

0

2

4

6

8

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Number of orders

Reel lay

J-lay

Multi Lay

S-lay

Component

Page 29: Huisman eric romeijn

A: Drilling Innovation 1998: Vertical Riser Storage in Columns Semi

Using a special riser

handling crane the risers

are stored vertically in the

columns and can still be

brought into the drill rig.

Advantage: The ship can

Using a special riser

handling crane the risers

are stored vertically in the

columns and can still be

brought into the drill rig.

Advantage: The ship can

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: The ship can

take more pay load on

deck.

Advantage: The ship can

take more pay load on

deck.

Page 30: Huisman eric romeijn

A: Drilling Innovation 1999: Multi Purpose Tower (MPT)

TRADITIONAL LOOK FUNCTIONAL LOOK NEW LOOK SINGLE MPT 1999 DUAL MPT 2007

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 31: Huisman eric romeijn

A: Drilling Innovation 2000 Drilling tower: Splittable blocks

Sheaves in lower blocks

can be removed from

the block with a push

button.

Advantage: The speed

of the tackle can be

Sheaves in lower blocks

can be removed from

the block with a push

button.

Advantage: The speed

of the tackle can be

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

of the tackle can be

increased if less load is

suspended in a safe

and reliable way.

of the tackle can be

increased if less load is

suspended in a safe

and reliable way.

Page 32: Huisman eric romeijn

A: Drilling Innovation 2005: Containerized Land Drill Rig

A drilling unit is completely

containerized and

automated.

Advantage: The transport

costs and mobilization

time is reduced. The

A drilling unit is completely

containerized and

automated.

Advantage: The transport

costs and mobilization

time is reduced. The

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

time is reduced. The

operation is more safe and

predictable.

time is reduced. The

operation is more safe and

predictable.

Page 33: Huisman eric romeijn

A: Drilling Innovation 2006: Vertical Riser Storage

Crane for vertical riser

storage.

Advantage:

Faster handling of

risers.

Crane for vertical riser

storage.

Advantage:

Faster handling of

risers.

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 34: Huisman eric romeijn

A: Drilling Innovation 2007 Drilling tower: Dual activity

The drilling string and

riser strings can be built

on separate drill floors.

Advantage: The drillers

are not hindered by

their colleagues in the

The drilling string and

riser strings can be built

on separate drill floors.

Advantage: The drillers

are not hindered by

their colleagues in the

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

their colleagues in the

other drilling process.

their colleagues in the

other drilling process.

Traditional dual

activity rig

Huisman dual

activity rigHuisman single

activity

Page 35: Huisman eric romeijn

A: Drilling Innovation 2007:Alternative set back pipe storage

By placing the set back

pipes in a carroussel the

pipe racker crane can be

more reliable.

Advantage: Less down

time by replacing linear

By placing the set back

pipes in a carroussel the

pipe racker crane can be

more reliable.

Advantage: Less down

time by replacing linear

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

guides to pivoting.guides to pivoting.

Page 36: Huisman eric romeijn

A rig with less functionality

can do the well

intervention.

Advantage: Much cheaper

ship can do the job

compared to a traditional

A rig with less functionality

can do the well

intervention.

Advantage: Much cheaper

ship can do the job

compared to a traditional

A: Drilling Innovation 2007: Well Intervention Tower

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

compared to a traditional

drill ship.

compared to a traditional

drill ship.

Page 37: Huisman eric romeijn

TYPICAL DRILLSHIP HUISDRILL DESIGN DRILL SHIP

A: Drilling Innovation 2009: Compact drill ship

� Payload: 20000 mt

� Derrick: 2.5 mln + 2.0 mln lbs

� Water depth: 3600 m

� Wind area: 6600 m2

� Displacement: 100000 mt

� Thruster power/Displ: 0.33 kW/mt

� Payload: 20000 mt

� Derrick: 2 x 2.4 mln lbs

� Water depth: 3600 m

� Wind area: 3200 m2

� Displacement: 54000 mt

� Thruster power/Displ: 0.41 kW/mt

230m 189m

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Page 38: Huisman eric romeijn

A: Specials Innovation 1990:Sledge to transport bridge elements up to 8400t

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Compact sledge with guaranteed load distribution at the concrete sliding track.Compact sledge with guaranteed load distribution at the concrete sliding track.

Page 39: Huisman eric romeijn

A: Specials Innovation 2001:Grippers to lift the Kursk Submarine

Grippers are extremely

strong and guarantee

opening and closing,

regardless what is

inside the submarine.

Advantage: Our client

Grippers are extremely

strong and guarantee

opening and closing,

regardless what is

inside the submarine.

Advantage: Our client

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

Advantage: Our client

received the salvage

order.

Advantage: Our client

received the salvage

order.

Page 40: Huisman eric romeijn

B: DELIVER QUALITY

Reliable equipment:� Effective Quality Assurance System

���� ISO 9001/API Q1 to improve our organization

���� Test step-by-step

���� Learn from mistakes and improve designs and

cooperation

Reliable equipment:� Effective Quality Assurance System

���� ISO 9001/API Q1 to improve our organization

���� Test step-by-step

���� Learn from mistakes and improve designs and

cooperation

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

� Personnel

���� Careful Selection process

���� Education in Huisman Academy

���� Lots of design freedom and responsibility

� Personnel

���� Careful Selection process

���� Education in Huisman Academy

���� Lots of design freedom and responsibility

Page 41: Huisman eric romeijn

C: TURN KEY DELIVERY

� Sales and concepts

� Steel structure

� Mechanical structure

� Electrical system

� Hydraulic system

� Control System

� Purchasing

� Sales and concepts

� Steel structure

� Mechanical structure

� Electrical system

� Hydraulic system

� Control System

� Purchasing

Optimize

the

complete

Optimize

the

complete

BIJEENKOMST MATERIALENKRING METAALUNIE - 18TH SEPT 2013

� Purchasing

� Subcontracting

� Welding

� Machining

� Assembly

� Testing and commissioning

� Operation

� Service

� Purchasing

� Subcontracting

� Welding

� Machining

� Assembly

� Testing and commissioning

� Operation

� Service

complete

equipment

and

proces

complete

equipment

and

proces

Page 42: Huisman eric romeijn

Thank you for

your attention!