  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    1/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    1.0 GENERAL

    1.1 The intent of this document is to cover the basis and calculat ions for sizing of

    6.6kV (UE), !"E cables re#uired for6.6kV Main Switchboard, Distribution

    Transor!"rs, # $T Motors in th" insta%%ations.

    &.0 'AS(S # ASS)M*T(+NS

    $ollo%ing are the basis and assum&tions made %hile sizing the 'T cables.

    .1 6.6kV(UE) grade cables shall be o&&er conductor %ith inner semi conducting la*er

    over conductor, !"E insulated %ith semi conducting la*er + co&&er ta&e over insulation

    inner sheath, "V etruded outer sheath, armoured cables.

    . The cables %ill be laid on cable tra*s and in single la*er %hich %ill be sho%n in cable

    la*out dra%ing.

    .- esign /mbient has been considered as 0.

    .0 6.6kV (UE) able from 1.23V/ "o%er Transformer to 6.6kV 3ain 4%itchboard shall be

    sized for carr*ing 6.-k/ short circuit current for 1 second duration since numerical t*&e

    &rotective rela*s are &rovided in the s*stem to isolate the fault* e#ui&ment %ithin less

    than .0 sec.

    .0 6.6kV (UE) able from 6.6kV 3ain 4%itchboard to istribution Transformers shall be

    sized for carr*ing 6.-k/ short circuit current for 1 second duration since numerical t*&e

    &rotective rela*s are &rovided in the s*stem to isolate the fault* e#ui&ment %ithin less

    than .6 sec

    .2 6.6kV (UE) able from 6.6kV 5solator "anel to 'T 3otor feeder shall be sized for

    carr*ing short circuit current of 6.-k/ for . second duration.

    .6 4tarting current for k 47 8 9! motor is - times greater than rated current.

    .: $ollo%ing formula %ill be used for calculating receiving end terminal voltage during full

    load conditions;

    Page 1 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    2/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    )1000())(3( tflsr NLSinXCosRIVV +=

    here,

    rV < Voltage available at receiving end terminals during full load

    onditions.

    sV < =ominal voltage of the s*stem.

    flI < $ull !oad current.

    Cos < "o%er factor during stead* state conditions (onsidered as .>2 in

    calculations).

    7 < 7esistance of &o%er cable ? km in @.

    < 7eactance of &o%er cable ? km in @.

    ! < 7oute length of cable in meter. ( 7oute !ength of cables

    considered are the estimated lengths %ith 1A margin)

    tN < =umber of 7uns

    .> able &arameters such as resistance, reactance values etc. are taken from

    atalogues of "ol*cab make cables -o/ attach"d. These values for the cables

    to be su&&lied actuall* %ill meet the values assumed in the calculations subBect

    to manufacturing tolerances as allo%ed in res&ective standards.

    .C alculation for erating $actor 8 6.6kV (UE), !"E, o&&er conductor ables for

    7oute of "o%er Trafo. to 6.6kV 'T 4%itchboardD

    .!.

    1erating factor for 0

    /mbient /ir tem&eratures.

    1 R". Ann"ur" 2 A3 *o%/cab -ab%"

    -ata%o4u" 5 Tab%" No. A or Air #

    Ground T"!"ratur" on *a4" No. 7

    o 8..!.

    ables laid inside concrete

    trench, on cable tra*s. The

    cables s&aced b* one cable

    .>1 R". Ann"ur" 2 A9 Tab%" No. A

    on *a4" No. : o 8.

    Page 2 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    3/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    diameter and tra*s are in tiers

    s&aced b* -mm.

    =o. of cable < - + =o. of cable

    tra*s in tier < -

    .!.3

    9verall erating $actor for 6.6

    kV (UE) able installed

    inside concrete trench on cable

    tra*s.

    < 1 .>1 ; 0.

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    4/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    7.0 -A'LE S(>(NG -AL-)LAT(+N

    3.1 T*&ical calculation of able sizing for 6.6kV )E -o"r ?L*E cab%" ro! 1&.8MVA

    *ow"r Transor!"r to 6.6kV Main Switchboard.

    7.1.1 -ab%" si@" conir!ation or short circuit withstands caacit/.

    a) 3aimum &ossible short circuit current on 6.6kV side 3 5 6.-k/ for 1 sec.

    b) 4hort circuit rating of selected cable (7- ? &:0 s. !!) 3 5-0.-k/ for 1 sec.

    c) uration for carr*ing short circuit current 3 51 sec.

    4hort circuit rating of selected cable is -0.- k/ for 1 sec. %hich is more than of &ossible

    short circuit current of 6.- k/ for 1 sec.

    $"nc" s"%"ct"d cab%" o si@" 7- ? &:0 s. !!. is suitab%" or Short

    -ircuit Bithstand -aacit/.

    7.1.& -ab%" si@in4 bas"d on -ontinuous -urr"nt -arr/in4 -aacit/.

    a) $ull load current on 6.6kV side;51C-.2/.

    b) able size considered 3 5-7 - 0 4#. mm. !"E insulated o&&er

    conductor.

    c) urrent rating of the cable under standard conditions of installation in trench

    i.e. in /ir 3 52/ R". Ann"ur" 2 A9 *o%/cab -ab%" -ata%o4u", Tab%" No.

    &: o *a4" No. 8 o 8

    d) /s the ables laid on cable tra*s e&osed to air, the erating factor

    considered 3 5.>1 R" &.=.7 aboC"

    e) erated ca&acit* of cable 3 5112/ as against re#uirement of 1C-.2/.

    $"nc" s"%"ct"d cab%" si@" o 7R 7- &:0 S. !!. ?L*E is suitab%"

    Page 4 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    5/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    or -ontinuous -urr"nt -arr/in4 -aacit/.

    7.1.7 -ab%" si@in4 bas"d on Co%ta4" dro durin4 u%% %oad condition.

    a) $ull load current on 11kV side;51C-.2/.

    b) 7oute length of cable 3 5 1C meter

    c) able size considered 3 5 -7 - 0 4#. mm. !"E insulated o&&er

    conductor.

    d) Voltage at receiving end terminals is given b* follo%ing formula 3 5

    )1000())(3( tflsr NLSinXCosRIVV +=

    e) 7esistance of cable at C 3 5.C62 @ ? km R"3 Ann"ur" 5 A *o%/cab

    -ab%" -ata%o4u", Tab%" 1 o *a4" No. 1 o 8

    f) 7eactance of cable at 2 'z. 3 5.>2 @ ? km R"3 Ann"ur" 5 A *o%/cab-ab%" -ata%o4u", Tab%" 6 o *a4" No. & o 8

    g) "o%er $actor of s*stem (i.e. os);5.>2 lagging. (4in < . 26)

    =o% %e have, )1000())(3( tflsr NLSinXCosRIVV +=

    )31000()190)526.0085.085.00965.0(5.10933(6600 +=rV

    )20.15(6600 =r

    V

    8.6584=rV V

    =o% "ercentage Voltage ro&, A 100)( = srsD VVVV

    A 1006600)8.65846600( =DV

    A 0.23=DV %hich is ver* negligible.

    $"nc" 6.6kV )E, 7R 7- ? &:0 s. !!. ?L*E -o"r conductor -ab%" is ad"uat" or

    Vo%ta4" Dro consid"ration.

    Page 5 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    6/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    7.& T*&ical calculation of able sizing for 6.6kV (UE) o&&er !"E cable from 6.6kV Main

    Switchboard to &000kVA Transor!"r.

    7.&.1 -ab%" si@" conir!ation or short circuit withstands caacit/.

    a) 3aimum &ossible short circuit current on 6.6kV side 3 5 6.-k/ for 1 sec.

    b) 4hort circuit rating of selected cable (7- ? 1

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    7/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    7.&.7 -ab%" si@in4 bas"d on Co%ta4" dro durin4 u%% %oad condition.

    a) $ull load current on 6.6kV side;51:0.C2/.

    b) 7oute length of cable 3 5 - meter

    c) able size considered 3 5 - 1>2 4#. mm. !"E insulated o&&er

    conductor.

    d) Voltage at receiving end terminals is given b* follo%ing formula 3 5

    )1000())(3( tflsr NLSinXCosRIVV +=

    e) 7esistance of cable at C 3 5.1: @ ? km R"3 Ann"ur" 5 A *o%/cab

    -ab%" -ata%o4u", Tab%" 1 on *a4" No. 1 o 8f) 7eactance of cable at 2 'z. 3 5.>: @ ? km R"3 Ann"ur" 5 A *o%/cab

    -ab%" -ata%o4u", Tab%" 6 on *a4" No. & o 8

    g) "o%er $actor of s*stem (i.e. os);5.>2 lagging. (4in < . 26)

    =o% %e have, )1000())(3( tflsr NLSinXCosRIVV +=

    )11000()30)526.0087.085.0127.0(95.1743(6600 +=rV

    )4.1(6600 =r

    V

    6.6598=rV V

    =o% "ercentage Voltage ro&, A 100)( = srsD VVVV

    A 1006600)6.65986600( =D

    V

    A 0.021=DV %hich is ver* negligible.

    $"nc" 6.6kV )E, 7- ? 1

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    8/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    7.7 T*&ical calculation of able sizing for 6.6kV (UE) co&&er !"E cable from 6.6kV

    (so%ator *an"% to 6.6kV &&00kB -"!"nt Mi%% Motor.

    7.7.1 -ab%" si@" conir!ation or Short -ircuit Bithstands -aacit/.

    a) 3aimum &ossible short circuit current on 6.6kV side 3 5 6.-k/ for 1 sec.

    b) 4hort circuit rating of selected cable (7- ? 1

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    9/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    -urr"nt -arr/in4 caacit/.

    7.7.7 -ab%" si@in4 bas"d on st"ad/ stat" Vo%ta4" Dro durin4 u%% %oad condition.

    a) $ull load current on 6.6kV side;5-0.:/.

    b) 7oute length of cable;5 18meter.

    c) able size considered; 5 - 1>2 4#. mm. !"E insulated o&&er

    conductor.

    d) Voltage at receiving end terminals is given b* follo%ing formula 35

    )1000())(3( tflsr NLSinXCosRIVV +=

    e) 7esistance of cable at C 3 5.1: @ ? km R"3 Ann"ur" 2 A, *o%/cab

    -ab%" -ata%o4u", Tab%" No. 1 on *a4" No. 1 o 8

    f) 7eactance of cable at 2 'z. 3 5.>: @ ? km R"3 Ann"ur" 2 A, *o%/cab

    -ab%" -ata%o4u", Tab%" 6 on *a4" No. & o 8

    g) "o%er $actor of motor (i.e. os);5.>6 lagging. (4in < . 21)

    =o% %e have, )1000())(3( tflsr NLSinXCosRIVV +=

    )11000()15)510.0087.086.0127.0(7.2343(6600 +=rV

    )939.0(6600 =rV 061.6599=

    rV V

    =o% "ercentage Voltage ro&, A 100)( = srsD VVVV

    A 1006600)061.65996600( =DV

    014.0=DV %hich is ver* negligible.

    Page 9 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    10/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    $"nc" 6.6kV )E, 7- ? 12 4#. mm. !"E insulated o&&er

    conductor.

    e) Voltage at receiving end terminals is given b* follo%ing formula 35

    )1000())(3( tflsr NLSinXCosRIVV +=

    f) 7esistance of cable at C 3 5.1: @ ? km R"3 Ann"ur" 2 A, *o%/cab

    -ab%" -ata%o4u", Tab%" No. 1 on *a4" No. 1 o 8

    g) 7eactance of cable at 2 'z. 3 5.>: @ ? km R"3 Ann"ur" 2 A, *o%/cab

    -ab%" -ata%o4u", Tab%" 6 on *a4" No. & o 8

    h) "o%er $actor of s*stem at starting (i.e. os);5 .- lagging.

    (4in < . C2)

    =o% %e have, )1000())(3( tflsr NLSinXCosRIVV +=

    )11000()15)95.0087.03.0127.0(1.7043(6600 +=rV

    )22.2(6600 =r

    V

    78.6597=rV V

    =o% "ercentage Voltage ro&, A 100)( = srsD VVVV

    Page 10 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    11/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    A 1006600)78.65976600( =D

    V

    034.0=DV %hich is ver* negligible.

    $"nc" 6.6kV )E, 7- ? 12 s#. mm.

    !"E cable( 6.0 k/ for 1 sec) is more than the &ossible short circuit current (i.e.

    6.-k/ at . sec.) in the s*stem for 'T 3otor feeder.

    0.0 The current carr*ing ca&acit* of selected cables after deration is more than the

    re#uired current of the s*stem.

    0.2 4ince the stead* state voltage dro& is much less than s&ecified value of 2A, the cable

    selection is correct from voltage dro& &oint of vie%. The attainable stead* state

    voltage dro& in cable is much less than the &ermissible voltage dro&.

    0.6 4ince the starting voltage dro& is much less than s&ecified value of 12A, the cable

    selection is correct from voltage dro& &oint of vie%. The attainable starting

    voltage dro& in cable is much less than the &ermissible voltage dro&.

    Page 11 of 12

  • 8/9/2019 HT Cable Sizing Cal.for HT SWBD, Dist. Trafo. & HT Motor 27.07.10.doc

    12/12

    HT CABLE SIZING CALCULATION

    PROJECT100TPH CLINKER GRINDING PLANT,

    DAR Es - SALAAM.DOC NO.

    17/0035-EL-04-

    80

    CLIENT M/s. WALCHANDNAGAR INDUSTRIES LTD., PUNE. DATE 4.0!.010

    CUSTOMER M/s. MAWENI LIMEST"NE LTD. REV NO. 0

    ELECTRICALCONTRACTO

    R

    AR#EE ELECTRICALS $ ENGINEERS P#T. LTD.,

    PUNE.

    PREP. BY A#S

    CHKD.BY

    MND

    APPD.BY

    NCD

    Th" s"%"ct"d cab%"s co!%i"s with a%% th" r"uir"!"nts and h"nc" th" s"%"ction o

    6.6kV )E, 7- ? &:0 s. !!. ?L*E insu%at"d -o"r -ab%" or 6.6kV Main Switchboard #

    6.6kV )E, 7- ? 1