  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    1/18

    1

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    2/18

    KESC Engineering & Construction

    Department.

    2

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    3/18

    Safety of PMT Project.

    Toolbox Talk of AEs, Supervisors &representative of the contractor beforeexecution of work at site (Both formats .i.e.

    Toolbox Talk Form & Safety inspection formsprovided by HSEQ Department to beproperly understood & filled by the personal

    that will be present at the site).Qualification of Personnel of the contractor

    should be according to the trade.3

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    4/18

    Step 1: Identify the hazards.

    Step 2: Decide who might be harmed andhow.

    Step 3: Evaluate the risks and decide on

    precautions.Step 4: Record your findings and

    implement them.

    Step 5: Review your assessment andupdate if necessary.

    4

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    5/18

    Risks Assessment:

    When working on O/H Lines (H.T, L.T &

    Installation of PMT)

    Electrocution of Personal.Falling from heights.Falling of tools & Tackles fromheights.Return of supply from consumerends (UPS, Generators etc.)Worse conditions of workingtools .i.e. rust on metals, improper

    & weak insulations.Hopeless condition of existingnetwork while dismantling job is tobe done.Lines not properly grounded or

    de-energized.5

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    6/18

    E l e c t r o c u t i o n o f P e r s o n a l .

    P i c k a x i n g o f U / G c a b l e ( H . T &L . T ) w h i l e e x c a v a t i o n , i s d o n e f o r

    e r e c t i o n o f p o l e s , i d e n t i f i c a t i o n o f U / G c a b l e f o r j o i n t i n g o r j u s ts i m p l e e x c a v a t i o n f o r l a y i n g o f U / GC a b l e f a i r c h a n c e s o f f l a s h o v e r s &Tr i p p i n g o f f e e d e r s .

    D a m a g i n g o f G a s P i p e s , W a t e rL i n e s e t c .

    D u e t o w e i g h t o f t h e C a b l e D r u m& H . T c a b l e 3 0 0 m m 2 i t s h a n d l i n gc o u l d b e r i s k y i f n o t p r o p e r l y

    h a n d l e d .

    Risk Assessment:

    When working on U/G Cables (H.T & L.T)

    6By Engr. Naveed Memon

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    7/18

    Safety Measures for minimizing or mitigating

    the Risks & Hazards.

    7

    Proper & Regular Toolbox talk with AEs, Supervisors & authorized personal of thecontractors

    Proper isolation to prevent/mitigating electrocution of the personal.

    Safety equipments including safety belts, safety harnesses, safety helmets, propersafety dress, safety shoes & safety gloves must be used while working on O/H linesto minimize the Hazards & Risks.

    Lines properly grounded & de-energized.

    Cutting tools must be in good conditions while dismantling, safety gloves must beused along with other safety tools to avoid the risk of cutting.

    While excavation job for U/G cables is to be done safety uniform including safetyshoes, gloves & safety helmet with visor must be worn to mitigate the risk offlashovers.

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    8/18

    Safety Measures for minimizing or

    mitigating the Risks & Hazards.

    8

    Due to weight of the H.T Cable 300mm2 it must be handled with care.

    Test lamp must be included in tool box of the lineman.

    Proper use of safety signs & tags is pretty necessary.

    Work must be done in well synchronized manner between different department(Operations, SSM, Concerned NTW centers IBCs, VIBCs & UGM).

    Log book to be maintained for incidents God forbidden if occur.

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    9/18

    Do & Donts:

    9

    Do the do's not the don'ts!

    Being safe is like breathing - you never want to stop.

    Do your work with pride, put safety in every stride.

    Don't be a fool, cause safety is cool, so make that your rule.

    Don't be a fool, use the proper tool.

    Don't be safety blinded, be safety minded.

    Don't fix the blame, fix the problem!

    Don't learn safety by accident!

    Don't lose your head to gain a minute!

    Every accident - every - time if it's predictable it's preventable!"

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    10/18

    10

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    11/18By Engr. Naveed Memon 11

    Q No.01: What is Safety?

    A. Safety means working freely without following the safety rules set up by yourcompany.

    B. Safety means a complete understanding of your work and knowledge of every stepthat must be taken and the realization that mistakes could be costly to yourself andto the company.

    C. Safety means working with following the safety rules set up by your company, butignoring the importance of PPEs & SPEs.

    D. None of above.

    Q No.02: How many Parts of Safety Oath of KESC (Safety Ahudnama)?

    A: 2 B: 3 C: 1 D: 0

    Q No.03: What is Risk?

    A. State of EnjoymentB. State of ExcitementC. State of HappinessD. A source of Danger

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    12/18By Engr. Naveed Memon 12

    Q No. 04.No: What is Hazard?

    A. Any source of Potential DamageB. Any source of Electric ShockC. Any source of Voltage

    D. None of above.

    Q No.05: What is the main reason(s) for electrocution for live line worker (Lineman)?

    A. Negligence in ShutdownB. Improper Isolation from live System

    C. Improper GroundingD. All of above.

    Q No.06: While working on heights (e.g. pulling, jointing, of wires) what equipmentsare necessary to be used by a person?

    A. Insulated tools & Gloves

    B. Safety Belt, Full body Harness & GlovesC. PPEs & SPEsD. Safety Belt & Insulated Tools.

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    13/18By Engr. Naveed Memon 13

    Q No.07: What is the International Standard for using Full Body Harness while workingon heights?

    A. Above 6 FeetB. At 6 Feet

    C. Below 6 FeetD. Both (a) & (b).

    Q No.08: What is Toolbox Talk?

    A. Telling a Story to a Site Supervisor

    B. Talking about working tools with Site SupervisorC. Talking about box of safety toolsD. A kind of discussion before carrying out the Site work about, following safety rules, sort

    of work & sites conditions etc

    Q No.09: When TBT form is to be filled?

    A. execution of any kind of site workB. Middle of workC. After completion of site workD. There is no need of filling of TBT form before or after carrying out the work.

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    14/18

    By Engr. Naveed Memon 14

    Q No.10: While a person using/working on Bamboo Ladder it should be..

    A. Kept against the wall onlyB. Should be held in position by at least a person standing near the feet of Ladder &

    tightened by a rope as well.

    C. Should be tightened by a ropeD. Left Free

    Q No.11: It is very safe when working with electricity on slippery or wet surfaces.

    A. True

    B. False

    Q No. 12: What should be done if tools are not in good condition?

    A. Replace themB. Repair them (if required)

    C. Both (a) & (b)D. None of above

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    15/18

    By Engr. Naveed Memon 15

    Q No. 13: Use --------------- in case of Electric Fire.

    A. Dry SandB. Wet Sand

    C. Carbon PowderD. Water.

    Q No. 14: When Lifting, Handling & Installation of PMTs are to be performed, whatnecessary checks are strictly to be done?

    A. Crane & Boom (Moving Arm of Crane)s conditions along with other PPEs.B. Over all Cranes Fitness.C. Crane Operators Experience.D. Fitness Certificate of CraneE. All of above.

    Q No.15: Housekeeping isA. Neat & Clean Working Environment.B. Well-managed work placeC. Communication Cables & Electric Appliances wires tied up neatlyD. All of above.

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    16/18

    By Engr. Naveed Memon 16

    Q No.16: 100 near misses lead to one Major Accident.

    A. TrueB. False

    Q No.17: If proper Shut down is not arranged dont execute the Site job.

    A. TrueB. False\

    Q No.18: What is First Aid?

    A. Initial Medical TreatmentB. Full Medical TreatmentC. Last Medical TreatmentD. None of above.

    Q No.19: What are distribution Voltage Levels in KESC?

    A. 11 KV,& 415 VoltsB. 11 KV & 220 VoltsC. 415 Volts & 220 VoltsD. None of above

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    17/18

    By Engr. Naveed Memon 17

    Q No.20: HSEQ is short form of

    A. Health, Safety, Exercise & QualityB. Health, Safety, Environment & QualityC. House, Safety, Environment & QuantityD. None of above.

  • 7/27/2019 HSEQ Prestentation PMT Project (1)

    18/18

    By Engr. Naveed Memon 18