hrsg handbook brochure
DESCRIPTION
Boilers constructionTRANSCRIPT
-
Since 1993, the HRSG User's Group has brought together users, manufacturers, service providers, and consultants from around the world to discuss the design, operation, and maintenance of heat-recovery steam generators. After a decade of technical meetings, the Group captured the many lessons its members had learned in a practical set of HRSG guidelines. That 1st Edition proved highly valuable to owner/operators, project developers, manufacturers, design engineers, insurance representatives, and many other industry participants in 41 countries.
HRSG Users Handbook, 2nd Edition, builds upon that first effort, and goes well beyond! Published in 2006, the 2nd Edition captures the industrys latest and best thinking in greater depth and clarity, with all-new chapters contributed by a team of 30 combined-cycle authoritiesall experts in their respective fields who have actively participated in HRSG Users Group meetings for many years, and who know first-hand the information needed to achieve operational excellence. At 512 pages, HRSG Users Handbook comprises nearly three times more substance than the 1st Edition! It is more comprehensive in its span, more detailed in its content, and more visually interesting with better graphics, textbook-style layouts, and a durable, permanently bound hardcover. The information presented has never been compiled previously in such detail and made available at an affordable price.
HRSGUsers
HandbookDesign
Operation
Maintenance
HRSGUsers
HandbookDesign
Operation
Maintenance
www.HRSGusers.org
Only the HRSG User's Group could have put together such a wide-ranging and up-to-date handbook! The Group tapped its 1200-plus members and hand-picked the top industry authorities to author the book's 40 insightful chapters. Contributing companies include HRSG users, designers, engineering consultants, and water-treatment specialists.
Order the HandbookOrder the HandbookHRSG Users Handbook, 2nd Edition, is available exclusively through the HRSG User's Group. Individual copies cost $345.00. There are no shipping or handling fees. The Handbook also is available at special quantity discounts for training purposes. To discuss your training needs, please contact the Group's Executive Director at the office listed below. Fast, secure ordering is available on-line at www.HRSGusers.org. Or you may complete this form, and fax it with your credit-card order. A third option is to mail a check (remit to HRSG User's Group, amount must be in US dollars). Send all orders to:
No. of Books ______________________
Price ($ ea.) _______ $ 345.00 _______
Total Order ($) ______________________
Name ________________________________________________ Company _____________________________________
Billing Address ________________________________________________ City, State, Zip_____________________________________
Shipping Address ________________________________________________ City, State, Zip _____________________________________
Country ________________________________________________ _____________________________________
Fax
________________________________________________ Email
_____________________________________
Circle One My check is enclosed Please bill my credit card Type of Credit Card O Visa O MasterCard O American ExpressCard Number ________________________________________________ Expiration Date _____________________________________
Signature ________________________________________________
S
Chapter 3 COMMISSIONING & INITIAL STARTUP 3.1 Overview of a Successful Commissioning 3.2 Steam-System Cleaning 3.3 Initial Performance TestingChapter 4 STEAM-SYSTEM OPERATION 4.1 Best Practice Operating Procedures 4.2 Steam Bypass Systems 4.3 Duct Burner Operation 4.4 AttemperatorsChapter 5 COMBINED-CYCLE PERFORMANCE 5.1 Real-World Performance Monitoring 5.2 Performance Monitoring of HRSGs 5.3 Performance Monitoring of Steam Turbines & Condensers
6.1 HRSG Failure Mechanisms6.2 Makeup Water Treatmenty 6.3 Steam-Cycle Chemistr6.4 HRSG Layup6.5 Cooling-Water Treatment
7.1 Emissions-Control Systems7.2 Certifying a CEMS
9.1 Standard Maintenance Practices to Avoid Substandard HRSG Life
9.2 Pinpointing & Repairing HRSG Tube Leaks 9.3 Welding Tube-to-Header Joints 9.4 NDE Tools for HRSG Users 9.5 Special Maintenance Practices
10.1 Piping Basics 10.2 Special Piping ConsiderationsChapter 11 VALVE MAINTENANCEChapter 12 DUCTWORK, DAMPERS, & STACKSChapter 13 MAINTENANCE OF DUCT BURNERSChapter 14 INSTRUMENTATION & CONTROLSChapter 15 PLANT STAFFING & ORGANIZATIONChapter 16 FAILURE ANALYSIS 16.1 Overview of Root-Cause Analysis 16.2 HRSG Tube-Failure Root-Cause Analysis Chapter 17 OUTAGE MANAGEMENTAppendix A. Directory of Industry SuppliersAppendix B. Presentations at Annual Conferences Appendix C. Glossary of Acronyms and Abbreviations
Executive Director, HRSG Users GroupPO Box 1054 Bozeman, MT 59771 USATel: 1-406-582-8655 Fax: 1-406-582-8657Email: [email protected]
Chapter 1 SAFETY FIRSTChapter 2 HRSG DESIGN 2.1 The HRSG as an Operating System 2.2 Developing Design specification 2.3 Vertical HRSGs 2.4 Small HRSGs
Chapter 6 WATER TREATMENT
6.6 Water-Chemistry AutomationChapter 7 ENVIRONMENTAL SYSTEMS
Chapter 8 MAINTENANCE PROGRAMChapter 9 MAINTENANCE OF HRSGs
Chapter 10 PIPING SYSTEMS
Telephone
-
Order the HRSG Users HandbookOrder the HRSG Users HandbookFirst published in 2003, this 2nd Edition Handbook was substantially expanded in 2006, with all-new chapters contributed by a team of 30 combined-cycle authorities. Individual copies cost $390.00. Fast, secure ordering is available on-line at www.HRSGusers.org. Or you may complete this form, and fax it with your credit-card order. Third option is to mail a check (remit to HRSG User's Group, amount must be in US dollars). Send all orders to:
No. of Books ______________________
Price (each) _______ $ 390.00 _______
Total Order ($) ______________________
Name ________________________________________________ Company _____________________________________
Billing Address ________________________________________________ City, State, Zip _____________________________________
Shipping Address ________________________________________________ City, State, Zip _____________________________________
Country ________________________________________________ Tel _____________________________________
Fax ________________________________________________ Email _____________________________________
Circle One My check is enclosed Please bill my credit card Type of Credit Card O Visa O MasterCard
Card Number ________________________________________________ Expiration Date _____________________________________
Signature ________________________________________________
Chapter 1 SAFETY FIRSTChapter 2 HRSG DESIGN 2.1 The HRSG as an Operating System 2.2 Developing Design Specifications 2.3 Vertical HRSGs 2.4 Small HRSGsChapter 3 COMMISSIONING & INITIAL STARTUP 3.1 Overview of a Successful Commissioning 3.2 Steam-System Cleaning 3.3 Initial Performance TestingChapter 4 STEAM-SYSTEM OPERATION 4.1 Best Practice Operating Procedures 4.2 Steam Bypass Systems 4.3 Duct Burner Operation 4.4 AttemperatorsChapter 5 COMBINED-CYCLE PERFORMANCE 5.1 Real-World Performance Monitoring 5.2 Performance Monitoring of HRSGs 5.3 Perf Monitoring of Steam Turbines & CondensersChapter 6 WATER TREATMENT 6.1 HRSG Failure Mechanisms 6.2 Makeup Water Treatment 6.3 Steam-Cycle Chemistry 6.4 HRSG Layup 6.5 Cooling-Water Treatment 6.6 Water-Chemistry Automation
Chapter 7 ENVIRONMENTAL SYSTEMS7.1 Emissions-Control Systems7.2 Certifying a CEMS
Chapter 8 THE MAINTENANCE PROGRAMChapter 9 MAINTENANCE OF HRSGs
9.1 Standard Maintenance Practices to AvoidSubstandard HRSG Life9.2 Pinpointing & Repairing HRSG Tube Leaks9.3 Welding Tube-to-Header Joints9.4 NDE Tools for HRSG Users9.5 Special Maintenance Practices
Chapter 10 PIPING SYSTEMS10.1 Piping Basics10.2 Special Piping Considerations
Chapter 11 VALVE MAINTENANCEChapter 12 DUCTWORK, DAMPERS, & STACKSChapter 13 MAINTENANCE OF DUCT BURNERSChapter 14 INSTRUMENTATION & CONTROLSChapter 15 PLANT STAFFING & ORGANIZATIONChapter 16 FAILURE ANALYSIS
16.1 Overview of Root-Cause Analysis16.2 HRSG Tube-Failure Root-Cause Analysis
Chapter 17 OUTAGE MANAGEMENTAppendix A. Directory of Industry SuppliersAppendix B. Presentations at Annual ConferencesAppendix C. Glossary of Acronyms and Abbreviations
Executive Director, HRSG Users GroupPO Box 1054 Bozeman, MT 59771 USATel: 1-406-582-8655 Fax: 1-406-582-8657Email: [email protected]
Improve New Combined-Cycle/Cogen Project Designs
Upgrade O&M Procedures at Existing Plants
Get Top Value in Plant Sales and Acquisitions