HQ Developments Limited c/o Feargal OSullivan, Arup, Albert Quay, Cork 26 June 2019 Re: Design Submission for Horgans Quay, Railway Street, Cork (the “Development”) (the “Design Submission”) / Connection Reference No: CDS19002038 Dear Feargal, Many thanks for your recent Design Submission. We have reviewed your proposal for the connection(s) at the Development. Based on the information provided, which included the documents outlined in Appendix A to this letter, Irish Water has no objection to your proposals. This letter does not constitute an offer, in whole or in part, to provide a connection to any Irish Water infrastructure. Before you can connect to our network you must sign a connection agreement with Irish Water. This can be applied for by completing the connection application form at www.water.ie/connections. Irish Water’s current charges for water and wastewater connections are set out in the Water Charges Plan as approved by the Commission for Regulation of Utilities (CRU)(https://www.cru.ie/document_group/irish-waters-water-charges- plan-2018/). You the Customer (including any designers/contractors or other related parties appointed by you) is entirely responsible for the design and construction of all water and/or wastewater infrastructure within the Development which is necessary to facilitate connection(s) from the boundary of the Development to Irish Water’s network(s) (the “Self-Lay Works”), as reflected in your Design Submission. Acceptance of the Design Submission by Irish Water does not, in any way, render Irish Water liable for any elements of the design and/or construction of the Self-Lay Works. If you have any further questions, please contact your Irish Water representative: Name: PJ Murphy Phone: 022 52267 Email: [email protected] Yours sincerely, Maria O’Dwyer Connections and Developer Services

Upload: others

Post on 12-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HQ Developments Limited c/o Feargal O Sullivan, Arup, Corkresishd.horgansquay.com/wordpress/wp-content/uploads/2019/08/... · Cork 26 June 2019 Re: Design Submission for Horgans Quay,

HQ Developments Limited c/o Feargal O’Sullivan,

Arup,

Albert Quay,

Cork

26 June 2019

Re: Design Submission for Horgans Quay, Railway Street, Cork (the “Development”)

(the “Design Submission”) / Connection Reference No: CDS19002038

Dear Feargal,

Many thanks for your recent Design Submission.

We have reviewed your proposal for the connection(s) at the Development. Based on the

information provided, which included the documents outlined in Appendix A to this letter, Irish

Water has no objection to your proposals.

This letter does not constitute an offer, in whole or in part, to provide a connection to any Irish

Water infrastructure. Before you can connect to our network you must sign a connection

agreement with Irish Water. This can be applied for by completing the connection application

form at www.water.ie/connections. Irish Water’s current charges for water and wastewater

connections are set out in the Water Charges Plan as approved by the Commission for

Regulation of Utilities (CRU)(https://www.cru.ie/document_group/irish-waters-water-charges-

plan-2018/).

You the Customer (including any designers/contractors or other related parties appointed by you)

is entirely responsible for the design and construction of all water and/or wastewater

infrastructure within the Development which is necessary to facilitate connection(s) from the

boundary of the Development to Irish Water’s network(s) (the “Self-Lay Works”), as reflected in

your Design Submission. Acceptance of the Design Submission by Irish Water does not, in any

way, render Irish Water liable for any elements of the design and/or construction of the Self-Lay

Works.

If you have any further questions, please contact your Irish Water representative:

Name: PJ Murphy

Phone: 022 52267

Email: [email protected]

Yours sincerely,

Maria O’Dwyer Connections and Developer Services

Page 2: HQ Developments Limited c/o Feargal O Sullivan, Arup, Corkresishd.horgansquay.com/wordpress/wp-content/uploads/2019/08/... · Cork 26 June 2019 Re: Design Submission for Horgans Quay,

Appendix A

Document Title & Revision

HQDPR-ARP-ZZ-XX-DR-C-0011-P02 Overall Site and Phasing Layout

HQDPR-ARP-ZZ-XX-DR-C-1400-C02 Proposed Foul Drainage Layout

HQDPR-ARP-ZZ-XX-DR-C-1500-C02 Proposed Water Main Layout

HQDPR-ARP-ZZ-XX-DR-C-3304-P02 Proposed Foul Drainage Longitudinal Sections

Standard Details/Code of Practice Exemption: N/A

For further information, visit www.water.ie/connections

Notwithstanding any matters listed above, the Customer (including any appointed

designers/contractors, etc.) is entirely responsible for the design and construction of the Self-Lay

Works. Acceptance of the Design Submission by Irish Water will not, in any way, render Irish

Water liable for any elements of the design and/or construction of the Self-Lay Works.

Page 3: HQ Developments Limited c/o Feargal O Sullivan, Arup, Corkresishd.horgansquay.com/wordpress/wp-content/uploads/2019/08/... · Cork 26 June 2019 Re: Design Submission for Horgans Quay,

M

M

M

FFL: 3.60m

FFL: 5.40m

FFL: 4.40m

FFL: 4.40m

FFL: 4.15m

F

F

L

: 5

.4

0

m

FFL: 4.80m

FFL: 4.80m

FFL: 4.50m

FFL: 4.50m

FFL: 4.65mFFL: 4.80m

FFL: 3.60m

FFL: 3.95m

FFL: 4.40m

FFL: 4.40m

LP

LP

LP

LP

LP

LP

LPLP

EP

G

A

T

E

G

A

T

E

R

G

R

G

R

G

R

G

R

G

Phase 1

Hotel and Retail Development

Phase 3

Residential Development

Phase 1

Office Development

Phase 2

Retail Development

NOTE:

This application is in relation to Phase 1

only which is the first phase of the

overall development.

HQDOQ

Office

HQDNQ

Hotel

HQDNQ

Retail

HQDRQ

Residential

HQDNQ

Residential

A1

1

2

3

4

5

6

7

8

9

10

11

A B C D E F G H I J K L M N

Do not scale

Arup Job No

Suitability

Name

Project Title

Client

© Arup

Rev Date By Chkd Appd

Rev

Drawing Title

Scale at A1

Role

HQDPR-ARP-ZZ-XX-DR-C-0011

P02252901-00

S2 - Suitable for Information

Civil

1:500

Overall Site and Phasing Layout

for Irish Water Connection Application

HQ

Horgan's Quay

One Albert Quay

Cork, Ireland

Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345

www.arup.com

N

/ /P01 11 04 19 D.F. F.O'S. J.D.

Irish Water Connection Application

Legend:

Site Location Boundary

Phase 1 Buildings Extents

Phase 2 Buildings Extents

Phase 3 Buildings Extents

Notes:

1. This drawing is to be read in conjunction with

the Connection Application form to Irish Water

and all other relevant documents as part of

application.

/ /P02 07 06 19 D.F. F.O'S. J.D.

Issued to Irish Water

AutoCAD SHX Text
2.93
AutoCAD SHX Text
MH
AutoCAD SHX Text
2.71
AutoCAD SHX Text
BACKSIGHT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
G
AutoCAD SHX Text
KERB
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
IC
AutoCAD SHX Text
UP
Page 4: HQ Developments Limited c/o Feargal O Sullivan, Arup, Corkresishd.horgansquay.com/wordpress/wp-content/uploads/2019/08/... · Cork 26 June 2019 Re: Design Submission for Horgans Quay,

R

A

M

P

U

P

T

OP

L

A

T

F

O

R

M

4

R

A

M

P

U

P

T

O

P

L

A

T

F

O

R

M

5

LP

LP

LP

LP

LP

LP

LP

LP

LPLP

EP

G

A

T

E

G

A

T

E

R

G

R

G

R

G

R

G

R

G

R

A

M

P

U

P

T

OP

L

A

T

F

O

R

M

4

R

A

M

P

U

P

T

O

P

L

A

T

F

O

R

M

5

LP

LP

LP

LP

LP

LP

LP

LP

LPLP

EP

G

A

T

E

G

A

T

E

R

G

R

G

R

G

R

G

R

G

M

M

M

FFL: 3.60m

FFL: 5.40m

FFL: 4.40m

FFL: 4.40m

FFL: 4.15m

F

F

L

: 5

.4

0

m

FFL: 4.80m

FFL: 4.80m

FFL: 4.50m

FFL: 4.50m

FFL: 4.65mFFL: 4.80m

FFL: 3.60m

FFL: 3.95m

FFL: 4.40m

FFL: 4.40m

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F1

F1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F1

F1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F

1

F1

F1

F1

F

F

F

F

F

F

F

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

Proposed Foul Backdrop

Connection to Cork Main

Drainage Interceptor

ManholeExisting Culvert

Connection to

Main Drainage

C.L.=2.998

I.L.=-0.184

Proposed Manhole Constructed over the line of

the Existing Drain for the Proposed Diversion.

Contractor is to excavate and confirm the invert

level prior to any diversion works.

Proposed Foul Water

Manhole to intercept existing

foul drain from Kent Station

Existing stone culvert

measured at approximately

780 x 780mm in cross section

Proposed Foul Water

Manhole to intercept existing

foul drain from Kent Station

Proposed Foul Water Manhole

to intercept existing foul drain

from Kent Station

Proposed Manhole Constructed over the line

of the Existing Drain for the Proposed Diverted

Drain to connect into.

Contractor is to excavate and confirm the

invert level prior to any diversion works.

Proposed Surface Water Drain to

connect to Diverted Drain as Shown.

Refer to Surface Water Drainage

Layout for Information.

Proposed Grease

Interceptor

Refer to Note 6

Existing Culvert

to be diverted

as shown

Cork Main Drainage

Siphon Chamber

Existing drain to be

removed following

diversion works

Existing drains to be

removed following

diversion works

GT

1

8

0

0

m

m

Ø

In

te

rc

e

p

to

r

1050mmØ Interceptor

FWMH13

CL: 4.60

IL: 1.05

FWMH10

CL: 4.50

BD IL: 2.33

IL: 1.36

FWMH12

CL: 4.50

IL: 2.50

FWMH18

CL: 4.50

IL: 2.80

FWMH19

CL: 4.50

IL: 2.45

FWMH4

CL: 4.40

IL: 1.92

FWMH7 - T2

CL: 4.40

IL: 2.75

FWMH9

CL: 4.40

BD IL: 2.70

IL: 1.65

FWAJ8

CL: 4.40

IL: 3.50

FWMH1

CL: 4.30

IL: 2.75

FWMH2

CL: 4.30

IL: 2.61

FWMH3

CL: 4.30

IL: 2.42

FWMH14

CL: 4.15

IL: 0.91

FWMH20

CL: 3.70

IL: 2.06

FWMH15

CL: 3.70

IL: 0.63

FWMH16

CL: 3.60

IL: 0.47

FWMH17

CL: 3.50

BD IL: 1.86

IL: 0.23

FWMH21

CL: 3.40

IL: -0.06

150m

m

150m

m

150m

m

2

2

5

m

m

2

2

5

m

m

225m

m

225m

m

2

2

5

m

m

1

5

0

m

m

1

5

0

m

m

2

2

5

m

m

2

2

5

m

m

2

2

5

m

m

2

2

5

m

m

2

2

5

m

m

1

5

0

m

m

1

5

0

m

m

1

5

0

m

m

3

0

0

m

m

3

0

0

m

m

300m

m

9

0

0

m

m

9

0

0

m

m

9

0

0

m

m

9

0

0

m

m

9

0

0

m

m

FWAJ1

CL: 4.60

IL: 3.50

2

2

5

m

m

FWAJ2

CL: 4.60

IL: 3.50

2

2

5

m

m

FWMH8

CL: 4.40

IL: 2.27

FWMH22

CL: 4.14

IL: 0.782*

FWMH23

CL: 4.16

IL: 0.484*

FWMH24

CL: 4.18

IL: 0.449*

FWMH25

CL: 3.82

IL: 0.231*

FWMH26

CL: 3.60

IL: 0.086*

FWMH27

CL: 3.50

IL: -0.021*FWMH28

CL: 3.30

IL: -0.092*

Ex. MH

CL: 4.073

IL: 1.248*

IL 300dia : 3.173*

FWAJ3

CL: 4.60

IL: 3.50

FWAJ4

CL: 4.60

IL: 3.50

FWAJ5

CL: 4.60

IL: 3.50

FWAJ6

CL: 4.60

IL: 3.50

FWAJ7

CL: 4.60

IL: 3.50

F

F

F

F

F

F

F

FW MH6 - T2

CL: 4.60

IL: 3.60

F

F

2

2

5

m

m

EX FWMH

CL: 3.40

IL: -0.23 BD

IL: -1.60

FWMH11

CL: 4.50

IL: 3.00

FWMH5

CL: 4.40

IL: 1.86

G

T

1

5

0

m

m

FWMH6

CL: 4.40

IL: 3.15

Proposed Grease

Interceptor

Refer to Note 6

F

F

F1

F1

F

F

Proposed Foul Drain

Proposed Foul Manhole

Type 1

Proposed Foul Manhole

Type 2

Existing Main Drainage

Network

Existing Drainage to be

Diverted and Removed

Proposed Grease

Interceptor

Proposed Foul Drain

Access Chamber

MH FW xx - T1

GT

MH AJ

F

MH FW xx - T2

A1

1

2

3

4

5

6

7

8

9

10

11

A B C D E F G H I J K L M N

Do not scale

Arup Job No

Suitability

Name

Project Title

Client

© Arup

Rev Date By Chkd Appd

Rev

Drawing Title

Scale at A1

Role

HQDPR-ARP-ZZ-XX-DR-C-1400

C02252901-00

A4 - Approved as Stage Complete

Civil

1:500

Proposed Foul

Drainage Layout

HQ

Horgan's Quay

One Albert Quay

Cork, Ireland

Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345

www.arup.com

Notes:

1) This drawing shall be read in conjunction with all

other releveant specifications & drawings

including civil site drawings.

2) All foul water pipework shall be Polypipe

Polysewer and Rigisewer pipework and fittings,

or similar approved.

3) Drains designed to achieve a min. self-cleansing

velocity of 0.75m/s

4) All pipes and manholes shall be constructed as

per construction details drawings.

5) All manhole covers shall be Noroc ductile iron

covers by EJ Covers with a load classification

D400 to IS EN 124.

6) All discharges from food preparation areas shall

be treated for FOG in a grease interceptor

designed in accordance with BS EN 1825.

External Grease Trap Units to be stainless steel

units by Kent Stainless supplied with D400

covers. Covers are to be recessed in paved

areas.

7) Proposed Foul Water AJ chambers to be Wavin

Range 315 IC or similar approved.

8) Proposed Foul Water Manhole Type 2 to be

Wavin Range 600 IC or similar approved.

9) For Longitudinal sections to drainage line refer to

Drawing No. HQDPR-ARP-ZZ-XX-DR-C-3304

Legend:

N

/ /P04 15 01 19 J.B. F.O'S. J.D.

Revisions as Clouded

/ /P05 18 02 19 J.B. F.O'S. J.D.

Issued for Planning

/ /P06 07 03 19 J.B. F.O'S. F.O'S

Issued for Construction Approval

/ /P07 12 03 19 J.B. F.O'S. J.D.

Issued for Pre-Connection Enquiry

/ /P08 13 03 19 J.B. F.O'S. J.D.

Issued for Partial Construction

/ /P09 11 04 19 D.F. F.O'S. J.D.

Irish Water Connection Application

N.B.

All cover levels shown on this drawing are

indicative only. The contractor shall coordinate

the final level with the landscape architect.

/ /P10 12 04 19 D.F. F.O'S. J.D.

Issued for Partial Construction

/ /C01 18 04 19 C.F. D.F. F.O'S

Issued for Construction (Status A4)

Note that the construction and installation of all

wastewater drains, manholes and chambers are to

be carried out in accordance with the Wastewater

Infrastructure Standard Details by Irish Water.

If any discrepancies are found between the Irish

Water Standard Details and the details provided

then the Irish Water Standard Details shall govern.

C02

/ /C02 17 06 19 C.F. D.F. F.O'S

Issued for Construction (Status A4)

AutoCAD SHX Text
2.93
AutoCAD SHX Text
MH
AutoCAD SHX Text
2.71
AutoCAD SHX Text
BACKSIGHT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
G
AutoCAD SHX Text
KERB
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
IC
AutoCAD SHX Text
UP
AutoCAD SHX Text
2.93
AutoCAD SHX Text
MH
AutoCAD SHX Text
2.71
AutoCAD SHX Text
BACKSIGHT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
G
AutoCAD SHX Text
KERB
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
IC
AutoCAD SHX Text
UP
Page 5: HQ Developments Limited c/o Feargal O Sullivan, Arup, Corkresishd.horgansquay.com/wordpress/wp-content/uploads/2019/08/... · Cork 26 June 2019 Re: Design Submission for Horgans Quay,

M

M

M

FFL: 3.60m

FFL: 5.40m

FFL: 4.40m

FFL: 4.40m

FFL: 4.15m

F

F

L

: 5

.4

0

m

FFL: 4.80m

FFL: 4.80m

FFL: 4.50m

FFL: 4.50m

FFL: 4.65mFFL: 4.80m

FFL: 3.60m

FFL: 3.95m

FFL: 4.40m

FFL: 4.40m

LP

LP

LP

LP

LP

LP

LP

LP

LPLP

EP

R

E

S

V

P

G

A

T

E

G

A

T

E

R

G

R

G

R

G

R

G

R

G

W

W

W

W

W

H

H

M

H

H

H

M

W9

W9

W

9

W

9

W

9

W

9

W

W

W

W

W

W

W

M

M

M

W

W

W

W

W

M

H

W

W

W

W

W

W

W

W

W

W

W

W

W

W

H

W

W

W

W

W

W

W

W

W

W

W

W

BM

H

Existing 180mm O.D. HPPE Watermain

Existing 180mm O.D. HPPE Watermain

Existing Hydrant

CONNECTION No. 1

Proposed watermain is to be connected

to existing watermain. Sluice valves and

thrust blocks to be constructed as per

Irish Water Requirements.

Proposed 200mm O.D.

HDPE Watermain

SV

Proposed 200mm O.D.

HDPE Watermain

P

r

o

p

o

s

e

d

1

8

0

m

m

O

.

D

.

H

D

P

E

m

a

i

n

Existing watermain

Existing 600mmØ trunk watermain

Existing watermain

Contractor is to determine

the route and extent of the

existing watermain and

remove if necessary

Existing watermain supply

is to be removed back to

the exisiting main.

TB

Proposed 110mmØ

O.D. HDPE Watermain

SV

TB

Proposed 200x100 unequal tee for

proposed connection to the office block

SV

SV

SV

BM

SV

Proposed Irish Water Bulk Water

Meters and associated valves in

accordance with Irish Water

requirements

Proposed bulk water meters and

associated valves in accordance

with Irish Water requirements

125mmØ O.D. Blank End on Iarnrod

Eireann Site for potential future

extension. Refer to STD-W-05 of Irish

Waters Details for Information.

Proposed Irish Water Meters and

associated valves in accordance

with Irish Water requirements

Proposed Surface Water

Storage Tank

22°

22°

22°

22°

SV

Proposed 200mm O.D.

HDPE Watermain

H

Existing Hydrant

Proposed Bulk Water Meter to

office block in accordance with

Irish Water requirements.

Proposed 200mm equal tee

Proposed 180mm

O.D. HDPE main

BM

Proposed 200mm equal tee

Proposed taper

BM

Proposed taper

22°

22°

Proposed Hydrant

Proposed 180mmØ

O.D. HDPE Dry Riser

Proposed 110mm O.D. HDPE Watermain

connection for office building

Proposed 160mm O.D.

HDPE Watermain connection

for residential building

Watermain connection size

for residential building TBC

Watermain connection

size for hotel TBC

Watermain connection

sizes for retail units TBC

AV

S

c

V

W

O

Proposed washout hydrant detail with

scour valve chamber as per Irish

water standard detail STD-W-30A

Proposed non-return valve as

per Irish water requirements

Proposed non-return valve as

per Irish Water requirements

N

R

V

N

R

V

Proposed air valve as per Irish

Water standard details to be

positioned at high point of network

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

H

H

H

H

H

H

H

W

W

W

W

W

W

W

W

W

H

W

M

W

W9

TB

H

SV

Existing Watermain

Proposed Watermain

Proposed Dry Riser

Proposed Hydrant

Proposed Thrust Block

Existing Hydrant

Proposed Boundary Box with

Meter as per Irish Water Details

Proposed Bulk Irish Water

Meter

Proposed Sluice Valve

Proposed Air Valve chamber

Proposed Non-return valve

Proposed Scour

Valve and Wash-out

Chambers

BM

AV

ScV WO

W

NRV

A1

1

2

3

4

5

6

7

8

9

10

11

A B C D E F G H I J K L M N

Do not scale

Arup Job No

Suitability

Name

Project Title

Client

© Arup

Rev Date By Chkd Appd

Rev

Drawing Title

Scale at A1

Role

HQDPR-ARP-ZZ-XX-DR-C-1500

C02252901-00

A4 - Approved as Stage Complete

Civil

1:500

Proposed Watermain

Layout

HQ

Horgan's Quay

One Albert Quay

Cork, Ireland

Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345

www.arup.com

Notes:

1. This drawing shall be read in conjunction with all

other relevant engineering specifications &

drawings including civil site drawings.

2. All potable water pipework shall be HDPE, SDR

17 pipework and fittings. Fire water pipework

shall be HDPE, SDR 11 pipework and fittings.

3. Thrust blocks shall be constructed where

identified on the layout.

4. Sluice valves shall be installed on all branch

connections and on fire hydrant branch

connections. All valves shall be Anti-clock closing

5. A water meter shall be installed on the

potable supply for each property. The meter

shall be as per Irish Water requirements.

6. All sluice valves and chambers are to be

constructed as per Irish Water Requirements

7. This drawing should be read in conjunction with

all Irish Water specifications and standard

construction drawings.

8. Separation distances required shall be as per

Irish Water requirements. Ref to Irish Water

standard details drawing STD-W-11 for

information.

Legend:

N

/ /P01 20 06 18 B.M. F.O'S. J.D.

Issued for Review & Comment

/ /P02 23 07 18 B.M. F.O'S. J.D.

Issued for Tender

/ /P03 05 10 18 JTC F.O'S. J.D.

Issued for Construction Approval

/ /P04 15 01 19 J.B. F.O'S. J.D.

General Revisons

/ /P05 18 02 19 J.B. F.O'S. J.D.

Issued for Planning

/ /P06 12 03 19 J.B. F.O'S. J.D.

Issued for Pre-Connection Enquiry

/ /P07 11 04 19 D.F. F.O'S. J.D.

Irish Water Connection Application

/ /P08 12 04 19 C.F. D.F. F.O'S.

Issued for Partial Construction

/ /C01 18 04 19 C.F. D.F. F.O'S

Issued for Construction (Status A4)

/ /C02 17 06 19 D.F. F.O'S. J.D.

Issued for Construction (Status A4)

Note that the construction of all watermains, valves, hydrants,

water meters, chambers, marker posts etc. are to be carried out

in accordance with the Water Infrastructure Standard details by

Irish Water. If any discrepancies are found between the Irish

Water Standard Details and the details provided then the Irish

Water Standard Details shall govern.

C02

C02

C02

C02

C02

C02

AutoCAD SHX Text
2.93
AutoCAD SHX Text
MH
AutoCAD SHX Text
2.71
AutoCAD SHX Text
BACKSIGHT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
TIE SHOT
AutoCAD SHX Text
G
AutoCAD SHX Text
KERB
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
IC
AutoCAD SHX Text
Hy
AutoCAD SHX Text
UP
Page 6: HQ Developments Limited c/o Feargal O Sullivan, Arup, Corkresishd.horgansquay.com/wordpress/wp-content/uploads/2019/08/... · Cork 26 June 2019 Re: Design Submission for Horgans Quay,

FW MH

1

4.300m

-1.600m

150Ø

Proposed Foul Drain Diversion Along Western Drainage Line - Longitudinal Section

SCALE 1:500 (Horz.); 1:100 (Vert.)

4.300m

4.300m

4.400m

4.400m

4.500m

4.600m

4.150m

2.610m

2.420m

1.920m

1.620m

1.360m

1.050m

0.910m

1:100

Polypipe

Ridgisewer

-2.00m O.D.

FW MH

2

FW MH

3

FW MH

4

FW MH

9

FW MH

10

FW MH

13

FW MH

14

Proposed Pipe

Material

Existing Invert

Level

Proposed Invert

Levels

Cover

Level

Pipe Ø

Pipe Slope

FW MH

15

FW MH

16

FW MH

17

FW MH

21

EX FW

MH

3.700m

0.600m

3.600m

0.440m

3.500m

1.860m

3.400m

-0.060m

3.400m

-0.230m

2.750m

0.230m

150Ø 150Ø 225Ø 225Ø 225Ø 225Ø 225Ø 225Ø 225Ø 300Ø 300Ø

Ex MH

4.073m

approx 780x780

Proposed Foul Drain Diversion Along Eastern Drainage Line - Longitudinal Section

SCALE 1:500 (Horz.); 1:100 (Vert.)

4.140m

4.160m

4.180m

3.820m

0.782m

*

0.484m

*

0.449m

*

0.231m

*

1:120

Polypipe

Ridgisewer

-1.00m O.D.

FW MH

28

FW MH

29

FW MH

30

FW MH

31

Proposed Pipe

Material

Existing Invert

Level

Proposed Invert

Levels

Cover

Level

Pipe Ø

Pipe Slope

FW MH

32

FW MH

33

FW MH

34

Ex MH

3.600m

0.086m

*

3.500m

-0.021m

*

3.300m

-0.092m

*

2.998m

-0.184m

1.248m

*

900Ø

MH

on Iarnrod

Eireann Lands

1:150

900Ø 900Ø 900Ø 900Ø 900Ø 900Ø

Existing Stone Culvert Drain on Iarnrod Eireann Lands

2.330m

4.400m

1.86m

FW MH

5

150Ø

Proposed Backdrop

Proposed Backdrop

Proposed Backdrop

Approximate Ground Level

Proposed Foul Drain

Notes:

1) All foul water pipework shall be Polypipe

Polysewer and Rigisewer pipework and fittings,

or similar approved U.N.O.

2) All pipes and manholes shall be constructed in

accordance with Irish Water construction details.

3) All manhole covers shall be Noroc ductile iron

covers by EJ Covers with a load classification

D400 to IS EN 124.

4) This drawing is to be read in conjunction with all

other relevant drawings and specifications.

A1

1

2

3

4

5

6

7

8

9

10

11

A B C D E F G H I J K L M N

Do not scale

Arup Job No

Suitability

Name

Project Title

Client

© Arup

Rev Date By Chkd Appd

Rev

Drawing Title

Scale at A1

Role

HQDPR-ARP-ZZ-XX-DR-C-3304

P02252901-00

S2 - Suitable for Information

Civil

As Shown

Proposed Foul Drainage

Longitudinal Sections

HQ

Horgan's Quay

One Albert Quay

Cork, Ireland

Tel +353 (0)21 427 7670 Fax +353 (0)21 427 2345

www.arup.com

/ /P01 05 10 18 JTC F.O'S. J.D.

Issued for Construction Approval

/ /P02 11 04 19 D.F. F.O'S. J.D.

Irish Water Connection Application