hpcon-b/fpcon-b dc phase-2 re-openingiadc.edu/wp-content/uploads/2020/09/director-brief_2...20 hours...
TRANSCRIPT
Director’s Update Brief 02 September 2020
HPCON-B/FPCON-B DC Phase-2 Re-opening
Crisis Action Team
RECENT COVID-19 UPDATES Latest News
Local • James Madison University - will transition to virtual online instruction after experiencing a “rapid
increase” in cases of COVID-19 among students • NCR - 4,500 local childcare centers are closed, some permanently, six months into the COVID-19
crisis • Virginia – surpassed over 1,000 cases on Tuesday
National
• Ohio – yesterday, reported the highest number of COVID-19 cases since July • Vaccine - Large trials for anticipated Oxford COVID-19 vaccine begin in the U.S.
Government Agencies • FDA - says outside pressure won't influence COVID-19 vaccine approval
White House
• Trump Administration – stated the U.S. will not join a global effort to develop, manufacture, and distribute a COVID-19 vaccine because of involvement of the mismanaged WHO
• Trump administration - order banning landlord evictions due to renter income loss from COVID-19
International • Colombia - Colombia reports more than 7,000 new coronavirus cases as unemployment soars • Vaccine - nearly 3 in 4 adults plan to get vaccinated against the coronavirus, global survey shows
China had the highest support for vaccination with 97%. Russians showed the least interest with just 54%
COVID-19 (SARS-CoV-2) USA Statistics
USA: • Total 6,076,281 (+38,994) • Deaths 184,697 (+1,095)
NCR # of Cases by State: • VA: 121,615 (+1,021) 2,612 deaths • DC: 14,049 (+57) 607 deaths • MD: 108,863 (+614) 3,609 deaths
National Capital Region Positive Cases
Virginia (NCR) Total 44,941 (+220)
Fairfax County / Alexandria 22,091
Arlington County 3,560
Loudon County 6,008
Prince William County 13,282
District of Columbia 14,049 (+57)
Maryland (NCR) Total 46,459 (+238)
Prince George's County 26,356
Montgomery County 20,103
NCR Total 105,449 (+515)
Last 24 Hours
Next 24-72 Hours
Current 24 Hours
Concerns / Recommendations / Guidance
CAT-EOC CUOPS/FUOPS
• Task 86 Update from IE (Mrs. Alicia Waldon) • Draft CAT Message #96 – NEW FDA Warning on Hand-Sanitizers • Monitored European COVID-19 Surge • Monitored Daily Update of Critical COVID-19 Mitigating Tasks • Monitored State, DoD, NORTHCOM, and MDW guidance on
reopening and FP/HPCON changes • Sustained coordination w/ MDW regarding RTW way ahead • Monitored DoS Travel Guidance for “Entry into the US” • Continued to Monitored the Crisis
• Monitor European COVID-19 Surge • Daily Update of Critical COVID-19 Mitigating Tasks • Monitor State, DoD, NORTHCOM, and MDW guidance on reopening
and FP/HPCON changes • Continue to Monitor the Crisis • Monitor DoS Travel Guidance for “Entry into the US” from other
countries
Labor Day Weekend Andrew Rader Clinic will close at noon on Friday, Sept. 4,
and will remain closed through Monday, Sept. 7 SC 4-Day weekend 4-7 Sep MDW 4-Day weekend 4-7 Sep
• Prepare for Labor Day Weekend • Monitor European COVID-19 Surge • Monitor Daily Update of Critical COVID-19 Mitigating Tasks • Monitor State, DoD, NORTHCOM, and MDW guidance on reopening
and FP/HPCON changes • Monitor DoS Travel Guidance for “Entry into the US” from other
countries • Continue to Monitor the Crisis
CAT Working Tasks Task # Task Deliverable Status Department / AO Suspense Date
83 Monitor two specific sites from HELC policy guidance to maintain abreast of COVID-19
education guidance
Track and report any applicable information
In Progress IE Ongoing
84 Update roster of international members for base access
Each department provides Admin updated roster of personnel to include family members
Completed ADMIN/ALL Ongoing
86 Lessons learned from colleges and
universities that have opened for presence-based classes/activities.
Obtain lessons learned from colleges and universities that have opened for presence-based activities to enhance IADC’s guidelines and preventive actions.
In Progress Institutional
Effectiveness. (Studies)
Ongoing
CAT MESSAGES
CAT MESSAGES LOG NUMBER TITLE DESCRIPTION DATE PUBLISHED
CAT-9320 Return to Work Flowchart and Critical Definitions To Provide all IADC personnel the RTW flowchart that will be followed and clarify critical definitions related to COVID-19 pandemic
28-August
CAT-9420 Road Closures for Friday's March for Racial Justice To Provide all IADC personnel information regarding road closures for this Friday, and the weekend, in D.C. and the NCR
27-August
CAT-9520 Fines in Arlington Country To Provide all IADC personnel information regarding fines for not adhering to social distancing/mask requirements 28-August
CAT-9620 NEW FDA Warring on Hand Sanitizers To Provide all IADC personnel an update to a recent, new FDA Warning on Hand Sanitizers 02-September
Critical COVID-19 Mitigating Tasks
Inter-American Defense College Crisis Action Team
A
G
R
Task Completed
Tracking; No issues
Not Tracking; issues
Administration Department
Task/ Action/ Event OPR/AO Suspense Status Remarks
Ft Belvoir Access ADMIN Ongoing
All letters issued that can be. As new personnel are assigned to College an issue will be provided if they require access to Ft Belvoir.
Access to Installations Utilizing DBIDS ADMIN Ongoing Sponsors not in DBIDS must go to Visitors Center to be added.
A
A
A
G
R
Task Completed
Tracking; No issues
Not Tracking; issues
Institutional Effectiveness Department
Task/ Action/ Event AO Suspense Status Remarks To monitor the DC HELC and CDC websites for any changes in guidance that may be implemented, and then report to CAT so that they can update the Return to Campus Plan
Ms. Alicia Daily No updates so far.
"Covid-19 Update - Campus Response" for ACICS. Dr. Malamud
Every two months • Aug. 1 • Oct. 1 • Dec. 1
We already completed and submitted the August 1 update.
Obtain lessons learned from colleges and universities that have opened for presence-based activities to enhance IADC’s guidelines and preventive actions
Ms. Alicia Daily The information is been gleaned and sent directly to CAT.
A
A
A
A
G
R
Task Completed
Tracking; No issues
Not Tracking; issues
Operations Department
Task/ Action/ Event OPR/AO Suspense Status Remarks Turn on the video from Ceremonial Auditorium to Academic Auditorium
Mr. Steiger Brahler Aug. 25 COMPLETED
Fish the Ethernet cables from the Interpreters Booths at the Ceremonial Auditorium
Mr. Steiger Brahler Aug. 25 Pathway obstructed, researching
other method.
Update the firmware of the new console stations at the Ceremonial Auditorium Brahler Aug. 24
Local upgrade delayed, performing work at contractor site to confirm functionality prior to delivery.
Tape the cables (from the consoles) over the floor at the Ceremonial Auditorium
Mr. Steiger Maj Alan Aug. 25 COMPLETED
Run the cables in the ceiling in Ceremonial Auditorium
Mr. Steiger Maj Alan Aug. 25 COMPLETED
Wireless keyboards for Seminar room 221, Green room and Admin room
Mr. Steiger Maj Alan Aug 20 COMPLETED
Upgrade the Speaker system at the Ceremonial Auditorium
Mr. Steiger Maj Alan Sep. 18 Contract signed. 3 to 4 weeks to
install the new speakers.
Fix the Projector screen at Ceremonial Auditorium
Mr. Steiger Maj Alan Aug. 25 Temp fix in place, contractors
contacted. Expecting ~$6,500
A
A
A
A
G
G
G
G
A
G
R
Task Completed
Tracking; No issues
Not Tracking; issues
Operations Department (cont.)
Task/ Action/ Event OPR/AO Suspense Status Remarks
Medical Screening Station Mr. Steiger LTC Lomba Daily In progress. Enabled module for a
rainy day
Purchase of Additional Dehumidifiers and Air Purifier for New Faculty Rooms (Basement of Bldg 52)
Mr. Steiger Sep. 4 Ordered 4 additional air purifiers and 4 dehumidifiers
Medical Screening Tent Replacement Mr. Steiger/LTC Lomba Sep. 12 Three companies contacted for
quotes.
A
A
A
A
G
R
Task Completed
Tracking; No issues
Not Tracking; issues
Studies Department Task/ Action/ Event OPR/AO Suspense Status Remarks
Improvements to Seminar Rooms for Comfort
LTC Gutierrez Mr. Steiger Aug. 28 Update: Installation of window
coverings completed yesterday.
Modification to Temporary Desks in the Ceremonial Auditorium
LTC Gutierrez Mr. Steiger TBD
Students have indicated that the temporary desks are too large to be used comfortably and inhibit the use of a laptop computer. Studies will work with Ops to determine modifications.
Improvement to the Sound System in Ceremonial Auditorium
LTC Gutierrez Mr. Steiger Sept. 18
Students have indicated that the sound system is inaudible. Contract has been signed, waiting on installation to be completed.
A
A
G