1 Collaborative KPIs: How to turn around a buyer-supplier relationship in co-producing services Henk Akkermans* [email protected] Tilburg University The Netherlands Willem van Oppen [email protected] Provoque Consulting The Netherlands *: Corresponding author Address: Department of Information Management Faculty of Economics and Business Administration Tilburg University Warandelaan 2, P.O.Box 90153 5000 LE Tilburg, The Netherlands Version March 31, 2009

Upload: lykiet

Post on 17-Jun-2018

219 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

1

Collaborative KPIs:

How to turn around a buyer-supplier relationship

in co-producing services

Henk Akkermans* [email protected] Tilburg University The Netherlands

Willem van Oppen [email protected] Provoque Consulting The Netherlands

*: Corresponding author

Address: Department of Information Management Faculty of Economics and Business Administration Tilburg University Warandelaan 2, P.O.Box 90153 5000 LE Tilburg, The Netherlands

Version March 31, 2009

Page 2: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

2

Collaborative KPIs:

How to turn around a buyer-supplier relationship

in co-producing services

ABSTRACT

This paper describes findings from an action research project in which the question of

how to achieve a turn-around in an adversarial buyer-supplier relationship in co-

producing services. This paper takes as empirical setting the ups and downs of the

buyer-supplier relationship between Atos Origin, one of the main IT-outsourcing

companies in Europe, and its customer KPN Telecom, the leading Telco in the

Netherlands. The organizational change approach, which is called “Collaborative

KPIs”, consists of three steps, consistent with the Unfreeze-Move-Free approach

developed by Kurt Lewin.

In this case, the Collaborative KPI approach resulted in significant operational

improvements on the shop-floor level by means of true collaboration. The

environment of trust and measurable alignment that was created with concrete

measurements and rewards for both supplier and customer demonstrated over the past

four years its robustness. The paper also contains descriptions of the action research

approach employed in this research, where insights gained from direct clinical

intervention during the change effort are combined with much longer-term

“anthropological” research activities long prior during and long after the intervention

period itself.

Keywords: services, telecom, action science, organizational change, IT outsourcing

Comment [CvO1]: Had het hier kort met Willem over… Als “doorbraak” bedoeld wordt zou ik het iets anders formuleren. Hier wat opties: 1.How to create a breakthrough in a buyer-supplier relationship in co-producing services 2.How to advance a buyer-supplier relationship in co-producing services 3. How to restore … (optie 2 heeft mijn voorkeur)

Page 3: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

3

1. Introduction: stuck in vicious cycles

Even in potentially close relationships, buyers and sellers often have difficult, if not

adversarial relations (Mudampti & Helper 1998). Both sizes appear to be stuck in a

vicious cycle of mutual distrust, low information transparency on both sides and at

best mediocre business performance (Jap & Anderson 2007). As long as supplier A

does not trust buyer B, he will not be providing the advance and detailed information

that B needs to optimize performance, which will lead B to distrust A further. Buyer

B will therefore also not be as transparent as she could be in informing A in advance

and in detail on possible problems and opportunities, which will further lower joint

performance, and make trust in B with A even lower (Ring and van de Ven 1994,

Akkermans et al. 1999, Nooteboom 20002, Sundaramurthy & Lewis 2003,

Akkermans et al. 2004). Many buyer-supplier relationships remain stuck in such

“spirals of suspicion” (Anderson & Jap 2005), because even when one of the two

parties attempts to make a major change, the other side will be inclined to interpret

this effort at improvement as yet another trick from “them”, which won’t work

anyway (Bell et al. 2002).

In service operations, such relationship gridlock becomes even more stifling.

Here, buyer and supplier by definition co-produce value (Vargo & Lusch 2004). As a

consequence, responsibilities and dependencies between buyer and supplier become

very difficult to delineate. In the absence of objective criteria of performance

evaluation, personal perceptions and hence emotions can play an increasingly

dominant role in service supply chains. This notion forms the motivation for the

research question in this paper:

Page 4: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

4

How can one turn around a buyer-supplier relationship in services

where both parties are caught in a vicious cycle of distrust, low

transparency and at best mediocre operational performance?

The case setting we draw on to investigate this question is in the telecom industry,

which is especially well suited to address this issue for a number of reasons. Firstly,

the fragmented nature of the industry leads to a multitude of close relationships that

must be maintained. In Telecoms, services are typically no longer provided by

integral firms, but by service supply networks (Choi et al. 2001, Dyer & Hatch 2002,

Nooteboom 2004, Akkermans & Dellaert 2005) consisting of anywhere between three

and twelve independent organizations, who all maintain buyer-supplier relationships

with one another. Secondly, there are many settings in telecoms where mediocre

performance exists, as is indicated by academics who have rated service performance

as “poor” (Gerstner & Libai 2007) and business journals who have even called it

“stinking” (Brady 2000). In the Netherlands, where our case is set, two cable

companies and one telecom operator in 2007 even led the top three of the “most

irritating companies for consumers”, just ahead of the Tax Revenue Service

(Consumentenbond 2007). One possible root cause for this mediocre performance is

that telecom companies themselves may be caught in a vicious cycle of low customer

experience, low service quality, high cost of rework and as a result a strong urge to

“cut corners”, which further hurts service quality (Roth & Jackson 1995, Oliva &

Sterman 2001, Akkermans & Vos 2003).

The buyer-supplier dyad that we investigate concerns an IT services company

that owned and managed the outsourced IT infrastructure for its telecom customer.

Page 5: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

5

Many IT outsourcing arrangements combine antagonistic behavior on both sides with

mediocre performance, which makes them interesting to study in the context of our

research question. Why? Again, there may be a vicious cycle at play. In the context of

IT outsourcing, this vicious cycle is better known as “the winner’s curse” (Kern et al.

2002). This refers to the theory that the IT provider that “wins” the outsourcing deal

from its competitors will tend to have paid so much for it that it ends up trying to

recover its initial costs, which often leads to dissatisfaction and poor performance on

both sides, again a vicious cycle.

The research design that we employ to explore this question is that of action

science. At present we have very little academic knowledge on how to design and

carry through such an organizational transformation processes successfully. This may

seem strange. After all, processes of planned change are certainly not excluded from

the research agenda of the field of operations management. The Institute for

Operations Research and the Management Sciences (INFORMS) even labels its field

as “the science of better” (www.thescienceofbetter.org) The Production and

Operations Management society (POM) has as one of its key goals “to promote the

improvement of POM” (www.poms.org, italics added). So, why this paucity of

research on planned organizational change? Again, there may be vicious cycle at play

here. We suggest that there is very little action research on OM because this research

method is still unknown to most OM researchers, and not without the doubts about its

applicability that go with any new method or approach. As a result, OM researchers

remain reluctant to engage in action research, which leads to very little publications

using action research, and a vicious cycle is born. This paper boldly attempts to start

reversing this vicious cycle, by discussing in some detail the action research design

that was employed for this study.

Page 6: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

6

2. Literature

2.1. Services are important, different and difficult

Services have become the largest economic sector in Western economies (Boyer and

Metters 2004). Not long ago, innovation was still felt to be strongest in

manufacturing, with services lagging considerably behind. These days, many service

industries have become strongly innovation-driven, with successive radical product

innovations stumbling over one other. One clear example is the telecom industry, with

third generation mobile networks, IP telephony and Internet TV, service offerings of

today’s telco’s are vastly different from those of the sleeping giants such as the “Ma

Bells” of a decade ago. Not only have the types of services changed radically; on

anorganizational level, telco’s have changed considerably as well. Nowadays, telco’s

offer their services through service supply networks (Choi et al. 2001, Hameri &

Paatela 2005), where easily up to a dozen independent companies collaborate closely

via a host of interrelated IT systems and business processes to serve the needs of end

customers.

In the past, in the field of OM by far the most attention has been given

to production operations. In the last decade this has been changing rapidly (e.g.,

Heskett et al. 1997, Johnson 1999, Rust and Chase 1999, Hill et al. 2002) A great deal

of the knowledge on how to coordinate production operations is applicable to service

operations, but the service industry remains unique on some very critical points as

well, including the high level of customer contact and influence, simultaneity of

production and consumption, intangibility, nonstorability, perishability, and labor

intensity (Nie and Kellogg 1999; Slack, Chambers, and Johnston 2001). Recently, in

the fields of marketing (Vargo & Lusch 2004), IT (Spohrer and Maglio 2008) and

Page 7: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

7

operations (Scott et al. 2006), appeals have been made to position services as a

separate field of science, as “a science of services” (Chesborough, 2005). In all these

new visions, a central place is allocated to the notion that, buyer and supplier are

always co-producing value in services (Bettencourt et al. 2002, Bendapudi & Leone

2003), which fundamentally changes the nature of the relation between a buyer and a

supplier.

2.2. Buyer-supplier relationship dynamics

Relationship dynamics between buyer and supplier can be very complex, and can

result in both virtuous and vicious cycles. One description of the causal structure that

can generate such complex dynamics is provided in Figure 1. This Figure was

generated to explain the remarkable success of a project aimed at synchronizing

supply chain performance between two product divisions of Philips Electronics and

several contract manufacturers. This project saved Philips many millions during the

downturn in worldwide electronics in 2000-2001 (de Kok et al. 2005)

Page 8: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

8

Informationtransparency

Quality ofdecision-making in

supply network

Performancetowards endcustomers

History ofsuccessful

collaborationHabituation

Communicationintensity

Trust

"TRAVAIL"

Communicationopenness

Opportunisticbehavior

+

+

+

+

-

--

+

-

+

+

+

R1

R4

R2

R3

Figure 1: Causal loops in buyer-supplier relationships dynamics,

adapted from Akkermans et. al. 2004

At the core of this diagram lies a reinforcing feedback loop (Sterman 2000) between

trust, behavior and performance (R1). The existence of the causal links in this loop

have been confirmed in various fields. Supply chain management literature suggests

that the closer the collaboration with buyers and suppliers is, the better the business

performance becomes (Spina and Zotteri 2000, Frohlich and Westbrook 2001, Fynes

et al. 2005). In the field of marketing, Palmatier et al. (2007): find commitment-trust

as immediate precursors to and key drivers of exchange performance, asdo

Narayandas & Rangan (2007). Organizational literature on trust supports the notion

of upward and downward spirals of trust and information transparency. Nooteboom

(2002), in his standard work on trust writes: “When offered trust, people may

reciprocate (…) and there is a possibility of an upward spiral of trust. However, the

converse may also apply, where trust engenders mistrust, and then there may be a

downward spiral of suspicion. Which is the case can depend on minor events or

misunderstandings. Thus, with such non-linear feedbacks, the trust process can

Page 9: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

9

assume the properties of a chaotic system. (Nooteboom 2002, p.94). Bell et al. (2002)

note that performance first has to pass a certain threshold before “the relationship

becomes “sensitive” and the trustor observes more frequent trust violations” (Bell et

al. 2002, p.68.). The three other loops reinforce these cycles. There is the two-sided

relation between opportunism, or “gaming” and information transparency in loop R3,

which lies at the core of most work in information sharing in supply chains (e.g, Lee

et al. 1997). There is also the axiom in R3 that better information will lead to better

decisions.

Finally, there is notion of “habituation” between partners in loop R4, as

developed by Nooteboom et al. (1997). It is here that the concept of “travail” kicks in,

the hard and ongoing work done by all parties in many collaborative meetings that

increases communication intensity. Step by step, these meetings make sure that

operational performance improves, which is seen as a key lever to change the

direction of all loops from vicious to virtuous cycles.

2.3. IT Outsourcing

One special form of a buyer supplier relationship is outsourcing, where a third-party

provider is made responsible for the execution of certain activities or even complete

business processes. When companies located in other countries perform the

outsourced activities, the term often used is offshoring, although offshoring also refers

to situations where the activities performed abroad are still executed by the same

company. Several kinds of outsourcing exist, of these IT outsourcing is probably the

most popular one, which has steadily been rising in popularity over the past ten years,

with a correspondingly large number of academic articles dedicated to it (Gonzalez et

al. 2006). We know that an outsourcing relation can grow into a strategic partnership

(Zviran et al. 2001) but this is by no means an automatic development. For this

Comment [CvO2]: Is dit belangrijk voor het argument?

Page 10: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

10

reason, many firms are reluctant to outsource fully, especially when the IT activities

in question are high-risk (Aubert et al. 2004) or highly asset-specific (Barthelemy &

Geyer 2005). Rather, firms will outsource the assets but bind the activities to their

own firm through contracts, in what Barthelemy and Geyer (2005) call “quasi-

outsourcing”.

Whether or not outsourcing actually really improves business performance is

at this point still unclear (Bhalla et al. 2007, Stringfellow et al. 2007, Ellram et. al.

2008). At any rate, IT Outsourcing relationships can become as “adversarial” as any

other buyer-supplier relationship. Kern et al. (2002) even warn for “relational

trauma” in these settings, as an indirect result of the bidding process that usually

forms the start of an outsourcing relationship. This bidding process brings the

company that places the highest offer, who becomes the buyer of the assets annex the

provider of future IT support, in a position where costs need to be recovered from the

so direly paid-for investments. Through this cost-drive, the supplier inadvertently may

start off a vicious cycle of mistrust and suboptimal performance (Kern et al., 2002).

Such a vicious cycle can often only be stopped by ending the relationship. An

alternative to ending the relations is reversing such a vicious cycle of mistrust and

mediocre performance through a successful effort of planned organizational change.

2.4. Planned organizational change

How does one change the attitudes of large groups of people towards each other?

Working with prejudiced groups of different races and religions in the U.S. in the

1930s, this was the question that intrigued Kurt Lewin, the father of the field of group

dynamics and planned organizational change. Lewin made extensive use of

workshops with leaders of different communities. His observations regarding the

Comment [CvO3]: Over het algemeen vind ik dat het nog te weinig vloeit. Ook niet gek als het stuk nog zo in ontwikkeling is. Maar zou dus adviseren om iets meer aan te geven aan het begin van de hoofdstukken wat er allemaal besproken wordt. Tot nu toe is het elke keer een verrassing.

Page 11: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

11

outcomes of these workshops sound as relevant today as in 1946: "Even a good and

successful workshop, however, seems seldom to have the chance to lead to long-range

improvements in the group of inter-group relations. The individual who comes home

from the workshop full of enthusiasm and new insights will again have to face the

community (...). We are facing a question which is of prime importance for any social

change, which is the problem of its permanence" (Lewin 1948, p.148). This

experience made Lewin develop the notion of improving group performance by a

three-stage process of “unfreeze-move-freeze” (Lewin 1951, p.330). This concept has

formed the basis of much subsequent research into organizational development (e.g.

French & Bell 1973, Schein 1987, Argyris 1990, 1993, 2000). However, these

concepts from group psychology have had relatively little impact in the field of

operations management. Naturally, practitioner-led movements such as lean

manufacturing have stressed the need for a different type of employee and

management attitude, even for a “learning” manufacturing organization (Hayes et al.

1988). However, published research on how such a change is to be achieved has been

rare in the academic OM community. Part of the answer why may lie in the nature of

the research method required to investigate planned organizational change.

3. Research method: action research

It is difficult to learn how companies go through periods of organizational change

because most conventional research tools are ineffective in such times. Surveys,

laboratory experiments and mathematical models remain at a great distance from

what is really happening during these periods of intense and sometimes apparently

chaotic behavior. Case studies come closer but many of them are not longitudinal, and

Page 12: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

12

change is by definition something that evolves over time (Narayandas & Rangan

2007). Research methods that will allow the researcher to observe the organization

from very close, even during the times of greatest turmoil, appear better suited to

learn about change processes. Such research methods require that the researchers

adopt a participative stance during certain stages of the research process. The

researcher’s goal is always twofold: to develop general scientific knowledge

regarding the process involved and to help develop concrete solutions for the

problems the parties involved are experiencing. Such research is called action

research (The research method employed in this study has been that of action

research (Lewin 1946, 1951, Argyris 1990, 1993, 2000, Schein 1969, 1987,

Westbrook 1995, Coughlan & Coghlan 2002).

Although there has been an often-repeated call to increase “all types of

empirical research” in the field of operations management for almost two decades

(Flynn et al. 1990), for a long time there have only been incidental explicit calls for

action research in OM (Westbrook 1995, Coughlan and Coglan, 2002). More recently,

there have been strong pleas for more collaborative research with industry, which

usually takes the form of action research (Guide and van Wassenhove 2007, Lee

2007). For instance, in his President’s Message in the 2007 Newsletter of the POM

Society, Hau Lee argues that “we should rigorously promote the research paradigm

that is based on an interactive approach with industry”. (Lee 2007, p.3).

As indicated, action research is especially appropriate as research design

when the object of study is organizational change. This change orientation has been

inherent to action research from its beginnings, which go back to the work done in the

1930s and 1940s by Kurt Lewin (Lewin 1946, 1951). In action research, the

researcher is actively involved in a clinical capacity (Schein 1987). Action research

Page 13: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

13

goes a great deal further than longitudinal case study research designs do. There, the

researcher remains acts as an ethnographer (Schein 1987), where he remains as much

as possible in the role of an unobtrusive (participant) observer. In action research, the

starting assumption of the researcher is that often-quoted saying by Kurt Lewin that

“if you want truly to understand something, try to change it.” When a situation is

stable, you cannot infer the underlying structure and its resulting dynamics. Only

when change occurs can one learn about this underlying structure. By taking up a

“clinical” role, the researcher has the organizational justification to intervene, and

thereby induce change, and observe the response to his interventions. According to

Schein (1987), “the nature of the that response then becomes primary diagnostic data

for determining what may really be going on” (Schein 1987, p.29).

Schein (1987) contrasts the clinical and the ethnographic model for field work

in various ways. One final observation he makes is that “the ethnographer’s job is not

finished when the fieldwork is finished. The problem of analyzing the data, deciding

what has been learned and how to present it are integral to the ethnographic task and

may require a great deal of time and effort after the relationship with the field site has

been severed. (…) If the clinician then spends years mulling over what he or she has

learned from the case, this is typically not thought of as part of the clinical work”.

(Schein 1987, p.35). This distinction between clinical and ethnographic work

becomes directly relevant for the current research if we look at the timeline of

research activity as shown in Figure 2.

Page 14: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

14

2001 2002 2003 2004 2005 2006 2007 2008 20091999 2000

Theory on Travail,Transparency & TrustAkkermans et al 2004

publishedDelphi study onVicious&virtuous

cyclesIn SCM published

Concept of ŅFromBuying

Equipmentto ContractingFunctionality

implemented atDSM

1st wavequestionnaire

On TT&T data collected

2nd wavequestionnaire

On TT&Tcollected

Case onVicious&virtuous

cyclesIn ERP

implementationpublished

ŅWhyÓ Questions

Concept ofŅPot of GoldÓ& Two-way

KPIs

Renga workshopdesign for

InterorganizationalCollaboration

published

ŅHowÓ Questions

CPO of theYear award

ForCollaborative

KPI work

Gene RichterAward for

ProcessInnovationPlenary

Presentationat SD

conference

3rdquestionnaryon Agency

theoryaspects Presentations

for academicseminars

Asking forfeedback

from leadingacademics

PHASE OF DIRECTCLINICAL

INTERVENTIONS

VariousPresentations for

managementaudiences

TestimonialsFrom seniorMgt buyer& supplier

Figure 2: Off-site data-collection, refining & theorizing

prior, during and after the intervention

Figure 2 illustrates that, we would be presenting a very limited picture of the

actual research process if one only focus on the insights that we, the authors, gained

during the time we were directly involved in the transformation of the buyer-supplier

relationship in the case setting, broadly speaking from Q3 2003 to Q1 2005. We

distinguish three phases here.

First, there is the ex ante work we did. Our theories of why buyer-supplier

relationships in general go bad goes back several years and had even been published

in academic journals prior to our work in the case (Akkermans et al. 1999, Akkermans

et al. 2004). Our ideas on how a successful transformation could be achieved was tried

and tested in several earlier efforts. The 2nd author had redefined a buyer-supplier

relationship through KPIsdefined in customer terms during his management career at

DSM, a chemical company, in 1999-2000. The 1st author had run workshops with

Page 15: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

15

representatives of multiple organizations in a supply network for, amongst others,

ASML (Akkermans 2001), Boeing and Philips Electronics (Akkermans et al. 2004)

prior to the current case. So, rather than a one-year involvement with the case setting,

we ourselves see this particular case as one manifestation of a research programme

(Lakatos 1976, Lee 2009). Our use of prior theory to design our intervention can be

seen as yet another example of another well-know quote by Kurt Lewin: “Nothing is

quite so practical as a good theory”. Secondly, there is knowledge we generated

durante, during our work with the client company. The next section will contain much

more detail on this, but here it suffices to say that our interventions generated many

revealing insights into the underlying structure in the relationship under study.

However, on top of that we did collect information of a more “anthropological”

nature, in particular by sending out a questionnaires to key staff on both sides that

measured scores on the key aspects of “travail, transparency and trust”, in line with

our prior theory on the key drivers of the relationship as laid out in Akkermans et al.

(2004). Also, significant learning did grow out of the reflective discussions we, the

authors, had amongst ourselves regarding the status of the planned stage, how our last

interventions had worked out and what would be best to do next. Van Aken (2004)

labels this the “reflective cycle”, through which so-called “technological rules” are

developed.

Thirdly, there are the ex post activities we conducted to arrive at a better

understanding of what had happened and why. These include additional

“anthropological” data collection activities such as an additional questionnaire round

in January 2006 similar to the one conducted in 2004, and in-depth interviews with

key staff from both the supplier and buyer company on agency-theory aspects of the

case in November 2007. These activities also include various attempts at peer review,

Page 16: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

16

at benefiting from the feedback from other professionals, be they academics or

practitioners, on our work. For the 2nd author, this directly led to his election as “CPO

of the Year 2006” in The Netherlands, granted for his description of the

“Collaborative KPI concept”. Moreover, his presentations on this subject also led to

his company winning in the U.S. the Gene Rigter award for process innovation in

2008. In short, we have strived to achieve a synergy between the clinical and the

anthropological aspects of our research design, in the sense as intended by Romme

(2003) in his description of how in management research, the so-called “design

mode” and “science mode” should be combined.

4. Case setting: IT outsourcing in telecom services

4.1. Company introductions

Royal KPN Telecom is the former state owned incumbent telephone services provider

in the Netherlands. Today, KPN is market leader in main segments of the Dutch

telecom and ICT markets. KPN recently acquired Getronics, a major international IT

service provider, thereby solidifying its position in the IT market. KPN has growing

market shares in wireless services in Germany and Belgium with 5.4 million fixed-

line customers, 2.4 million internet customers, and 27 million mobile customers

In the Netherlands, KPN is still the market leader in the existing market

segments and a dominant player in the “new world” of IP and DSL. Furthermore it

has recently transformed its brand image from a telephony - towards a customer

focused multi-media company, with a staff of 25,500 FTE (43,500 FTE including

Page 17: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

17

Getronics). KPN was privatized in 1989. KPN's shares are listed on the stock

exchanges in Amsterdam, London and Frankfurt.

Atos Origin is a leading European IT company, headquartered in France with

a strong presence in the Netherlands as a result of acquiring Origin in 2000. Origin in

turn was formed by the merger of Philips Electronics’ former IT subsidiary and Dutch

software house BSO in 1995. Today, it has more than 47,000 employees in 40

countries.

4.2. Case background: IT outsourcing during a financial crisis

The Internet Bubble and investments in third generation UMTS licences drove

almost all European operators into near bankruptcy in 2001, including KPN. This

called for drastic measures. In the fall of 2001, KPN initiated a massive turnaround

process, cutting costs and divesting non-profitable and non-essential assets and using

the proceeds to reduce the massive debts. One of the major elements of the latter was

a company-wide outsourcing program whereby a/o IT, Call Centres, Research,

Logistics, Training and Educational Services were outsourced. Aside from the exit of

hard assets, about 7500 employees thus left the company.

One part of KPN’s assets that was outsourced was its IT infrastructure, i.e. the

IT systems that supported the business processes of the company. At this time, KPN

had a legacy structure of over 1000 internally and externally developed applications

with stove-pipe solutions, and more than 1700 point-to-point connections between

them. Not surprisingly, performance left much to be desired. Data were inconsistent,

customer satisfaction was poor and operating costs were high. Also, the IT demand

organization was very disparate.

Page 18: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

18

The main objectives of this outsourcing deal were not long-term; "Assets out,

Cost out and Cash in" were its main drivers. This led to the outsourcing of non-

optimized processes, systems and organizations. Moreover, in many instances explicit

subject matter expertise - a key requirement to be able to manage the outsourcing

partner - was transferred as well.

Within a period of 18 months, KPN’s data centre, its end user services and its

software house were outsourced by KPN to Atos. For KPN management, the main

criteria in selecting its outsourcing partner were foremost financial, next to the ability

to take over personnel professionally and the ability to provide continuity of services.

However, the main criteria, in light of the prevailing crisis, were purchasing price and

cost reductions. For Atos, the main drivers in this deal were twofold: making a serious

entry into the Telco industry and expanding and entering the Dutch and German

market respectively.

During, but more prevalently shortly after the outsourcing process, the

Telecom business further collapsed, and the corresponding IT business followed suit.

This meant that Atos’ intention to use KPN's assets as springboard to the market was

no longer realistic in light of the new market situation. Now, it had to rely heavily on

the returns from the outsourcing deal with KPN rather than on external revenue

growth. As such, KPN's cost-down drive came into direct conflict with Atos’ revenue

aspirations.

During the outsourcing, Atos secured two safeguards regarding revenues:

• A revenue guarantee: In case KPN demand would be less than a certain

threshold, KPN would compensate Atos by paying penalties ranging between

25 and 50 % of the gap between guaranteed- and actual revenues. This

Comment [CvO4]: Je bent best consistent met je Amerikaans… maar zorg echt dat je voor 1 van de 2 kiest!!!

Page 19: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

19

effectively means that the higher the level of guarantees offered, the higher the

purchase obtained.

• A First-Call-Last-Bid clause that on the one hand ensured KPN confidence

with regard to market conformity, and on the other hand, ensured that Atos

would have a chance to match any competitive offer from the market.

4.3. Changing markets and unchanging contracts

In 2003, almost two years after the outsourcing had contract had taken effect,

the relationship between KPN and Atos was deteriorating rapidly. In hindsight, it was

also clear why: in the new market setting, the original set-up of the outsourcing deal

was counterproductive against improved performance and partnership. KPN's

aggressive cost-down drive led to lower than expected IT expenditures. This, in turn,

invoked penalties under the Revenue Guarantees. To counter these, KPN occasionally

would enter into ill-founded projects with AO, not for competence-based reasons, but

mainly financial ones, i.e. only to avoid penalty costs, which in turn led to imploding

customer satisfaction within KPN’s BU’s. This situation was aggravated because

KPN’s IT in-sourcing capabilities had been out-sourced, and supplier relationship

management remained under-developed and shaky.

On the other side, the revenue guarantee inevitably led to complacency at AO.

This business set-up gave Atos the incentive to utilize its current assets as much as

possible and not spend energy on developing major innovative, cost cutting ideas.

Atos was perceived by KPN as “leaning against the fence” and not the risk-taking

innovative partner that KPN was eagerly looking for on its way back to business

prosperity.

Page 20: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

20

At the end of 2003, both KPN and Atos suffered from the “shadow of the

past” (Nooteboom 2004): To KPN, Atos was partly still the former internal supplier

whose performance was not especially loved, and who could finally be treated as an

external party and expected to deliver the same level of performance as any other

external party. To Atos, KPN was the company that had it paid good money to and

helped get its balance sheet cleaned up of excess assets and staff, in exchange for a

solid future revenue growth. To both organizations, the performance of the other party

so far had been disappointing.

Meanwhile, the IT system landscape between Atos and KPN was still

characterized (a) by dozen of bespoke systems, (b) with many, many customized

interfaces and (c) literally thousands of service level agreements (SLAs) monitoring

their performance. At the same time, KPN’s rapid product introduction process meant

that these systems had to support new functionality every month.

5. The change process: The Collaborative KPI approach

The overall timeline of the relationships between KPN and its outsourcing partner

Atos Origin is visualized in Figure 3.

Page 21: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

21

Oct 03 Nov 03 Dec 03 Jan 04 Feb 04 Mar 04 Apr 04 May 04 Jun 04 July 04

29/10: At Partnerboard

Atos-KPNÓBend or bustÓ

PreparationworkshopAtos-KPN

10/11, 12/11

PreparationworkshopAtos-KPN11-12/12

WorkshopsAtos-KPN13/1, 20/1, 26/1, 9/2,

25/2

Two-day Operational-level

workshopAtos-KPN

4-5/3

16-30/6Final agreement on Turnaround document

16/12-15/01NegotiateNPV ofpenalties

9/7 Formal signing

of agreement

19/12 Signing of

Letter of Intentby both parties

18/02Partnerboard

Agree on NPV of penalties

Oct 04 Nov 04 Dec 04 Jan 05 Feb 05Aug 04 Sep 04Aug 03 Sep 03 Mar 05

New CPO (2nd author)

Joins company 1-15/12 Negotiate

Letter of IntentSolve 2003/3Outstanding

issues

1-15/01Negotiate

Top-levelKPIs

1-15/02Detail out sub-KPIÕs

16-31/03Agree on offensive

KPIÕs

1/11ŅColoured

HatsÓsession

CFOKPN

Leaves

PartnerboardReview

turnaround

Agree on Payment

of incentives

15/04-15/05NegotiateŅManage-to-BudgetÓ-deal

Incremental joint process

Improvementinitiatives

Phase 1 Phase 4Phase 2 Phase 3 Phase 5

Initiation RedefiningThe relationship

Detailing out Incrementalimprovements

Payout time.. And beyond

Figure 3: Timeline of turnaround KPN-Atos relationship

5.2. Phase 1: “Putting a pot of gold under the CFO’s seat”

The second author of this article joined KPN as its new Chief Procurement

Officer (CPO) in August 2003. How to salvage the relationship between KPN and

Atos, and have it evolve towards a strategic partnership, was the first major issue to

be dealt with in his new job. Clearly, some major “unfreezing” had to be done, to use

Lewin’s terminology of change mangement (Lewin 1946, 1951). In October 2003, the

turnaround started. The CPO and CFO proposed to Atos top management a

redefinition of the contractual relationship. KPN proposed to abolish the notion of the

stifling Revenue Guarantee and suggested to do this by:

a) Consolidating the revenue guarantee exposure;

b) Putting the Net Present Value (NPV) of the exposure in escrow, and “placing

this pot of gold under the CFO’s seat”, as it was called at the time;

Page 22: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

22

c) Start measuring Atos’ performance from there on against new, to-be-defined

KPIs, linked to what KPN considered business value and

d) Reward Atos for how it performed against these KPIs out of this escrow

money.

This was the first stage of the Collaborative KPI approach. The second stage was

entered when he first author joined this process. This was when this new concept of

managing the relationship had been accepted in general, but the specifics had to be

detailed out.

5.3. Phase 2: Mapping out “offensive” performance metrics

Together, the authors designed a collaborative process for this purpose that was based

upon the first author’s earlier experience with inter-organizational collaboration (e.g.,

Akkermans 2001, Akkermans et al. 2004). It would start with presentations from

either side followed by a brainstorming session on opportunities and next steps.

The first meeting in this specification process took place during an evening in

November 2003. When the session participants entered the room this meeting was to

be held in, it became immediately obvious that things were not going well at that

time. Both parties entered in close group formation, settled on opposite sides of the

table and waited for things to happen. The presentations were fine enough, although

understandably not directed at the heart of the dispute, i.e., the joint relationship. One

of the top managers of KPN explained the challenges his business was facing, the

competitive pressures KPN was under and the market imperative to cut costs

drastically. The top account manager of Atos presented on Atos’ position in the

European market, its value proposition to the market and endorsements from various

customers.

Page 23: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

23

Both sides remained polite and business-like. A glimpse of the underlying

emotions became visible to the first author when the top executive from KPN stepped

out of the room. The top executive from KPN bent over to him, in his position as

facilitator, and whispered in his ear: “If he is leaving, I’m out of here too!”.

Fortunately for the process at this stage, the KPN top executive reappeared shortly,

notifying the room that he had just made a telephone call to one of his fellow

managers, to secure backing for a favorable business deal he wanted to propose to

Atos, as a sign of good faith from the KPN side. In reflection, this was one of these

moments where Lewin’s saying “if you truly want to understand something, try to

change it”…

From the beginning, there was the clear aspiration of the CPO and CFO to

transform this classic buyer-supplier relationship into a performance-driven one: from

buying to contracting performance, as the CPO described this turnaround.. What was

needed for this was a better understanding of what drove performance of both Atos’

systems and KPN’s business processes and how these were interrelated. The only way

in which these interrelationships could be identified was by mapping them out jointly.

There was a series of preparatory meetings of employees and middle managers

that led up to a major two-day off-site workshop, where some twenty-odd people from

both organisations came together. This was a memorable event. In this meeting of two

long-time partners, there were many personal introductions and handshakes, between

Atos and KPN employees, but also amongst unacquainted colleagues. In a plenary

meeting, where the first author facilitated a so-called group-model-building session,

the question: “what happens when something goes wrong?” was explored. A causal

loop diagram was developed with the group to get to the root of this question. Figure

Page 24: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

24

4 shows part of the causal loop diagram generated through this particular

investigation.

BREAKDOWNS ofinterfaces between

systems in day process

Disturbances resultingfrom humanintervention

Time-outs ofsystems

Fullness of filesystems

Interruption interceptionof service order (as a

circumvention)

Ability to key incomplete order

Up-to-dateness ofdatabases

+

+

+

+

-

-

Intensity ofmonitoring of

interfaces

-

Attention given todealing with error

lists

-

Ability to sortout queries

Correctness ofconfirmation letter

Confusion withcustomer

Customer calls

Customer queries

Customer orderchanges

Agent queries

Agent timeinvestment

Work pressure

-

-

+

-

-

+

+

+

+

+

+

+

CUSTOMERSATISFACTION

-

No of critical customerprocess applications

(40)

-Appear on work

list for backoffice

-

Backoffice activity

Correction of errors

Quality of delivery

-

Revenues

Budgets

+

+

+Upgrade skill levels

+

People'scompetence

Coding complexity+

Backup systemsavailable

Prevention quality

Stability ofinterfaces between

systems

No interfacesbetween systems

Focus onsystem-specific

performance

Owners ofinterfaces

-

SLAs on interfaces

+

-

Interrelatedness ofsystem performance

-

Control ofsystem network

Predictability ofconsequences of local

changes to other systems

-

+

-

-

Figure 4: A causal loop diagram of propagation of errors in the network

This diagram reads as follows. At the top-left one can see a central element in

“what can go wrong and corresponding results”: some interface between IT systems

during the day breaks down. Consequently, the order entry systems are not, or only

partially available. This makes that new customer orders cannot be (fully) entered,

that systems cannot be updated and that pending queries cannot be resolved.

There are many potential reasons for such a breakdown of an interface. Some

of them are technical, others are human. The top-right part of the diagram explains

why this happens so often. Most importantly, when a change is made to one of the

Page 25: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

25

40+ critical systems in the delivery process, the effect on any of the other systems is

unclear, because of the large number of systems involved, complex

interdependencies, and lack of control over their interfaces.

When errors are made people will try to correct them. This is described in the

lower-middle part of the diagram. Doing so is a complex undertaking, requiring

considerable skill. Much of that skill had either left the companies or was becoming

obsolete as a result of the ongoing changes in all these systems. Budgets were too low

to keep technical expertise up to standard. As a result, actual service deliveries were

not “right the first time” far too often.

The bottom-left of the diagram illustrates the vicious cycle the delivery

process went into when such errors occurred. Mistakes in service deliveries could be

caused by the wrong kind of confirmation letter to the customer because of system

errors, or because of data pollution in the systems as a result of inadequate error

corrections. In all cases, mistakes lead to customer confusion, customer queries and

therefore greater time pressure for the agents to sort out these queries, leaving even

less time for dealing with the list of known errors to be resolved.

Such a delivery process evidently leads to low customer satisfaction, lower

future revenues and further pressure on budgets necessary to improve performance;

thus creating yet another vicious cycle of low performance leading to low revenues

leading to low investments leading to even lower performance. This is shown in the

bottom of the diagram. Upon reflection, these are precisely the kinds of vicious cycles

that Oliva & Sterman (2001) point at, which according to them keep service quality

lower than it would need to be.

Let us return to this notion of SLAs one more time, as this is essential to

understand the nature of the mental turnaround that took place during this day. It is

Page 26: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

26

important to appreciate that the operational cooperation between the parties in

managing the delivery and installation process and its supporting IT was based on

SLAs per server. If the server was performing according to SLA, Atos could not be

penalized even if complaint levels would be sky-high. These SLAs were input

oriented. This was a clear example of why conventional performance contracts do not

work. The supplier delivers according to hardware related requirements completely

under his control, and yet the performance of the delivery process as a whole was

disastrous. At the time, the complaint level of customers was 15 %, the rate of first-

time-right installation at 82 % of all service deliveries.

The technical reasons are obvious, with some 40 critical application programs

in the total process, all with their point-to-point interfaces that were not being

managed. But organizationally the situation was no better. At KPN, server SLAs were

managed by at least four to five KPN managers, each “involved” solely from their

own functional perspective. At the other side of the table, Atos managers controlled

only parts of the system landscape. Communication between all these individuals was

preferably by e-mail. Most operational managers were hardly acquainted with one

another nor did they understand their process-interdependencies. Furthermore, this

organizational set up had implications for working relationships. At the beginning of

the workshop a slightly hostile atmosphere of “us against them” could still be felt.

As a result of this group-model-building process, the process managers from

both KPN and Atos discovered not only what went wrong, but also why things went

wrong. More importantly, they saw how they could cooperate and mend the flaws.

Indeed, managers who at the beginning of the session were at arms length later could

be found in the bar well beyond bed time discussing ways to enhance the delivery

process. The enthusiasm this generated made participants step across company

Page 27: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

27

borders. The clear joint objective led the operational managers to embrace the idea of

aiming for the business result of the process: driving the complaint level down. This

KPI directly drove customer satisfaction in KPN’s consumer market. A major

turnaround to Output oriented process SLAs thus was achieved.

Upon reflection, it was the combination of the redefinition of the relationship

at senior management level in combination with this workshop at the operational level

that was effective in “unfreezing” the mindset of the people involved in this

relationship. This brings us to our first proposition in response to our original research

question: how can one turn around a relationship caught in a vicious cycle in co-

producing services”

P1. In order to achieve the “unfreezing” necessary to initiate a

turnaround, it is effective to combine a redefinition of the buyer-

supplier relationship into a more partnership oriented one at the top

management level with an in-depth workshop diagnosing root causes

for operational issues in the buyer-supplier processes at the middle-

management level.

5.4. Phase 3: Defining two-way performance targets

Following this initial workshop a series of workshops were organized to detail

out the KPIs, the sub-KPIs, their measurement, normalization and determining the

relevant data sources. Within about two months, the Operational and Enabling KPIs

were specified and agreed upon. In the process of detailing out, we “discovered” that

in order to truly succeed both parties needed KPIs.

In the months ensuing this breakthrough at the operational level, many

meetings at higher and middle management of both companies took place. A major

Page 28: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

28

step in redefining the contractual relationship between both parties was the

identification of eight main KPIs. As had been recognized from the beginning, the

supplier side was also affected by the performance and attitude of KPN towards them

in their own performance. Hence, two-way performance targets were developed, as is

shown in Table 1.

Table 1: Two-way KPI with their weights over time

KPIs 2004 2005 2006 2007 Total

Innovation & Redesign 3% 2% 2% 0% 6%

Operational and Enabling KPIs 6% 6% 5% 3% 20%

Total Cost of Ownership 8% 6% 0% 0% 14%

KPN BU Client Satisfaction 2% 2% 2% 2% 6%

Sell to and with Atos 3% 3% 2% 2% 9%

Total of Atos-directed KPIs 21% 18% 9% 6% 55%

Atos wallet share at KPN BUs 6% 12% 6% 3% 27%

IT Governance 3% 6% 2% 0% 11%

Operational & Enabling KPIs 3% 2% 2% 2% 8%

Total of KPN-directed KPIs 12% 20% 9% 5% 45%

Five KPIs (with a host of supporting KPIs via the so-called KPI Tree) applied

to Atos’ performance, and three KPIs applied to KPN’s performance. Meeting the

Atos Origin KPIs would lead to “drawing rights” for Atos and, in fact, payment in

cash by KPN. Partial satisfaction of KPIs would lead to a lower amount being paid

out. Payment would take place on a year-by-year basis. The size of the “pot of gold”

to be allocated according to this scheme was substantial, as this pot was directly

related to the annual IT budget of KPN, so in the order of millions of Euros.

Page 29: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

29

The structure of the KPN KPIs was such that lest KPN would not be able to achieve

these performance targets, it would have to remit cash to Atos. A joint KPI Office was

set up that managed and monitored the main KPIs and their supportive KPI Trees.

5.5. Phase 4: Achieving operational improvements

The Atos Origin KPIs

Of the four KPIs that Atos was measured against, the area of Operational &

Enabling KPIs was most affected by this turnaround. This KPI saw drastic

improvements of the complaint level, as evidenced by Figure 2. Within five months,

the complaint level came down from 14 % to around 8 %. Certainly, this was key for

customer satisfaction. However, one should not underestimate the cost impact that

such improved operational performance had. After all, hundreds of people are

involved with fixing problems in a company the size of KPN. If the error level halves,

so shall the number of FTE required to deal with quality issues.

% Aftercare

Required

(4 wk avg)

13,5% 13,3%

12,6% 12,4%

11,7%

11,3%

10,8%

10,3%

9,6%

9,5%

9,2%

9,1%

8,7% 8,8%

8,8%

9,0% 9,5%

9,7%

0%

2%

4%

6%

8%

10%

12%

14%

16%

Weeks

Figure 5: Development of operational performance as a result of joint

improvements

Page 30: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

30

The KPN KPIs

KPN also had clear performance targets towards Atos. One KPI was the Atos “wallet

share” at KPN. This KPI was to ensure that Atos’ business volume with the KPN

group would minimally stay in line with the overall trend in IT spending. As a spin-

off of the collaborative KPI workshops, Atos and KPN could collaborate so that this

KPI was met in 2004 and 2005.

The KPI for IT Governance was a real test for KPN’s internal IT organization.

Was KPN capable of getting a grip on its own IT demand? Here, one of the most

defective processes was: “payment on time”. The KPI Office that the CPO established

to monitor the development of all KPIs was tasked to challenge and haunt the KPN

organizations to pay their monies due in time in this quarter.

“Operational and Enabling” KPIs. For KPN’s processes to run better it was

essential not to limit the challenge to Atos only, but to extend it to the KPN

colleagues in the process. Thus, this KPI was in every aspect, linked to those of Atos

Origin, as can be distilled from Table 1.

5.6. Phase 5: Payment time!

In the Autumn of 2004, it became clear that significant improvements had been made,

both in the actual operational performance as in the quality of the buyer-supplier

relationship. Not solely in terms of operational performance, but also in terms of the

quality of the relationship, with clear improvements in terms of trust and

transparency. Next to operational changes, improvements that had been achieved to

the “soft” aspects of the relationship also became undeniably clear. An outside

Page 31: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

31

researcher surveyed regarding this topic amongst the key players on both sides, in

October 2004. The respondent group totaled nine people, four from Atos Origin and

five from KPN. These respondents were the managers most closely involved in the

change effort, and represented both the operational and the managerial levels of the

organizations. The results are summarized in Table 2. Obviously, the sample size of

respondents is too low to produce statistically reliable results, but that was not the

point of the exercise. The point was to see if we were indeed making progress in

terms of the key constructs in our theory on the root causes of the relationships crisis,

the concepts of “travail” (i.e., “hard work”), transparency and trust as introduced by

Akkermans et al. (2004) in the context of improving buyer-supplier relations. Survey

questions were taken from existing questionnaire sets in the relevant literature (De

Jong and Nooteboom 2001, Johnson et al. 2004, Humphreys et. al. 2004).

These data, however limited the sample size, suggest a major improvement

from the nature of the relation at the peak of the crisis. On a five-point scale, personal

trust scores of 4.0 and 3.9 are fairly high. KPN is seen by Atos as a party that keeps its

promises and that provides trustworthy information. Nevertheless, these remain two

very large organizations, so it should not come as a surprise that interorganizational

trust is only just above average.

In terms of transparency, notable improvements were also made. For two

parties that previously did not share expectations about their joint future business, the

scores on “exchange of information” and “informing each other of changes” are very

reasonable indeed. Both parties also perceived the relationship as relatively

transparent, with an exception for Atos’ perception of how clearly KPN specified its

IT requirements (which remains, one might add to put this score into perspective,

invariably a difficult issue with IT requirements). From this table it can be distilled

Page 32: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

32

that both parties recognized the value of developing joint KPI’s and, in general, the

value of putting time and effort (“travail”) into the collaborative process, despite the

haggling that was apparently required.

Table 2: Scores on perceived quality of buyer-supplier relationship, Oct 2004

All answers on a 1-5 scale Atos 2004 (n=4)

KPN 2004 (n=5)

“TRAVAIL” • In dealing with this firm, we spend a lot of time haggling

unproductively over such issues as price and responsibility for problems.

4.4 3.8

• Both our customer/supplier and we are very willing to modify our agreements if unexpected events occur.

3.4 3.0

• Sharing each other’s business processes has helped us better understand our counterpart.

3.0

3.8

• The development of joint KPIs is a useful exercise 4.3 4.3 • Devoting valuable time and high-level staff to ‘KPI-tree’

sessions does not pay off. 3.1 3.0

TRANSPARENCY • Our customer provides us with any information that might

help us to plan for their needs. 3.6 3.5

• Our customer provides us with feedback about how we are performing periodically.

4.1 4.3

• Our customer communicates the specifications and quality requirements clearly and accurately to us.

2.9 3.6

• The exchange of information between this customer/supplier and our firm takes place timely and frequently.

3.6 3.8

• It is expected that we keep each other informed about events or changes that may affect the other party.

3.9 4.8

TRUST • We have strong personal confidence in one another 3.9 4.0 • We have strong business confidence in one another 3.3 2.8 • This customer/supplier keeps promises it makes to our

company. 3.6 3.0

• We believe the information that our partner provides us. 4.3 3.3 • This customer/supplier is genuinely concerned that our

business succeeds. 3.3 3.5

It is also of interest to note that this closer collaboration did not entail that

parties were enjoying a level playing field. Atos Origin, as the supplier, was still seen

as being in a more subordinate role towards the customer KPN. Once more, one might

add that this is a fact of life in buyer-supplier relations such as these, and not so much

a score that is indicative of the nature of the collaborative climate at this time.

Page 33: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

33

However positive these scores are to be interpreted, there were nevertheless

clear differences in maturity levels in the collaboration in other parts of both

organizations. One particular telling incident in this respect was the “Colored Caps

session” in November of 2004. In this session, there was a clear disagreement

between the operational managers representing both sides (the ones wearing green

hats, indicating that they were free to speak in the meeting), and the senior managers

responsible for the overall process on both sides (wearing orange caps, indicating that

they were there to observe, not to speak). Quite early in the meeting it became clear

that the Green Caps, the operational professionals, were wondering: “Why are we

here?” For them, there were no issues to be sorted out as the process was running fine

and the results were worthy of celebration, as Figure 5 already suggested. Not so,

however, for the Orange Caps. They took over the meeting and started, each from

their own vantage point of view, attacking the mere roots, structure and agreements

reached with regard to the Operational and Enabling KPI.

Why? From KPN side it became clear that KPN wanted to pay as little as

possible whereas from the Atos side it became clear that Atos wanted to delay and

loosen this risky concept of collaborative KPIsby allowing some traditional KPIsinto

the framework. After one hour of haggling, the first author who acted as the referee

had to ask the Orange caps to continue their discussion outside, and the Green Caps to

stay and finally spell out their opinion with respect to the result for 2004. Inside, the

meeting was quickly settled and so the operational basis for payment time was agreed

upon. Outside, the discussion continued for some time. Once more, our “clinical”

orientation in this session provided an insight into the underlying sentiments of the

players involved that a mere “anthropological” observer attitude could not have

yielded (Schein 1987).

Page 34: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

34

And so, first payment of the “drawing rights” took place in February 2005, as

agreed. Over 2004, Atos was awarded 79 % of its potential under the Atos Origin

KPIsand KPN had to remit 7,5 % to Atos of its potential 2004 exposure. We had

successfully changed the rules of the game, the operational performance and, indeed,

the nature of the relation. In terms of Lewin’s organizational change model, we had

“moved” the relationship to a new level. This brings us to our next proposition:

P2. In order to achieve the “move” necessary to effectuate a turnaround in a

buyer-supplier relationship, it is effective to identify two-way performance

targets for both buyer and supplier, and translate these carefully in a

series of sessions with middle management and higher management, into

financial rewards for often non-financial performance targets.

In the years that followed, this system of two-way KPIs was maintained. The KPI

office remained in place. One year later, operational performance in the PSTN/ISDN

process had improved further, with fallout percentages down to 5-6%. In 2007, the

final payment scheme of the two-way KPI scheme looked as shown in Table 3:

Page 35: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

35

Table 3: Final payment results for Two-way KPI scheme

KPI’s 2004 ~ 2007 Rewards Potential Ultimate RewardsInnovation & Redesign 6% 3%

Operational and Enabling KPIs 20% 17%Total Cost of Ownership 14% 14%

KPN BU Client Satisfaction 6% 6%Sell to and with Atos 9% 5%

Total of Atos-directed KPIs 55% 45%

Atos wallet share at KPN BUs 27% 21%IT Governance 11% 8%

Operational & Enabling KPIs 8% 6%

Total of KPN-directed KPIs 45% 35%

From 2004 to 2007, customer satisfaction with KPN BU management, one of the five

Atos Origin KPIs, improved from 4.2 at the time of the crisis in 2004 to 5.6, 5.9 and

6.2 in the following years. However, perhaps the strongest evidence that the

turnaround had indeed been achieved can be drawn from the following two

testimonials from senior managers from the AO and KPN organization, collected late

2007:

"The collaborative KPIs were instrumental in building trust for the cooperation

between KPN and ATOS in an innovative business area where both parties could

benefit only if they were willing to invest and change their mode of operations. The

success was safeguarded by setting attainable goals with a healthy balance in

ambition and practical measurement of progress. The workforce at both ATOS and

KPN was empowered on operational management level to drive the collaborative

KPIs. Not boardroom deal-making but better understanding of each other’s processes,

creating value together.”

(Eric Kuisch, Director Business Process Management, formerly Director IT

Operations (2004-2007)

Page 36: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

36

“The collaborative KPIs have been the lever for Atos Origin to change its standard

behavior towards its customers. It has opened our vision in towards a more customer

focused attitude. It has regained trust in cooperation between KPN and ATOS in

conjunction with innovations to the benefit of both parties. SMART objectives

were set with the mutual focus on the R (Realistic) goals, rather than the standard

way of beating each other on the Measurability. Finally, success was safeguarded

by mutual incentives for both Customer and vendor. “

(Jos Blejie, Executive Vice President Managed Operations Atos Origin)

This brings us to our third proposition, which treats the third stage of Lewin’s

Unfreeze-Move-Freeze model of organizational change:

P3. In order to achieve the “freezing” necessary to consolidate a turnaround,

it is effective to maintain a two-way KPI measurement & reward system

over a period of multiple years, thereby ensuring that the “new” behavior

becomes an established way of working within the relationship.

6. Conclusions

In the past decades, we have seen in industrialized economies a shift from

“manufacturing” to “services”. Today’s services typically are service “supply

networks”, with multiple independent companies contributing to the service delivered

to the end customer. In such settings, collaboration with the supply base is essential.

This certainly holds in a service-to-service environment as the telecom setting that we

have described in this paper. In this article, we have looked at how to turn around a

relationship between buyer and supplier in such a service supply network, i.e. IT

Page 37: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

37

outsourcing in telecom services. We have followed the ups and downs of the

outsourcing relationship between two European firms, KPN as the leading Dutch

Telco and Atos Origin as a leading European IT services provider. In an action

research design, we have followed the relationship dynamics and the evolution of

their contractual arrangements were followed from the original outsourcing deal in

2001, into a relationship crisis in 2003, and the subsequent resurrection from this

crisis in 2004. In our research design, we have combined direct “clinical” work on the

improvement of the relation with more passive, “anthropological” data collection and

analysis.

In our clinical roles as lead manager and external consultant in this change

effort, the authors developed and applied, the Collaborative KPI approach, which

proved to be highly effective in turning this relationship around during this crisis. This

approach contains of three phases, consistent with the three-stage organizational

change approach originally developed by Kurt Lewin: Unfreeze-Move-Freeze.

In the Unfreeze phase approach, a certain amount of money is set aside in

escrow. This money is paid to the supplier if the supplier meets certain jointly defined

(“collaborative”) KPIs, and if the buyer fails to meet certain jointly defined KPIs for

her as well. The development of these joint two-way KPIs is initiated in a series of

root cause mapping workshops in which operational experts from both sides

participate,

In the “Move” phase, these KPIs are further refined in a KPI tree, involving

different management layers from both sides. The KPIs for the supplier link as much

as possible to the performance of the end customer, and are therefore not fully under

control of the supplier. This requires a partnership attitude and a certain amount of

risk-taking, on both sides.

Page 38: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

38

In the Freeze phase, these two-ways KPIs become the standard way of

measuring and rewarding performance on both sides, over a number of years, so that

the new nature of the relationship and the procedures securing it become

institutionalized.

In our “anthropological” role as observant researchers, we have supplemented

the insights gained from our direct involvement as change agents with the companies

involved with additional insights prior, during and after our direct clinical

involvement. Ex ante, we have used prior theory and methods we as authors had

developed several years before our interventions to guide our change approach.

Durante, we have collected data via questionnaires on attitude changes and have

conducted several rounds of reflection and peer review on diagnosis of the setting at

the time and best steps going forward. Ex post, we have continued our interviewing

and have sought feedback from both practitioners and academics on our preliminary

findings to further sharpen our insights.

In total, these research activities span more than a decade, while the direct

change effort lasted just over a year. The present article presents our current level of

understanding. However, we firmly intend to keep our virtuous cycle between insights

from theory and practice going on for a long time, because nothing remains quite so

practical as a good theory…

REFERENCES

Akkermans H.A., 2001. RENGA: A systems approach to facilitating inter-

organizational network development. System Dynamics Review 17 (3) 179-193.

Page 39: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

39

Akkermans, H.A., Bogerd, P., Vos, B. 1999. ‘’Virtuous and vicious cycles on the road

towards international supply chain management’’ International Journal of Operations

and Production Management. 19 (5/6), 565-581.

Akkermans, H.A., N.P. Dellaert. 2005. The rediscovery of industrial dynamics: the

contribution of system dynamics to supply chain management in a dynamic and

fragmented world. System Dynamics Review 21(3), 173-186.

Akkermans, H.A. & Vos B., 2003. Amplification in service supply chains: An

exploratory study from the telecom industry. Production and Operations Management

12(2), 204-223.

Akkermans, H.A. Bogerd P., van Doremalen P., 2004. Travail, Transparency and

Trust: A case study of computer-supported collaborative supply chain planning in

high-tech electronics. European Journal of Operational Research 153, 445–456.

Anderson EG, Morrice DJ, & Lundeen G (2005) The “physics” of capacity and

backlog management in servie and custom manufacturing supply chains. System

Dynamics Review 21(3), 217-248.

Anderson, E. and Jap, S. D. (2005), "The dark side of close relationships", MIT Sloan

Management Review, 46, 3, pp. 75-82

Argyris, C. 1990. Overcoming organizational defenses: Facilitating organizational

learning. Allyn & Bacon, Needham MA.

Argyris, C. 1993. Knowledge for action. A guide to overcoming barriers to

organizational change. Jossey-Bass, San Francisco.

Argyris, C., 2000. Flawed Advice and the Management Trap: How Managers Can

Know when They're Getting Good Advice and when They're Not. Oxford University

Press US.

Page 40: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

40

Ariño, A., J., de la Torré 1998. Learning from failure: Towards an evolutionary view

of collaborative ventures. Organization Science 9(3), 306-325.

Aubert BA, Rivard S, Patry M 2004. A transaction cost model of IT oursourcing.

Information & Management 41,921-932.

Barthelemy J & Geyer D 2005. An empirical investigation of IT oursourcing versus

quasi-outsourcing in France and Germany. Information & Management 42, 533-542.

Bell, G.G., R.J. Oppenheimer, A. Bastien. 2002. Trust deterioration in an international

buyer-supplier relationship. Journal of Business Ethics. 36, 65-78.

Bendapudi, N., Leone, R.P. 2003, Psychological implications of customer

participation on co-production, Journal of Marketing, Vol. 67 No.January, pp.14-28

Bettencourt et al., 2002 L.A. Bettencourt, A.L. Ostrom, S.W. Brown and R.I.

Roundtree, Client Co-Production in Knowledge-Intensive Business Services,

California Management Review 44 (Summer) (2002), pp. 100–128.

Bhalla, A, M. S. Sodhia & B.-G. Son, 2007. Is more IT offshoring better?: An

exploratory study of western companies offshoring to South East Asia. Journal of

Operations Management 26(2), 322-335.

Bowen, J. & R.C. Ford, 2002. Managing service organizations: Does having a “thing”

make a difference? Journal of management 28, 447-469.

Boyer, K, & R. Metters, 2004. Introduction to the special issue on “service strategy

and technology application”. Production and Operations Management 13(3), 201-

204.

Chesborough, H. 2005. Toward a science of services. Harvard Business Review 83(2),

16-17.

Page 41: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

41

Choi T.Y., Dooley K.J. & Rungtusanatham M., 2001. Supply networks and complex

adaptive systems: control versus emergence. Journal of Operations Management

19(3), 351-366.

Coughlan, P., D. Coglan, 2002. Action research for operations management.

International Journal of Operations & Production Management 22(2), 220-240.

De Jong, G., and Nooteboom B. 2001. The causal structure of long-term supply

relationships. Kluwer Academic Publishers, Boston.

De Kok, T.G., Janssen, F., van Doremalen, J., van Wachem, E., Clerkx, M., W.

Peeters. 2005. Philips Electronics synchronizes its supply chain to end the bullwhip

effect, Interfaces, 35(1), 37-48.

Dwyer, F.R., P.H. Schurr, S. Oh. 1987. Developing buyer-seller relationships.

Journal of Marketing 51(4), 11-27.

Dyer, J.H. and N. W. Hatch 2002. Using supplier networks to learn faster, MIT Sloan

Management Review, 45(3), 57-63.

Ellram, L.M., W.L. Tateb, & C. Billington, 2008. Offshore outsourcing of

professional services: A transaction cost economics perspective. Journal of

Operations Management 26(2), 148-163.

Flynn, B.B., Sakakibara, S., Schroeder, R.G., Bates, K.A., Flynn, E.J., 1990.

Empirical research methods in operations management. Journal of Operations

Management 9 (2), 250-284

French, W. L., Bell, C.H., 1973. Organization development: behavioral science

interventions for organization improvement. Prentice-Hall. New Jersey

Frohlich M.T. & Westbrook R. 2001. Arcs of integration: an international study of

supply chain strategies. Journal of Operations Management 19(2), 185-200.

Page 42: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

42

Fynes, B., Voss, C. and De Búrca, S. 2005. The impact of supply chain relationship

dynamics on manufacturing performance, International Journal of Operations &

Production Management, 25, 1, pp. 6-19

Goffin, K., Lemke, F. and Szwejczewski, M. 2006, An exploratory study of ‘close’

supplier-manufacturer relationships, Journal of Operations Management, 24, 2, pp.

189-209

Gonzalez, R., J. Gasco, J. Llopis, 2006. Information systems outsourcing: A literature

analysis. Information and Management 43, 821–834.

Guide, V.D.R., L.N van Wassenhove, 2007. Dancing with the Devil: Partnering with

Industry but Pusblishing in Academia. Decision Sciences 38(4), pp. 531-545.

Hameri A. & Paatela A., 2005. Supply network dynamics as a source of new

business. International Journal of Production Economics 98, 41-55.

Hayes, R. H., Wheelwright, S. and Clark, K. B., 1988, Dynamic Manufacturing.

Creating the learning organization. New York, The Free Press.

Heskett J.L, Sasser W.E. & Schelsinger L.A., 1997. The Service Profit chain: How

leading companies link profit and growth to loyalty, satisfaction and value. Free

Press, New York.

Hill, A.V., Collier ,D.A., Froehle, C.M., Goodale, J.C., Metters, R.D. & Verma, R.,

2002. Research opportunities in service process design. Journal of Operations

Management 20(2), 189-202.

Humphreys, P.K., Li, W.L. & Chan, L.Y. 2004. The impact of supplier development

on buyer-supplier performance. Omega 32(20), 131-143.

Jap, S.D., E. Anderson. 2007. Testing a life-cycle theory of cooperative

interorganizational relationships: Movement across stages and performance.

Management Science 52(20, 260-275.

Page 43: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

43

Johnson, D.A., McCutcheon, D.M., Stuart, F.I., Kerwood, H. 2004. Effects of supplier

trust on performance of cooperative supplier relationships. Journal of Operations

Management 22(1), 23-38.

Johnston, R. 1999. Service operations management: return to roots. International

Journal of Operations and Production Management, 19(2), 104–124.

Kaplan, R.S. & D.P. Norton, 2004. Strategy Maps. Converting Intangible Assets into

Tangible Outcomes. Harvard Business School Press, Boston.

Kern, Th., L.P. Willcocks, E. van Heck. 2002. The Winner’s Curse in IT Outsourcing.

Strategies for avoiding relational trauma. California Management Review 44(2), 47-

69.

Lakatos, I. 1976. "Falsification and the Methodology of Scientific Research

Programmes", In: Lakatos, I, Musgrave, A. (eds.) Criticism and the Growth of

Knowledge. Cambridge University Press, Cambridge, 91-196.

Lee, H., 2007. Industry Interactions and Impact. President’s Message, POM Chronicle

41(1), accessed on March 30, 2009 at http://www.poms.org/chronicle/Vol14No1.pdf

Lee, H.L., Padmanabhan, V., and S. Whang. 1997. Information distortion in a supply

chain: The bullwhip effect, Management Science 43(4), 1997, pp. 546-558.

Lee, Th.W., 2009. The Management Professor. Academy of Management Review

Lewin, K. 1948. Resolving Social Conflicts: Selected Papers on Group Dynamics.

Edited by Gertrud Weiss Lewin, Harper & Row.

Lewin, K. 1951. Field theory in Social Sciences. Edited by Dorwin Cartwright.

Harper & Brothers.

Liker, J.K. and T. Y. Choi. 2004. Building deep supplier relationships, Harvard

Business Review, 82(12), 104-113.

Page 44: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

44

Mudambi, R., S. Helper. 1998. The close but adversarial model of supplier

relationships in the U.S. auto industry. Strategic management Journal 19, 775-792.

Narayandas, D., V.K. Rangan. 2007. Building and sustaining buyer-seller

relationships in mature industrial markets. Journal of marketing 68, 63-77.

Nie, W. & Kellogg D 1999. How Professors of Operations Management View Service

Operations. Production and Operations Management, 8(3), 339–355.

Nooteboom, B. 2002. Trust. Forms, Foundations, Functions, Failures and Figures.

Edward Elgar Publishing, Cheltenham UK.

Nooteboom, B., H. Berger and N. Noorderhaven, 1997. Effects of trust and

governance on relational risk, Academy of Management Journal 40(2), 308-338.

Oliva, R. & Sterman J.S., 2001. Cutting Corners and Working Overtime: Quality

Erosion in the Service Industry. Management Science 47(7), 894–914.

Ring, P.S., A.H. van de Ven. 1994. Developmental processes of cooperative

interorganizational relationships. Academy of Management Review 19(1), 90-118

Roth, A.V. & Jackson W.E. 1995. Strategic Determinants of Service Quality and

Performance: Evidence from the Banking Industry, Management Science 41(11),

1720–1733.

Rust, R. & Chase, R. 1999. Introduction to the Special Issue on Service Marketing

and Service Operations, Production and Operations Management 8(3), 207.

Schein, E.H., 1969. Process Consultation: Its Role in Organization Development.

Addison Wesley, Reading Mass.

Schein, E.H., 1987. The clinical perspective in fieldwork. Qualitative Research

Methods 5. Sage Publications, Newbury Park.

Page 45: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

45

Scott E., Sampson S.E., Froehle, C.M., 2006. Foundations and Implications of a

Proposed Unified Services Theory. Production and Operations Management 15(2),

329 –343.

Spina, G. & G. Zotteri, 2000 The implementation process of customer-supplier

partnership: lessons from a clinical perspective. International Journal of Operations

and Production Management 20(1), 1164-1182.

Spohrer, J. P.P. Maglio. 2008. The emergence of service science: Toward systematic

service innovations to accelerate co-creation of value. Production and Operations

Management 17(3), 238-246.

Sterman, J.D. 2000. Business Dynamics. Systems Thinking and Modeling for a

Complex World. Irwin McGraw-Hill, Boston.

Stringfellow, A., M.B. Teagarden & W. Nie, 2007. Invisible costs in offshoring

services work. Journal of Operations Management 26(2), 164-179.

Sundaramurthy, C., Lewis, M, 2003. Control and collaboration: paradoxes of

governance. Academy of Management Review 28(3). 397-415.

Van Aken, J.E., 2004. Management Research Based on the Paradigm of the Design

Sciences: The Quest for Field-Tested and Grounded Technological Rules. Journal of

Management Studies 41(2), 219-246.

Vargo, S. L., R. F. Lusch. 2004. Evolving to a new dominant logic for marketing.

Journal of Marketing 68, 1–17.

Westbrook, R., 1995. Action research, a new paradigm for research in production and

operations management. International Journal of Operations & Production

Management 15(12), 6-20.

Page 46: How to turn around a buyer-supplier relationship in co … · 2009-12-04 · buyer-supplier relationship between Atos Origin, ... In this case, the Collaborative KPI approach resulted

46

Zviran, M., Ahituv, N & Armoni, A. 2001. Building outsourcing relationships across

the global community: the UPS-Motorola experience. Strategic Information Systems

10, 313-333.