HOW TO DO BUSINESS WITH GOAA

Planning, Engineering and Construction Services

September 23, 2016

• Future Projects• Contact Information• Planning & Environmental• Engineering• Construction

Agenda

September 23, 2016

Future Projects

Orlando International AirportOrlando Executive Airport

September 23, 2016

Davin Ruohomaki, Senior Director of Planning, Engineering and Construction [email protected] – 407-825-3105

Brad Friel, Director of [email protected] – 407-825-3139

Mark Birkebak, Director of [email protected] – 407-825-4058

Mike Patterson, Director of Construction [email protected] – 407-825-2460

Debbie McKeown, Manager of Project [email protected] – 407-825-3826

Kathy Anderson, Contracts & Grants [email protected] – 407-825-3753

Planning, Engineering and ConstructionPrimary Contacts

September 23, 2016

Current Continuing Design Consultants

Architectural (thru February 2017): Borrelli + Partners, Inc.Le-Huu Partners, P.A.

MLM-Martin Architects, Inc.MRI Architectural Group, Inc.

Rhodes & Brito Architects, Inc.

Building Envelop (thru June 2017): CMC Design Group, Inc.Gale Associates / South /, Inc.

Planning / Engineering Services

September 23, 2016

Current Continuing Design Consultants

CAD, GIS, BIM & Related Services (thru March 2019):EPIC Engineering & Consulting Group, LLC

Montgomery Consulting Group, Inc.T-Squared Support Services, Inc.

Woolpert, Inc.

Civil Engineering (thru September 2017): AECOM Technical Services, Inc.Avcon, Inc.

Kimley-Horn and Associates, Inc.Prime Engineering Incorporated

Planning / Engineering Services

September 23, 2016

Current Continuing Design Consultants

Environmental (thru May 2019): DRMP, Inc.Environmental Management & Design, Inc.

Vanasse Hangen Brustlin, Inc.

Environmental Engineering (thru July 2017): 3E Consultants, Inc.AECOM Technical Services, Inc.

Terracon Consultants, Inc.

Planning / Engineering Services

September 23, 2016

Current Continuing Design Consultants

MEP Engineering (thru October 2017): C&S Engineers, Inc.Matern Professional Engineering, Inc.

RTM Engineering Consultants, Inc.SGM Engineering, Inc.

Specialty – APM Systems (thru February 2018): Lea & Elliott, Inc.

Transportation Planning (thru October 2017): HDR Engineering, Inc.HNTB Corporation

Planning / Engineering Services

September 23, 2016

Planning Services

Airport Master Planning

Land Use Planning• Airspace• Transportation• Noise-related Services

Environmental

September 23, 2016

Planning Services

Ongoing Projects

Environmental Assessments• East Airfield

Land Use • Tradeport Drive Redevelopment• Poitras Property• East Airfield• Heintzelman Boulevard

Transportation• Roadway Concept Studies• Operational Analysis

September 23, 2016

Design Procurement Process

Non-Federally Funded Services:• ≤ $2M: Direct Negotiated with Continuing Design Consultant• ≥ $2M: Public Advertisement, Qualification-Based Selection

Federally Funded Services:• Public Advertisement, Qualification-based Selection

Agreements typically 3 years with two 1-year Extension OptionsAdvertised in Orlando Sentinel and Posted on Aviation Authority Website:

www.orlandoairports.net/airport-business

Engineering Services

September 23, 2016

Engineering Services

Current Design EffortsSouth Terminal C, Phase 1

Fentress Architects, Inc.Burns Engineering, Inc.

HNTB Corporation

September 23, 2016

Unique Aspects to Design Services with the Aviation Authority• ID Badge Requirement• E-Verify• AOA Access• Insurance• GOAA Design Guidelines• Documenting Existing Conditions• Phasing vs. Airport Operations• Coordination with Adjacent and Future Projects• DBE/MWBE/LDB/SDVOBE Programs

Engineering Services

September 23, 2016

Invoice Process• Invoices submits via upload in Box.com• Project Controls processes for payment

• Downloads and verify accuracy and completeness• Obtains Authorization for Payment from Sr. Project Manager and Director• Submits to Construction Finance for payment

• Invoices now paid electronically thru ViewPost

Planning / Engineering Services

September 23, 2016

Delivery Systems• Design/Bid/Build• Design/Build• Construction Management• Contractor Shortlisting

Contract Types• Lump Sum• Unit Price

Contract Process• Bid and Award• Construction Committee• Professional Services Committee• Aviation Authority Board

Construction Services

September 23, 2016

Contracting Process

Non-Federally Funded Services:• ≤ $300k: Direct Negotiated with Continuing Contractor• $300k - $2M: Public Bid or Bid amongst Continuing Contractors• ≥ $2M: Public Bid

Federally Funded Services:• Public Bid

Agreements typically 3 years with 2 1-year Extension OptionsAdvertised in Orlando Sentinel and Posted on Aviation Authority Website:

www.orlandoairports.net/airport-business

Construction Services

September 23, 2016

Current Continuing Contractors

Electrical (thru December 2017):BergElectric Corp. dba BergElectric Corp. Contractors and Engineers

Electric Services, Inc.H.L. Pruitt, Inc.

Morton Electric, Inc.Power Engineering Group, Inc.

Construction Services

September 23, 2016

Current Continuing Contractors

Horizontal (thru April 2017): Gibbs & Register, Inc.JCB Construction, Inc.

PCL Construction Services, Inc.Prime Construction Group, Inc.

The Middlesex Corporation

Low Voltage (thru December 2017): Garnier Group & Associates, LLCGlobal One Networks, LLC

Orion Management Services, LLCOrlando Business Telephone Systems, Inc.

Quality Cable Contractors, Inc.

Construction Services

September 23, 2016

Current Continuing Contractors

Roofing (thru February 2017): P & A Roofing and Sheet Metal, Inc.RSS Roofing Services & Solutions, Inc.

Southland Rowe Roofing, Inc.Tecta America Southeast, LLC

Signage (thru June 2017): AC Signs, LLCInternational Signs & Lighting, Inc.

Construction Services

September 23, 2016

Current Continuing Contractors

Vertical (thru January 2017):Clancy & Theys Construction Co.

Gomez Construction CompanyH.W. Davis Construction, Inc.

R.L. Burns, Inc.Verde Construction Managers, LLC

Construction Services

September 23, 2016

Construction Opportunities• Continuing Contractors• Aviation Authority Website• Local Newspapers (Sunday and Wednesday)• Contact Office of Small Business Development• Tenant Projects• CM@R Outreach Program

Project Designations:• BP – Bid Package, Public Bid and Award• E – Electrical Package, using Continuing Contractor• G – Graphics/Signage Package, using Continuing Contractor• H – Horizontal/Civil Package, using Continuing Contractor• L – Low Voltage Package, using Continuing Contractor• R – Roofing Package, using Continuing Contractor• V – Vertical/Building Package, using Continuing Contractor

Construction Services

September 23, 2016

Unique Aspects to Construction with the Aviation Authority• ID Badge Requirement• E-Verify• AOA Access• Insurance• Bonds• Night Work• Coordination• Safety• Public Environment• No Impacts to Airport Operations• DBE/MWBE/LDB/SDVOBE Programs

Construction Services

September 23, 2016

Construction ServicesUpcoming Projects

Maintenance• A-Side Garage Lighting Replacement (Construction $2-3M)• Loop Road Mill + Resurface (Construction $7-8M)• Taxiway C Rehab (Construction $8-9M)• Airside 2 & 4 APM Switchgear Control (Construction ($3-500K)• Taxiway G+H Safety Area Improvements (Construction $2-3M)• Slab Replacement, Airsides 1 & 3 Ramps (Construction $7-800K)• AOA Security Fence Replacement (Construction $2-3M)

September 23, 2016

Construction ServicesUpcoming Projects

Maintenance - Continued• Fire Alarm Replacement, A Garage (Construction $5-700K)• HVAC Replacement, B Garage (Construction $6-700K)• Gate E-50 Reconfiguration (Construction $4-5M)• Holdroom Seating Power, AS 4 (Construction $2-300K)• Access Control +CCTV, LS + AS Doors (Construction $2-3M)• Electrical Service Panel Replacements (Construction $8-900K)• HVAC Replacement, Hyatt (Construction $800-900K)

September 23, 2016

Ongoing Projects – CIP• South Airport APM/ITF Program

• CM@R for South Airport APM Complex – Hensel Phelps Construction Co.o GMP Packages – 15 Issued

• CM@R for South Airport ITF Complex – Turner-Kiewit Joint Ventureo GMP Packages – 8 Issued

• South Terminal C, Phase 1• CM@R – PCL Construction Services, Inc.• Negotiations for Pre-Construction Services in-progress

Construction Services

September 23, 2016

Ongoing Projects – CIP• Ticket Lobby Modifications Program (TLP)

• BP-447, TLP – Main Ticket Lobby Modifications

• Airside 4 Improvements Program (A/S 4)• BP-443, A/S 4 – FIS/CBP Renovation and Wing Expansion

• Baggage Handling System Program (BHS)• BP-432, Optimization of Pod D• BP-444, BHS Pods A and B Optimization• BP-445, BHS Replacement, A and B Sides, West End• BP-463, BHS Optimization of Pod C

Construction Services

September 23, 2016

Ongoing Projects – CIP• BP-452, Hangar Blvd. Sanitary Sewer Improvements – Phases 1 and 2• BP-466, Landside Air Handling Unit HVAC North Terminal Complex

Construction Services

September 23, 2016

Pay Application Process• Pay Application submits to OAR (1 hard copy original)• OAR obtains A/E signature (if applicable), and submits to Project Controls• Project Controls processes for payment

• Verify accuracy and completeness• Obtains Authorization for Payment from Sr. Project Manager and Director• Submits to Construction Finance for payment

• Pay Applications now paid electronically thru ViewPost

Construction Services

September 23, 2016

Small Business Goals TypicalProfessional Services MWBE – 17%

LDB/SDVBE – 1.7%DBE – 20% (State and Federal Funded)

Construction Services MWBE – 25%LDB/SDVBE – 2.5%DBE – 20% (State and Federal Funded)

Total Annual Contracts Awarded FY15 Current FY16

Professional Services $52M $313M

Construction $96 M $191MPayments to Small Businesses FY15

Professional Services $13,228,522Construction $23,109,762

Engineering and Construction Goals and Expenditures