how to create a validated ectd submission based on the new …€¦ · submission based on the new...

55
How to create a validated eCTD submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director Sales Dr. Gerhard Neurauter Director Regulatory Competence Center 14/15. February 2013

Upload: hoangthu

Post on 11-Jul-2018

249 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

How to create a validated eCTD

submission based on the new

guidelines and specification -

Part 1 supported by eCTDmanager

Schei Dattner Director Sales

Dr. Gerhard Neurauter Director Regulatory Competence Center

14/15. February 2013

Page 2: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Creating an eCTD submission for MCC

20.02.2013 EXTEDO Confidential 2

Compiling an eCTD Submission

Compilation of MCC Module 1

Terminology, Metadata, Structure

Compilation of Module 2-5

Terminology, Metadata, Structure

Page 3: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Creating an eCTD submission for MCC

20.02.2013 EXTEDO Confidential 3

Compilation of MCC Module 1

Terminology, Metadata, Structure

Page 4: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1 – the problem

20.02.2013 EXTEDO Confidential 4

Page 5: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1 – the solution

20.02.2013 EXTEDO Confidential 5

Page 6: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1

20.02.2013 EXTEDO Confidential 6

At the end of this training session you are well-informed about the following

topics:

Electronic Submission Management & the eCTD Background

The elementary terminology of eCTDmanager

The eCTDmanager environment & GUI

eCTDmanager Story 1: your first Electronic Submission!

Page 7: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 7

Electronic Submission Management

Page 8: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

eCTDmanager integration into business scenarios

20.02.2013 EXTEDO Confidential 8

• Import of eCTDs

• Documents

• VDs

• Scan

2

2 Import of structure and content

• eCTD

• paper prints

• VDs

• PDF

• print streams

• various reports

3

3 Export and Publishing capabilities

Post Approval Maintenance/ Lifecycle Management 4

Using eCTDmanager for Post

Approval Maintenance tasks

4

eCTDmanager core functionality 1

1

Page 9: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

The electronic Common Technical Documentation

20.02.2013 EXTEDO Confidential 9

1.0 Regional Administrative Information

1.1 ToC of Module 1 or overall ToC,

including Module 1

2.1 ToC of the CTD (Mod 2,3,4,5)

2.2 Introduction

2.3 Quality Overall Summary

2.4 Non clinical Overview

2.5 Clinical Overview

2.7 Clinical Summary

2.6 Non clinical Written and

Tabulated Summaries Module 3 Module 4 Module 5

2.1

2.2

2.3

2.4 2.5

2.6 2.7

1.0

Quality Non clinical

Study Reports

Clinical

Study Reports

Module 2

Module 1

Page 10: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

The eCTD – Regional Differences in M2 – M5

20.02.2013 EXTEDO Confidential 10

Module 2

Summaries

Module 3

Quality

Module 4

Nonclinical

Study Reports

Module 5

Clinical Study

Reports

Module 1

Regional Admin

Japanese

Language

ISS/ISE

STF

Node

Extensions

Dataset

Folders

Tab List

Trial Sub.

Case Report

Forms

2.3.R

3.2.R

Slide provided by courtesy of Harv Martens

Page 11: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 11

The Elementary Terminology of eCTDmanager

Page 12: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

The Graphical User Interface

20.02.2013 EXTEDO Confidential 12

Menubar

Project

Explorer

Document

Explorer

Toolbar

Tool-tab …

Submission

Explorer

eCTDmanager does not have a „Save” button!

All changes are stored immediately!

Document

Viewer

Page 13: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Project / Dossier / Submission

20.02.2013 EXTEDO Confidential 13

Project: The Project is the root of the Project Explorer

Project

Dossier

Submission

Dossier: There may be more than one Dossier in a Project

Submission: Submissions are ordered by Submission Numbers (0000 etc.)

Page 14: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Submission

20.02.2013 EXTEDO Confidential 14

Collection of Documents is submitted to the regulatory authority to get application rights.

Has an organized structure, displayed in the predefined Table of Content (TOC) of the Submission Explorer.

Its TOC consists of chapters and subchapters as well as user defined extensions, sub-extensions and documents.

Submission

Document

Module

Page 15: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Different Levels – Different Explorers:

20.02.2013 EXTEDO Confidential 15

Project

Dossiers

Submissions Submission

Modules

Extensions Linear Listing of

Documents

Page 16: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1

20.02.2013 EXTEDO Confidential 16

Live demonstration!

Page 17: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 17

eCTDmanager Story: Your first Submission!

Create Dossier / Submission

Module 1

Add Application Letter

Page 18: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Starting the eCTDmanager

20.02.2013 EXTEDO Confidential 18

1a

1b

2

Double-click the eCTDmanager icon on your desktop

Select the eCTDmanager

entry in your start menu

Enter your login name

and password

3 eCTDmanager will be started

Page 19: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Create a New Dossier

20.02.2013 EXTEDO Confidential 19

2

3

Activate in the context menu „New Dossier“ or

choose in the menu Dossier „New Dossier“

Enter the „Dossier Name“ and press OK.

1 Select the Project

item in the Project View

A new dossier with

submission 0000

is created

Page 20: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

New Dossier Settings

20.02.2013 EXTEDO Confidential 20

Region

eCTD Version

Initial Submission (Y/N)

1. Enter Dossier Name and Directory of Submission

2. „Check“ Create Initial Submission

3. Choose „eCTD Version 3.2“ in eCTD Version List

4. Choose „MCC: eCTD Version 1.0

How to create a new MCC-Dossier?

Page 21: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Create a New Dossier (Business Perspective)

20.02.2013 EXTEDO Confidential 21

Page 22: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Open a Submission of a Dossier

20.02.2013 EXTEDO Confidential 22

Select a submission item in the Project Explorer

and view the Submission content displayed in the Submission Explorer.

Select &

Double Click

View

Page 23: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1

20.02.2013 EXTEDO Confidential 23

Live demonstration!

Page 24: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 24

The MCC Regional Part

Module 1

Page 25: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Regional Part MCC (v1.0) – (Business Perspective)

20.02.2013 EXTEDO Confidential 25

1 Based on the “Swiss Module 1 Specification for eCTD Version 1.1 of 21.05.2010” 2 CTD Module 1, current version

Envelope Information

Page 26: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Regional Part MCC (v1.0) – (Business Perspective)

20.02.2013 EXTEDO Confidential 26

Module 1 MCC Information

Page 27: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Regional Part MCC (v1.0)

20.02.2013 EXTEDO Confidential 27

Envelope Information Module 1 MCC Information

Page 28: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Module 1: Create GCC Envelope Attributes

20.02.2013 EXTEDO Confidential 28

The MCC Envelope is created automatically with all required nodes!

All nodes can be filled, supported by wizzards!

Examples…

Page 29: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Module 1: GCC Meta-Data

20.02.2013 EXTEDO Confidential 29

All folder structure is created

automatically and is ready to be

filled with your documents!

Page 30: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 30

Adding Documents

Page 31: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Drag & Drop a PDF document from Windows Explorer

20.02.2013 EXTEDO Confidential 31

Drag a PDF document (i.e. the “Letter of Application”)

from the windows explorer… 1

…and Drop it into the

submission of eCTDmanager

2

Page 32: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Activating the Viewer, Zooming

20.02.2013 EXTEDO Confidential 32

Double-Clicking a Document

activates the Page Viewer

1 Zoom in/out..

2 Fit to

Width/Window ..

Page 33: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1

20.02.2013 EXTEDO Confidential 33

Live demonstration!

Page 34: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Creating an eCTD submission for MCC

20.02.2013 EXTEDO Confidential 34

Compilation of Module 2-5

Terminology, Metadata, Structure

Page 35: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Goals for this session

20.02.2013 EXTEDO Confidential 35

At the end of this training session you are well-informed about the

following topics:

eCTD specific sections

Node extensions

Managing Documents

Hyperlinking

Page 36: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 36

eCTD Specific Sections

Module 2 - Module 3

Page 37: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Sections Module 2 and 3 – Business Perspective

20.02.2013 EXTEDO Confidential 37

Page 38: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Folder & Documents - Specification

20.02.2013 EXTEDO Confidential 38

The M4 Granularity document

provides the information about

documents and folders.

Page 39: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

The Submission Table of Content

20.02.2013 EXTEDO Confidential 39

Section

Extensible Section

Section Template

Page 40: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Sections

20.02.2013 EXTEDO Confidential 40

Sections: are predefined chapters in the CTD.

Appending of sections is not allowed.

Extensible Sections:

are chapters enabling the

addition of extensions

and subordinated extensions.

Section Templates:

need attributes (e.g. product, manufacturer)

as input to be built up.

may contain a single section or a set of

Sections and Subsections.

Page 41: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Create Specific Section (I)

20.02.2013 EXTEDO Confidential 41

1

Complete the attributes questioned by eCTDmanager and press OK 2

Choose a Section Template in the Submission Viewer.

Activate the context menu and select „Create Specific Section“

Page 42: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Create Specific Section (II)

20.02.2013 EXTEDO Confidential 42

3 eCTDmanager adds the Specific Section 3.2.S to the TOC,

the Section Template for 3.2.S can be re-used!

Specific Section

Section Template

The content of the Section Template

depends on the CTD Structure

Page 43: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Delete Specific Section (I)

20.02.2013 EXTEDO Confidential 43

1 Select a Specific Section in the Submission Viewer and activate the

context menu selecting Delete Specific Section

Confirm to delete the Specific Section 2

Page 44: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Delete Specific Section (II)

20.02.2013 EXTEDO Confidential 44

3 Note: eCTDmanager deletes sections and extensions

according the following rules:

Documents added in the actual submission will be deleted

Page 45: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 45

Node Extensions

All Modules

Page 46: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Starting to built up a new ToC Extension (I)

20.02.2013 EXTEDO Confidential 46

1

Insert number and title of the

extension (chapter)

2

Individual chapter number

Title of the chapter

The field NUMBER is freely capable for editing

Choose an Extensible Section

and select Subordinate Extension

Page 47: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Compilation of MCC Module 1

20.02.2013 EXTEDO Confidential 47

Live demonstration!

Page 48: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 48

Managing Documents

Page 49: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Ways of adding Documents

20.02.2013 EXTEDO Confidential 49

1 Scanning of paper based

documents

Importing PDF documents 2

Importing WORD documents 3

Drag & Drop from windows

explorer to eCTDmanager 4

Use Template documents like

Interim Documents,

Table of Content Documents …

5

Page 50: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Add Interim Document

20.02.2013 EXTEDO Confidential 50

new TOC element „Interim Document“

supports hyperlink creation in an early phase of dossier compilation

enhances parallel working on document completion and dossier compilation

An Interim Document behaves like a document:

title

number

can be used as hyperlink target.

Can be replaced by another document

Hyperlinks will remain!

Page 51: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 51

Hyperlinking

Page 52: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Ways to create Hyperlinks in eCTDmanager

20.02.2013 EXTEDO Confidential 52

1. Create Hyperlinks manually (e.g. m2 summary to m3 quality)

Use Adobe Functionality!

2. Automatic resolution of Hyperlinks (e.g. literature m4.3)

3. Create Hyperlinks from Text (e.g. study documentation)

Search documents for reference keywords,

automatic target detection

Documents

Page number

Bookmarks & Named Destinations

Page 53: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Automatic resolution of externally created hyperlinks

20.02.2013 EXTEDO Confidential 53

1

broken links

are coloured

red

2

Add the associated studies

To the submission and the

broken links will be repaired

automatically.

Page 54: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

20.02.2013 EXTEDO Confidential 54

Create an eCTD Submission – can be so easy!

Page 55: How to create a validated eCTD submission based on the new …€¦ · submission based on the new guidelines and specification - Part 1 supported by eCTDmanager Schei Dattner Director

Danke

Baie Dankie

Ngiyathokoza

Ke a leboha

Ke a leboga

Siyabonga

Inkomu

Ndo livhuwa

Ro livhuwa

Enkosi

Ngiyabonga

Thank You