how to build a successful startup and attract investment, even if you have no idea — jaroslav...
TRANSCRIPT
SCIENCE PARK “KYIVSKA POLYTECHNIKA” MODERN INNOVATIVE ENVIRONMENT
Yaroslav Kologryvov
Mission of the Science Park:
Integration of education, science and advanced technological production for the rapid development of advanced technological products, as well as their implementation in national and external markets.
LEGISLATION, WHICH REGULATES THE ACTIVITY OF THE SCIENCE PARK “KYIVSKA POLYTECHNIKA”
v Law of Ukraine December 22, 2006, № 523 On Science Park “Kyivska Polytechnika” v Order of the Cabinet of Ministers of Ukraine July 18, 2007, № 546. On approval of the action plan for the implementation of the Law of Ukraine “On Science Park “Kyivska Polytechnika” v Order of the Cabinet of Ministers of Ukraine September, 19, 2007 № 760. On approval of the innovation programs for the Science Park “Kyivska Polytechnika” for 2007-2011
On the base of the University
The biggest technical university of Ukraine 10 Educational-Research Institutes 19 Faculties 13 Research Institutes 30 000 Students 5 000 Scientists 25% of all engineers of Ukraine
KPI’s Campus
On the territory of the university there are: 23 academic buildings, 22 hostels, Sports complex, Library, Center of Culture and Arts, Kindergarten, 2 canteens and recreation place (the territory near the Black Sea), Students policlinic, Health Center 43 cafeterias
www.wdc.org.ua
www.wdc.org.ua
Sikorsky Challenge 2014 results
Переробка твердих побутових відходів
14 820 000 UAH
7 275 000 UAH
1 325 000 UAH
35 000 UAH
New generation Metal-ceramic X-ray tubes
Investments: 4 000 000 UAH Manufacturing : RI “Orion”
LEDs
Development of: KPI and National Academy of Sciences Institute of Microdevices
CamTouch
• Investments: 25 000 UAH
TechnoEyes
Investments: from 325 000 UAH
Monitoring and analysis of social networks and social media
Investments: 1 300 000 UAH
BDM MultiVision
FORCE
Luciding
Low Waste Sewage Water Purification Technology
DESCRIPTION Membrane-based water purification technology. This technology purifies water into a high quality drinking water from natural salt water and industrial sewage water. The technology treats liquid wastes, that are created during water purification.
KEY NUMBERS
Productivity – 1000 - 20000 m3/day. 12000 m3/day treatment facility approximate initial cost – $6.5 million; Cost of 1m3 of purified water – $0.7 - $1.2; Facility set up period – 1.5 - 2 years; Payback period – 5 years.
Polyteco Science City
Общий план Инновационного города
Total area,
sq.m. Living area
sq.m. Block «А» 45 000 36 000 Block «В» 42 000 33 600 Block «C1» 58 000 46 400 Block «C2» 42 500 34 000 Block «C3» 20 000 16 000 Block «D» 43 500 35 000
Total: 251 000 201 000
Polyteco Science City
Heat Power Supply Complex
Power: 20 + 20 MW Project start time - heating season 2016 No Hydrocarbon using
Science Park “Kyivska Polytechnika”
THANK YOU FOR YOUR ATTENTION! Yaroslav Kologryvov [email protected] +38 050 990-00-44 +38 044 454-99-19 www.spark.kpi.ua www.startup.kpi.ua www.sikorskychallenge.com