Page 1: How Microsoft Does Data Centres

How Microsoft DoesData Centres

John DwyerArea Data Centre Mgr - InternationalData Centre Solutions

Page 2: How Microsoft Does Data Centres

The Global Services FoundationAcross the company, all over the world, around the clock

Zurich .Net Online

2 MBS Online

Office Labs

Sharepoint.Microsoft.com

Yellow box or text = pipeline

Plus over 150 more sites

and services

Azure

Page 3: How Microsoft Does Data Centres

Scale and Market Growth

Server Infrastructure Doubling Every Year

Network Capacity 9x Growth in Four Years

Tripling of Data Centre Instances

Dramatic Expansion of Server & Network Geo-Diversity

Managed Growth of Power Capacity & Consumption

Middle East

Africa Latin America

Asia Europe Oceania / Australia

North America

0%

200%

400%

600%

800%

1000%

1200%

Internet Population Growth Rate 2000-2008

Source: http://www.internetworldstats.com

3

Page 4: How Microsoft Does Data Centres

Data Centre Economics Have Changed!• Cost of physical space was a primary consideration in data centre design

• Cost of power and cooling has risen to prominence

• Data centre managers now must prioritize investment in efficient power and cooling systems to lower the total cost of operating (TCO) of their facilities.

Belady, C., “In the Data Center, Power and Cooling Costs More than IT Equipment it Supports”, Electronics Cooling Magazine (Feb 2007)

4

Page 5: How Microsoft Does Data Centres

Site Selection Internet Population Internet Peering / NetworkMobile UsersPower PricingEnvironmental Construction CostsTax Climate IT Labor AvailabilityCorporate Citizenship

Composite Heat Map

5

Page 6: How Microsoft Does Data Centres

Why Power Matters…• In 2006, U.S. data centres consumed an estimated 61 billion

kilowatt-hours (kWh) of energy, which accounted for about 1.5% of the total electricity consumed in the U.S. that year.

• In the EU, data centres consumed an estimated 56 billion kilowatt-hours in 2007.

• As an Industry Segment, Data Centres are the fastest growing Energy Segment in the US.

• Current projections are that data centre power consumption will exceed 100 billion kWh by 2011 in the US and by 2020 in the EU.

• Those levels of power consumption in the US would necessitate the construction of 10 additional power plants.

6

Page 7: How Microsoft Does Data Centres

Relevant Metrics at Microsoft

PUE/DCiE

DC Utilization

Server Utilization

CostMove from Cost = f(space)

Cost = f(power)

X 100%

The Green Grid

Page 8: How Microsoft Does Data Centres

SCRY

8

Page 9: How Microsoft Does Data Centres

Setting Aggressive PUE Targets

2006 2008 2010 20121.000

1.200

1.400

1.600

1.800

2.000

2.200

Annual Average PUE Targets

PUE

9

Page 10: How Microsoft Does Data Centres

Environmental Control Standards

10

Page 11: How Microsoft Does Data Centres

Air Movement12%

Electricity Transformer/

UPS10%

Lighting, etc.3%

Cooling25%

IT Equipment50%

Source: EYP Mission Critical Facilities Inc., New York

Where Data Centre Power Goes

GFS’ Infrastructure Services is focusing on all the pieces of the pie

Opportunities

areEverywhere

11

Page 12: How Microsoft Does Data Centres

Air Movement12%

Electricity Transformer/

UPS10%

Lighting, etc.3%

Cooling25%

IT Equipment50%

Source: EYP Mission Critical Facilities Inc., New York

Where Data Centre Power Goes

GFS’ Infrastructure Services is focusing on all the pieces of the pie

Opportunities

areEverywhere

Widening environment can remove chillers and drive this to

zero

Offline UPS technologies can drive this substantially

down

Virtualization, active power management

12

Page 13: How Microsoft Does Data Centres

Three of our Data Centres

13

Page 14: How Microsoft Does Data Centres

Data Centre Costs in the US

Land - 2%Core & Shell Costs – 9% Architectural – 7%Mechanical / Electrical – 82%

Since 2004 -16% increase year-to-year

LandCore / ShellMech /ElecArch

Where the costs are:>80% scale with power<10% scale with space

14

Page 15: How Microsoft Does Data Centres

SCRY – Window to Our World

15

Page 16: How Microsoft Does Data Centres

SCRY Helps Demonstrate Continuous Improvement

2006 2008 2010 20121.000

1.200

1.400

1.600

1.800

2.000

2.200

Microsoft Average PUE Targets for

New DCs

PUE

22% improvement over 3 years

Follows Moore’s Law

On existing data centres and helps set goals for new data centres at Microsoft

Page 17: How Microsoft Does Data Centres

Where We Think Things Are Going …

17

Page 18: How Microsoft Does Data Centres

18

Page 19: How Microsoft Does Data Centres

19

Page 20: How Microsoft Does Data Centres

Futures – Containers (Chicago)

20

Page 21: How Microsoft Does Data Centres

Why We Like Containers1) Can deploy at scale2) Plug and Play3) Drives Innovation4) Abstracts away religious wars in

competitive bid• AC vs DC• Air vs Liquid

5) Cost can include maintenance6) Allows for easy cost and

performance measurement7) Creates an environment to drive

competition around efficiency8) One throat to choke

Question:Is this water cooling or air cooling?

21

Page 22: How Microsoft Does Data Centres

Container SolutionsUse a standard ISO (40’, 20’, 10’ x 8 x 8’6”) shipping container to hold servers

Portability allows the delivery and operation of servers in self -contained units

Move costs from long lead to short lead equipment, increased ROI CapitalOptimize server Delivery at 1000U+ as a unit vs. 40+U in a rack and a Single SKU & Warranty

Containers seen as a solution to burst demand and temporaryMicrosoft’s approach is different –use them as a primary packaging unit

Cost: It costs less to ship 2,000+ servers in one container than it does to ship and then install individual racks. Additional savings come from not needing raised floors or fans for each server, and requiring a lot less wiring, packaging and shipping. 22

Page 23: How Microsoft Does Data Centres

Container SolutionsThe container gives us the opportunity to test new technology such as increased supply air temperature, removal of fans from servers, managed airflow with hot aisle containment, significantly increased WPSF and more efficient electrical distributionsMicrosoft have stand alone units running in production today and are running proof of concepts on newer technology

Energy efficiency:  At more than 1,000 Watts per square foot, containers allow us to power a lot more servers in a given area. This is the key reason containers have become economically viable. PUE numbers tested in a POC measured at peak ~1.323

Page 24: How Microsoft Does Data Centres

Microsoft Confidential

Container POC  

  

  

GFS DCS Ran a Proof of Concept on a Container System in Seattle, Washington, USA

PUE came in between 1.2 and 1.3 éRan unit up to full load measured at 107 kW = 178 watts per server éDropped power to unit and came back online no issues éFans and servers ran at full speed for 7 minutes on batteries éContainer spec completed and vendor RFP underway é

Batteries temp remained at 75 F using probe and IR camera. Back is exposed to 85 F Need to place a temp probe at rear of battery èAmbient air temp had a large effect on temp inside the trailer due to no insulation èPermit and UL inspection took 90 days to obtain è

Harmonics above 15%: varies across all 3 phases ê

24

Page 25: How Microsoft Does Data Centres

Timeline started with container in late August

PO approved in October First unit Live in January5 months from Engineering to Live Delays encountered:

1 month: Flood plain re-planNew location, elevated foundation

1 month: Excell energy transformer install1 month: Final concrete delayed due to snow

Actual planning, permitting, construction effort totaled about 3 monthsFirst container Jan 5th, third container Feb 2nd

Container vendor committing to 6-8 week turn around on order long term

Virtual Earth Case Study

25

Page 26: How Microsoft Does Data Centres

Containers - Chicago Data Centre

Elevated Spine Connection

Microsoft Container: •2400 Servers•375 KW•Standard 40 foot shipping container• Target PUE 1.25

Top Floor: 10.8MW Traditional COLO CapacityGround Floor: 20 MW Container Capacity

26

Page 27: How Microsoft Does Data Centres

27

But More Change Is Coming…

Page 28: How Microsoft Does Data Centres

Generation 4 Modular Data CentresChallenging Many Data Centre Conventions

Prefabrication of Shell and M&E PlantPre-Assembled ContainersPower Density > 1,000 Watt / Square FootTotally Flexible Configuration (Classes)PUE < 1.1 (depending on Class)

3-5 Month Time-to-MarketReduced Cost of EntryApplying the Model-T Approach

http://loosebolts.wordpress.comhttp://blogs.technet.com/msdataCentres/