how long will your customer wait for you to ship his …...bluebridge.lt 6 identify building blocks...

12
How long will your customer wait for you to ship his cargo? bluebridge.lt Aivaras Liutvinas Business development manager

Upload: others

Post on 08-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

How long will your customer waitfor you to ship his cargo?

bluebridge.lt

Aivaras LiutvinasBusiness development manager

Page 2: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

2bluebridge.lt

Customer centric service Self-Service

Personal contact

Customers now expect instant results

Page 3: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

3bluebridge.lt

More over RU’s face pressure from other means of transportation

Page 4: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

4bluebridge.lt

They (RU’s) need to work in at least two different standards of communication

Page 5: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

5bluebridge.lt

How to ensure fluent communication at least in two different standards at low operational costs?

Page 6: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

6bluebridge.lt

Identify building blocks which will not change over time

Accept the future

Work on these blocks to make a future proof portfolio of solutions

Together with Clients identify near future needs, to be prepared for them

Analyze existing data and adapt based on evidences

Page 7: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

7

Existing / near future landscape

Wagon fault and maintenance

Detaching wagon from

train

Train stopping

Train passage

Attaching wagon to train

Changing locomotive

TRAIN RUNNING

Repair of wagon

Wagon loading

Wagon movements

Wagon unloading

Waybill preparation

Wagon exchange between RU’s

WAGONS IN STATION

Trainready

Train preparation

Train exchange between RU’s

TRAIN ARRIVAL

Train arrival

Wagons inspection

Train separation

TRAIN PREPARATION

Basic operations with trains, wagons and documents Communication between RU’s and IM’s

Communication with customers

TAF-TSI

Common European gauge standard for RU’s and IM’s communication

INFOSET-21, SMGS AGREEMENT

Common Russian gauge standard for RU’s and IM’s communication

CUSTOMS STANDARDS

Custom implementations between various RU’s and IM’s

BLOCKCHAIN, E-DELIVERY, E-INVOICE, E-SIGNATURE

Near future or existing implementations of processes digitalization

DIRECT IN STATIONS

First / one time customers, which need guidance to easy transport their cargo

COSTUMERS PORTALS

Self service, most common for semi large reoccurring customers withdedicated people

THIRD PARTY SERVICES THROUGH STANDARD API’S

Forwarder, other departments of thesame company, large customers who creates additional value by integrating logistics in theirs processes

Mostly never changing Ever changing

Page 8: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

8bluebridge.lt

All this is required for businesses of today and tomorrow in order to survive in market.

How to achieve it?

Page 9: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

9bluebridge.lt

By executing operations instead of filling document forms

RU’s employees enter operations data

Wagonsbusiness component

Trainsbusiness component

Waybillsbusiness component

Customsbusiness component

Business events and API

Operations data automatically transformed into standard communication message

Business events and data integration engine

Documents generated automatically Customers and partners connect in their preferred way

API

Document forms and generationcomponent

Integration component

TAF-TSI

SMGS standards

Customers API

Page 10: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

10bluebridge.lt

But you can go even furtherIf all communication with customer would be digitalized…

Station 1 Station 2 Station N…

Central office

Wagon movement

Wagon loaded

Wagon unloaded

Train prepared

Wagon delivered

Wagon in repair

Wagon prepared

Client 1 Client 2 Client N…

Orders Way bill information

Price calculation

Wagon location

Customs support

Customs support

Customers support

Page 11: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

Back to numbers, by using our product, you will:

11bluebridge.lt

60%

Save the cost of customer service:

Up to 60% savings in staff time by customer service

35%

More effectively managed day to day operations

Up to 35% more efficiently managed business operations, their planning activities

70%Reduce human resources

Up to 70% savings in the station office

Page 12: How long will your customer wait for you to ship his …...bluebridge.lt 6 Identify building blocks which will not change over time Accept the future Work on these blocks to make a

12bluebridge.lt

We can help you out!

Aivaras LiutvinasBusiness development manager

Blue Bridge [email protected]