how bim can accelerate project-wide review cycles - webinar, november 11, 2015
TRANSCRIPT
1 Trusted by the world’s largest projects
How BIM can accelerate project-wide review cycles
With
BIM Consulting
2
AgendaIntroductionIndustry SuccessConnected BIM DemoQ&A
Steve Fox, BIM Consulting Chris Pynn, ArupJohn Barkwell, AconexAll
Steve FoxManager | BIM Consultant
‘Optimisation of built assets through digitisation.’
BIM Consulting
BIM global adoption
High / Very High BIM Implementation Levels (by Country)
H
F
E
M
S.FAB
STR.C
ARC
ConstructionARC
STR.C
S.FAB
M
E
F
H
As Built
STR.S
M
E H
F
STR.C
ARC
DesignAs the model moves from design through construction to handover, collaboration becomes increasingly challenging
Challenges of realizing the full benefits of BIM project-wide
• Increasing project complexity• Information silos• Software accessibility• Design focused• Handover to owner• Initial investment• Industry adoption• Training
Who is BIM Consulting?
• Strategic advisory services• Design to construction to operations• Practical approach to Building Information
Modelling (BIM)
BIM Management and project implementation
*Considered predominantly low BIM capability in the industry and may not be included as a sub-contractor Contract model.
Federated Construction stage BIM The most current Contract models are aggregated by individual consultants & sub-contractors within their own software environment for coordination and collaboration
Fire SC
Mech SC
Mech Elec Hyd Fire Structural Concrete Steel
Structural Steel Concrete
Elec SC
Hyd SC
Federated (WIP) Navisworks Works in Progress Construction Models for Clash Detection/ 3D Coordination
Federated (WAE) Navisworks Works as Executed handover model to the Principal
Central Park, Sydney – To be built twice, once virtually
Image: NSW Planning and Environment
What are we trying to achieve?
• Faster project start up
times
• Better decisions
• More efficient review
cyclesImproved project outcomes
Challenges to realizing value of project-wide BIMPeople, Process, Technology & Policy
• Ensuring the right contractual conditions and framework
• Determining the activities and BIM processes to be adopted
• Selecting appropriate hardware and software
• Defining and controlling model & data structure and versioning
• Facilitating efficient and effective collaboration and communication
• Supporting project teams with a wide range of BIM maturity
How are we achieving goals?
Standardized processes
Innovative use of data
Project-wide access to
models and data
Tailored implementation by organization and project
Results
• Faster design development
• Informed and integrated
decisions
• Accelerated review cycles
Deliver a better quality asset
Chris PynnAssociate PrincipalBIM Leader | Melbourne, Australia
Marina Bay Bridge
Manchester Stadium
Singapore MRT
Singapore Flyer
Marina Bay Sands
Singapore Sports Hub
“We shape a better world”
Together, we shape a better worldFrom more than 90 offices in over 38 countries, over 12,000 planners, designers, engineers and consultants deliver innovative projects across the world with creativity and passion.
Recommendations forBIM for FMDepartment of Defence
University of SydneyCAMPUS BIM Utilities and GIS Strategy
Brisbane AirportBIM Requirements & Implementation Strategy
City of SydneyDigital Strategy
Perth StadiumProject BIM Strategy
BIM Advisory for Investa Property
Arup Global BIM Strategy - Implementation
Getting the basics right
• Greater productivity
• Reduction in risk
• Greater value for our clients
• Greater satisfaction in our work
• Future proofing our business
PeopleKeeping it Relevant
ProcessBringing order to it all
Technology
Making it reality
How are we collaborating with BIM?
SHARED BIM
MODEL
orTraditional
BIM
Project-wide BIM
Does isolated clash checking add value to design collaboration?
Putting the model first
For design
Use the model to drive design coordination across the entire project team.
Project-wide BIMBenefits of a “Connected BIM” project
• Common Data Environment (CDE)• Accelerated design reviews• No need for proprietary software• Full project-team can access the model• No file size restrictions• Issue tracking• Connecting data sources
One Model
Design
Teams
Contr-
actors
Client
Stake-holder
s Consul-
tants
Project-wide BIM on the Perth Stadium
Design Authoring
Tekla Rhino Bentley
IFC Collaboration Model
Arch Struc MEP Civil
Classification
Review VDR
Planning
Costing
Field BIMAsset
Capture
COBie Drops
Design Brief & Program
Management
Verification
CAFM / CMMS
Dro
fus
Model Server
Dro
fus
WIP
Federated Model
Master Workflow
Collaboration Model
How project-wide BIM can accelerate review cycles
Collaboration and VDR model workflowUsing Aconex, Navisworks and Solibri
75% Fasterreview cycles
30
How BIM can accelerate project-wide review cycles
John Barkwell, Aconex
How BIM can accelerate project-wide review cycles
John Barkwell, Director of BIM, Aconex
31
Cloud & Mobile
Information & Process
Management
Engineering & Construction
Project-Wide
Across the Project Lifecycle
Plan Design Construct OperateBidOperatorSub-contractorsContractorConsultantsOwner EPC Designer
Aconex collaboration Save money, increase productivity. Manage project risk.
32
• File distribution• Submittals• Transmittals• Version control• Shop drawings• Package assembly
• RFIs & change mgt• Progress claims• Delays & EoTs• Design queries• Technical queries• Approvals: commercial, equipment, etc
• Access Documents
• Upload Documents
• Forms completion• Photo/Video/Audio
• QA/QC, HSE• Commissioning
• Design reviews• Module delivery• Squad checks• “Ball in court” tracking
• Procurement• Invoice reviews
• Interface management
• Issue management
• Risk management
• Assets
• Earned value• Control account & Work packages
• Budgeting & forecasting
• Much more…
• Viewing & mark-up
• Collaboration• Enriched models
• Handover• O&M manuals• Vendor documents
Manage dozens of project-wide processes in one placeProcess ExamplesDocument Mgt Correspondence Mobility Workflows
Registers Cost / Payment CAD / BIM / GIS O&M / Deliverables
OperateConstructDesignBidPlan
33
Managing model files Managing project data
Disconnected BIM
Limited to the design team
Everyone on the project
Disparate datasets Fully connected dataset
Design & Construct Full lifecycle, handover
Restricted access, requires specialized software
Common Data Environment via browser and mobile
Connected BIM, for better delivery
Connected BIM
34
Design team
Rest of your project team
Document Control
RFIs & change orders
Bidding & Tenders
Workflows &
approvals
Commissioning
Submittals
Field Inspections
Handover
Authoring tools Coordination tools
But “Traditional BIM” leaves project teams, information & processes disconnected
How do I…• View models without special software?• Link RFIs with objects for resolution of
clashes and issues
How do I…• Link information into my
model for a complete BIM handover?
• Get an audit trail of decisions made?
How do I…• Distribute huge BIM files?• Reduce cycle times on clash
resolution?• Version control to avoid
errors on out-of-date models?
How do I…• Access models on my
mobile device?
35
Rest of your project team
Authoring tools
Coordination tools
Document Control
RFIs & change orders
Bidding & Tenders
Workflows &
approvalsCommissioni
ng
Packages &
DeliverablesField
Inspections
Handover
Document Control
RFIs & change orders
Bidding & Tenders
Workflows &
approvals
Commissioning
Submittals
Field Inspections
Handover
Native model data
Open BIM, IFC, COBie
The Solution: Aconex “Connected BIM”…driving everyone project-wide to participate in BIM
Open BIM
Handover
Design team
36
Updates model, submits
to Aconex
Retrieves models, runs
clash detection
Submits clash report, assigns to disciplines
Retrieves assigned clashes
Smarter and faster processes and decisionsExample: Clash detection / design coordination
Designer / Engineer
BIM Coordinator
37
Finds issue on site, checks
BIM model
Resolves issue on site
Responds with instruction
Receives RFI, clicks through to BIM model
Reviews linked information for
full context
Raises RFI
Accelerated and connected review cycle Example: RFI process
Contractor Designer / Engineer
38
Leading to better delivery of your asset
Better design coordination
and constructability
Construction
Streamlined processes &
better decisions
Operations
A richer, higher quality BIM into
asset operations
Design
39
Demo: Accelerating project-wide review cycles
• Overview• Federated Model Visualization• Model Collaboration • Model Enrichment
40
Summary
Traditional BIM
• Disconnected teams and information
• BIM in silos• Managing files not data
Managing files instead of data
Connected BIM
• Improved coordination
• Better decisions• Accelerated review cycles
• Higher quality model into asset operations
Managing files inst
41
Process improvement with Aconex
Delivering value through customer
engagements
• Process Discovery Workshop
• Process Mapping & Assessment
• Enterprise Deployment Standards
CONFIDENTIAL | 42
Most trusted platform
$1 TrillionAsset value delivered across 50,000 orgs, more than any
other platform.
Aconex UnlimitedTraining & support for your entire
project community guarantees everyone’s success.
Secure PerformanceScalable, reliable platform to
support global projects. ISO 27001 certified.
43 Trusted by the world’s largest projects
With thanks to our participants from Arup and BIM Consulting
Learn more at aconex.com/Demo
BIM Consulting