how a blue print works
TRANSCRIPT
Abernethy R
d
Leach H
wy
Abernethy R
d
Leach H
wy
Abernethy R
d
Leach H
wy
Abernethy R
d
Leach H
wy
Abernethy R
d
Leach H
wy
Abernethy R
d
Leach H
wy
Abernethy R
d
Leach H
wy
GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
B
C
D
E
F
D
E
A
B
C
F
1 2 3 4 5 6 7 8
SAS - BLUE PRINT INVESTAGATION DRAWING
SCID, CSD AND DBYD DATA
AREA 4 - SHEET 07
04-070-SE-SK-4107 OCT
1:250@A0 29.08.14
PCG94
1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR
ANY PERMIT TO DIG.
2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED
DATA.
3. POTHOLES ARE SHOWN AS A SYMBOL.
4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.
5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.
6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS
DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE
ADDED ON REQUEST.
7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.
GENERAL NOTES
KEYPLAN LEGEND
GAS
COMMUNICATIONS
POWER LV
SEWER
WATER
REDUNDANT OR UNKNOWN
DRAINAGE
POWER HV
BP FUEL
POTHOLE POINT
SURVEY POINT
0
25
5010 20 30 40
5
GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
B
C
D
E
F
D
E
A
B
C
F
1 2 3 4 5 6 7 8
SAS - BLUE PRINT INVESTAGATION DRAWING
SCID, CSD AND DBYD DATA
AREA 4 - SHEET 07
04-070-SE-SK-4107 OCT
1:250@A0 29.08.14
PCG94
1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR
ANY PERMIT TO DIG.
2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED
DATA.
3. POTHOLES ARE SHOWN AS A SYMBOL.
4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.
5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.
6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS
DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE
ADDED ON REQUEST.
7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.
GENERAL NOTES
KEYPLAN LEGEND
GAS
COMMUNICATIONS
POWER LV
SEWER
WATER
REDUNDANT OR UNKNOWN
DRAINAGE
POWER HV
BP FUEL
POTHOLE POINT
SURVEY POINT
0
25
5010 20 30 40
5
GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
B
C
D
E
F
D
E
A
B
C
F
1 2 3 4 5 6 7 8
SAS - BLUE PRINT INVESTAGATION DRAWING
SCID, CSD AND DBYD DATA
AREA 4 - SHEET 07
04-070-SE-SK-4107 OCT
1:250@A0 29.08.14
PCG94
1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR
ANY PERMIT TO DIG.
2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED
DATA.
3. POTHOLES ARE SHOWN AS A SYMBOL.
4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.
5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.
6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS
DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE
ADDED ON REQUEST.
7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.
GENERAL NOTES
KEYPLAN LEGEND
GAS
COMMUNICATIONS
POWER LV
SEWER
WATER
REDUNDANT OR UNKNOWN
DRAINAGE
POWER HV
BP FUEL
POTHOLE POINT
SURVEY POINT
0
25
5010 20 30 40
5
GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
B
C
D
E
F
D
E
A
B
C
F
1 2 3 4 5 6 7 8
SAS - BLUE PRINT INVESTAGATION DRAWING
SCID, CSD AND DBYD DATA
AREA 4 - SHEET 07
04-070-SE-SK-4107 OCT
1:250@A0 29.08.14
PCG94
1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR
ANY PERMIT TO DIG.
2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED
DATA.
3. POTHOLES ARE SHOWN AS A SYMBOL.
4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.
5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.
6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS
DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE
ADDED ON REQUEST.
7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.
GENERAL NOTES
KEYPLAN LEGEND
GAS
COMMUNICATIONS
POWER LV
SEWER
WATER
REDUNDANT OR UNKNOWN
DRAINAGE
POWER HV
BP FUEL
POTHOLE POINT
SURVEY POINT
0
25
5010 20 30 40
5
GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
B
C
D
E
F
D
E
A
B
C
F
1 2 3 4 5 6 7 8
SAS - BLUE PRINT INVESTAGATION DRAWING
SCID, CSD AND DBYD DATA
AREA 4 - SHEET 07
04-070-SE-SK-4107 OCT
1:250@A0 29.08.14
PCG94
1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR
ANY PERMIT TO DIG.
2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED
DATA.
3. POTHOLES ARE SHOWN AS A SYMBOL.
4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.
5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.
6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS
DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE
ADDED ON REQUEST.
7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.
GENERAL NOTES
KEYPLANLEGEND
GAS
COMMUNICATIONS
POWER LV
SEWER
WATER
REDUNDANT OR UNKNOWN
DRAINAGE
POWER HV
BP FUEL
POTHOLE POINT
SURVEY POINT
0
25
5010 20 30 40
5
GATEWAY WA: PERTH AIRPORT & FREIGHT ACCESS PROJECT
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
B
C
D
E
F
D
E
A
B
C
F
1 2 3 4 5 6 7 8
SAS - BLUE PRINT INVESTAGATION DRAWING
SCID, CSD AND DBYD DATA
AREA 4 - SHEET 07
04-070-SE-SK-4107 OCT
1:250@A0 29.08.14
PCG94
1. THIS DRAWING IS TO BE USED AS PART OF INITIAL INVESTIGATION FOR
ANY PERMIT TO DIG.
2. THIS SKETCH CONTAINS POTHOLED/SCANNED, DBYD AND SURVEYED
DATA.
3. POTHOLES ARE SHOWN AS A SYMBOL.
4. DBYD DATA IS REPRESENTED BY DASHED LINE WITH A SINGLE LETTER.
5. SURVEYED DATA IS REPRESENT BY DASHED LINE WITH 3 LETTERS.
6. STREET LIGHTING, TRAFFIC SIGNALS AND INTELLIGENT TRAFFIC SIGNS
DATA ARE NOT SHOWN ON BLUE PRINT DRAWING. THIS DATA CAN BE
ADDED ON REQUEST.
7. FOR THE LINE TYPE LEGEND REFER TO DRAWING 00-071-SE-DG-0011.
GENERAL NOTES
KEYPLAN LEGEND
GAS
COMMUNICATIONS
POWER LV
SEWER
WATER
REDUNDANT OR UNKNOWN
DRAINAGE
POWER HV
BP FUEL
POTHOLE POINT
SURVEY POINT
0
25
5010 20 30 40
5
HOW A BLUE PRINT WORKS
The satellite image is your
base reference point for
your work area. This allows
you to reference your work
to your surrounding. The
satellite image is updated
every 3 months.
Survey points identify a
known point. Surveyors can
peg these out for you. Survey
points are broken up into two
types.
Pothole points created using
vacuum trucks, GPR and
survey.
Gateway survey points taken
as the service was installed
Pothole Points
Gateway Points
The opaque blue is the work
within boundary for this
project. It has changed and
will keep changing during
the life of this project.
Finished Drawing
This is the finished design.
When the project is complete
this will line up with the
satellite background.
This design can be swapped
out for different stages or
different sections of work to
better clarify the extents of
your work area.
Services area shown over
the top of all the layered
information.The data is
represented in two ways.
DBYD data collected from
the asset owners.
Installed services by
Gateway
Leach DesignAbernethy Design
DBYD with SurveyInstalled with Survey
REVISION
SCALE REVISION DATE
DRAWING No.
DATUM
AHD
PROJECT ZONE
A
04-070-SE-SK-4107 OCT
1:250@A0 29.09.14
PCG94
The data on each drawing is updated at
the beginning of each month. The
drawing is valid for that month only.
Check the month in the revision box
before filling out you permit