KEEPINGHOUSTON AIRPORTS OPENING DAY FRESH
Copyright © 2016. Houston Airport System. All rights reserved.
Houston Airport System Assistant Director – DesignDevon Tiner, P.E., PMP, M. ASCEMarch 22, 2016
![Page 2: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/2.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.
VISION AND MISSION STATEMENTMISSION: WE EXIST TO CONNECT PEOPLE, BUSINESSES, CULTURES AND ECONOMIES OF THE WORLD TO HOUSTON.
VISION: ESTABLISH HOUSTON AS A FIVE-STAR GLOBAL AIR SERVICE GATEWAY WHERE THE MAGIC OF FLIGHT IS CELEBRATED.
2
![Page 3: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/3.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.3
ABOUT HOUSTON AIRPORT SYSTEM
![Page 4: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/4.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.4
ABOUT HOUSTON AIRPORTSIAH
EFDHOU
• George Bush Intercontinental Airport (IAH) – the largest airport ,43 million passengers annually
• William P. Hobby Airport (HOU) –12 million passengers annually, with international flights Oct 2015
• Ellington Airport (EFD) – GA/Military potential spaceport site
![Page 5: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/5.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.5
PASSENGER GROWTH:1988 TO 2014ABOUT HOUSTON AIRPORTS
![Page 6: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/6.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.6
ABOUT HOUSTON AIRPORTSLEADERSHIP: CITY OF HOUSTON
MayorSylvester Turner
Chief Development OfficerAndy Icken
Director of AviationMario Diaz
![Page 7: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/7.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.7
ABOUT HOUSTON AIRPORTSLEADERSHIP: HOUSTON AIRPORT SYSTEM
Chief Operating Officer
Balram Bheodari
Deputy DirectorInfrastructureJeffrey Brown
Deputy DirectorCapital Projects
Bob Barker
Director of AviationMario Diaz
![Page 8: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/8.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.8
ABOUT HOUSTON AIRPORTSLEADERSHIP: HOUSTON AIRPORT SYSTEM – INFRASTRUCTURE
Deputy DirectorInfrastructureJeffrey Brown
Interim Assistant Director – PMO
Casey Zaunbrecher
Interim Assistant Director –
ConstructionCynthia Straughan
Assistant Director - Design
Devon Tiner
Assistant Director – Maintenance Management
Peter Ferguson
![Page 9: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/9.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.9
ABOUT HOUSTON AIRPORTSORGANIZATION: HOUSTON AIRPORT SYSTEM – INFRASTRUCTURE
Infrastructure Division1. Project Management Office (PMO) Business Unit
• Financial Controls Section• Project Controls Section• Document Controls Section
2. Design Business Unit• Tenant Improvement Program
3. Construction Business Unit• Survey Section• Construction Inspection Section
![Page 10: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/10.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.10
ABOUT HOUSTON AIRPORTSORGANIZATION: HOUSTON AIRPORT SYSTEM – INFRASTRUCTURE
Infrastructure Division (Cont.)4. Maintenance Management Business Unit
• Horticulture Section• Fleet Management Section• Job Order Contract Program
5. Asset Management Business Unit• GIS Section
6. Environment & Land Use Business Unit7. Administration Business Unit
![Page 11: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/11.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.11
INFRASTRUCTURE PMO
![Page 12: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/12.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.12
INFRASTRUCTURE PMOPROJECT MANAGEMENT OFFICE CONFIGURATION
PMO
DESIGN CONSTRUCTION
![Page 13: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/13.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.13
INFRASTRUCTURE PMO
2011 2012 2013 2014 2015 2016$0
$20,000,000
$40,000,000
$60,000,000
$80,000,000
$100,000,000
$120,000,000
Annual Project Invoicing
Construction Professional Services
INFRASTRUCTURE PMO - PROJECT SPENDING
![Page 14: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/14.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.14
INFRASTRUCTURE PMO
• Key Responsibilities– Project Development– Design Services– Design Management– Construction Support Services
• Tools– In-House Design– Consultant A/E Services
• On-Call Consultants• Request For Qualifications (RFQs)
DESIGN SECTION - OVERVIEW
![Page 15: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/15.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.15
INFRASTRUCTURE PMO
• 3 Contracts with 5-year duration:– Civil – RS&H– Architectural – PGAL– MEP - Jacobs
• Origination date: 9/19/2012• Total Contract to date: $30,600,000
– Original Appropriation: $6,000,000– Additional Appropriation on 12/18/2013 for $6,600,000– Additional Appropriation on 12/1/2014 for $18,000,000
• Proposed additional appropriation for $20,000,000 in March 2016• Total proposed contract is $50,600,000• Expiration date 9/26/2017
DESIGN ON CALL CONTRACTS - OVERVIEW
![Page 16: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/16.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.16
INFRASTRUCTURE PMO
FY2013 FY2014 FY2015 FY2016$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
Invoicing
Civil MEP Architectural
DESIGN ON-CALL CONTRACTS ANNUAL EXPENDITURES
![Page 17: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/17.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.17
DESIGN ON-CALL - TOTAL EXPENDITURESINFRASTRUCTURE PMO
$10,741,10
0
$4,316,173
$3,468,591
Billed to Date $18,525,866
Civil MEP Architectural
55%26
%
19%
Total LOAs $26,814,412
Civil MEP Architectural
![Page 18: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/18.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.18
INFRASTRUCTURE PMO
39%
28%
35%
Concessions ConstructionProfessional Services
DIVERSITY CHAMPION
![Page 19: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/19.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.19
2016 INFRASTRUCTURE RFQSINFRASTRUCTURE: $110,000,000
![Page 20: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/20.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.20
2016 INFRASTRUCTURE RFQS
• Infrastructure– Architectural/Engineering Design On-Call Services– Infrastructure Staff Augmentation– Estimating Services
• IAH– Multi-Use Building - Design/Build– Vehicle / Fleet Maintenance Facility - Design/Build – IAH Tower Demolition – Design/Build– Taxiway SA & SB Rehabilitation - Design– Landside Roadway Repairs - CMAR– Sanitary Sewer Improvements - CMAR
OVERVIEW
![Page 21: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/21.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.21
2016 INFRASTRUCTURE RFQS
• HOU– Taxiways D & E Reconfiguration - Design
• EFD– Spaceport Incubator Building – Design Build– Spaceport Phase 1 Infrastructure – Design Build
OVERVIEW
![Page 22: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/22.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.22
2016 INFRASTRUCTURE RFQS
• Five (5)-year contract• Anticipated projects include:
ARCHITECTURAL/ENGINEERING DESIGN ON-CALL SERVICES
– Fuel Farm Expansion– Signage Improvements– BHS Enhancements– Central Utility Plant (CUP) Upgrades– Parking Garage Rehabilitation– Automated People Mover (APM)
Rehabilitation– Drainage Improvements
– Electrical Distribution System Upgrades
– Terminal Restroom Remodel– Airfield Pavement Rehabilitation– Landside Roadway Improvements– Parking Development &
Improvements
RFQ anticipated to advertise in November 2016
![Page 23: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/23.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.23
2016 INFRASTRUCTURE RFQS
• Infrastructure Staff Augmentation– Three (3)-year contract– RFQ anticipated in April 2016– Proposed Staffing Needs:
OTHER PROFESSIONAL SERVICES
• Project Managers• Design Engineers• QA/QC Manager• Safety Manager• Contract Administrators
• Schedulers• Construction Inspectors• CAD Designers• Data Entry Clerks
• Estimation Services– Three (3)-year contract– RFQ anticipated in May 2016– Provides professional cost estimation services for projects in
programming, planning, design and construction
![Page 24: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/24.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.24
IAH – MULTI-USE BUILDING2016 INFRASTRUCTURE RFQS
• Airport Emergency Operations Center (AEOC)
• Division Operations Center (DOC)
• Airport Communications Center (ACC)
• Data Center (Tier 3-ish)• IT Division Office• Design / Build• Approximately $30,000,000• RFQ anticipate October 2016
ACC
DataCenter
DOC
AEOC
![Page 25: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/25.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.25
IAH – VEHICLE / FLEET MAINTENANCE FACILITY2016 INFRASTRUCTURE RFQS
• 24,000-SF Facility• Design/Build• Approx. $8,500,000• RFP anticipated Sept. 2016
Proposed Location
![Page 26: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/26.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.26
IAH – TOWER DEMOLITION2016 INFRASTRUCTURE RFQS
• Demolish existing tower and pave facility location.
• Estimate is $3,000,000• RFQ anticipated March 2016.
![Page 27: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/27.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.27
IAH – TAXIWAY SA & SB REHABILITATION2016 INFRASTRUCTURE RFQS
• Reconstruction of asphalt taxiways• $40,000,000 AIP Entitlement Program• RFQ anticipated May 2016• Bids in hand by May 2017
![Page 28: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/28.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.28
IAH – LANDSIDE ROADWAY REPAIRS2016 INFRASTRUCTURE RFQS
• RFQ for CMAR • Approx. $14,000,000
• RFP anticipated April 2016
![Page 29: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/29.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.29
IAH – SANITARY SEWER IMPROVEMENTS2016 INFRASTRUCTURE RFQS
• CMAR for rehabilitation of sanitary sewer mains.
• Estimate is $9,600,000• RFQ anticipated June 2016.
![Page 30: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/30.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.30
2016 INFRASTRUCTURE RFQSWILLIAM P. HOBBY AIRPORT
![Page 31: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/31.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.31
2016 INFRASTRUCTURE RFQSHOU - HOT SPOTS - DRAFT
![Page 32: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/32.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.32
HOU - TAXIWAY D & E RECONSTRUCTION2016 INFRASTRUCTURE RFQS
• Demolish and reconstruct taxiways to FAA standards.
• Program Estimate: $27,000,000• RFQ for design services going
to advertise in August 2016• Bids in hand by May 2018
![Page 33: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/33.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.33
2016 INFRASTRUCTURE RFQSEFD – SPACEPORT DEVELOPMENT
Future Phases of
Development
PHASE IDEVELOPMENT
![Page 34: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/34.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.34
2016 INFRASTRUCTURE RFQSEFD – SPACEPORT PHASE 1
![Page 35: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/35.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.35
2016 INFRASTRUCTURE RFQSEFD – SPACEPORT PHASE 1 - INFRASTRUCTURE
• RFQ for Design/Build to go out in December 2016
• Estimated value is $20,000,000
• RFQ for Design/Build to go out in December 2016
• Estimated value is $12,000,000
Incubator Building
Boeing Building
Space Center
Blvd
Incubator Building
Phase 1 Infrastructure
![Page 36: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/36.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.36
2016 INFRASTRUCTURE RFQSEFD – SPACEPORT PHASE 1 – WEST VIEW
Boeing Building
Phase I Incubator Building
![Page 37: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/37.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.37
2016 CONSTRUCTION FORECASTINFRASTRUCTURE: $232,000,000
![Page 38: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/38.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.38
CONSTRUCTION FORECAST2016 CONSTRUCTION PROCUREMENTS - INFRASTRUCTURE
Identifier Title Estimated Value EFD PN629 Control Tower Replacement 7,400,000 EFD PN632 Scholl Road Rehabilitation 1,500,000 EFD PN732 Rehabilitation of Airfield Service Road 2,000,000
HOU PN738 HOU Parking Offi ce 460,000 IAH PN565 Landside Roadway Rehabilitation 13,800,000 IAH Emergency Repairs for Taxiway RA 1,000,000 IAH 699 Sanitary Sewer Improvements 9,600,000
0 to 3 months
![Page 39: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/39.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.39
CONSTRUCTION FORECAST2016 CONSTRUCTION PROCUREMENTS - INFRASTRUCTURE
Identifier Title Estimated Value IAH PN746 IAH Tower Demolition 3,000,000 IAH PN749 Terminal A & B Up Ramps and
Approach Slab Reconstruction 1,600,000
EFD PN733 T-Hangar Pavement, Twy D/Rwy 4-22 3,000,000 IAH PN460C Airfield Pavements Rehabilitation 4,500,000 IAH PN675 Taxiway NA 54,000,000 IAH PN721 Cell Phone Lot Commercial
Development 3,250,000
0 to 3 months (Cont.)
![Page 40: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/40.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.40
CONSTRUCTION FORECAST2016 CONSTRUCTION PROCUREMENTS - INFRASTRUCTURE
Identifier Title Estimated Value IAH PN737 Terminal B Core Electrial Upgrades 21,000,000 HOU PN460C Rehabilitate Airfield Pavements 1,500,000 IAH Termina A Painting 1,000,000 HOU PN703 Curbside Drop Off Canopy 4,000,000 IAH 699 Sanitary Sewer Improvements 9,600,000
3 to 6 months
![Page 41: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/41.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.41
CONSTRUCTION FORECAST2016 CONSTRUCTION PROCUREMENTS - INFRASTRUCTURE
Identifier Title Estimated Value IAH PN740 Design/Build for Vehicle / Fleet
Maintenance Facility 6,000,000
IAH PN736 Design/Build for Data Center / AOC / IT Offi ce
30,000,000
IAH PN686 Storm Water Pollution Control System - Environmental Stations
6,000,000
6 to 9 months
![Page 42: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/42.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.42
CONSTRUCTION FORECAST2016 CONSTRUCTION PROCUREMENTS – ITRP DRAFT
![Page 43: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/43.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.43
CONSTRUCTION FORECAST2016 CONSTRUCTION PROCUREMENTS – ITRP CURRENT RFQS
• MLIT A/E Design Services– Advertised on March 11, 2016– Pre-Submittal Conference is March 24, 2016 at 9:00 AM at IAH
Marriot.– Proposals are due 4/29/2016 @ 10:00 AM– Contact Andre Morrow – [email protected]
• ITRP PMO Office Design/Build– Advertised on March 11, 2016– Pre-Submittal Conference is March 24, 2016 at 11:00 AM at IAH
Marriot.– Proposals are due 4/29/2016 @ 10:00 AM– Contact Al Oracion – [email protected]
![Page 44: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/44.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.
HOW TO DO BUSINESS WITH HOUSTON AIRPORT SYSTEM
![Page 45: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/45.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.45
HOW TO DO BUSINESS WITH HOUSTON AIRPORT SYSTEMHTTP://FLY2HOUSTON.COM/WELCOME
![Page 46: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/46.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.46
HOW TO DO BUSINESS WITH HOUSTON AIRPORT SYSTEMHTTP://FLY2HOUSTON.COM/CONTRACTINGOPPORTUNITIES
![Page 47: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/47.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.47
HOW TO DO BUSINESS WITH HOUSTON AIRPORT SYSTEM
EVENT DATE LOCATIONHobbyFest April 16, 2016 Hobby Airport
88th Annual AAAE Conference & Exhibition hosted by HAS
May 14th – 18th, 2016 George R. Brown Convention Center – Houston
ASCE International Conference on Transportation & Development 2016
June 26th-29th, 2016 Omni Houston Galleria Hotel
UPCOMING EVENTS
![Page 48: Houston Airport System Infrastructure CIP](https://reader035.vdocuments.us/reader035/viewer/2022062823/58796b7f1a28ab37368b4df3/html5/thumbnails/48.jpg)
Copyright © 2016. Houston Airport System. All rights reserved.
THANK YOU