Housing Crisis Act of 2019 (SB330)
February 13. 2020
Grip of La 4nQ«*a
SB330 SummaryHousing Crisis Act of 2019
Effective for 5 years as of January 1,2020
Restricts actions to reduce housing, protects existing housing, incentivizes production of housing by
supplementing discretionary review process
**
I r“u
- Adds to and amends Permit Streamlining Act, Housing
Accountability Act and Planning & Zoning law, all underline 7 of the California Government Code
,,■ No mandated upzoning, no new ministerial approvals
Ifikdi rnCEQA, Coastal Act. Short Term Rental regulations still apply
I: !■..!:>Does not apply to by-right projects an<] projects that are not Housin
sy^d_Committoe
Council File No J ZdWL^ih
Item No _ . ____
Deputy _
SuhmitteH in
- 11/) J rrs/ * //C/DMtfTOTLj
1vm m ]
2/18/2020
•jlRMl
1
ply, nf jflf AAgalai
Restrictions on Actions to Reduce Housing
- Site Intensity Restrictions• Prohibits the adoption of plans, zoning
ordinances, moratoria, conditions, and other certain actions that could result in fewer housing units than would be allowed
- Project Intensity Restrictions■ Prohibits the establishment of new non
objective development standards, design guidelines
* Prohibits discretionary Housing Development Projects from resulting in a net loss of units
- Expands rights for residential occupants in “Protected Units” when removed by discretionary Housing Development Projects
'
Iy
■ -
4A
2
2/18/2020
Development Review Process Changes for Housing Development Projects #52*
CTcw i|f mil Angiin
Housing Development Project Defined- Residential-only project that creates at
least two residential units
- New mixed-use project, at least 2/3 of the Building Area dedicated to residential uses
- Transitional Housing
- Supportive Housing
3
2/18/2020
Rif AflfiV AflQflHn.
Project Review Process Changes
Historic Cultural Monument approvals must be made by the time a City Planning application is deemed complete
Time to approve/disapprove a Housing Development Projects with EIR shortened from 120 days to 90 days; and from 90 days to 60 days for HDPs 49% affordable to tow income households and public funding application , .1pfa l|T■ v •
«!5 hearing limit for HDPs that meet all applicable, objective zoning standards
i~.fi
s*,,,... l::A -LNew Application Features for discretionary Housing
Development Projects deemed complete on or after January 1,2020
■ Optional vesting S3330 Preliminary Application* Required LAD8S Preliminary Zoning Assessment• Required HCIDLASB330 Replacement Unit
Determination
i- ' .r - if
1*; 'i
V
■ ?*r. < **. *
*‘ i #
€^2I t *-• * 0%New City Planning case number suffixes: HCA and VHCA - « #
Off er
Preliminary Zoning Assessment Purpose■ SH_ * . . -
Conformance with SB330 and State housing, lawfor the expeditious review of Housing Development Projects
U 4 *■■- ' ~*r ' W - ■
mt f nf i_ - . ■ Reduces late zoning hitsr t
Reduces time spent figuring oiu conformance during process
f ’ositng
ertijttomsnt racuKisls rfahtHelps
upfrontget distStefiomc
For the broad range of discretionary Housing DtjvijiopiT.ard Projects
y
4
2/18/2020i
C«rj r/u.1' AJlflrt-Ui
Replacement Unit Determination Purpose
4
n jExisting units to be replaced by new units equivalent in bedroom count
Occupants can live in units up to six months prior to demolition
E IRelocation assistance
Occupants have first right-of-return at an affordable rate
Applies to all discretionary Housing Development Project deemed complete per the Permit Streamlining Act on or after January 1,2020 *
CHr Un
Discretionary Housing Development Project Work Flow - 2019ZMbu Plan Otack submittal [Appffcant):t
L ZonFnf Ptan ChacfcCbn«ction9liajad(DU)No
1
DCPYesNo ConstnicbonApplication until Kb
able to be Deemed
Com plate
Review and Decision Ptan Check(DBS) (Applicant)(Applkant) V/H
»CP) ItXP)Y/N
Yes
t }Dfl/TOCABzSSe Pctermtnation Complete [HOD)Hold ooveaant issuance durtni entUemant procasdnit
| DB/K)CABB5t AppftjtlonFUedwttiHaDlXiipllcitit)]
>♦iMtafHniClMcktfiUlDiscretionary hra/roc
5
2/18/2020
cjiy nr
Discretionary Project Review Work Flow - 2020BOday# .| f lIV)
REQUIREDPreliminary
Zoning
PreliminaryHo Id permit tesuane* during ant It lament pnsceeslmAssessment
completed[DBS!
I I HHHibmlttfl
{Applicant} Nof A1I missing,
materials provided Untllitil
able to be
OPTIONAL f Conformance Review and Entitlement
\ Proceolni \(KP) >
kP 1DCP Applicationdeemed
complete
Yes ConstructionNo Final
<Permit Plan Oieel {DBS]
AppbntkMi . submittal ,i [Applicant) ;
Decision(CM^
!■"=>Preliminary ¥I {Applicant} [
Y/NCompleteIW
Y/N1Yes
SBS30 Unit
completed(HOD)
Hold covenant hauanuduring antftlement processingsubmitted(Apptont]
FOOTNOTESLEGEND
^DkWm >*-
1* An option^ Pralminary App8o*tkn may only b* vrii City Planning prior to fflko an appHcmUon fa a
2. An spptedtaBtea wflh City Planning to s dlKraiunwy Blbtn rnUMtWi filed AfYxr. 19C aayi cf fr* d*to C-sI ft,
r J H frw aiy Planrtng ^ptoaten Is dawned iroompiote iAtt ffing. fho applicant final lutimll ail missing orOptwnalSB | 330 Prelflm Application
PrelmbiaryZoning
Assessment
5B3S0Determination Process [HCID]
■ heerrpate to City Plenrtng within 90 days of w'rg raUftad In arierg by t3ty Plrnirg iWT.v->t Mo and cne-hatf /Mrs Mowtog4. Ccnafaudton of the prejeProcess (D 35) racwvs* final approval
Optional VestingPreliminary Application
6
2/18/2020
L ip iff lei Ang?*1
Optional Vesting SB 330 Preliminary Application
Vests to development rules in place on day that Prelim inary Application is “deemed complete"
If used, this would supersede local vesting options
Provides more certainty and flexibility than local options
Must be filed before main caseL/S
+ 1 Cases will be tagged with VHCA suffix
Applicant obligations:■ File within 180 days■ Project stays within 20% of unit count and Building Area
proposed■ Provide all missing Information within 90 days■ Commence construction within 2.5 years of final approval
Preliminary Zoning Assessment
7?
7
2/18/2020
LADBS PROCESS - PRELIMINARY ZONING ASSESSMENT REPORT (PZA)Preliminary Zoning Assessment Report (PZA)
* The Preliminary Zoning Assessment Report shall be completed by LADBS through a zoning only plan check process in order to determine what planning entitlements would be required.
T
■' Applicant shall submit the PZA form along with a zoning only plan check set to LADBS.IV
Jl
uJVf li * After the zoning review, tho PZA form can be completed and the applicant can continue to file their entitlement case to City Planning
■.:I i
Z9
SB330 Replacement Unit Determinations for Protected Units
af
ri
8
2/18/2020
CHVIVLzi '"Ufe-
Replacement Requirements for Protected Units
No replacement requirement if eovenant/regulatory agreement expired
Same as 330One tor One. Same aribraaDimy level.
Unite wnn reairicied affordability in the past 5 years
No replacement requirementSame as 330One for One. Same or lower affordability level.
Units occupied by lower- or very low- income households within the last 5 years
If tenant incomes are unknown, determination defaults to HUD's CHAS database (70%).
One for one RSO replacement (unless more than 20% affordable)
Seme as 330, but only includes local RSO not 1482 units
One for One.Units that sublect to rent or price control in the past 5 years
No Replacement Requirement if 5No replacement requirement
UnclearUnits Ellised within the past 10 years.years have passed since Ellis
City at ill* Aiijllltf-ii
HCIDLA Application Review ChecklistRelocation Process□ Process and review unit withdrawal application
Replacement Determination ProcessQ Process and review application for completion
□ Determine tenant relocation□ Conduct tenant outreach
□ Respond to any appeals
Verify relocation was paid prior to clearing demolition
□ Determine replacement requirements
□ Conduct Land Use review□ Property research□ Tenant outreach□ Inform tenants of Right to Return
□ Conduct RSO review□ Property research□ Ellis lookback
□
□ issue demotion clearances
□ Issue final replacement determination
Q Process and record covenant
□ Issue building permit clearance once covenant is executed
9
2/18/2020
HCIDLA AB 2556 Determination Process (Pre-SB330)1-2 Weeks 2-5 Weeks 1 Week
NoDetermination (1 -3 weeks)Income
documents review/ verification of documents provided or affordability defaults to HUD’s CHAS,
All missing, t incomplete j materials
ApplicationSubmittal(HCIDLA).
No WBrify | rdatabases for ------W
J Review of ) Documents
| YesApplicationcomplete. Issue AB
2556 Detprovided i the 5 veer look back Inuntil I
application j Is complete. J
Yes1) Property
2) Humber of resWcfitial untts,
3) Bad roam types Of web unft.
I
Of LLu *nye <•
HCIDLA SB 330 Replacement Unit Determination (RUD) Process
J - 2 Weeks 3-a Weeks l Week
1) Send Tenant letter to each residential unit (Notice to Return and Relocation)
2) If tenant responds, we verify the affordability of eachtenant.
JJ If tenant docs nat respond, w» bcfeudi to
HlfD's CHAS
Request RSO Determination (2 to 4 weeks)
No 1i: All missing,
NO) incomplete j materials i ’ provided
untilapplication is complete.
ApplicationSubmittal(HCIDLA).
1 'Verifydatabases for the 5 or 10 year look hack reconfirm1) Property
use.2) Number of
resldenbal units.
3) Bedroom types of each units.
YesApplicationcomplete.
DocumentsReview.
^^1 Issue SB| 330 RUD
Yes
I
10
2/18/2020*
otv sr
Unit withdrawal & tenant relocation processIndepfinuem t»H atLappItaaUon. b-Jl Tisquli Ml fb'r denw ponr<i(
120 Days to one-year
Relocation Owner filesRelocationDetermination
review
forHCIDLA refers to
Relocation Consultant
Landlord Files provides full amouitof
-► moves out DemolitionClearanceEllis & notifies
w/tenants, doc review]
h'iiuifiir- ,:ir ■ a’-'."-'
11
2/18/2020
ImplementationMilestones
OlV lif it\ I'rgnitK
I
Implementation MilestonesOctober-December2019:
■ Weekly, multi-hour inter-agency implementation coordination meetings
• Online appointment scheduling begins for optional vesting SB330 Preliminary Application
• New, updated application forms, instructions• Announcements of newly modified processes
January-February 2020:• Interdepartmental Implementation Memo■ Filing appointments begin for optional vesting
SB330 Preliminary Application• HCID and DBS determinations required for City
Planning cases related to HDPs not yet deemed complete
■ New case suffixes: HOA, VffCA
LV
12
2/18/2020
Contacts t—
f *■ at Las,
Contacts
- City Planning1 [email protected]
- HCIDLA: [email protected]
- LADBS; [email protected]
13