HOUSEENVEST PROJECT Energy Eficiency Investments in Multifamily Houses Daniel Encinas Martín. Industrial Engineer Technical Department Coordinator AGENEX - Extremadura Energy Agency

Upload: others

Post on 14-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

HOUSEENVEST PROJECT

Energy Eficiency Investments in Multifamily Houses

Daniel Encinas Martín.

Industrial Engineer

Technical Department Coordinator

AGENEX - Extremadura Energy Agency

Page 2: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

CONTENTS

HousEEnvest Project. Main Data

The Region of Extremadura

Why HousEEnvest?

Ex-Ante Assesment

Typology of investments

Organizational Innovation

Structure of the Project

Impact of the Project

Page 3: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

HouseEEnvest Project: Main data

Name of the project- HousEEnvest

Title of the project- Energy Efficiency Investments in multifamily houses

Start- 01/03/2018

Duration - 36 months

Budget - 1.798.733,75 €

PARTNERS

Page 4: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

HouseEEnvest Project: Main data

Objetives

Implement a regional financial instrument to solve the current barriers to

finance energy refurbishment of existing buildings.

Achieve the private-public colaboration to créate a guarantee fund to give

“security” to the financial institutions and the final client about the technical and

economic viability of the project.

To catch high energy performance potentials non explored in energy

refurbishment of buildings in Extremadura by gathering low risk investments

with other with higher risk and uncertainty.

Page 5: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

The Region of Extremadura

Page 6: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Why HOUSEENVEST?

Energy is one regional priority.

Energy Efficiency in buildings as driver

of growth and jobs.

Market lacking financial support

Page 7: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Why HOUSEENVEST?

WHICH IS THE BEST MODEL TO PROMOTE EE INVESTMENT?

Page 8: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Why HOUSEENVEST?

FINANCIAL INSTRUMENTS

• Long term sustainability of Structural Funds - revolving effect.

• Higher efficiency in the use of (scarce) public funding - higher

leverage effects.

• More business-oriented attitude and financial discipline into the

public identification/selection of projects

• Blending or combination of funds, public or PPP, including

technical assistance to overcome market barriers.

• Capacity to implement innovation (risk sharing, bundling, de-

risking, etc)

• Move away from grant dependency culture

Main source of

information

FI-COMPASS INITIATIVE

Page 9: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

EXANTE ASSEMENT RESULTS

Market failures

Lack of specific financial products for comprehensive rehabilitation

Low demand for rehabilitation works due to lack of permanent incentives from

public administrations, as well as the lack of knowledge of citizens about the

economic savings they bring

Great costs of management of rehabilitation projects

Ex-Ante Assesment

Page 10: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Ex-Ante Assesment

Extremadura Region Potential

> 9.000 Buildings built before 1980, before NBE-79, no insulation

> 1.400 fuel central heating

> 150 Target buildings

Page 11: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

> 100.000 Single family houses

> 2.800 M€ of investments

Average investments > 24.000€

PRIORITARY MARKET

Potential clients

> 100 Owners of buildings associations

> 40 M€ of investments

Average investments > 450.000€

SECUNDARY MARKET

Ex-Ante Assesment

Page 12: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Typology of investments

Comprehensive energy refurbishments, including:

CHANGE OF

CENTRAL BOILERS

(HEATING/SHW)

IMPROVEMENT OF

THE WINDOWSREFURBISHMENT

OF THE ENVELOPE

IMPROVEMENT OF

ELEVATORS AND

ACCESIBILITY

Economic savings > 50% of the energy bill

(> 600 €/year per dweling)

Other possibilities:

Solar PV installations Solar thermal installationsfor sanitary hot water

Page 13: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Building E: 22 owners

Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR

Investment: 429.070 €

Total monthly energy savings: 1.210,21 €

Monthly savings/owner: 55 €

Credit duration: 20 years

Monthly fee*: 1.787,79 € Monthly fee/owner*: 81,26 €

Possible grants**: 128.721 €

Monthly fee with grants*: 1.251,45 € Monthly fee with grants/owner*: 56,88 €

** Subvención de un 30%. Ayuda Pareer II (IDAE)

NOTA: Escenario de cálculo: precio estimado tendencial para el gasóleo basado en los precios de

los últimos 5 años y ahorros teóricos encontrados en bibliografía del IDAE para cada tipo de

actuación

* Amortización lineal sin intereses

Typology of investments

Page 14: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Organizational Innovation

Mobilization of investment

Financial engineering

- Users’ attraction system- Framework contract- Tools for standardization- Bundling and pooling

- Made to measure scheme- Guarantees system- Subsidies financing- De-risking system- Risk-sharing

Page 15: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Organizational Innovation

Mobilization of investment

- Users’ attraction system

Professional Association of Building Administrators of Extremadura Region

Commercial network, training and advice

- Framework contract

Procurement framework

Panel of contractors

- Tools for standardization

Project pipeline platform: HousEE Platform

- Bundling and pooling

Bundling of investments per building (5 investments lines)

Pooling of risk

Page 16: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Organizational Innovation

Financial engineering

- Made to measure scheme

Financial products adapted to the life duration of the investment.

Includes de-risking system

Includes risk-sharing method for safeguarding the public ESIF contribution to the fund.

Commercial banks will be awarded by the Fund for commercializing

- Guarantees system

System of guaranteed energy savings, both to owners of the buildings and financial institutions

Full technical guarantee of energy savings during the project lifetime

Page 17: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Organizational Innovation

Financial engineering

- Subsidies financing

Full service of requesting and pre-financing of available subsidy or grant

- De-risking system

Combined PPP

• ESIF or regional funds

• Private financial institutions

- Risk-sharing

Between PDA and the awarded company

For safeguarding the public ESIF contribution to the fund

Page 18: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Structure of the project

Page 19: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Structure of the project

Page 20: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Assistance in the project development

1. Technical and financial feasibility studies.

2. Presentation of the results to the

association of owners.

3. Agreement and pre-contract.

4. Tender process

5. Contract and implementation of the

investments

6. Control of works

7. Monitoring in the long term.

TA.0. Users attracting system2

TA.1–TA.3. Feasibility studies3

TA.4. Procurement system4Funding system1

TA.5. Investing system5

PDA Unit

Structure of the project

Page 21: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

EMPLOYMENT GENERATED

756 jobs

TOTAL INVESTMENT EXPECTED

>40 M€

NUMBER OF ENERGY USERS BENEFICIARIES

6000 usuarios

PAYBACK FOR THE PUBLIC ADMINISTRATION

56% of the global investment goes back to the public Budget: 22,85 M€

Source: ACA, Asociación de Ciencias ambientales; CNC, Confederación Nacional de Construcción; INE, Instituto Nacional de Estadística

Impact of the project

Page 22: HOUSEENVEST PROJECT Energy Eficiency Investments in ... · Building E: 22 owners Investments: CHANGE OF BOILERS+ENVELOPE+WINDOWS+ELEVATOR Investment: 429.070 € Total monthly energy

Thank you very much for your attention!

Daniel Encinas Martín

Extremadura Energy Agency (AGENEX)

[email protected]