  • 7/25/2019 Hotel Ispravke

    1/7

    Correct wrong

    Stair structure (green line) should be leaning on column

    ground floormissing column

  • 7/25/2019 Hotel Ispravke

    2/7

    it was agreed that this opening will be removed

    slab thickness of pitched roof slabs (POS 401-416) should be 15 cm instead 12 cm

  • 7/25/2019 Hotel Ispravke

    3/7

    slab thickness of pitched roof above arrival drop of area is 15 cm instead of 25 cm

    slab thickness on POS 417 (above service lift and stairs L/09-11) should be 15 cm instead of 30

    cm

    GENERAL NOTE: FOUNDATIONS AND FOUNDATIONS SLABS SHOULD BE INCORPORATED FROM

    STRUCTURAL DRAWINGS

  • 7/25/2019 Hotel Ispravke

    4/7

    MEZZANINECROSS SECTION 02

    WRONG

    CORRECT

  • 7/25/2019 Hotel Ispravke

    5/7

    MISSALIGMENT IN ELEVATIONS IN SECTIONS AND PLANS

    THICKNESS OF WALL ARROUND BALLROOM SHOULD BE CORDINATED IN SECTIONS AND PLANS

    (THICKNES OF WALLS IS CORRECT IN PLANS )

  • 7/25/2019 Hotel Ispravke

    6/7

    arrival levelbeneath timber canopy and tree pitwrong parapet walls in section

    wrong correct (orange cross section)

  • 7/25/2019 Hotel Ispravke

    7/7

    mezzanine (POS 209) in elevation 03 wrong section

    wrong

    correct