hotel ispravke
TRANSCRIPT
-
7/25/2019 Hotel Ispravke
1/7
Correct wrong
Stair structure (green line) should be leaning on column
ground floormissing column
-
7/25/2019 Hotel Ispravke
2/7
it was agreed that this opening will be removed
slab thickness of pitched roof slabs (POS 401-416) should be 15 cm instead 12 cm
-
7/25/2019 Hotel Ispravke
3/7
slab thickness of pitched roof above arrival drop of area is 15 cm instead of 25 cm
slab thickness on POS 417 (above service lift and stairs L/09-11) should be 15 cm instead of 30
cm
GENERAL NOTE: FOUNDATIONS AND FOUNDATIONS SLABS SHOULD BE INCORPORATED FROM
STRUCTURAL DRAWINGS
-
7/25/2019 Hotel Ispravke
4/7
MEZZANINECROSS SECTION 02
WRONG
CORRECT
-
7/25/2019 Hotel Ispravke
5/7
MISSALIGMENT IN ELEVATIONS IN SECTIONS AND PLANS
THICKNESS OF WALL ARROUND BALLROOM SHOULD BE CORDINATED IN SECTIONS AND PLANS
(THICKNES OF WALLS IS CORRECT IN PLANS )
-
7/25/2019 Hotel Ispravke
6/7
arrival levelbeneath timber canopy and tree pitwrong parapet walls in section
wrong correct (orange cross section)
-
7/25/2019 Hotel Ispravke
7/7
mezzanine (POS 209) in elevation 03 wrong section
wrong
correct