Hot AisleContainment System
Installation
Contents
General Information.................................................1
Main Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
System Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Tools — Not Provided . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Hardware and Trim Identification . . . . . . . . . . . . . . . . . . . . . . . 5Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Joining hardware and trim . . . . . . . . . . . . . . . . . . . . . . . . . 5
Installation...............................................................6
Layout and Position of the Main Components . . . . . . . . . . . . . . 6Assemble main components . . . . . . . . . . . . . . . . . . . . . . . . 7
Door Frame Assembly and Installation. . . . . . . . . . . . . . . . . . . . 9Door frame assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Door frame installation . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Joining Enclosures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Joining 900 mm and 900 mm enclosures . . . . . . . . . . . . . . 12
Joining 900 mm and 1070 mm enclosures . . . . . . . . . . . . . 12
Joining 1070 mm enclosures. . . . . . . . . . . . . . . . . . . . . . . 14
Doors and locksets installation . . . . . . . . . . . . . . . . . . . . . 15
Ceiling Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18Types of ceiling panels and required hardware . . . . . . . . . . 18
Preparing for ceiling panel installation . . . . . . . . . . . . . . . . 19
Fire suppression . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
End ceiling panels - new installation . . . . . . . . . . . . . . . . . . 20
End ceiling panels - pre-existing installation . . . . . . . . . . . . . 21
FM-to-rack ceiling panels - new installation . . . . . . . . . . . . . 22
FM-to-rack ceiling panels - pre-existing installation . . . . . . . . 23
Ceiling Panel Inserts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Data Troughs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Side Panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Hot Aisle Containment System iGeneral Information
The Hot Aisle Containment System encloses an aisle to collect and cool equipment exhaust, making it available for cool air intakes. This creates a self-contained system capable of supporting high power density loads.
The Hot Aisle Containment System can be built using new equipment or with existing equipment.
Hot Aisle Containment System 1
Main Components
Rack-to-rack (19-inch) ceiling Plinth block
panel assembly Door
Rack-to-rack (23-inch) ceiling Door threshold
panel assembly Door frame upright - left
FM-to-rack ceiling panel assembly Side panel - left
FM-to-FM ceiling panel assembly 1070 mm-to-1070 mm joining bracket
Door header Cap plug
Side panel - right 21U side panels (not shown)
Door frame upright - right 900 mm-to-1070 mm joining trim
Note
Ceiling panel assemblies come with Lexan® inserts that are not yet attached to the frames. Remove these and store them in safe location until beginning the ceiling panel installation process.
2 Hot Aisle Containment System
System Configuration
Existing equipment used to create the Hot Aisle Containment System must meet dimensional requirements. If your existing layout must be altered to meet these requirements, consider an arrangement that does not require moving and turning off the power to the UPS and PDU. If your new configuration requires that the PDU and/or UPS must be moved, you will be required to remove power from that system.
See also
See the installation manuals provided with the equipment for installation procedures.
See also
See the InfraStruXure System Installation Manual available on the Utility CD that came with the PDU or from the APC Web site, for proper system shut-down.
119.6 (3037.8)
na0771a
* Dimensions are in inches (millimeters)
Hot Aisle Containment System 3
Tools — Not Provided
P2 Phillipsscrewdriver
P1 Phillipsscrewdriver
T-30 Torx®
screwdriverOpen end wrench
13-mm/14-mmOpen end wrench
7-mm/8-mm
Tape measure Chalk line Cutting tool for door-frame gasket
Drill M5 socket
4 Hot Aisle Containment System
Hardware and Trim Identification
Hardware
Joining hardware and trim
LocksetCeiling panel bracket
threadedCeiling panel
bracketScrew
M6 × 30-mm
Plasti-GrommetScrew
M6 × 12-mmRetaining fastener
ScrewM3 × 12-mm
Door stop
12–24 × 1/2" FHPHSS undercut screw
M6 flange nutDoor-frame
gasket Ceiling-panel gasketScrew
8-32 × 3/8"
pan-headsocket screw
M6 × 12-mm screw
M6 × 16-mmTorxscrew
M6 flange
nut
Joining trim
FM to FM
Joining trim
900-mm to
900-mm
Joining trim
900-mmto
1070-mm
Joining bracket
1070-mmto
1070-mm
1070-mmtrim
bracket
900-mm trim bracket
M8 flat washer
Hot Aisle Containment System 5
Installation
Layout and Position of the Main Components
1. Determine the position of the main components and the total length of the Hot Aisle Containment System. Using a chalk line or a similar tool, lay out the perimeter, making sure all corners are square.
Note
If the existing equipment requires no adjustments, see “Door Frame Assembly and Installation” on page 9.
* Dimensions are in inches (millimeters).
119.6(3037.8)
32.46( 824.48)
NetShelter NetShelter NetShelter PDUUPS
NetShelterNetShelter NetShelterNetworkAIR FM
70.87(1800)
52.25(1327.15)
23.62(600)
na1335a
42.50(1079.50)
36.00(914.40)
36.00(914.40)
23.62(600)
Critical Dimensions
6 Hot Aisle Containment System
Installation: Layout and Position of the Main Components
2. Position the NetworkAIR™ FM Unit, centering it in the row as shown.
Assemble main components
1. Join enclosures to each side of the FM unit.
See also
See the NetworkAIR FM installation manual for information on how to install this unit.
Note
The installation of the NetworkAIR FM unit does not have to be completed in order to continue with this installation.
Note
Finish installing all of the main components before fully tightening joining trim hardware.
See also
See the joining instructions in the NetworkAIR FM-to-Netshelter Baying Kit installation manual for information on how to join the enclosures to the unit.
Hot Aisle Containment System 7
Installation: Layout and Position of the Main Components
2. Install the duct extensions.
See also
See the Duct Extension Kit instructions for information on how to install duct extensions.
8 Hot Aisle Containment System
Door Frame Assembly and Installation
A door and door frame are installed on both ends of the Hot Aisle Containment System, and are used for aligning and joining the two rows of equipment.
Door frame assembly
Assemble both sets of door frames.
1. Attach the header to the left- and right-side door frame uprights using six M6 × 12-mm screws.
2. Attach the plinth blocks to the bottom of the door frame uprights using four M6 × 12-mm screws.
3. Attach the threshold to the bottom of the plinth blocks using two M6 flange nuts.
Hot Aisle Containment System 9
Installation: Door Frame Assembly and Installation
Door frame installation
1. Use five M6 × 12-mm screws and M6 flange nuts to attach the door frame to the racks at the end of the aisle.
2. Attach the plinth blocks to the enclosure using two M8 × 25-mm screws.
3. Position the end component that will start the second row, and repeat steps 1 and 2 to complete the assembly.
10 Hot Aisle Containment System
Installation: Door Frame Assembly and Installation
4. Complete the door frame installation process for the remaining door frame by repeating steps 1 through 3.
5. Before installing the enclosures for the second row, install two 21 U side panels to IT racks.
Note
Both rows must be aligned and straight, with the corners square before proceeding.
Note
Existing equipment rows may need to be pulled apart to install the brackets and 21 U panels. The 21U panels are options for enclosures.
Hot Aisle Containment System 11
Joining Enclosures
Joining 900-mm enclosures
Joining 900-mm and 1070-mm enclosures
1. Attach two 1070-mm trim brackets to the side of the 1070-mm enclosure. Align the bracket’s mounting hole with the bottom hole of the top and bottom set of holes in the enclosure. Use an M6 × 12-mm screw and an M6 flange nut for each bracket.
See also
See the instructions included with your NetShelter Enclosure Installation Manual for information on front, and rear joining of 900-mm enclosures.
1070-mm
900-mm
Joining brackets - top view
1070-mm
900-mm
1070-mmshown
12 Hot Aisle Containment System
Installation: Joining Enclosures
2. Attach two 900-mm trim brackets to the side of the 900-mm enclosure. Align the bracket’s mounting hole with the top hole of the upper and lower set of holes in the enclosure.Use a M6 × 12-mm screw and a M6 flange nut for each bracket.
3. Move the enclosures into the row, slide them together, and align the joining trim brackets as shown.
900-mm
1070-mm to 900-mm shown
Hot Aisle Containment System 13
Installation: Joining Enclosures
4. Install the joining trim to the joining trim brackets, using four pan-head screws.
Joining 1070-mm enclosures.
When joining two 1070-mm enclosures, the appropriate rear joining bracket must be used. Orient the brackets so that the two round holes are at the top position. The slots should be located in the middle and lower positions. Use six M6 × 12-mm screws to join two 1070-mm enclosures.
na0835a
ElectricalHazard
The rear doors of the enclosures must be removed before the joining brackets can be installed. Do not remove the rear doors of the UPS, PDU, or XR Battery.
See also
See the instructions included with your equipment for information on how to remove the rear doors.
14 Hot Aisle Containment System
Installation: Joining Enclosures
Doors and locksets installation
1. Apply the door frame gasket material to the door frame sides, and cut off any excess. Position the door gasket bulb on the outside of the door frame where it will make contact when the door is closed.
2. Hang the door on the frame.
na0767b
Hot Aisle Containment System 15
Installation: Joining Enclosures
3. Attach a lockset to each door.
4. Install the strike plate onto each door frame, using two 12-24 × 1/2-inch FHPHSS undercut screws (provided).
Note
Position the lock cylinder on the outside of the door.
Note
Do not use the screws supplied with the lockset.na0777b
16 Hot Aisle Containment System
Installation: Joining Enclosures
5. Install door stops using four M3 × 12-mm Phillips screws.
Hot Aisle Containment System 17
Ceiling Panels
Ceiling panels are available in different lengths and widths based on the size of the enclosures they span. Ceiling panels are available as a complete assembly or as a multi-part unit that can be disassembled for existing applications that require that cables not be disconnected. Each ceiling panel configuration has a unique set of installation hardware.
Types of ceiling panels and required hardware
Configuration Ceiling panel Hardware required
FM-to-FMFour 8–32 × 3/8-inch screws
FM-to-rack
Two Plasti-GrommetsTwo M6 × 12-mm screwsTwo 8–32 × 3/8-inch screws
Rack-to-rack (19-inch)
Four Plasti-GrommetsFour M6 × 12-mm screws
Rack-to-rack (23-inch)
Four Plasti-GrommetsFour M6 × 12-mm screws
Caution
Ceiling panels are not designed to support weight. Do not use ceiling panels to route power or data cables.
See also
See the instructions that come with your equipment for proper installation of the ladders.
na1316a
18 Hot Aisle Containment System
Installation: Ceiling Panels
Preparing for ceiling panel installation
Install Plasti-Grommets into the tops of the equipment (two grommets per enclosure top).
Fire suppression
A hole is located in the center of each ceiling panel for a fire suppression device. If no fire suppression device is used, close off the hole in each panel with the supplied caps.
If this installation is to use existing equipment, proceed to “End ceiling panels - pre-existing installation” on page 20 to begin the installation process
End ceiling panels - new installation
na1337a
10 holespaces
10 holespaces
na1337a
Hot Aisle Containment System 19
1. Apply the foam gasket to the end ceiling panels (rack-to-rack ceiling panels)
Installation: Ceiling Panels
2. Attach the ceiling panels to the racks using eight M6 × 12-mm screws (four per panel).
End ceiling panels - pre-existing installation
20 Hot Aisle Containment System
1. Disassemble the end ceiling panels using a 7-mm wrench.
Installation: Ceiling Panels
2. Apply a foam gasket to door frame.
3. Lift up the cable troughs, and attach ceiling panel ends using four M6 × 12-mm screws (two screws per end). Re-attach cable troughs; see the instructions supplied with the troughs for proper installation.
Rack end
Rack end
Remove
Loosen
Mid-railangle bracket
na1325a
Hot Aisle Containment System 21
Installation: Ceiling Panels
4. Re-attach the ceiling panel centers to the ceiling panel ends using a 7-mm wrench.
FM-to-rack ceiling panels - new installation
1. Apply the foam gasket to two of the three remaining ceiling panel frames to be installed.
2. Attach a ceiling panel (without a foam gasket) first to the racks using two M6 × 12-mm screws and two 8-32 × 3/8-inch screws.
3. Repeat steps 1 through 2 for each of the remaining ceiling panels.
Attach
Mid-railangle bracket
Tighten
22 Hot Aisle Containment System
Installation: Ceiling Panels
FM-to-rack ceiling panels - pre-existing installation
1. Disassemble FM-to-rack ceiling panels using a 7-mm wrench.
2. Apply a foam gasket to both previously installed rack-to-rack ceiling panels.
Rack end
Remove
Mid-railangle bracket
Loosen
Hot Aisle Containment System 23
Installation: Ceiling Panels
3. Lift up the cable trough and attach the ceiling panel rack end to the enclosure using twoM6 × 12-mm screws.
4. Re-attach the cable trough to the ceiling panel end; see the instructions supplied with the troughs for proper installation.
5. Re-attach the ceiling panel center to the ceiling panel end using a 7-mm wrench.
6. Attach the ceiling panel (FM end) to the FM unit using two 8-32 × 3/8-inch screws.
7. Repeat steps 1 through 6 for each FM-to-rack ceiling panel.
na1333a
Attach
Tighten
Mid-railangle bracket
24 Hot Aisle Containment System
Installation: Ceiling Panels
Ceiling Panel Inserts
1. Remove the adhesive backing film from the panel frame; remove the protective plastic from both sides of the Lexan and carefully set the Lexan panel in place, pressing the edges firmly.
2. Attach each end ceiling panel to the door header using three angle brackets andfive M6 × 30-mm screws.
3. Remove the adhesive backing film from the panel frame; remove the protective plastic from both sides of the Lexan. Carefully set the Lexan panels in place, pressing the edges firmly.
na1308a
na1309a
Hot Aisle Containment System 25
Installation: Ceiling Panels
4. Secure the ceiling panel to the previously installed ceiling panel. Use a set of fasteners consisting of a M6 × 30-mm screw, a ceiling panel bracket, and a threaded ceiling panel bracket at each connection point.
5. Repeat steps 3 through 4 for each of the remaining FM-to-rack ceiling panels.
6. Complete the installation by repeating steps 1 and 2 for the last rack-to-rack ceiling panel.
Panel FM-to-FM FM-to-rack Rack-to-rack
FM-to-FM 3 3 3
FM-to-rack 3 4 4
Rack-to-rack 3 4 5
na0762a
Threaded ceiling bracket
Ceiling bracket
M6 × 30-mm screw
26 Hot Aisle Containment System
Data Troughs
Install the troughs into the slots located in the ceiling panel frames.
See also
See the instructions supplied with the troughs for proper installation.
Hot Aisle Containment System 27
Side Panels
Install the side panels at the ends of each row of the Hot Aisle Containment System.
28 Hot Aisle Containment System
*990-1607A*
APC Worldwide Customer Support
Customer support for this or any other APC product is available at no charge in any of the following ways:• Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer
support requests.– www.apc.com (Corporate Headquarters)
Connect to localized APC Web sites for specific countries, each of which provides customer support information.
– www.apc.com/support/Global support searching APC Knowledge Base and using e-support.
• Contact an APC Customer Support center by telephone or e-mail.– Regional centers:
– Local, country-specific centers: go to www.apc.com/support/contact for contact information.
Contact the APC representative or other distributor from whom you purchased your APC product for information on how to obtain local customer support.
To obtain a repair authorization number for a NetworkAIR product, call APC NetworkAIR technical services between 8:00 A.M. and 5:00 P.M. Eastern time, Monday through Friday:
• Phone: (1)(888)695-6500 (USA and Canada only, toll free)• Fax: (1)(401)788-2691
Direct InfraStruXure Customer Support Line (1)(877)537-0607 (toll free)
APC headquarters U.S., Canada (1)(800)800-4272 (toll free)
Latin America (1)(401)789-5735 (USA)
Europe, Middle East, Africa (353)(91)702000 (Ireland)
Japan (0) 35434-2021
Australia, New Zealand, South Pacific area (61) (2) 9955 9366 (Australia)
Entire contents © 2005 American Power Conversion. All rights reserved. Reproduction in whole or in part without permission is prohibited. APC, the APC logo, NetworkAIR, NetShelter, and
InfraStruXure are trademarks of American Power Conversion Corporation and may be registered in some jurisdictions. All other trademarks, product names, and corporate names are the property
of their respective owners and are used for informational purposes only.
990-1607A 05/2005