hosam - cv

4
Page 1 of 4 CURRICULUM VITAE C. V. PERSONAL DATA: - Name : Hosam Mohammed EL-Sayed Hendawe. Nationality : Egyptian. Address : Hamdan St.&El Nagda St. Behind El Dorado Cinema AbuDhabi UAE Telephone : Mobile in UAE 0504918779. Date Of Birth : 26-08-1982 Marital status : Married. Driving License : Available UAE Qualification : B.Sc. in Civil Engineering, Faculty of Eng. Zagazig University May 2004 . Degree : Good -------With %73.1 . Graduation Project : Construction Management Projects : (Shebien EL-Kom Water Treatmemt Plant).&(Arab Contractor.Co). Degree : Excellent. Email : [email protected]

Upload: hosam-mohamed-hindawe

Post on 18-Jul-2015

63 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Hosam - CV

Page 1 of 4

CURRICULUM VITAE

C. V. PERSONAL DATA: -

Name

: Hosam Mohammed EL-Sayed Hendawe.

Nationality

: Egyptian.

Address : Hamdan St.&El Nagda St. –Behind El Dorado Cinema –

AbuDhabi –UAE

Telephone : Mobile in UAE 0504918779.

Date Of Birth : 26-08-1982

Marital status

: Married.

Driving License : Available UAE

Qualification : B.Sc. in Civil Engineering, Faculty of Eng. Zagazig University

May 2004 .

Degree : Good -------With %73.1 .

Graduation Project : Construction Management Projects :

(Shebien EL-Kom Water Treatmemt Plant).&(Arab Contractor.Co).

Degree

: Excellent.

Email : [email protected]

Page 2: Hosam - CV

Page 2 of 4

PAST EXPERIENCES: -

September 2014 – Now

Job : Junior Resident Engineer .

Company : ARCHITECTURE PLANNING GROUP For Engineering Consultantcy Services

– Abou Dhabi – UAE .

Project : Mosque Donated by MR. GHANEM BIN HAMOUDA - KHALIFA City ( A ) – Abou

Dhabi – Cost : 10 Million Dollar .

Project Description : The Mosque serving 1400 prayers, the project Comprises of Men prayer hall, Women

prayer hall, Men ablution & toilets, Women Ablution & toilets Imam and Moazen

accommodation as well 32 m height Minaret. The Mosque equipped with elevator,

package unit AC system, Fire Alarm, SMATV system and public address system.

March 2009 – September 2014

Job : Civil Team Leader Engineer .

Company : ARCHITECTURE PLANNING GROUP For Engineering Consultantcy Services –

Abou Dhabi – UAE .

Project : 4 Mosques Donated by H.H.SH MANSOUR BIN ZAYED AL NAHYAN - KHALIFA

City ( A ) – Abu Dhabi – Cost : 30 Million Dollar .

Project Description : The Mosques serving from 1400 to 2000 prayers each , Each Mosque Comprises of Men

prayer hall, Women prayer hall, Men ablution & toilets, Women Ablution & toilets,

Islamic Library , Imam and Moazen accommodation as well each mosque has it's

Minaret that matching with the mosque Style. Each Mosque equipped with package

unit AC system, fire alarm, MATV system and public address system

March 2009 – March 2011

Job : Civil Team Leader Engineer .

Company : ARCHITECTURE PLANNING GROUP For Engineering Consultantcy Services –

Abu Dhabi – UAE .

Project : SHEWEHAT HOUSING COMPLEX FOR FAMILIES - RUWAIS - WESTERN AREA

- Cost : 100 Million Dollar .

Owner : ADWEA-ABU DHABI WATER &ELECTRIC AUTHORITY .

Project Description : This Project have been Constructed to serve ADWEA’s Employers families that work

for Sheweihat Main Electical station at Abu Dhabi western area on land area of

1104000 m² The project Comprises of 204 villas with 4 different types ( 80 Nos. of A -

TYPE Villa of One bed room , 104 Nos. of B - TYPE Villa of Two bed rooms, 10 Nos. of

Page 3: Hosam - CV

Page 3 of 4

C - TYPE Villa of Three bed rooms, 10 Nos. of D - TYPE Villa of Four bed rooms ), 3

elevated water tanks, 3 substations , and Precast Boundry wall around all The Project

Plot - all villas are connected with internal road net work and serviced by a sewage

treatment plant

July 2007 – March2009

Job : Section Engineer .

Company : TARGET ENGINEERING CONTRUCTION .Co – Abu Dhabi – UAE .

Project : JUMEIRAH HEIGHTS - DUBAI -- Cost : 100 Million Dollar .

Owner : NAKHEEL .

Consultant : ARENCO .

Project Description : This project Comprises of 6 multi story buildings divided in two sections east and west

each section contains 3 building with 6 floors each building consists of 42 flat on Duplex

system with 3 different types ( 3 bed rooms , 4 bed rooms, and 5 bed rooms), Each

Building equipped with 2 elevators, chillers AC system, fire alarm system

July 2006 – July 2007

Job : Site Engineer .

Company : NATIONAL ENGINEERING BUREAU – Abou Dhabi – UAE .

Project : Several Villas projects in ABU DHABI CITY .

March 2006 –June2006

Job : Site Engineer .

Company : ABU RWASH Co. FOR CONSTRUCTION AND CONTRACTING - KSA

Project : ABU RWASH HOTEL - ALAZIZIA - MAKA ALMOKARAMA -

Cost : 10 Million Dollar .

Owner : ABU RWASH GROUP FOR INVESTMENT .

Consultant : SEIF BIN ADNAN AL MARGHOUTHE .

November 2004 – March 2006

Job : Site Engineer .

Company : THE EGYPTIAN GULF COMPANY FOR CONTRACTING & SUPPLYING .

Project : LOULOWA ABD EL AZIZ ALKETAME MOSQUE – AMERICAN PROJECT

REGION - HELWAN –CAIRO - EGYPT -- Cost : 0,35 Million Dollar .

Owner : THE HOUSE OF KUWAITIAN DONNERS IN CAIRO .

Consultant : CEGMAN-CIVIL ENGINEERING GROUPE/ CONS.PROF.DR./MOHAMED ADWE NASEF .

Page 4: Hosam - CV

Page 4 of 4

June. 2004 – November 2004

Job : Site Engineer .

Company : THE MODERN ENGINEERING OFFICE (CONS.ENG./MOHAMMED HINDAWE) .

Project : HAMOUDA ABOU ELNIEL STEEL STORAGE YARD –COST : 0.25 Million Dollar.

Owner : HAMOUDA ABOU ELNIEL GROUP .

TRAINING COURSES: -

Computer courses

1-Primavera Project Planner (P3.1).

2 – Auto CAD .

3- Microsoft Office (Word, Excel) .

4 – SAP 2000 V( 8 ) .

Language

- Arabic “ The mother Language”.

- Excellent command of English Language .

- Fair command of French language .