PURPOSE: (FOR YOU AS GRADE 7 STUDENTS) . . . ?
BRIDGE BUILDING PROJECT (bbp)
THE BRIDGE....
MUST SPAN 30 CM AND BE NO LONGER THAN 40 cm
BE 5 CM ACROSS (WIDE)BE ABLE TO HAVE A WEIGHT HOOKED
OVER THE CENTERINCLUDE AT LEAST 1 TYPE OF BRIDGECANNOT HAVE PILLARSHeight cannot exceed 1/3 of length ANYTHING ELSE??
ROLES
ACCOUNTANT:
ARTIST:
BUILDER:
PROJECT MANAGER:
BE MORE DOG VIDEO
Accountant
ACCOUNTANT MUST FILL OUT THE FOLLOWING CHART (SEE WORKSHEET) ESTIMATED VALUES ACTUAL VALUES RETURNS
Budget is 110 000 (10 x $10 000, 10 x $1 000)TAXESKEEP TRACK OF $ (IF YOU LOSE IT, IT’S GONE FOR
GOOD!)FOR EVERY 10 000$, 1 BONUS POINT WILL BE GIVENWORK ON VIDEO/BLOG??
Artist
COMPLETES THE MAIN DESIGN ALTHOUGH EACH STUDENT ALSO MUST
COMPLETE A DRAWING ON THEIR WORKSHEET
THE DRAWING MUST BE HANDED IN, LABELLED, DETAILED, HAVE MEASUREMENTS AND INCLUDE GROUP IDEAS FOR POSSIBLE CHANGES
THE ARTIST WILL ALSO HELP/OVERSEE BUILDING and make sure it FOLLOWS THE DESIGN
Builder
BUILDS THE BRIDGE (ARTIST HELPS WITH THIS PART TOO).
OTHER TEAM MEMBERS ARE ALSO A PART OF THIS BY GETTING THE BUILDER MATERIALS, HOLDS THINGS, HELPS GLUE ETC.
Project Manager
OVERSEES ALL OTHER WORKERS SHOULD BE ORGANIZED AND ON TASK!!!TELL PEOPLE WHAT THEY SHOULD BE
DOING IF GROUP IS OFF TRACK, THE MANAGER GETS PPL
BACK ON TRACK (OTHERWISE FINES ARE GIVEN)
BLOGS/WORKS ON VIDEO! (ARTIST/ACCOUNTANT CAN HELP TOO)
OUTLINE FOR PROJECT
ASSIGN TASKSDESIGN AS A GROUP
BRAINSTORM IDEAS (SHOULD TAKE ~ 40 MINS) POSTER (NEEDS TO BE HANDED IN W/ REPORT: ARTIST)
THERE CAN BE MANY DRAFTS BUT 1 FINAL ARTIST POSTER ESTIMATED # OF MATERIALS:ACCOUNTANT MANAGER: START BLOG COME UP WITH GROUP NAME (MANAGER?)
BUILD THE BRIDGEHAND EVERYTHING IN...TEST THE BRIDGE
Cost of Materials
SCISSORS $10 000/20 MINSPAPER $15 000/ SHEETPOPSICLE STICKS $ 2 000/STICKADD’N TOOTHPICKS $ 1 000/PICKPIPECLEANERS $ 1 000/PIPECLEANERTAPE (CLEAR TAPE) $ 10 000/10 CMTAPE (MASKING TAPE) $20 000/ 5 CMSTRING $30 000/ 10 CM
RETURNS MUST BE MADE THE SAME CLASS AND CANNOT BE DAMAGED! PROOF OF PURCHASE REQUIRED (ACCOUNTANT SHEET)
TAXES MUST BE DONE ON FINAL CHART.
FINAL PROJECT
GO THROUGH EACH PART (report)SELF-ASSESSMENT AND PEER ASSESSMENT (report)
AT THE END: YOU WILL HAND IN 4 REPORTS 1 DETAILED DRAWING 1 ACCOUNTANT CHART BLOG AND/OR VIDEO FINAL BRIDGE MODEL!!!
VIDEO: HOW TO DEFEND YOURSELF BY CHOCHAGAK
Blog/video
Every manager must blog about their groups daily activities
Managers can also create a video of their bridge being built every day (this can be done as creatively as desired; will be submitted to me online)
Videos cannot have faces of students in them!! Must only be talking/daily construction of bridge