home | transmission | xcel energy - wholesale customer ......w bailey county $ 385.68 $ 355.37 z-65...

82
Circuit Number Asset Location Wholesale or Retail Customer Customer Name Wholesale Installed Plant Value Wholesale Net Plant Value Retail Installed Plant Value Retail Net Plant Value V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) W Bailey County 385.68 $ 355.37 $ Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country 1,559,421.15 $ 802,085.44 $ Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int W CVEC 2,172,618.65 $ 1,955,365.45 $ Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int W CVEC 109,412.45 $ 98,471.64 $ W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) W CVEC 1,858.30 $ 1,763.03 $ Y-67 Elec Tran-Line OH-TX- 69KV-Castro Co REC Sub Tap W Deaf Smith 149,986.28 $ 56,423.52 $ Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) W Deaf Smith 194,860.32 $ 155,470.59 $ Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) W Deaf Smith 43,791.24 $ 34,939.13 $ Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) W Deaf Smith 499,091.91 $ 398,203.77 $ Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap W Deaf Smith 341,806.58 $ 286,602.87 $ Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap W Deaf Smith 1,057.48 $ 886.69 $ Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap W Deaf Smith 289,797.76 $ 242,993.77 $ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 61,883.93 $ 59,078.74 $ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 38,969.54 $ 37,203.05 $ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 286.43 $ 273.45 $ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 407.03 $ 388.58 $ T-04 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Castro Co Intg (T-04) W Deaf Smith 935.30 $ 856.12 $ T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) W Deaf Smith 1,060.99 $ 997.87 $ W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) W Farmers 1,600.26 $ 1,491.29 $ W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) W Farmers 19,147.92 $ 17,844.01 $ Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) W Green Belt 1,475,795.89 $ 1,378,046.91 $ T-28 Elec Tran-Line OH-TX-115KV-Plant X Sta-Lamton Intg (T-28) W Lamb County 685.53 $ 618.90 $ T-31 Elec Tran-Line OH-TX-115KV-Sundown Int Tap North Ckt W Lamb County 531.48 $ 360.26 $ Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) W Lighthouse 278,114.52 $ 253,035.53 $ Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) W Lighthouse 18,531.46 $ 16,860.38 $ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 14,225.90 $ 12,623.19 $ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 115.55 $ 102.53 $ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 64,568.65 $ 57,294.23 $ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 96,037.68 $ 85,217.91 $ Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) W LPL 4,338.37 $ 3,985.11 $ Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) W LPL 5,936.05 $ 5,452.68 $ T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) W LPL 145,319.23 $ 122,969.03 $ V-46 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub W LPL 1,226,344.53 $ 671,486.88 $ Z-20 Elec Tran-Line OH-TX- 69KV-Cochran Co Int-Sundown REC W Lyntegar 392,625.74 $ 261,133.97 $ Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co W Lyntegar 541,903.77 $ 414,162.76 $ Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co W Lyntegar 974,934.82 $ 745,116.98 $ Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) W Lyntegar 130,150.52 $ 121,286.36 $ Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) W Lyntegar 238,396.98 $ 222,344.26 $ Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) W Lyntegar 37,612.03 $ 35,079.38 $ Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) W Lyntegar 1,382.62 $ 1,289.52 $ V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int W Lyntegar 1,597.88 $ 1,139.54 $ V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt W Lyntegar 879.83 $ 689.71 $ V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt W Lyntegar 2,121.94 $ 1,663.43 $ V-66 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int W Lyntegar 872.30 $ 553.11 $ V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta W Rita Blanca 1,354.62 $ 814.13 $ Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner W South Plains 28,422.09 $ 24,352.39 $ T-83 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int W South Plains 1,526.81 $ 944.89 $ V-33 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int W South Plains 1,523.21 $ 1,152.55 $ V-62 Elec Tran-Line OH-TX-115KV-Denver City Sta-Tuco Int W South Plains 7,226.71 $ 4,837.59 $ T-01 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int W Tri County 1,566.21 $ 1,129.02 $ Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop R SPS 375,648.31 $ 243,320.39 $

Upload: others

Post on 03-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Circuit Number Asset Location

Wholesale or Retail

Customer

Customer Name

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) W Bailey County 385.68$ 355.37$ Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country 1,559,421.15$ 802,085.44$ Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int W CVEC 2,172,618.65$ 1,955,365.45$ Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int W CVEC 109,412.45$ 98,471.64$ W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) W CVEC 1,858.30$ 1,763.03$ Y-67 Elec Tran-Line OH-TX- 69KV-Castro Co REC Sub Tap W Deaf Smith 149,986.28$ 56,423.52$ Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) W Deaf Smith 194,860.32$ 155,470.59$ Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) W Deaf Smith 43,791.24$ 34,939.13$ Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) W Deaf Smith 499,091.91$ 398,203.77$ Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap W Deaf Smith 341,806.58$ 286,602.87$ Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap W Deaf Smith 1,057.48$ 886.69$ Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap W Deaf Smith 289,797.76$ 242,993.77$ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 61,883.93$ 59,078.74$ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 38,969.54$ 37,203.05$ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 286.43$ 273.45$ Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) W Deaf Smith 407.03$ 388.58$ T-04 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Castro Co Intg (T-04) W Deaf Smith 935.30$ 856.12$ T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) W Deaf Smith 1,060.99$ 997.87$ W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) W Farmers 1,600.26$ 1,491.29$ W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) W Farmers 19,147.92$ 17,844.01$ Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) W Green Belt 1,475,795.89$ 1,378,046.91$ T-28 Elec Tran-Line OH-TX-115KV-Plant X Sta-Lamton Intg (T-28) W Lamb County 685.53$ 618.90$ T-31 Elec Tran-Line OH-TX-115KV-Sundown Int Tap North Ckt W Lamb County 531.48$ 360.26$ Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) W Lighthouse 278,114.52$ 253,035.53$ Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) W Lighthouse 18,531.46$ 16,860.38$ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 14,225.90$ 12,623.19$ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 115.55$ 102.53$ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 64,568.65$ 57,294.23$ Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) W LPL 96,037.68$ 85,217.91$ Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) W LPL 4,338.37$ 3,985.11$ Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) W LPL 5,936.05$ 5,452.68$ T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) W LPL 145,319.23$ 122,969.03$ V-46 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub W LPL 1,226,344.53$ 671,486.88$ Z-20 Elec Tran-Line OH-TX- 69KV-Cochran Co Int-Sundown REC W Lyntegar 392,625.74$ 261,133.97$ Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co W Lyntegar 541,903.77$ 414,162.76$ Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co W Lyntegar 974,934.82$ 745,116.98$ Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) W Lyntegar 130,150.52$ 121,286.36$ Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) W Lyntegar 238,396.98$ 222,344.26$ Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) W Lyntegar 37,612.03$ 35,079.38$ Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) W Lyntegar 1,382.62$ 1,289.52$ V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int W Lyntegar 1,597.88$ 1,139.54$ V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt W Lyntegar 879.83$ 689.71$ V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt W Lyntegar 2,121.94$ 1,663.43$ V-66 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int W Lyntegar 872.30$ 553.11$ V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta W Rita Blanca 1,354.62$ 814.13$ Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner W South Plains 28,422.09$ 24,352.39$ T-83 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int W South Plains 1,526.81$ 944.89$ V-33 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int W South Plains 1,523.21$ 1,152.55$ V-62 Elec Tran-Line OH-TX-115KV-Denver City Sta-Tuco Int W South Plains 7,226.71$ 4,837.59$ T-01 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int W Tri County 1,566.21$ 1,129.02$ Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop R SPS 375,648.31$ 243,320.39$

Page 2: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Circuit Number Asset Location

Wholesale or Retail

Customer

Customer Name

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 293,058.16$ 213,399.59$ Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 90,979.72$ 66,249.76$ Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 297,343.25$ 216,519.91$ Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 692,355.13$ 504,160.33$ Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 157,346.31$ 114,576.70$ Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 148,462.59$ 108,107.74$ Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub R SPS 330,683.31$ 240,797.54$ Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac R SPS 503,987.66$ 323,955.37$ Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash R SPS 20,734.63$ 13,857.44$ Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash R SPS 47,227.73$ 31,563.41$ Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash R SPS 23,862.43$ 15,947.83$ Z-24 Elec Tran-Line OH-NM- 69KV-Clovis East Sub Tap R SPS 225,990.69$ 195,770.55$ Z-24 Elec Tran-Line OH-NM- 69KV-Industrial Sub-Ethanol Plant Sub R SPS 119,801.22$ 37,302.77$ Z-24 Elec Tran-Line OH-NM- 69KV-Portales Grain Alcohol R SPS 473,070.61$ 301,497.05$ Z-24 Elec Tran-Line OH-NM- 69KV-Cherry Sub Tap R SPS 19,775.51$ 4,037.99$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 37,409.66$ 26,206.63$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 53,800.48$ 37,688.91$ Z-48 Elec Tran-Line OH-NM- 69KV-IMC #2 Sub Tap R SPS 119,761.12$ 80,275.83$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 32,473.12$ 22,748.43$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 5,399.33$ 3,782.40$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 79,061.64$ 55,385.14$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 16,776.50$ 11,752.46$ Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap R SPS 1,859.38$ 681.90$ Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap R SPS 1,410.56$ 517.30$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 539.93$ 378.24$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole R SPS 98,947.47$ 59,502.52$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole R SPS 2,559.83$ 1,539.37$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap R SPS 809.90$ 567.36$ Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole R SPS 280,695.74$ 168,797.71$ Z-50 Elec Tran-Line OH-NM- 69KV-Curry Co Int-TX St Line R SPS 157,248.93$ 101,596.01$ Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) R SPS 97,536.74$ 82,760.68$ Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) R SPS 1,266.71$ 1,074.81$ Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) R SPS 24,216.53$ 20,547.92$ T-05 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Fiesta Sub R SPS 272,613.42$ 119,042.74$ T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) R SPS 17.09$ 16.25$ T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) R SPS 35.60$ 33.85$ T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) R SPS 41.30$ 39.27$ T-26 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell City (T-26) R SPS 4,580.31$ 3,101.96$ T-45 Elec Tran-Line OH-NM-115KV-Norris St Tap R SPS 5,642,204.40$ 3,261,577.75$ T-84 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub R SPS 70.04$ 66.33$ T-84 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub R SPS 29,718.61$ 28,143.22$ T-97 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97) R SPS 564.57$ 484.37$ T-97 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97) R SPS 148.57$ 127.47$ T-98 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Higg Sub (T-98) R SPS 954.97$ 925.95$ U-03 Elec Tran-Line OH-NM-115KV-NEF Sub-Cardinal Sub (U-03) R SPS 43,414.44$ 42,632.52$ U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) R SPS 352.53$ 338.82$ U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) R SPS 138,084.07$ 133,829.77$ U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) R SPS 4,218.00$ 4,088.05$ U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) R SPS 62,160.03$ 60,244.91$ U-08 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08) R SPS 41,399.04$ 40,116.09$ U-08 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08) R SPS 45,771.89$ 44,353.43$

Page 3: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Circuit Number Asset Location

Wholesale or Retail

Customer

Customer Name

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) R SPS 1,155.00$ 1,143.11$ U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) R SPS 86,961.81$ 86,066.69$ U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) R SPS 1,270.87$ 1,257.78$ V-26 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Roswell Int R SPS 2,303.45$ 1,780.71$ V-77 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell Int R SPS 869.64$ 591.57$ W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) R SPS 157,925.47$ 153,761.88$ W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) R SPS 1,833.97$ 1,785.62$ W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) R SPS 1,183.22$ 1,069.51$ W-32 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32) R SPS 32,038.99$ 27,603.61$ W-32 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32) R SPS 1,047.50$ 902.49$ W-38 Elec Tran-Line OH-NM-115KV-Wipp Sub-Red Bluff Sub (W-38) R SPS 111.26$ 79.19$ W-61 Elec Tran-Line OH-NM-115KV-Pecos Intg-North Canal Sub (W-61) R SPS 379,113.01$ 310,540.97$ W-62 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-62) R SPS 196,521.91$ 188,025.21$ W-64 Elec Tran-Line OH-NM-115KV-FEC Intg-Pleasant Hill Sub (W-64) R SPS 318,141.20$ 292,748.84$ W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) R SPS 66,790.57$ 61,986.25$ W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) R SPS 18,605.95$ 17,267.60$ W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) R SPS 21,973.54$ 20,392.95$ W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) R SPS 324,327.17$ 300,997.92$ W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) R SPS 673.52$ 625.07$ Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line R SPS 746,541.10$ 493,561.03$ Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line R SPS 167,890.84$ 110,997.74$ Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line R SPS 157,776.93$ 104,311.13$ Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line R SPS 56,368.17$ 37,266.71$ Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line R SPS 506,639.25$ 334,954.62$ Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line R SPS 1,677,424.99$ 1,108,996.68$ Y-59 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub R SPS 213,474.66$ 150,076.43$ Y-59 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub R SPS 1,341,961.96$ 943,422.78$ Y-60 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Bowers Sub (Y-60) R SPS 378,416.35$ 351,649.97$ Y-61 Elec Tran-Line OH-TX- 69KV-Borger Loop R SPS 1,943.17$ 1,001.95$ Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) R SPS 1,616,385.09$ 1,509,324.22$ Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub R SPS 548,629.67$ 496,420.76$ Y-74 Elec Tran-Line OH-TX- 69KV-Hale Co Int-Plainview South Sub R SPS 99,807.20$ 32,640.82$ Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub R SPS 376,759.67$ 309,871.65$ Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub R SPS 153,489.41$ 126,239.68$ Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta R SPS 66,645.10$ 59,400.55$ Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta R SPS 454,805.11$ 405,366.24$ Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta R SPS 207,764.29$ 185,179.60$ Y-92 Elec Tran-Line OH-TX- 69KV-East Sta-Van Buren Sub R SPS 187,162.03$ 104,725.34$ Y-93 Elec Tran-Line OH-TX- 69KV-East Plant Intg-Van Buren Sub (Y-93) R SPS 12,503.35$ 10,571.28$ Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub R SPS 14,370.38$ 11,951.01$ Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop R SPS 156,365.41$ 137,019.31$ Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop R SPS 938.19$ 822.12$ Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop R SPS 203,431.40$ 178,262.12$ Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop R SPS 809,894.65$ 709,691.50$ Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop R SPS 187,951.23$ 164,697.21$ Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview R SPS 516,064.94$ 432,603.07$ Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview R SPS 1,761,022.25$ 1,476,216.61$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 87,077.19$ 75,329.04$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 148,136.26$ 128,150.25$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 861.88$ 745.60$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 70,566.73$ 61,046.12$

Page 4: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Circuit Number Asset Location

Wholesale or Retail

Customer

Customer Name

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 188.54$ 163.10$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 65,179.96$ 56,386.11$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 1,212.02$ 1,048.50$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 173,454.10$ 150,052.29$ Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap R SPS 727.21$ 629.10$ Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) R SPS 1,099,973.97$ 1,032,799.50$ Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) R SPS 791,878.44$ 743,519.10$ Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) R SPS 97,994.63$ 92,010.18$ Z-34 Elec Tran-Line OH-TX- 69KV-Northwest Intg-Hastings (Z-34) R SPS -$ (1.33)$ Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) R SPS 14,395.93$ 13,435.30$ Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post R SPS 1,248,207.63$ 1,018,676.25$ Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) R SPS 29,745.21$ 27,471.43$ Z-69 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap R SPS 602,920.65$ 537,261.92$ Z-69 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap R SPS 3,111,983.38$ 2,773,084.95$ Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek R SPS 3,879,676.50$ 2,929,366.98$ Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek R SPS 26,170.30$ 19,760.00$ Z-80 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Legacy Sub (Z-80) R SPS 134,211.52$ 116,582.13$ Z-83 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Cox Intg (Z-83) R SPS 179,989.61$ 163,439.71$ Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) R SPS 156,290.08$ 145,645.63$ Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) R SPS 599,713.03$ 568,010.32$ Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) R SPS 5,044.32$ 4,777.66$ Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) R SPS 17,094.62$ 16,190.95$ T-27 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int R SPS 310,259.59$ 269,073.18$ T-27 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int R SPS 1,118.72$ 970.22$ T-49 Elec Tran-Line OH-TX-115KV-Pringle-Phillips Cogen (T-49) R SPS 10,207.33$ 9,715.27$ T-53 Elec Tran-Line OH-TX-115KV-Nichols Sta-WTU R SPS 768.09$ 539.25$ T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) R SPS 301.47$ 295.02$ T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) R SPS 48.45$ 47.41$ T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) R SPS 554.11$ 528.21$ T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) R SPS 1,007.94$ 947.97$ T-64 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub R SPS 1,265,020.57$ 780,702.02$ T-64 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub R SPS 1,041,232.40$ 642,592.12$ T-70 Elec Tran-Line OH-TX-115KV-Coulter Intg-South Georgia Intg (T-70) R SPS 137,991.76$ 136,632.43$ T-73 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73) R SPS 1,016.57$ 986.59$ T-73 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73) R SPS 28,238.16$ 27,405.16$ T-75 Elec Tran-Line OH-TX-115KV-Arrowhead Sub Tap R SPS 637,271.81$ 457,028.37$ T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89) R SPS 2,237.23$ 2,016.54$ T-91 Elec Tran-Line OH-TX-115KV-Russell Pool Substation-Higg Substation (T-91) R SPS (6,495.82)$ (4,327.14)$ U-17 Elec Tran-Line OH-TX-115KV-CLTR-OUTP-115-01 (U-17) R SPS 237.37$ 234.93$ V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap R SPS 194,147.07$ 129,889.28$ V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02) R SPS 160,431.39$ 156,980.23$ V-03 Elec Tran-Line OH-TX-115KV-East Sta-Nichols Sta R SPS 2,367.12$ 1,464.74$ V-04 Elec Tran-Line OH-TX-115KV-Randall Co Int-East Sta R SPS 9,711.49$ 7,709.20$ V-12 Elec Tran-Line OH-TX-115KV-Plant X Sta-Bailey Co Int R SPS 97,862.18$ 78,158.31$ V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int R SPS 216,133.99$ 154,137.84$ V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 R SPS 8,715.64$ 6,030.54$ V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 R SPS 3,662.03$ 2,533.84$ V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 R SPS 476.06$ 329.40$ V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 R SPS 3,771.89$ 2,609.85$ V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 R SPS 76,097.03$ 52,653.19$ V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 R SPS 366.20$ 253.38$

Page 5: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Circuit Number Asset Location

Wholesale or Retail

Customer

Customer Name

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

V-43 Elec Tran-Line OH-TX-115KV-Osage Int Tap R SPS 77,017.80$ 69,023.43$ V-44 Elec Tran-Line OH-TX-115KV-Estacado Sub Tap R SPS 165,962.81$ 63,822.27$ V-49 Elec Tran-Line OH-TX-115KV-ODC Sub Tap R SPS 255.27$ 203.81$ V-49 Elec Tran-Line OH-TX-115KV-ODC Sub Tap R SPS 30,632.21$ 24,456.61$ V-49 Elec Tran-Line OH-TX-115KV-Arco Sub Tap R SPS 9,786.62$ 7,794.14$ V-50 Elec Tran-Line OH-TX-115KV-Northwest Int-Bush Sub R SPS 198,059.50$ 108,260.73$ V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap R SPS 309,691.33$ 149,683.11$ V-56 Elec Tran-Line OH-TX-115KV-Sundown Int-Cochran Co Int R SPS 1,744.71$ 1,205.41$ V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int R SPS 52,567.78$ 32,199.31$ V-79 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int R SPS 395,619.21$ 322,348.95$ V-79 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int R SPS 87,695.59$ 71,454.02$ V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub R SPS 98,614.77$ 74,102.70$ V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub R SPS 78,265.69$ 58,811.67$ V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub R SPS 20,870.85$ 15,683.11$ V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub R SPS 246,276.05$ 185,060.72$ V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub R SPS 3,548.04$ 2,666.13$ V-95 Elec Tran-Line OH-TX-115KV-El Paso Shell Tap R SPS 963.69$ 751.14$ W-11 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Seminole Interchange (W-11) R SPS 96,313.03$ 82,717.81$ W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) R SPS -$ -$ W-34 Elec Tran-Line OH-TX-115KV-AMFRAC-Johnson Draw (W-34) R SPS 108,702.59$ 94,807.31$ W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) R SPS 5,234.93$ 5,148.03$ W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) R SPS 3,489.95$ 3,432.02$ W-77 Elec Tran-Line OH-TX-115KV-Canyon West Sub-Randall County Intg (W-77) R SPS 164,332.07$ 156,358.45$

Total In-Service Prior to October 1, 2005 11,183,022.12$ 8,597,437.52$ 44,256,820.60$ 33,625,608.85$

Page 6: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Circuit Number Asset Location

Wholesale or Retail

Customer

Customer Name

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

U-06 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Agave Sub #2 (U-06) R SPS 434,542.90$ 422,711.73$ W-22 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 4&5 (W-22) R SPS -$ (0.97)$ W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) R SPS 228,875.92$ 193,774.59$ W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) R SPS 61,394.73$ 51,978.98$ W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) R SPS 45,143.18$ 38,219.84$ W-25 Elec Tran-Line OH-NM-115KV-Pecos Intg-Ocotillo Sub (W-25) R SPS 1,853,699.71$ 1,636,823.42$ W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66) R SPS 968,283.94$ 933,147.91$ W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66) R SPS 380,711.64$ 366,896.79$ W-79 Elec Tran-Line OH-NM-115KV-Battle Axe Sub-Roadrunner Sub (W-79) R SPS 9,000,997.03$ 8,397,846.46$ W-81 Elec Tran-Line OH-NM-115KV-Ponderosa Sub-Custer Mt Sw Sta (W-81) R SPS 5,716,030.98$ 5,531,940.14$ W-99 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Capitan Sub (W-99) R SPS 1,242,726.40$ 1,203,051.49$ T-86 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Spring Draw Sub (T-86) R SPS 3,109,701.20$ 2,469,171.22$ W-47 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Cherry Street Sub (W-47) R SPS 160,424.96$ 146,160.77$ W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) R SPS 5,768,904.36$ 5,417,895.37$ W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) R SPS 788,914.49$ 740,912.99$ W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) R SPS 3,704,376.64$ 3,478,983.83$ W-53 Elec Tran-Line OH-TX-115KV-Newhart-Lamton (W-53) R SPS 6,940.20$ 6,325.21$ W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) R SPS 4,343.43$ 3,964.85$ W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) R SPS 520,668.11$ 475,286.78$ W-78 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-Coburn Creek Sub (W-78) R SPS 7,164,598.90$ 6,908,130.28$ W-82 Elec Tran-Line OH-TX-115KV-Hereford Northeast Int-New Centre Street Sub (W-82) R SPS 4,968,384.14$ 4,908,639.63$ Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek R SPS 3,537,492.81$ 2,670,999.66$

Total In-Service On October 1, 2005 or Later -$ -$ 49,667,155.65$ 46,002,860.98$

Grand Total 11,183,022.12$ 8,597,437.52$ 93,923,976.25$ 79,628,469.84$

Page 7: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

6/22/2011 69 Z-56 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98 121,557.06 yes 52165 NAVAJR2 52169 ARTTOW2 123019.98 121557.06 R SPS #N/A

6/22/2011 69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98 121,557.06 yes Eagle Crk Navajo#1 97754.26284 96591.79584 123019.98 R SPS

6/22/2011 69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98 121,557.06 yes Navajo#1 ARTESIA TOWN 25265.71716 24965.26416 R SPS

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 568,271.90 441,549.53 yes NM POTASH TAP NM POTASH #2 (MISS EAST #2) 87919.58485 68313.86766 300755.2492 R SPS #N/A

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 568,271.90 441,549.53 yes ` KERMAC TAP NM POTASH #1 (KERMAC) 37744.02308 29327.25629 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid DEXTER TAP YO REC TAP 94456.76477 70887.79116 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid YO REC TAP CVEC HAGERMAN 55499.38992 41651.11067 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid CVEC LAKE ARTHUR COTTONWOOD TAP 203336.6798 152599.8495 W CVEC #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid ARTESIA SMITH TAP ARTESIA SMITH 483.2498788 362.6687466 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes TAP STATION 1.5 TMC TAP 56379.15572 40225.79764 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes TMC TAP WEST RIAC 10799.62711 7705.394118 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes TMC TAP TMC 453.5276478 323.5861047 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes TAP STATION 1.5 TAP STATION 1.6 2466.056585 1759.499444 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes TAP STATION 1.6 SWITCH 4702 13038.91987 9303.10051 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes TAP STATION 1.6 WHERRY HOUSING 18878.08834 13469.27161 R SPS #N/A

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 694,719.32 495,673.24 yes WHERRY HOUSING EAST RIAC 12415.31936 8858.169616 R SPS #N/A

115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) 403,756.41 386,089.71 yes CURRY2 NCLOVIS 31485.59161 30107.91317 R SPS #N/A

115 V-20 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) 335,413.83 331,591.77 yes EAGLE CREEK NAVAJO 2&3 335413.83 331591.77 1494252.987 R SPS #N/A

69 Z-80 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Legacy Sub (Z-80) 160,365.80 158,442.86 yes TENNECO TAP TENNECO 27,180.64 26,854.72 R SPS #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 4,655,963.05 3,525,998.37 yes 50819 BOWERS2 50823 GB-KELR2 729,308.38 552,311.12 W Green Belt GB-KELR2

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 yes 50819 BOWERS2 50823 GB-KELR2 10,916.83 10,785.03 W Green Belt #N/A

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,003,114.93 778,157.87 yes 51959 DENVRC2 52027 LE_KCM2 670,049.43 519,785.14 1003114.93 R Lea County #N/A

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,003,114.93 778,157.87 yes 52027 LE_KCM2 52017 LE_TIE 195,920.88 151,983.96 W Lea County #N/A

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,003,114.93 778,157.87 invalid 52017 NO 7795 52021 RILEY 137,144.62 106,388.77 R SPS #N/A

Direct Assignments (Set status to "yes")

Page 8: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

6/22/2011 69 Z-56 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76)

6/22/2011 69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76)

6/22/2011 69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76)

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-9 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75)

115 V-20 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23)

69 Z-80 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Legacy Sub (Z-80)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

Direct Assignments (Set status to "yes")

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 0.34 0.34 1 0 0 0 1 123019.98 121557.06 SPS 526 100 0.34 New asset location. No class change. NM7

69 1.3 1.636 1 0 0 0 1 97754.26284 96591.79584 1.3 New asset location. No class change. NM7

69 0.336 1.636 1 0 0 0 1 25265.71716 24965.26416 0.336 New asset location. No class change. NM7

69 1.152 7.446 1 0 0 0 1 87919.58485 68313.86766 SPS 526 100 1.152 Added tap detail. New line NM11

69 1.001 15.071 1 0 0 0 1 37744.02308 29327.25629 SPS 526 100 1.001 Added tap detail. New line NM11

69 2.541 51.229 0 0 0 0 1 0 0 SPS 526 100 2.541 New: Added tap detail

69 1.493 51.229 0 0 0 0 1 0 0 SPS 526 100 1.493 New: Added tap detail

69 5.47 51.229 0 1 0 0 0 0 0 SPS 526 100 5.47 New: Added tap detail

69 0.013 51.229 0 0 0 0 1 0 0 SPS 526 100 0.013 New: Added tap detail

69 1.989 24.509 1 0 0 0 1 56379.15572 40225.79764 SPS 526 100 1.989 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 0.381 24.509 1 0 0 0 1 10799.62711 7705.394118 SPS 526 100 0.381 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 0.016 24.509 1 0 0 0 1 453.5276478 323.5861047 SPS 526 100 0.016 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 0.087 24.509 1 0 0 0 1 2466.056585 1759.499444 SPS 526 100 0.087 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 0.46 24.509 1 0 0 0 1 13038.91987 9303.10051 SPS 526 100 0.46 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 0.666 24.509 1 0 0 0 1 18878.08834 13469.27161 SPS 526 100 0.666 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 0.438 24.509 1 0 0 0 1 12415.31936 8858.169616 SPS 526 100 0.438 NM5-6 Added tap detail. Revised total mileage. No classification change.

69 1.02 13.08 1 0 0 0 1 31485.59161 30107.91317 SPS 526 100 1.02 New: NM2 Added N. Clovis 115kV radial costs

115 0.904 0.904 1 0 0 0 1 335413.83 331591.77 SPS 526 100 0.904 NM7 New radial line assigned to SPS retail sb yes

69 1 5.9 1 0 0 0 1 27180.64407 26854.72203 SPS 526 100 1 Classiifciation change due to configuration change. Added new asset location. August 2011 went from invlaid to yes

69 22.99 146.77 1 1 729308.3772 552311.1162 0 0 0 SPS 526 100 22.99 New class change. NO2827 now open resulting in yes. August 2010 went from invalid to yes

69 22.99 76.985 1 1 10916.8292 10785.03201 0 0 0 SPS 526 100 22.99 New class change. NO2827 now open resulting in yes. TXN4,15,21 August 2010 went from invalid to yes

69 17.1 25.6 1 1 670049.4259 519785.1397 0 0 0 SPS 526 100 17.1Classiifciation change due to configuration change. Mid America - AmFrac 69kV to 115kV Conversion June 2009 went from invalid to yes

69 5 25.6 1 1 195920.8848 151983.959 0 0 0 SPS 526 100 5

Classiifciation change due to configuration change. Mid America - AmFrac 69kV to 115kV Conversion June 2009 went fro trans to radial but invalid because ERF load gone May 2012

69 3.5 25.6 0 0 0 0 1 0 0 SPS 526 100 3.5 Configuration change. No class Change. Legacy 115kV conversion

Page 9: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

115 W-25 Elec Tran-Line OH-NM-115KV-Pecos Intg-Ocotillo Sub (W-25) 1,295,733.79 1,280,578.28 yes PECOS OCOTILLO 1,295,733.79 1,280,578.28 R SPS

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) 266,627.40 263,456.69 yes RED BLUFF WOOD DRAW 266,627.40 263,456.69 R SPS

115 W-34 Elec Tran-Line OH-TX-115KV-AMFRAC-Johnson Draw (W-34) 105,702.35 104,487.40 yes JOHNSON DRAW AMFRAC/MAPCO 105,702.35 104,487.40 R SPS

115 W-59 Elec Tran-Line OH-NM-115KV-Lopez Int-Campbell St Sub (W-59) 1,654.06 1,635.97 yes Lopez Campbell 1,654.06 1,635.97 R SPS

115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) 636,648.11 599,639.66 yes East Clovis Tap

(Structure 42) East Clovis 53,080.64 49,995.05 R SPS

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap 60,910.57 25,223.34 yes IMC #3/Strata Tap (Structure 8A) Strata 85.94 85.94 R SPS

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap 60,910.57 25,223.34 yes IMC #3/Strata Tap (Structure 8A) IMC #3 65.20 27.00 R SPS

115 V-74 Elec Tran-Line OH-NM-115KV-Curry Co Int-Tucumcari 3,353,631.93 1,618,970.59 yes 51076 TUC-FEC 51070 LOPEZ $187,047.71 $90,297.55 R SPS

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 1,110,442.37 1,096,757.05 yes 50765 Howard Substation 50767 Buffalo Substation $392,221.20 $387,387.38 R SPS #N/A

115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42) 4,079,711.08 4,036,464.32 yes Rolling Hills Substation Hastings Substation $4,079,711.08 $4,036,464.32 $4,079,711.08 R SPS

115 W-47 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Cherry Street Sub (W-47) 70,972.28 70,240.27 yes Rolling Hills Substation Cherry Street

Substation $70,972.28 $70,240.27 $70,972.28 R SPS

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac $503,987.66 $333,531.49 yes Potash Junction Interchange

Kermac Tap structure 89 $503,987.66 $333,531.49 $880,213.67 R SPS #N/A

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash $175,062.74 $121,558.47 yes Kermac Tap structure 89

NM POTASH #1 (KERMAC) $20,745.57 $14,405.12 R SPS #N/A

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash $175,062.74 $121,558.47 yes Kermac Tap structure 89

New Mexico Potash Tap structure 21 $47,252.64 $32,810.86 R SPS #N/A

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac $503,987.66 $333,531.49 yes ` New Mexico Potash Tap structure 21

NM POTASH #2 (MISS EAST #2) $68,733.73 $45,486.95 R SPS #N/A

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac $503,987.66 $333,531.49 yes New Mexico Potash Tap structure 21

LIVINGSTONE RIDGE SUBSTATION $239,494.08 $158,493.60 R SPS #N/A

4/1/2016 115 W-62 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-62) $1,255,082.57 $1,223,476.56 yes East Clovis Tap

(Structure 42) East Clovis $190,511.57 $185,714.03 $190,511.57 R SPS

4/1/2016 115 W-64 Elec Tran-Line OH-NM-115KV-FEC Intg-Pleasant Hill Sub (W-64) $1,792,929.70 $1,680,641.69 yes North Clovis Tap (Structure 143) North Clovis Substation $317,957.98 $298,044.83 $317,957.98 R SPS

4/1/2016 115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) $518,207.80 $491,713.01 yes FEC Holland Tap

(Structure 57A)FEC Holland Substation $1,600.26 $1,518.44 $20,748.18 W Farmers

4/1/2016 115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) $518,207.80 $491,713.01 yes FEC Clovis #2 Tap

(Structure 7A)FEC Clovis #2 Substation $19,147.92 $18,168.93 W Farmers

4/1/2016 115 W-73 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73) $1,145,453.31 $1,085,893.56 yes 52346 Pearl Tap structure

132A 52348 Pearl Substation $673.56 $638.54 $52,128.53 R SPS Pearl Substation

4/1/2016 115 W-73 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73) $1,145,453.31 $1,085,893.56 yes 52360 Enron Tap (Structure

296) 52374 Enron Substation $50,713.83 $48,076.88 R SPS Enron Substation

4/1/2016 115 W-73 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73) $1,145,453.31 $1,085,893.56 yes 52372 Lea National Tap

structure 299 52346 Lea National Substation $741.14 $702.60 R SPS Lea National Substation

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) $432,370.75 $408,534.01 yes 52374 Quahada Substation 52380 Zia Substation #2 Tap structure number 1 $66,790.57 $63,108.39 $432,370.75 R SPS Zia Substation

Page 10: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

115 W-25 Elec Tran-Line OH-NM-115KV-Pecos Intg-Ocotillo Sub (W-25)

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

115 W-34 Elec Tran-Line OH-TX-115KV-AMFRAC-Johnson Draw (W-34)

115 W-59 Elec Tran-Line OH-NM-115KV-Lopez Int-Campbell St Sub (W-59)

115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75)

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap

115 V-74 Elec Tran-Line OH-NM-115KV-Curry Co Int-Tucumcari

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42)

115 W-47 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Cherry Street Sub (W-47)

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

4/1/2016 115 W-62 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-62)

4/1/2016 115 W-64 Elec Tran-Line OH-NM-115KV-FEC Intg-Pleasant Hill Sub (W-64)

4/1/2016 115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65)

4/1/2016 115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65)

4/1/2016 115 W-73 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73)

4/1/2016 115 W-73 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73)

4/1/2016 115 W-73 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73)

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 5.818 5.818 1 0 0 0 1 1295733.79 1280578.28 NM 8 New radial line assigned to SPS retail ISD 3/12

115 16.563 16.563 1 0 0 0 1 266627.4 263456.69 NM 11 New radial line assigned to SPS retail ISD 9/12

0.977 0.977 1 0 0 0 1 105702.35 104487.4 TXS 16 New radial line assigned to SPS retail ISD 9/12

115 0.051 0.051 1 0 0 0 1 1654.06 1635.97 100 June 2013 Change - Reflected in 2013 True Up

115 1.495 17.931 1 0 0 0 1 53080.63825 49995.0528 100 June 2013 Change - Reflected in 2013 True Up

69 0.029 20.553 1 0 0 0 1 85.94397558 85.94397558 100 December 2013 Change - Reflected in 2013 True Up

69 0.022 20.553 1 0 0 0 1 65.19887802 26.99914757 100 December 2013 Change - Reflected in 2013 True Up

4.497 80.628 1 0 $0.00 $0.00 1 $187,047.71 $90,297.55 SPS 526 100 4.5 June 2013 Change - Reflected in 2013 True Up

69 27.192 76.985 1 0 $0.00 $0.00 1 $392,221.20 $387,387.38 SPS 526 100 4 New Retail Assignment (line reconfigured after Howard Sub was built) - Reflected in 2013 True Up

115 6.09 6.09 1 0 $0.00 $0.00 1 $4,079,711.08 $4,036,464.32 SPS 526 100 6.09 May 2014 Change - new line - Reflected in 2014 True Up

115 0.156 0.156 1 0 $0.00 $0.00 1 $70,972.28 $70,240.27 SPS 526 100 0.156 May 2014 Change - new line - Reflected in 2014 True Up

69 9.510 9.51 1 0 $0.00 $0.00 1 $503,987.66 $333,531.49 SPS 526 100 9.510 clarified "To/From" description and corrected segment mileage

69 1.001 8.447 1 0 $0.00 $0.00 1 $20,745.57 $14,405.12 SPS 526 100 1.001 clarified "To/From" description and corrected segment mileage

69 2.280 8.447 1 0 $0.00 $0.00 1 $47,252.64 $32,810.86 SPS 526 100 2.280 clarified "To/From" description and corrected segment mileage

69 1.152 8.447 1 0 $0.00 $0.00 1 $68,733.73 $45,486.95 SPS 526 100 1.152 clarified "To/From" description and corrected segment mileage

69 4.014 8.447 1 0 $0.00 $0.00 1 $239,494.08 $158,493.60 SPS 526 100 4.014 clarified "To/From" description and corrected segment mileage

115 1.495 9.849 1 0 $0.00 $0.00 1 $190,511.57 $185,714.03 SPS 526 100 1.495 V75 replaced by W62 and W63 when Pleasant Hill was built ISD = February 2015 new retail assignment

115 1.728 9.744 1 0 $0.00 $0.00 1 $317,957.98 $298,044.83 SPS 526 100 1.728 V75 replaced by W62 and W63 when Pleasant Hill was built ISD = February 2015 new retail assignment

115 0.029 9.391 1 1 $1,600.26 $1,518.44 0 $0.00 $0.00 SPS 526 100 0.029 V75 replaced by W62 and W63 when Pleasant Hill was built ISD = February 2015 new retail assignment

15 0.347 9.391 1 1 $19,147.92 $18,168.93 0 $0.00 $0.00 SPS 526 100 0.347 V75 replaced by W62 and W63 when Pleasant Hill was built ISD = February 2015 new retail assignment

115 0.024 40.814 1 0 $0.00 $0.00 1 $673.56 $638.54 SPS 526 100 0.024 completion of Quahada Substation changed V83 to W73 ISD = July 2015

115 1.807 40.814 1 0 $0.00 $0.00 1 $50,713.83 $48,076.88 SPS 526 100 1.807 completion of Quahada Substation changed V83 to W73

115 0.026 40.184 1 0 $0.00 $0.00 1 $741.14 $702.60 SPS 526 100 0.026 completion of Quahada Substation changed V83 to W73

115 2.380 15.407 1 0 $0.00 $0.00 1 $66,790.57 $63,108.39 SPS 526 100 2.38 completion of Quahada Substation changed V84 to W74 ISD = July 2015

Page 11: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) $432,370.75 $408,534.01 yes Zia Substation #2 Tap structure number 1 Zia Substation #2 $18,605.95 $17,580.19 R SPS

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) $432,370.75 $408,534.01 yes Zia Substation #2 Tap structure number 1 Zia Substation #1 $21,973.54 $20,762.13 R SPS

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) $432,370.75 $408,534.01 yes Zia Substation #1 Maljamar #2 $324,327.17 $306,446.91 R SPS

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) $432,370.75 $408,534.01 yes 52380 Maljamar #2 52376 Maljamar $673.52 $636.39 R SPS Maljamar 1

4/1/2016 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94) $505,052.28 $477,115.81 yes Ochoa Tap (Structure 299A) Ochoa $63.76 $60.23 $95.64 R SPS

4/1/2016 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94) $505,052.28 $477,115.81 yes Agave Tap (Structure 213)

Agave Red Hills Substation (customer) $31.88 $30.12 R SPS

4/1/2016 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) $1,882,886.81 $1,769,239.14 yes RED BLUFF ENTERPRISE Tap

structure 72 $887,843.14 $834,254.53 $16,705,129.38 R SPS

4/1/2016 115 W-70 Elec Tran-Line OH-NM-115KV-Hopi Sub-North Loving Sub (W-70) $6,670,377.95 $6,317,323.39 yes Hopi Substation North Loving Substation $6,670,377.95 $6,317,323.39 $6,670,377.95 R SPS

4/1/2016 115 W-72 Elec Tran-Line OH-NM-115KV-North Loving Sub-China Draw Sub (W-72) $9,146,908.29 $8,657,970.74 yes North Loving

Substation China Draw Substation $9,146,908.29 $8,657,970.74 $9,146,908.29 R SPS

4/1/2016 115 W-79 Elec Tran-Line OH-NM-115KV-Battle Axe Sub-Roadrunner Sub (W-79) $9,000,997.03 $8,553,365.13 yes Roadrunner Substation Battle Axe Substation $9,000,997.03 $8,553,365.13 $9,000,997.03 R SPS

4/1/2016 115 W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66) $7,639,962.83 $7,285,513.91 yes Portales Interchange Kilgore Substation $7,639,962.83 $7,285,513.91 $7,639,962.83 R SPS

4/1/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) $339,716.16 $313,864.00 yes Kress Interchnage Lighthouse REC MBPXL tap $270,760.51 $250,155.83 $288,801.95 W Lighthouse

4/1/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) $339,716.16 $313,864.00 yes Lighthouse REC MBPXL tap

Lighthouse REC Plainview Substation $18,041.44 $16,668.50 W Lighthouse

4/1/2016 69 Z-84 Elec Tran-Line OH-TX- 69KV-Plainview City-Kiser Sub (Z-84) $156,561.12 $144,774.36 yes Kiser Substation Plainview City $156,561.12 $144,774.36 $156,561.12 R SPS

4/1/2016 69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) $380,841.63 $361,370.23 yes 52001 Sulphur Springs

Substation 51999 Adair Substation $156,402.14 $148,405.72 $1,339,494.36 R SPSOzark Mahoning#2

Tap struture number 107

4/1/2016 69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) $380,841.63 $361,370.23 yes 51999 Diamondback

Substation 51993 Lyntegar REC Ashmore Substation $130,243.84 $123,584.83 W Lyntegar LG-ASHM2

4/1/2016 69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) $621,376.33 $599,673.58 yes 51993 Diamondback

Substation 51997 Cedar Lake Substation $621,376.33 $599,673.58 R SPS Ozark Mahoning#2 Substation

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) $595,207.39 $565,241.99 yes 52023 Seagraves Substation 51991

Lyntegar REC McConnal Tap structure number 68

$238,396.98 $226,395.01 W LyntegarLyntegar REC

Sawyer Flat Tap structure 69A

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) $595,207.39 $565,241.99 yes 51989

Lyntegar REC McConnal Tap structure 68

52023 corner structure number 118 $37,612.03 $35,718.47 W Lyntegar LG-SAWY2

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) $595,207.39 $565,241.99 yes 51981 corner structure

number 118 51989 Lyntegar REC McConnal Substation $1,382.62 $1,313.02 W Lyntegar LG-MC&S2

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) $595,207.39 $565,241.99 invalid 52001 Diamondback

Substation 51999 Ozark Mahoning#2 Tap struture number 107 $26,293.27 $24,969.55 R SPS ADAIR2

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) $595,207.39 $565,241.99 invalid 51993 Ozark Mahoning#2 Tap

struture number 107 51997 Ozark Mahoning#2 Substation $32,808.00 $31,156.30 R SPS CEDARLK2

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) $595,207.39 $565,241.99 invalid 52023 Ozark Mahoning#2 Tap

struture number 107 51991 Lyntegar REC Sawyer Flat Tap structure 69A $94,979.15 $90,197.48 W Lyntegar OZMAH22

4/1/2016 115 T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89) #N/A #N/A yes Higg East Tap

structure 264 Higg East Substation #N/A #N/A #N/A R SPS

Page 12: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

4/1/2016 115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

4/1/2016 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94)

4/1/2016 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94)

4/1/2016 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

4/1/2016 115 W-70 Elec Tran-Line OH-NM-115KV-Hopi Sub-North Loving Sub (W-70)

4/1/2016 115 W-72 Elec Tran-Line OH-NM-115KV-North Loving Sub-China Draw Sub (W-72)

4/1/2016 115 W-79 Elec Tran-Line OH-NM-115KV-Battle Axe Sub-Roadrunner Sub (W-79)

4/1/2016 115 W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66)

4/1/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82)

4/1/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82)

4/1/2016 69 Z-84 Elec Tran-Line OH-TX- 69KV-Plainview City-Kiser Sub (Z-84)

4/1/2016 69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85)

4/1/2016 69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85)

4/1/2016 69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86)

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

4/1/2016 69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

4/1/2016 115 T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 0.663 15.407 1 0 $0.00 $0.00 1 $18,605.95 $17,580.19 SPS 526 100 0.663 completion of Quahada Substation changed V84 to W74

115 0.783 15.407 1 0 $0.00 $0.00 1 $21,973.54 $20,762.13 SPS 526 100 0.783 completion of Quahada Substation changed V84 to W74

115 11.557 15.407 1 0 $0.00 $0.00 1 $324,327.17 $306,446.91 SPS 526 100 11.557 completion of Quahada Substation changed V84 to W74

115 0.024 15.407 1 0 $0.00 $0.00 1 $673.52 $636.39 SPS 526 100 0.024 completion of Quahada Substation changed V84 to W74

115 0.002 15.842 1 0 $0.00 $0.00 1 $63.76 $60.23 SPS 526 100 0.002 W37 became W93 & W94 when Roadrunner Substation was built; ISD = October 2015

115 0.001 15.842 1 0 $0.00 $0.00 1 $31.88 $30.12 SPS 526 100 0.001 W37 became W93 & W94 when Roadrunner Substation was built; ISD = October 2016

115 7.810 16.563 1 0 $0.00 $0.00 1 $887,843.14 $834,254.53 SPS 526 100 7.810 Enterprise Tap to customer owned substation ISD = November 2015

115 9.525 9.525 1 0 $0.00 $0.00 1 $6,670,377.95 $6,317,323.39 SPS 526 100 9.525 new to list; North Loving ISD = June 2015

115 18.34 18.34 1 0 $0.00 $0.00 1 $9,146,908.29 $8,657,970.74 SPS 526 100 18.34 new to list; China Draw ISD = June 2015

115 19.728 19.728 1 0 $0.00 $0.00 1 $9,000,997.03 $8,553,365.13 SPS 526 100 19.728 new to list; Battle Axe ISD = October 2015

115 6.391 6.391 1 0 $0.00 $0.00 1 $7,639,962.83 $7,285,513.91 SPS 526 100 6.391 new to list; Kilgore ISD = October 2015

69 17.544 22.012 1 1 $270,760.51 $250,155.83 0 $0.00 $0.00 SPS 526 100 17.544 Z82 ISD = December 2014, when Kiser Substation was constructed

69 1.169 22.012 1 1 $18,041.44 $16,668.50 0 $0.00 $0.00 SPS 526 100 1.169 Z82 ISD = December 2014, when Kiser Substation was constructed

69 0.818 0.818 1 0 $0.00 $0.00 1 $156,561.12 $144,774.36 SPS 526 100 0.818 Z84 ISD = December 2014, when Kiser Substation was constructed

69 4.855 11.822 1 0 $0.00 $0.00 1 $156,402.14 $148,405.72 SPS 526 100 4.855 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 4.043 11.822 1 1 $130,243.84 $123,584.83 0 $0.00 $0.00 SPS 526 100 4.043completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 NO switch 7886 seperates Z85

69 2.175 2.175 1 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 2.175 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 10.173 25.399 1 1 $238,396.98 $226,395.01 0 $0.00 $0.00 SPS 526 100 10.173 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 1.605 25.399 1 1 $37,612.03 $35,718.47 0 $0.00 $0.00 SPS 526 100 1.605completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015 Lyntegar's line to LY-Seminole starts here

69 0.059 25.399 1 1 $1,382.62 $1,313.02 0 $0.00 $0.00 SPS 526 100 0.059 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 1.122 25.399 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.122completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015 NO switch 7778 seperates Z87

69 1.400 25.399 0 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.400 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 4.053 25.399 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 4.053 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

115 0.049 13.6 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.049 new to list: Higg East ISD = September 2015

Page 13: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

5/25/2016 115 V-12 Elec Tran-Line OH-TX-115KV-Plant X Sta-Bailey Co Int $709,743.90 $596,445.78 yes Muleshoe Valley Tap structure 86

Muleshoe Valley substation $31,281.78 $26,288.20 $31,281.78 R SPS

7/18/2017 115 V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap $296,070.33 $138,023.11 yes 51736 Amoco-Cryogenics Tap Structure 10 51738 Amoco-Cryogenics

Substation $296,070.33 $138,023.11 $299,072.20 R SPS #N/A

7/18/2017 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt $1,054,018.18 $857,309.75 yesLyntegar REC Levelland Tap Structure 28A

Lyntegar REC Levelland Substation $879.86 $715.65 W Lyntegar #N/A

7/18/2017 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt $1,054,018.18 $857,309.75 yes Lyntegar REC Clauene Tap Structure 116

Lyntegar REC Clauene Substation $2,122.01 $1,725.99 W Lyntegar #N/A

7/18/2017 115 W-99 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Capitan Sub (W-99) $663,201.56 $643,363.16 yes Capitan Substation Price Substation $663,201.56 $643,363.16 $663,201.56 R SPS

7/18/2017 115 T-98 Elec Tran-Line OH-NM-115KV-HOBBS GEN SUB-HIGG SUB (T-98) $0.00 $0.00 yes Bensing Tap Structure

114A Bensing Substation $0.00 $0.00 $0.00 R SPS

7/18/2017 115 W-81 Elec Tran-Line OH-NM-115KV-Ponderosa Sub-Custer Mt Sw Sta (W-81) $413,349.97 $402,936.36 yes Custer Mountain

Switch Station Ponderosa Substation $413,349.97 $402,936.36 $413,349.97 R SPS

7/18/2017 115 W-89 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89) $7,507,537.13 $7,426,480.92 yes Cardinal Switch Station Sage Brush Substation $7,507,537.13 $7,426,480.92 $7,507,537.13 R SPS

7/18/2017 115 W-78 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-Coburn Creek Sub (W-78) $1,535,145.02 $1,496,469.79 yes Wheeler County

InterchangeCoburn Creek Substation $1,535,145.02 $1,496,469.79 $1,535,145.02 R SPS

7/18/2017 115 U-06 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-AGAVE SUB #2 (U-06) $0.00 $0.00 yes Roadrunner Substation Agave Substation #2 $0.00 $0.00 $0.00 R SPS

7/20/2017 115 W-97 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (W-97) $155,351.25 $153,668.81 yes CVEC Dayton Tap Structure 104

CVEC Dayton Substation $0.00 $0.00 $0.00 W CVEC

7/20/2017 115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) $352,135.16 $348,324.16 yes CVEC Irish Hills Tap

Structure 152CVEC Irish Hills Substation $0.00 $0.00 $1,925.91 W CVEC

7/20/2017 115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) $352,135.16 $348,324.16 yes CVEC Lake Wood Tap

Structure 61Structure # 61A - ownership change $1,925.91 $1,905.07 W CVEC

8/8/2017 115 T-45 Elec Tran-Line OH-NM-115KV-Curry Co Int-Oasis Int $463,709.68 $378,232.41 yes 51156 FEC Cheese Tap Structure 77 51168 FEC Cheese Substation $0.00 $0.00 $0.00 W Farmers #N/A

8/8/2017 115 W-58 Elec Tran-Line OH-NM-115KV-Norton Sw Sta-Lopez Int (W-58) $129,073.45 $118,023.52 yes FEC Tucumcari Tap Structure 639A

FEC Tucumcari Substation $0.00 $0.00 $0.00 W Farmers

8/8/2017 115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int $3,231,825.43 $2,385,079.17 yes Lyntegar REC Plains Tap Structure 568A

Lyntegar REC Plains Substation $1,600.46 $1,181.13 $218,083.15 W Lyntegar #N/A

8/8/2017 115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int $3,231,825.43 $2,385,079.17 yes Lehman Tap Structure 321 Lehman Substation $216,482.69 $159,763.69 R SPS #N/A

8/8/2017 115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) $1,330,665.16 $1,274,089.23 yes Friona Tap Structures 244/246 flying tap Friona Rural Substation $342.78 $328.20 $342.78 R SPS #N/A

8/8/2017 115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) $1,330,665.16 $1,274,089.23 yes Deaf Smith REC #6 Tap Structure 76

Deaf Smith REC #6 Substation $0.00 $0.00 W Deaf Smith

8/8/2017 115 V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta $2,902,396.55 $1,790,141.39 yes Rita Blanca REC Sneed Tap Strcuture 180

RIta Blanca #14 (Sneed) Substation $1,226.58 $756.53 $195,373.65 W Rita Blanca

8/8/2017 115 V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap $194,147.07 $132,823.29 yes 50686 Herring Tap Structure 118 50688 Herring Substation $194,147.07 $132,823.29 R SPS #N/A

8/8/2017 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) $525,430.76 $461,038.80 yesSouth Plains REC Wolfforth Tap Structure 42

South Plains REC Wolfforth Tap Structure 42

$0.00 $0.00 $145,319.23 W South Plains

8/8/2017 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) $525,430.76 $461,038.80 yes Doud Tap Structure 26 DOUD $145,319.23 $127,510.24 W LPL #N/A

8/8/2017 115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24) $1,148,269.26 $1,089,767.07 yes Rita Blanca REC Spurlock Tap Structure 108

Rita Blanca REC Spurlock Substation $0.00 $0.00 $0.00 W Rita Blanca

Page 14: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

5/25/2016 115 V-12 Elec Tran-Line OH-TX-115KV-Plant X Sta-Bailey Co Int

7/18/2017 115 V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap

7/18/2017 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt

7/18/2017 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt

7/18/2017 115 W-99 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Capitan Sub (W-99)

7/18/2017 115 T-98 Elec Tran-Line OH-NM-115KV-HOBBS GEN SUB-HIGG SUB (T-98)

7/18/2017 115 W-81 Elec Tran-Line OH-NM-115KV-Ponderosa Sub-Custer Mt Sw Sta (W-81)

7/18/2017 115 W-89 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89)

7/18/2017 115 W-78 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-Coburn Creek Sub (W-78)

7/18/2017 115 U-06 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-AGAVE SUB #2 (U-06)

7/20/2017 115 W-97 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (W-97)

7/20/2017 115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98)

7/20/2017 115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98)

8/8/2017 115 T-45 Elec Tran-Line OH-NM-115KV-Curry Co Int-Oasis Int

8/8/2017 115 W-58 Elec Tran-Line OH-NM-115KV-Norton Sw Sta-Lopez Int (W-58)

8/8/2017 115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int

8/8/2017 115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int

8/8/2017 115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58)

8/8/2017 115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58)

8/8/2017 115 V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta

8/8/2017 115 V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap

8/8/2017 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71)

8/8/2017 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71)

8/8/2017 115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 0.967 21.94 1 0 $0.00 $0.00 1 $31,281.78 $26,288.20 SPS 526 100 0.967 new row, Muleshoe Valley converted to 115kV ISD Dec 2015

115 4.858 4.858 1 0 $0.00 $0.00 1 $296,070.33 $138,023.11 SPS 526 100 4.858 corrected misapplication of the definition of a radial line.

115 0.017 20.365 1 1 $879.86 $715.65 0 $0.00 $0.00 SPS 526 100 0.017 corrected misapplication of the definition of a radial line.

115 0.041 20.365 1 1 $2,122.01 $1,725.99 0 $0.00 $0.00 SPS 526 100 0.041 corrected misapplication of the definition of a radial line.

115 10.49 10.49 1 0 $0.00 1 0 $0.00 $0.00 1 $663,201.56 $643,363.16 SPS new row, Price converted to 115kV ISD July 2017

115 0.087 28.057 1 0 $0.00 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS new row, Bensing Substation ISD = May 2017

115 10.747 10.747 1 0 $0.00 1 0 $0.00 $0.00 1 $413,349.97 $402,936.36 SPS new row, Ponderosa Substation ISD = May 2017

115 19.236 19.236 1 0 $0.00 1 0 $0.00 $0.00 1 $7,507,537.13 $7,426,480.92 SPS new row, Sage Brush Substation ISD = January 2017

115 11.05 11.05 1 0 $0.00 1 0 $0.00 $0.00 1 $1,535,145.02 $1,496,469.79 SPS new row, Coburn Creek Substation ISD = April 2017

115 0.383 0.383 1 0 $0.00 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS new row, transmission line to customer owned substation ISD = May 2017

115 0.000 12.992 1 1 $0.00 1 1 $0.00 $0.00 0 $0.00 $0.00 SPSexpansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98 ISD September 2016

115 0.000 16.090 1 1 $0.00 1 1 $0.00 $0.00 0 $0.00 $0.00 SPSexpansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98 ISD September 2016

115 0.088 16.090 1 1 $1,925.91 1 1 $1,925.91 $1,905.07 0 $0.00 $0.00 SPSexpansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98 ISD September 2016

115 0.000 16.270 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 0.000 18.557 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 0.019 38.367 1 1 $1,600.46 $1,181.13 0 $0.00 $0.00 SPS 526 100 0.019 corrected misapplication of the definition of a radial line.

115 2.570 38.367 1 0 $0.00 $0.00 1 $216,482.69 $159,763.69 SPS 526 100 2.570 corrected misapplication of the definition of a radial line.

115 0.007 27.174 1 0 $0.00 $0.00 1 $342.78 $328.20 SPS 526 100 0.007 corrected misapplication of the definition of a radial line.

115 0.000 27.174 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 0.016 37.860 1 1 $1,226.58 $756.53 0 $0.00 $0.00 SPS 526 100 0.016 corrected misapplication of the definition of a radial line.

115 4.489 4.489 1 0 $0.00 $0.00 1 $194,147.07 $132,823.29 SPS 526 100 4.489 corrected misapplication of the definition of a radial line.

115 0.000 6.172 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 1.707 6.172 1 1 $145,319.23 $127,510.24 0 $0.00 $0.00 SPS 526 100 1.707 corrected misapplication of the definition of a radial line.

115 0.000 29.368 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

Page 15: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

8/8/2017 115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24) $1,148,269.26 $1,089,767.07 yesRita Blanca REC River Breaks ELK Tap structure 234

Rita Blanca REC River Breaks ELK Substation $0.00 $0.00 W Rita Blanca

8/8/2017 115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) $749,918.84 $687,576.08 yes Deaf Smith REC #24

Tap Structure 332Deaf Smith REC Substation #24 $0.00 $0.00 $1,000.78 W Deaf Smith

8/8/2017 115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) $749,918.84 $687,576.08 yes Parmer County Flying

TapParmer County Substation $487.56 $447.03 R SPS

8/8/2017 115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) $749,918.84 $687,576.08 yes

Deaf Smith REC #20 Tap Structure(s) 5H47 & 5H48

Deaf Smith REC #20 Substation $513.22 $470.56 W Deaf Smith

8/8/2017 115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int $3,854,889.79 $2,417,847.29 yes Rita Blanca Exum Tap Structure 222A

Rita Blanca REC Exum Substation $0.00 $0.00 $52,946.13 W Rita Blanca

8/8/2017 115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int $3,854,889.79 $2,417,847.29 yes Hilmar Cheese Tap Structure 412

Hilmar Cheese Substation $52,946.13 $33,208.64 R SPS

8/8/2017 115 V-66 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int $1,208,505.44 $792,167.51 yes LY-Pleasant Hill Tap Structure 146

Lyntegar REC Pleasant Hill Substation $876.21 $574.35 $876.21 W SPS

8/8/2017 115 T-83 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int $388,167.12 $249,388.80 yes SP-Quaker tap structures 185A & 185B

South Plains REC Quaker Substation $1,598.54 $1,027.03 $1,598.54 W South Plains

8/8/2017 115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) $945,891.87 $905,811.89 yes BC-Kelly Tap structure 123A

Bailey County REC Kelly Substation $0.00 $0.00 $0.00 W Bailey County

8/8/2017 115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) $945,891.87 $905,811.89 yes BC-Earth Tap structure 95B

Bailey County REC Earth Substation $376.76 $360.79 $376.76 W Bailey County

8/8/2017 115 V-33 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int $1,397,724.71 $1,094,148.08 yes SP-Woodrow tap structures 52A & 52AA Woodrow Substation $1,511.56 $1,183.26 $1,511.56 W South Plains

Revisions

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta 2,287,900.24 1,315,115.87 invalid ARTESIA COUNTRY CLUB TAP

ARTESIA COUNTRY CLUB $30,691.94 $17,642.14 R SPS

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta 2,287,900.24 1,315,115.87 invalid ARTESIA COUNTRY SWITCH 4699 $2,728.17 $1,568.19 R SPS

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta 2,287,900.24 1,315,115.87 invalid ARTESIA COUNTRY CLUB TAP ARTESIA SOUTH TAP $10,912.69 $6,272.76 R SPS

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta 2,287,900.24 1,315,115.87 yes ARTESIA SOUTH TAP ARTESIA SOUTH $13,777.27 $7,919.36 R SPS

115 T-26 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Urton Sub 2,261,567.19 1,306,448.77 yes CHAVES URTON 2261567.19 1306448.77 2261567.19 R SPS #N/A

69 Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop 996,030.14 770,153.08 yes 51175 CURRY2 51163 WCLOVI2 371707.2331 287412.4577 831434.6655 R SPS #N/A

69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis Loop 996,030.14 770,153.08 yes 51159 ECLOVI2 51155 NCLOVI2 274586.2509 212316.3129 R SPS #N/A

115 V-98 Elec Tran-Line OH-NM-115KV-Maddox Sta-Buckeye Sub 498,759.32 322,672.45 yes 52358 BUCKEYT 52370 BUCKEYE3 56871.07412 36792.75371 436514.2841 R SPS #N/A

69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap 124,608.15 42,925.11 yes NAVAJO-MALAGA TAP NAVAJO-MALAGA 25562.51887 8805.795882 R SPS #N/A

69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap 124,608.15 42,925.11 yes NAVAJO-MALAGA TAP SOUTH LOVING SUB 27479.70778 9466.230574 R SPS #N/A

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub 302,476.17 174,619.89 yes PORTALES ZODIAC TAP 158750.992 91647.15609 302476.17 R SPS #N/A

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub 302,476.17 174,619.89 yes ZODIAC TAP PORTALES SOUTH 143725.178 82972.73391 R SPS #N/A

Page 16: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

8/8/2017 115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24)

8/8/2017 115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

8/8/2017 115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

8/8/2017 115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

8/8/2017 115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int

8/8/2017 115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int

8/8/2017 115 V-66 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int

8/8/2017 115 T-83 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int

8/8/2017 115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37)

8/8/2017 115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37)

8/8/2017 115 V-33 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int

Revisions

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta

69 Z-56 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta

115 T-26 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Urton Sub

69 Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop

69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis Loop

115 V-98 Elec Tran-Line OH-NM-115KV-Maddox Sta-Buckeye Sub

69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap

69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 0.000 29.368 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 0.000 29.224 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 0.019 29.224 1 0 $0.00 $0.00 1 $487.56 $447.03 SPS 526 100 0.019 corrected misapplication of the definition of a radial line.

115 0.020 29.224 1 1 $513.22 $470.56 0 $0.00 $0.00 SPS 526 100 0.020 corrected misapplication of the definition of a radial line.

115 0.000 35.603 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 corrected misapplication of the definition of a radial line.

115 0.489 35.603 1 0 $0.00 $0.00 1 $52,946.13 $33,208.64 SPS 526 100 0.489 corrected misapplication of the definition of a radial line.

115 0.017 23.447 1 1 $876.21 $574.35 0 $0.00 $0.00 SPS 526 100 0.017 corrected misapplication of the definition of a radial line.

115 0.023 5.585 1 1 $1,598.54 $1,027.03 0 $0.00 $0.00 SPS 526 100 0.023 corrected misapplication of the definition of a radial line.

115 0.000 25.106 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0 corrected misapplication of the definition of a radial line.

115 0.010 25.106 1 1 $376.76 $360.79 0 $0.00 $0.00 SPS 526 100 0.01 corrected misapplication of the definition of a radial line.

115 0.026 24.042 1 1 $1,511.56 $1,183.26 0 $0.00 $0.00 SPS 526 100 0.026 corrected misapplication of the definition of a radial line.

69 2.25 167.724 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.25 Mileage change NM7

69 0.2 167.724 0 0 $0.00 $0.00 1 $0.00 $0.00 0.2 Mileage change NM7

69 0.8 167.724 0 0 $0.00 $0.00 1 $0.00 $0.00 0.8 Mileage change NM7

69 1.01 167.724 1 0 $0.00 $0.00 1 $13,777.27 $7,919.36 1.01 Mileage change NM7

69 3.7 3.7 1 0 0 0 1 2261567.19 1306448.77 SPS 526 100 3.7 Corrected tap mileage NM5

69 8.087 21.67 1 0 0 0 1 371707.2331 287412.4577 SPS 526 100 7.873 Corrected tap mileage NM2

69 5.974 21.67 1 0 0 0 1 274586.2509 212316.3129 SPS 526 100 5.991 Corrected tap mileage NM2

115 1.1 9.647 1 0 0 0 1 56871.07412 36792.75371 SPS 526 100 1.1 Corrected mileage NM10

69 2.8 13.649 1 0 0 0 1 25562.51887 8805.795882 SPS 526 100 2.8 Added detail mileage NM8

69 3.01 13.649 1 0 0 0 1 27479.70778 9466.230574 SPS 526 100 3.01 Added detail mileage NM8

69 2.43 4.63 1 0 0 0 1 158750.992 91647.15609 SPS 526 100 2.43 No class change. Revised Mileage NM4

69 2.2 4.63 1 0 0 0 1 143725.178 82972.73391 SPS 526 100 2.2 No class change. Revised busname description NM4

Page 17: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

69 Z-44 Elec Tran-Line OH-NM- 69KV-Zodiac Sub Tap 68,194.84 40,169.99 yes ZODIAC TAP ZODIAC 68194.84 40169.99 70019.49 R SPS #N/A

69 Z-01 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #1 & Duval #4 1,824.65 1,408.57 yes 52251 POTJCT2 52257 DUVAL12 1824.65 1408.57 1824.65 R SPS #N/A

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 568,271.90 441,549.53 yes NM POTASH TAP LIVINGSTONE RIDGE 135735.9956 105467.4093 572166.4633 R SPS #N/A

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 568,271.90 441,549.53 yes KERMAC TAP NM POTASH TAP 77099.66867 59906.74968 R SPS #N/A

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 568,271.90 441,549.53 yes POTASH JUNCTION KERMAC TAP 321586.7759 249874.2059 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid ROSWELL ORCHARD PARK TAP 39366.27859 29543.55405 1904339.08 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid ORCHARD PARK TAP SWITCH 4702 3717.30676 2789.759589 1989749.596 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid ORCHARD PARK TAP

CVEC ORCHARD PARK 372511.3104 279561.8084 W CVEC #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid CVEC ORCHARD PARK DEXTER TAP 159472.46 119680.6864 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid DEXTER TAP CVEC DEXTER 73230.94317 54958.26391 W CVEC #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid CVEC DEXTER DEXTER $71,000.56 $53,284.41 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid CVEC HAGERMAN CVEC LAKE ARTHUR 334557.6084 251078.363 W CVEC #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid COTTONWOOD TAP ARTESIA SMITH TAP 216347.2534 162364.0081 R SPS #N/A

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 1,904,339.08 1,429,165.94 invalid 52145 ARTESIA SMITH TAP ARTESIA INTG $446.08 $334.77 R SPS #N/A

69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis East Sub Tap 107,040.55 54,618.70 yes CURRY2 ECLOVIS $29,154.03 $14,876.19 R SPS #N/A

69 Y-97 Elec Tran-Line OH-NM- 69KV-North Clovis Sub Tap 26,246.68 7,298.59 yes CURRY2 NCLOVIS $26,246.68 $7,298.59 R SPS #N/A

115 T-34 Elec Tran-Line OH-NM-115KV-Cannon AFB Sub Tap 90,313.11 89,103.35 yes 51162 WCLOVIS 51166 CANONAFB 90313.11 89103.35 R SPS

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52) 363,327.02 358,940.66 invalid 51829 TERRYC2 51833 LG-BRWN2 $271,693.47 $268,413.38 W Lyntegar #N/A

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52) 363,327.02 358,940.66 invalid 51833 LG-BRWN2 51835 BROWNFI2 91633.54855 90527.27869 R SPS #N/A

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51465 LAMBCO2 51483 LC-LUMS2 $1,134.06 $1,120.37 2341022.156 W Lamb County #N/A

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51483 LC-LUMS2 51485 HOBGOOD2 1728.087619 1707.224762 R SPS #N/A

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51485 HOBGOOD2 51487 PUMP/YH2 540.027381 533.5077381 R SPS PUMP/YH2

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51487 PUMP/YH2 51489 MIDAMR2 2160.109524 2134.030952 R SPS #N/A

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51489 MIDAMR2 51493 WHITHAR2 270.0136905 266.753869 R SPS WHITHAR2

Page 18: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

69 Z-44 Elec Tran-Line OH-NM- 69KV-Zodiac Sub Tap

69 Z-01 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #1 & Duval #4

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-8 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis East Sub Tap

69 Y-97 Elec Tran-Line OH-NM- 69KV-North Clovis Sub Tap

115 T-34 Elec Tran-Line OH-NM-115KV-Cannon AFB Sub Tap

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52)

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 0.256 0.256 1 0 0 0 1 68194.84 40169.99 SPS 526 100 0.256 No class change. Revised busname description NM4

69 2.6 2.6 1 0 0 0 1 1824.65 1408.57 SPS 526 100 2.6 No class change. Corrected circuit id.

69 4.014 16.805 1 0 0 0 1 135735.9956 105467.4093 SPS 526 100 4.014 No class change. Revised mileage and description.NM11

69 2.28 16.805 1 0 0 0 1 77099.66867 59906.74968 SPS 526 100 2.28 No class change. Revised description.NM11

69 9.51 16.805 1 0 0 0 1 321586.7759 249874.2059 SPS 526 100 9.51 No class change. Revised description.NM11

69 1.059 51.229 0 0 0 0 1 0 0 SPS 526 100 1.059 Mileage change

69 0.1 51.229 0 0 0 0 1 0 0 SPS 526 100 0.1 Mileage change

69 10.021 51.229 0 1 0 0 0 0 0 SPS 526 100 10.021 Mileage change

69 4.29 51.229 0 0 0 0 1 0 0 SPS 526 100 4.29 Revised busname

69 1.97 51.229 0 1 0 0 0 0 0 SPS 526 100 1.97 Revised busname

69 1.91 51.229 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.91 Revised busname

69 9 51.229 0 1 0 0 0 0 0 SPS 526 100 9 Mileage change

69 5.82 51.229 0 0 0 0 1 0 0 SPS 526 100 5.82 Revised busname

69 0.012 51.229 0 0 $0.00 $0.00 1 0 0 SPS 526 100 0.012 Revised busname

69 1.501 5.511 1 0 0 0 1 29154.03113 14876.18739 SPS 526 100 1.501 NM2 Added tap mileage detail

69 5.09 5.09 1 0 0 0 1 26246.68 7298.59 SPS 526 100 5.09 NM2 N. Clovis converted to 115kV. Keep 69kV asset location until CAA ocnverts

2.176 2.176 1 0 0 0 1 90313.11 89103.35 SPS 526 100 2.176 New asset location. No class change. NM2

69 5.93 7.93 0 1 0 0 0 0 0 SPS 526 100 5.93 New asset location. No class change. TS11,14

69 2 7.93 0 0 0 0 1 0 0 SPS 526 100 2 New asset location. No class change. TS11,14

69 2.1 33.6 0 1 0 0 0 $0.00 $0.00 SPS 526 100 2.1 New asset location. No class change. TXS5,8

69 3.2 33.6 0 0 0 0 1 0 0 SPS 526 100 3.2 New asset location. No class change. TXS5,8

69 1 33.6 0 0 0 0 1 0 0 SPS 526 100 1 New asset location. No class change. TXS5,8

69 4 33.6 0 0 0 0 1 0 0 SPS 526 100 4 New asset location. No class change. TXS5,8

69 0.5 33.6 0 0 0 0 1 0 0 SPS 526 100 0.5 New asset location. No class change. TXS5,8

Page 19: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51585 LC-HODG2 51587 ELWOOD2 2553.249457 2522.424586 R SPS ELWOOD2

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51593 LC-WHIT2 51591 LC-HDT2 810.0410714 800.2616071 W Lamb County #N/A

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51595 LC-LEVL2 51593 LC-WHIT2 2646.134167 2614.187917 W Lamb County #N/A

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 18,144.92 17,925.86 invalid 51597 HOCKLEY2 51595 LC-LEVL2 918.0465476 906.9631548 W Lamb County #N/A

69 Y-93 Elec Tran-Line OH-TX- 69KV-East Plant Intg-Van Buren Sub (Y-93) 5,222.89 5,159.84 yes 50955 EASTPL2 50953 VNBRN22 5222.89 5159.84 R SPS #N/A

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77) 424,688.45 419,579.37 invalid LEGACY BOARDMAN 236348.3548 233505.0407 R SPS #N/A

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77) 424,688.45 419,579.37 invalid BOARDMAN FLANN-LYN(FLOREY) 188340.0952 186074.3293 R SPS #N/A

69 Y-60 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Bowers Sub (Y-60) 62,389.33 61,636.12 yes 50819 BOWERS2 MCCULL 14221.09728 14049.40971 R SPS #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 invalid 50823 GB-KELR2 50831 MAGICC2 2872.849789 2838.166318 R SPS #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51563 CROSBY2 51557 SP-ACUF2 2141.355078 2115.504623 W South Plains #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid NO6888 51621 SW67462 932.7248562 921.4649945 R SPS #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51621 SW67462 51623 SP-HETL2 693.8814052 685.5048635 W South Plains #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51623 SP-HETL2 51627 SP-IDAL2 1159.214336 1145.220291 W South Plains #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51627 SP-IDAL2 51629 VICKER2 275.9053659 272.5746341 R SPS #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51557 SP-ACUF2 NO6754 226.4894794 223.7552967 W South Plains #N/A

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51531 TUCO2 51551 SP-NDE2 2187.009867 2160.608267 5656.06 W South Plains SP-NDE2

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51551 SP-NDE2 51553 WHTE&MN2 1206.626133 1192.059733 R SPS WHTE&MN2

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51553 WHTE&MN2 51555 SP-SHLW2 904.9696 894.0448 W South Plains SP-SHLW2

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 5,656.06 5,587.78 invalid 51555 SP-SHLW2 51611 SW67872 1357.4544 1341.0672 R SPS SW67872

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 684,201.10 509,228.53 yes 51105 HEREFD2 51115 DS-#42 92926.00849 69161.79279 W Deaf Smith #N/A

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 684,201.10 509,228.53 yes 51115 DS-#42 51117 DS-#82 241676.8938 179872.2179 W Deaf Smith #N/A

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 684,201.10 509,228.53 invalid 51117 DS-#82 NO3736 141192.1155 105084.6797 R SPS #N/A

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 684,201.10 509,228.53 invalid 51135 DS-#32 51133 DIM CS 2 17582.7988 13086.30282 R SPS #N/A

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 684,201.10 509,228.53 invalid 51149 CASTRC2 51135 DS-#32 171141.9582 127375.3693 W Deaf Smith #N/A

Page 20: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-93 Elec Tran-Line OH-TX- 69KV-East Plant Intg-Van Buren Sub (Y-93)

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77)

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77)

69 Y-60 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Bowers Sub (Y-60)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 4.728 33.6 0 0 0 0 1 0 0 SPS 526 100 4.728 New asset location. No class change. TXS5,8

69 1.5 33.6 0 1 0 0 0 0 0 SPS 526 100 1.5 New asset location. No class change. TXS5,8

69 4.9 33.6 0 1 0 0 0 0 0 SPS 526 100 4.9 New asset location. No class change. TXS5,8

69 1.7 33.6 0 1 0 0 0 0 0 SPS 526 100 1.7 New asset location. No class change. TXS5,8

69 2.08 2.08 1 0 0 0 1 5222.89 5159.84 SPS 526 100 2.08 New asset location. No class change.

69 6.4 11.5 0 0 0 0 1 0 0 SPS 526 100 5 Configuration change. No class change. TXS16

69 5.1 11.5 0 0 0 0 1 0 0 SPS 526 100 5 Configuration change. No class change. TXS16

69 3.1 13.6 1 0 0 0 1 14221.09728 14049.40971 SPS 526 100 3.1 New asset locaiton. Noclass change TXN15

69 6.05 76.985 0 0 0 0 1 0 0 SPS 526 100 6.05

69 10.4 27.47 0 1 0 0 0 0 0 SPS 526 100 10.4 Added new asset location. One class chang to invalid due to a NO move TXS6,9

69 4.53 27.47 0 0 0 0 1 0 0 SPS 526 100 4.53 Added new asset location. No class change TXS6,9

69 3.37 27.47 0 1 0 0 0 0 0 SPS 526 100 3.37 Added new asset location. No class change TXS6,9

69 5.63 27.47 0 1 0 0 0 0 0 SPS 526 100 5.63 Added new asset location. No class change TXS6,9

69 1.34 27.47 0 0 0 0 1 0 0 SPS 526 100 1.34 Added new asset location. No class change TXS6,9

69 1.1 27.47 0 1 0 0 0 0 0 SPS 526 100 1.1 Added new asset location. No class change TXS6,9

69 7.25 18.75 0 1 0 0 0 0 0 SPS 526 100 7.25 Added new asset location. No class change TXS6,9

69 4 18.75 0 0 0 0 1 0 0 SPS 526 100 4 Added new asset location. No class change TXS6,9

69 3 18.75 0 1 0 0 0 0 0 SPS 526 100 3 Added new asset location. No class change TXS6,9

69 4.5 18.75 0 0 0 0 1 0 0 SPS 526 100 4.5 Added new asset location. No class change TXS6,9

69 4.561 33.582 1 1 92926.00849 69161.79279 0 0 0 SPS 526 100 4.561 No classificaion change. New asset location for Z51. TXN1,10

69 11.862 33.582 1 1 241676.8938 179872.2179 0 0 0 SPS 526 100 11.862 No classificaion change. New asset location for Z51. TXN1,10

69 6.93 33.582 0 0 0 0 1 0 0 SPS 526 100 6.93 No classificaion change. New asset location for Z51. TXN1,10

69 0.863 33.582 0 0 0 0 1 0 0 SPS 526 100 0.863 No classificaion change. New asset location for Z51. TXN1,10

69 8.4 33.582 0 1 0 0 0 0 0 SPS 526 100 7.08 No classificaion change. New asset location for Z51. TXN1,10

Page 21: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

115 W-1 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub 125,514.80 114,965.24 yes MARTIN CARSON 125514.8 114965.24 125514.8 R SPS #N/A

115 T-93 Elec Tran-Line OH-TX-115KV-T93-Martin Sub to Hutchinson County Sub 4,742,230.52 4,345,548.26 yes MARTIN HUTCHINSON CTY 4742230.52 4345548.26 4742230.52 R SPS #N/A

115 T-54 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int 3,612,343.97 3,546,925.84 yes PALOT PALO 1542.953723 1515.011438 1542.953723 R SPS #N/A

69 T-92 Elec Tran-Line OH-TX- 69KV-Am-Frac Sub Tap 166,850.62 129,234.16 yes 52017 HIGG 52021 M-AMR&A2 $166,850.62 $129,234.16 R SPS M-AMR&A2

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid 52153 Atoka 52171 Artesia South Tap structure 60 $0.00 $0.00 $0.00 R SPS #N/A

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid 52171 Artesia South Tap structure 60 52173 Artesia South

Substation $0.00 $0.00 R SPS Artesia Country Club substation

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid 52177 Artesia South Tap structure 60 52175 Artesia Country Club

Tap structure 45 $0.00 $0.00 R SPS #N/A

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid 52175 Artesia Country Club Tap structure 45 52173 Artesia Country Club

substation $0.00 $0.00 R SPS

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid Artesia Country Club Substation

Switch 4699 (feeds CV-West Artesia) $0.00 $0.00 W CVEC

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid Artesia Country Club Tap structure 45 Artesia 13th Street $0.00 $0.00 R SPS

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid Artesia 13th Street Artesia REC Tap structure 302 $0.00 $0.00 R SPS

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid Artesia REC Tap structure 302 CV-Artesia $0.00 $0.00 W CVEC

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) $0.00 $0.00 invalid 52179 Artesia REC Tap structure 302 52177 Artesia Interchnage $0.00 $0.00 R SPS #N/A

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes Carlsbad Interchange Loving S./Crlsbd Water tap (Structure 103) $534,633.97 $392,093.53 $6,921,722.77 R SPS

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes Loving S./Crlsbd Water tap (Structure 103)

Carlsbad Waterfield tap (Structure 127) $165,976.77 $121,725.19 R SPS

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap $4,866,142.49 $4,727,335.70 yes Loving S./Crlsbd Water tap (Structure 103)

Loving South/Navajo-Malaga Tap Struc 52A $2,398,921.40 $2,330,492.13 R SPS

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes 52319 Carlsbad Waterfield tap (Structure 127) 52323 White City $1,263,082.28 $926,327.97 R SPS White City

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap $4,866,142.49 $4,727,335.70 yes 52309 Loving South/Navajo-Malaga Tap Struc 52A 52327 Loving South Substation $1,269,446.81 $1,233,235.82 R SPS Loving South

Substation

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap $4,866,142.49 $4,727,335.70 yes Loving South/Navajo-Malaga Tap Struc 52A

Navajo-Malaga Substation $1,197,774.29 $1,163,607.76 R SPS

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Waterfield Sub Tap $91,887.26 $33,452.61 yes 52319 Carlsbad Waterfield tap (Structure 127) 52321 Carlsbad Waterfield $91,887.26 $33,452.61 R SPS Carlsbad Waterfield

4/1/2016 69 Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop $859,217.69 $567,256.75 yes 51175 Curry County 51163 West Clovis $373,758.73 $246,756.05 $373,758.73 R SPS #N/A

4/1/2016 69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis Loop $859,217.69 $567,256.75 invalid 51159 Curry County 51155 Switch 4626 $481,136.93 $317,647.29 $481,136.93 R SPS #N/A

4/1/2016 69 Z-50 Elec Tran-Line OH-NM- 69KV-Curry Co Int-TX St Line $157,248.93 $105,096.42 yes 51175 CURRY2 51183 TX/NM State Line $157,248.93 $105,096.42 $157,248.93 R SPS Farwell

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yes 52251 Potash Junction 52269 Mississippi Chem #2 Tap (Structure 17) $37,409.66 $26,816.88 $2,719,778.88 R SPS #N/A

Page 22: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

115 W-1 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub

115 T-93 Elec Tran-Line OH-TX-115KV-T93-Martin Sub to Hutchinson County Sub

115 T-54 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int

69 T-92 Elec Tran-Line OH-TX- 69KV-Am-Frac Sub Tap

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap

4/1/2016 69 Z-5 Elec Tran-Line OH-NM- 69KV-Carlsbad Waterfield Sub Tap

4/1/2016 69 Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop

4/1/2016 69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis Loop

4/1/2016 69 Z-50 Elec Tran-Line OH-NM- 69KV-Curry Co Int-TX St Line

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 1.223 1.223 1 0 0 0 1 125514.8 114965.24 SPS 526 100 1.223 Added new asset location. No class change.

115 5.231 5.231 1 0 0 0 1 4742230.52 4345548.26 SPS 526 100 5.231 Added new asset location. No class change.

115 0.016 37.459 1 0 0 0 1 1542.953723 1515.011438 SPS 526 100 0.016 Line was rebuiult in 2012 with a revised total mileage.

69 8.848 8.848 1 0 $0.00 $0.00 1 $166,850.62 $129,234.16 SPS 526 100 8.848 No class change. Revised busname and circuit id. Mid America-AmFrac 69 to 115kV conversion

69 4.047 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.047 clarified "To/From" description and corrected segment mileage

69 1.009 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.009 clarified "To/From" description and corrected segment mileage

69 0.800 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.800 clarified "To/From" description and corrected segment mileage

69 2.251 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.251 clarified "To/From" description and corrected segment mileage

69 0.011 11.581 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.011 clarified "To/From" description and corrected segment mileage

69 1.560 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.560 clarified "To/From" description and corrected segment mileage

69 1.190 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.19 clarified "To/From" description and corrected segment mileage

69 0.262 11.581 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.262 clarified "To/From" description and corrected segment mileage

69 0.451 11.581 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.451 clarified "To/From" description and corrected segment mileage

69 5.608 20.598 1 0 $0.00 $0.00 1 $534,633.97 $392,093.53 SPS 526 100 5.608 corrected total mileage to match asset location codes

69 1.741 20.598 1 0 $0.00 $0.00 1 $165,976.77 $121,725.19 SPS 526 100 1.741 corrected total mileage to match asset location codes

69 5.690 11.542 1 0 $0.00 $0.00 1 $2,398,921.40 $2,330,492.13 SPS 526 100 5.690 corrected total mileage to match asset location codes

69 13.249 20.598 1 0 $0.00 $0.00 1 $1,263,082.28 $926,327.97 SPS 526 100 13.249 corrected total mileage to match asset location codes

69 3.011 11.542 1 0 $0.00 $0.00 1 $1,269,446.81 $1,233,235.82 SPS 526 100 3.011 corrected total mileage to match asset location codes

69 2.841 11.542 1 0 $0.00 $0.00 1 $1,197,774.29 $1,163,607.76 SPS 526 100 2.841 corrected total mileage to match asset location codes

69 6.328 6.328 1 0 $0.00 $0.00 1 $91,887.26 $33,452.61 SPS 526 100 6.328 corrected total mileage to match asset location codes

69 7.783 17.892 1 0 $0.00 $0.00 1 $373,758.73 $246,756.05 SPS 526 100 7.783 corrected total mileage to match asset location codes

69 10.019 17.892 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 10.019 corrected total mileage to match asset location codes

69 8.147 8.147 1 0 $0.00 $0.00 1 $157,248.93 $105,096.42 SPS 526 100 8.147 corrected total mileage to match asset location codes

69 1.940 13.694 1 0 $0.00 $0.00 1 $37,409.66 $26,816.88 SPS 526 100 1.940 corrected total mileage to match asset location codes

Page 23: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Mississippi Chem #2 Sub Tap $276,781.04 $268,747.13 yes Mississippi Chem #2 Tap (Structure 17)

Mississippi Chem #2 Substation $276,781.04 $268,747.13 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $6,486,888.95 $6,127,987.44 yes Mississippi Chem #2 Tap (Structure 17)

IMC #2 Tap (Structure 55) $1,321,631.38 $1,248,509.20 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #2 Sub Tap $563,423.39 $563,423.39 yes IMC #2 Tap (Structure 55) 52275 IMC #2 Substation $563,423.39 $563,423.39 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yes 52271 IMC #2 Tap (Structure 55) 52275

United Salt Flying Tap (Structures 60-61 & 60A)

$32,473.12 $23,278.16 R SPS #N/A

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yesUnited Salt Flying Tap (Structures 60-61 & 60A)

United Salt Substation $5,399.33 $3,870.48 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yesUnited Salt Flying Tap (Structures 60-61 & 60A)

IMC #3/Strata/Duval/Borehole Tap (Structure 98)

$79,061.64 $56,674.86 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yesIMC #3/Strata/Duval/Borehole Tap (Structure 98)

IMC #3/Strata Tap (Structure 8A) $16,776.50 $12,026.13 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap $60,910.57 $24,123.99 yes 52269 IMC #3/Strata Tap (Structure 8A) Strata $1,859.38 $736.42 R SPS #N/A

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap $60,910.57 $24,123.99 yes 52275 IMC #3/Strata Tap (Structure 8A) IMC #3 $1,410.56 $558.66 R SPS #N/A

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yes 52279IMC #3/Strata/Duval/Borehole Tap (Structure 98)

52277Duval #3/IMC #4/Borehole Tap (Structure 122A)

$539.93 $387.05 R SPSDuval #3/IMC

#4/Borehole Tap (Structure 122A)

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole $379,643.21 $231,863.01 yes 52277Duval #3/IMC #4/Borehole Tap (Structure 122A)

52278 Borehole Substation $98,947.47 $60,431.10 R SPS Borehole Substation

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole $379,643.21 $231,863.01 yesDuval #3/IMC #4/Borehole Tap (Structure 122A)

Duval #3/IMC corner structure 123 $2,559.83 $1,563.39 R SPS #N/A

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap $264,065.89 $189,294.02 yes Duval #3/IMC corner structure 123 Duval #3 Substation $809.90 $580.57 R SPS

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole $379,643.21 $231,863.01 yes Duval #3/IMC corner structure 123 IMC #4 Substation $280,695.74 $171,431.91 R SPS

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub $344,980.25 $202,108.90 yes PORTALES ZODIAC TAP $117,725.10 $68,970.01 $244,170.58 R SPS #N/A

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub $344,980.25 $202,108.90 yes Portales South Tap (Structure 75) PORTALES SOUTH $525.32 $307.76 R SPS #N/A

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub $344,980.25 $202,108.90 yes Zodiac Tap (Structure 31)

Portales South Tap (Structure 75) $125,920.16 $73,771.13 R SPS

4/1/2016 69 Z-03 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2 $695,780.98 $372,170.56 yes 52239 PCA Substation 52245 Central Valley REC Lusk Substation $530,915.29 $283,984.55 $530,915.29 W CVEC Central Valley REC

Lusk Substation

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid 52141 Roswell Interchange 52143 Orchard Park Tap structure 68 $474,158.37 $313,635.15 $1,941,438.86 W CVEC Orchard Park Tap

structure 68

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid Orchard Park Tap structure 68

CVEC ORCHARD PARK $1,027.06 $679.35 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid Orchard Park Tap structure 68 Dexter Tap structure 27 $183,586.59 $121,434.55 R SPS #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid Dexter Tap structure 27 YO REC Tap structure 123 $107,584.31 $71,162.34 R SPS #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid Dexter Tap structure 27 CVEC Dexter $84,304.33 $55,763.65 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid CVEC Dexter Dexter Substation $81,736.69 $54,065.26 R SPS #N/A

Page 24: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Mississippi Chem #2 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #2 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

4/1/2016 69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

4/1/2016 69 Z-03 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 1.160 1.160 1 0 $0.00 $0.00 1 $276,781.04 $268,747.13 SPS 526 100 1.160 corrected total mileage to match asset location codes

69 2.790 13.694 1 0 $0.00 $0.00 1 $1,321,631.38 $1,248,509.20 SPS 526 100 2.790 corrected total mileage to match asset location codes

69 0.893 0.893 1 0 $0.00 $0.00 1 $563,423.39 $563,423.39 SPS 526 100 0.893 corrected total mileage to match asset location codes

69 1.684 13.694 1 0 $0.00 $0.00 1 $32,473.12 $23,278.16 SPS 526 100 1.684 corrected total mileage to match asset location codes

69 0.280 13.694 1 0 $0.00 $0.00 1 $5,399.33 $3,870.48 SPS 526 100 0.280 corrected total mileage to match asset location codes

69 4.100 13.694 1 0 $0.00 $0.00 1 $79,061.64 $56,674.86 SPS 526 100 4.100 corrected total mileage to match asset location codes

69 0.870 13.694 1 0 $0.00 $0.00 1 $16,776.50 $12,026.13 SPS 526 100 0.870 corrected total mileage to match asset location codes

69 0.029 0.950 1 0 $0.00 $0.00 1 $1,859.38 $736.42 SPS 526 100 0.029 corrected total mileage to match asset location codes

69 0.022 0.950 1 0 $0.00 $0.00 1 $1,410.56 $558.66 SPS 526 100 0.022 corrected total mileage to match asset location codes

69 0.028 13.694 1 0 $0.00 $0.00 1 $539.93 $387.05 SPS 526 100 0.028 corrected total mileage to match asset location codes

69 1.005 3.856 1 0 $0.00 $0.00 1 $98,947.47 $60,431.10 SPS 526 100 1.005 corrected total mileage to match asset location codes

69 0.026 3.856 1 0 $0.00 $0.00 1 $2,559.83 $1,563.39 SPS 526 100 0.026 added new row; provides more clarity to actual line description

69 0.042 13.694 1 0 $0.00 $0.00 1 $809.90 $580.57 SPS 526 100 0.042 corrected total mileage to match asset location codes

69 2.851 3.856 1 0 $0.00 $0.00 1 $280,695.74 $171,431.91 SPS 526 100 2.851 added new row; provides more clarity to actual line description

69 2.241 6.567 1 0 $0.00 $0.00 1 $117,725.10 $68,970.01 SPS 526 100 2.241 corrected total mileage to match asset location codes

69 0.010 6.567 1 0 $0.00 $0.00 1 $525.32 $307.76 SPS 526 100 0.010 corrected total mileage to match asset location codes

69 2.397 6.567 1 0 $0.00 $0.00 1 $125,920.16 $73,771.13 SPS 526 100 2.397 corrected total mileage to match asset location codes

69 11.11 14.56 1 1 $530,915.29 $283,984.55 0 $0.00 $0.00 SPS 526 100 11.11 corrected total mileage to match asset location codes

69 11.080 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 11.080 clarified "To/From" description and corrected total mileage to match asset location codes

69 0.024 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.024 clarified "To/From" description and corrected total mileage to match asset location codes

69 4.290 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.290 clarified "To/From" description and corrected total mileage to match asset location codes

69 2.514 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.514 clarified "To/From" description and corrected total mileage to match asset location codes

69 1.970 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.970 clarified "To/From" description and corrected total mileage to match asset location codes

69 1.910 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.910 clarified "To/From" description and corrected total mileage to match asset location codes

Page 25: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid YO REC Tap structure 123

Switch 4743 (to CVEC Y-O) $3,166.76 $2,094.68 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid YO REC Tap structure 123

HAGERMAN TAP (Structure 135) $63,891.56 $42,261.49 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid HAGERMAN TAP (Structure 135) CVEC Hagerman $299.56 $198.14 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid HAGERMAN TAP (Structure 135)

LAKE ARTHUR TAP (Structure 208) $385,146.69 $254,757.79 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid LAKE ARTHUR TAP (Structure 208) CVEC LAKE ARTHUR $470.73 $311.37 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid LAKE ARTHUR TAP (Structure 208)

COTTONWOOD TAP (Structure 252) $234,083.60 $154,836.12 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid COTTONWOOD TAP (Structure 252)

Switch 4788 (to CVEC Cottonwood) $2,824.41 $1,868.22 W CVEC #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid COTTONWOOD TAP (Structure 252) Cottonwood Substation $65,089.79 $43,054.07 R SPS #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid 52147 COTTONWOOD TAP (Structure 252) 52149 Artesia Smith Tap

structure 309 $249,061.52 $164,743.37 R SPS #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid 52145 Artesia Smith Tap structure 309

Artesia Smith Substation $213.97 $141.53 R SPS #N/A

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid Artesia Smith Tap structure 309 Artesia Interchange $513.53 $339.68 R SPS

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int $1,930,098.43 $1,276,676.22 invalid Orchard Park Tap structure 68 Switch 4702 $4,279.41 $2,830.64 R SPS

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 invalid 52071 Chaves County Interchange 52079 Price Substation $516,768.04 $451,864.02 $2,294,231.49 R SPS

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 invalid 52079 Price Substation 52081 CVEC Pinelodge $336,920.55 $294,604.67 W CVEC CVEC Pinelodge

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 invalid 52085 CVEC Pinelodge RIAC/Price Tap Structure 8 $1,305,420.40 $1,141,464.77 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes Roswell Interchange RIAC/Price Tap Structure 8 $65,740.60 $57,483.84 R SPS

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub $59,385.14 $25,004.73 yes 52085 RIAC/Price Tap

Structure 8 52093 RIAC East/West Tap Structure 5 $17,688.70 $7,448.01 R SPS RIAC East/West Tap

Structure 5

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub $59,385.14 $25,004.73 yes RIAC East/West Tap

Structure 5 TMC Tap Structure 11 $23,146.59 $9,746.11 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub $59,385.14 $25,004.73 yes TMC TAP (Structure

11 Z09.3) WEST RIAC $4,864.39 $2,048.20 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Walker AFB East Sub Tap $14,756.43 $2,840.88 yes TMC TAP (Structure 11 Z09.3) TMC $520.05 $100.12 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub $59,385.14 $25,004.73 yes RIAC East/West Tap

Structure 5RIAC East/Wherry Housing Tap Struc 4 $1,012.45 $426.30 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub $59,385.14 $25,004.73 yes RIAC East/Wherry

Housing Tap Struc 4Wherry Housing Tap (Structure 11 Z09.4) $7,750.44 $3,263.40 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub $59,385.14 $25,004.73 yes Wherry Housing Tap

(Structure 11 Z09.4) WHERRY HOUSING $162.92 $68.60 R SPS #N/A

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Walker AFB East Sub Tap $14,756.43 $2,840.88 yes Wherry Housing Tap (Structure 11 Z09.4) EAST RIAC $14,236.38 $2,740.77 R SPS #N/A

Page 26: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Walker AFB East Sub Tap

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub

4/1/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Walker AFB East Sub Tap

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 0.074 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.074 clarified "To/From" description and corrected total mileage to match asset location codes

69 1.493 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.493 clarified "To/From" description and corrected total mileage to match asset location codes

69 0.007 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.007 clarified "To/From" description and corrected total mileage to match asset location codes

69 9.000 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 9.000 clarified "To/From" description and corrected total mileage to match asset location codes

69 0.011 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.011 clarified "To/From" description and corrected total mileage to match asset location codes

69 5.470 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 5.470 clarified "To/From" description and corrected total mileage to match asset location codes

69 0.066 45.102 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.066 clarified "To/From" description and corrected total mileage to match asset location codes

69 1.521 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.521 clarified "To/From" description and corrected total mileage to match asset location codes

69 5.820 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 5.820 clarified "To/From" description and corrected total mileage to match asset location codes

69 0.005 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.005 clarified "To/From" description and corrected total mileage to match asset location codes

69 0.012 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.012clarified "To/From" description and corrected total mileage to match asset location codes; new row, provides more detailed description of line

69 0.100 45.102 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.100clarified "To/From" description and corrected total mileage to match asset location codes; new row, provides more detailed description of line

69 4.402 18.952 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.402inserted new row; provides more detailed description of entire line; corrected total mileage to match asset location codes

69 2.870 18.952 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 2.870 corrected total mileage to match asset location codes

69 11.120 18.952 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 11.120 corrected total mileage to match asset location codes

69 0.560 18.952 1 0 $0.00 $0.00 1 $65,740.60 $57,483.84 SPS 526 100 0.560 corrected total mileage to match asset location codes

69 1.520 5.103 1 0 $0.00 $0.00 1 $17,688.70 $7,448.01 SPS 526 100 1.520 corrected total mileage to match asset location codes

69 1.989 5.103 1 0 $0.00 $0.00 1 $23,146.59 $9,746.11 SPS 526 100 1.989 corrected total mileage to match asset location codes

69 0.418 5.103 1 0 $0.00 $0.00 1 $4,864.39 $2,048.20 SPS 526 100 0.418 corrected total mileage to match asset location codes

69 0.016 0.454 1 0 $0.00 $0.00 1 $520.05 $100.12 SPS 526 100 0.016 corrected total mileage to match asset location codes

69 0.087 5.103 1 0 $0.00 $0.00 1 $1,012.45 $426.30 SPS 526 100 0.087 corrected total mileage to match asset location codes

69 0.666 5.103 1 0 $0.00 $0.00 1 $7,750.44 $3,263.40 SPS 526 100 0.666 corrected total mileage to match asset location codes

69 0.014 5.103 1 0 $0.00 $0.00 1 $162.92 $68.60 SPS 526 100 0.014 corrected total mileage to match asset location codes

69 0.438 0.454 1 0 $0.00 $0.00 1 $14,236.38 $2,740.77 SPS 526 100 0.438 corrected total mileage to match asset location codes

Page 27: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

5/26/2016 115 T-13 ETRAN-OH-NM-115KV-HOBBS WEST SW STA-TAYLOR SW STA (T-13) $0.00 $0.00 yes flying tap structures

128 & 130 Hobbs South Hobbs South Substation $0.00 $0.00 $0.00 R SPS

5/26/2016 115 T-13 ETRAN-OH-NM-115KV-HOBBS WEST SW STA-TAYLOR SW STA (T-13) $0.00 $0.00 yes flying tap structures

232 & 121 East Sanger East Sanger Substation $0.00 $0.00 R SPS

5/26/2016 115 T-14 ETRAN-OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) $0.00 $0.00 yes Oxy Permian Tap (Structure 63)

Oxy Permian Substation $0.00 $0.00 $0.00 R SPS

5/26/2016 115 T-14 ETRAN-OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) $0.00 $0.00 yes West Bender Flying Tap West Bender Substation $0.00 $0.00 R SPS

5/26/2016 115 T-14 ETRAN-OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) $0.00 $0.00 yes 52394 West Bender Substation 52396 North Hobbs Substation $0.00 $0.00 R SPS #N/A

4/1/2016 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub $994,919.40 $723,852.47 invalid 51959 Denver City Substation 52027 KCM Tap Structure 40A $721,452.18 $524,891.71 $2,367,948.19 R SPS MIDAT2

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid Denver City Substation JayBee Tap Structure

51 $275,762.63 $258,746.18 R SPS

5/27/2016 69 Y-96 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid JayBee Tap Structure

51LY-Seagraves Tap Structure 67 $92,841.93 $87,112.94 W Lyntegar

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid 51978 LY-Seagraves Tap

Structure 683-WAY Switch Tap Structure 90 $132,329.89 $124,164.22 R SPS

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid 3-WAY Switch Tap

Structure 90Kinney Tap Structure 68 $300,731.48 $282,174.28 R SPS

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid 51904 Kinney Tap Structure

69Tokio Tap Structure 174 $454,965.64 $426,891.12 R SPS

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid 51901 3-WAY Switch Tap

Structure 90 51899 Seagraves Tap structure 132 $235,320.13 $220,799.25 R SPS #N/A

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid 51981 Seagraves Tap

Structure 132 51987 Moss Substation $502.39 $471.39 R SPS #N/A

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) $1,526,465.99 $1,432,272.52 invalid 51982 Seagraves Tap

Structure 133 51988 Seagraves Substation $954.54 $895.64 R SPS #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51465 Lamb County 51483 Lamb County REC

Lums Chapel $13,811.80 $12,600.53 $136,592.13 W Lamb County #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51483 Lamb County REC

Lums Chapel 51485 Hobgood Tap Structure 144 $21,506.95 $19,620.83 R SPS

Lamb County REC Hodge Tap structure

71

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51485 Hobgood Tap Structure

144 51487 Hobgood $473.55 $432.02 R SPS Switch 6776

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51487 Hobgood Tap Structure

144 51489 Yellowhouse Tap Structure 132 $7,287.37 $6,648.28 R SPS LC-Whitharral Tap

Structure 70

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51489 Yellowhouse Tap

Structure 132 51493 Yellowhouse $45,296.13 $41,323.74 R SPS Mid-America #2

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51585 Yellowhouse 51587 Phillips Pump #2 $27,051.40 $24,679.04 R SPS Whitharral

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51593 Yellowhouse Tap

Structure 132 51591 Mid-America #2 Tap Structure 106A $15,863.84 $14,472.61 R SPS Elwood

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51595 Mid-America #2 Tap

Structure 106A 51493 Mid-America #2 $184.16 $168.01 R SPS #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51597 Mid-America #2 Tap

Structure 106A 51595 Whitharral Tap Structure 96 $5,116.94 $4,668.20 R SPS #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51465 Whitharral Tap

Structure 96 51587 Whitharral $1,354.87 $1,236.05 $90,316.02 R SPS LC-Levelland #2 Tap Structure 14

Page 28: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

5/26/2016 115 T-13 ETRAN-OH-NM-115KV-HOBBS WEST SW STA-TAYLOR SW STA (T-13)

5/26/2016 115 T-13 ETRAN-OH-NM-115KV-HOBBS WEST SW STA-TAYLOR SW STA (T-13)

5/26/2016 115 T-14 ETRAN-OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

5/26/2016 115 T-14 ETRAN-OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

5/26/2016 115 T-14 ETRAN-OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

4/1/2016 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-96 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/27/2016 69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 0.012 13.529 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.012 asset location changed November 2015

115 0.025 13.529 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.025 asset location changed November 2015

115 0.028 16.280 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.028 asset location changed November 2015

115 0.017 16.280 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.017 asset location changed November 2015

115 2.730 16.280 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.730 asset location changed November 2015

69 17.156 23.659 0 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 17.156 corrected tap mileage

69 5.489 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 5.489 added new row; provides more clarity to actual line description

69 1.848 30.384 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.848 added new row; provides more clarity to actual line description

69 2.634 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.634 added new row; provides more clarity to actual line description

69 5.986 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 5.986 added new row; provides more clarity to actual line description

69 9.056 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 9.056 added new row; provides more clarity to actual line description

69 4.684 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.684 added new row; provides more clarity to actual line description

69 0.010 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.010 added new row; provides more clarity to actual line description

69 0.019 30.384 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.019 added new row; provides more clarity to actual line description

69 2.100 34.516 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 2.100 clarified "To/From" description and corrected segment mileage

69 3.270 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 3.270 new row; provides more detail of line

69 0.072 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.072 corrected segment mileage

69 1.108 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.108 new row; provides more detail of line

69 6.887 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 6.887 clarified "To/From" description and corrected segment mileage

69 4.113 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.113 clarified "To/From" description and corrected segment mileage

69 2.412 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.412 new row; provides more detail of line

69 0.028 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.028 corrected segment mileage

69 0.778 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.778 new row; provides more detail of line

69 0.206 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.206 corrected segment mileage

Page 29: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51483 Whitharral Tap

Structure 96 51485 Lamb County REC Hodge Tap structure 71 $14,337.96 $13,080.55 W Lamb County #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51485 Lamb County REC

Hodge Tap structure 71 51487 Switch 6776 $361.74 $330.01 W Lamb County #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51487 Lamb County REC

Hodge Tap structure 71 51489 LC-Whitharral Tap Structure 70 $440.66 $402.02 W Lamb County #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51585 LC-Whitharral Tap

Structure 70 51587 LC-Levelland #2 Tap Structure 14 $35,509.48 $32,395.36 W Lamb County #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51595 LC-Levelland #2 Tap

Structure 14 51593 Hockley County Substation $7,215.02 $6,582.28 W Lamb County #N/A

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) $227,013.39 $207,104.72 invalid 51597 Ellwood Tap Structure

59 51591 Elwood $31,096.28 $28,369.19 R SPS #REF!

5/27/2016 69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek #N/A #N/A yes GRAY COUNTY CRMWA #23 Tap Structure 119 A #N/A #N/A #N/A R SPS

5/27/2016 69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek #N/A #N/A yes CRMWA #23 Tap Structure 119 A CRMWA #23 #N/A #N/A R SPS

5/27/2016 69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek #N/A #N/A yes CRMWA #23 Tap Structure 119 A ADOBE CREEK #N/A #N/A R SPS

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $4,002,541.81 invalid 50823Green Belt REC Kellerman Tap Struc 334

50831 Magic City structure 395 $373,008.84 $354,518.38 R SPS #N/A

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $4,002,541.81 invalid 50831 Magic City structure 395 50833

structure 82 (ownership change to WTU Shamrock)

$500,448.39 $475,640.61 R SPS GB-WHEE2

5/27/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) $339,716.16 $313,864.00 yes Kress InterchnageLighthouse REC MBPXL Tap Structure 60

$270,760.51 $250,155.83 $288,801.95 W Lighthouse

5/27/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) $339,716.16 $313,864.00 yesLighthouse REC MBPXL Tap Structure 60

Lighthouse REC Plainview Substation $18,041.44 $16,668.50 W Lighthouse

4/1/2016 69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap $1,595,582.88 $1,372,962.61 invalid LC-HART2 LC-North Olton $103,051.30 $88,673.29 W Lamb County

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 yes 51175 TX/NM State Line 51183 Farwell $14,866.78 $14,096.65 $14,866.78 R SPS #REF!

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 invalid 51183 FARWELL2 NO 3718 $22,972.32 $21,782.31 $136,835.59 R SPS

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 invalid 51229 LARIAT2 51185 DS-#102 $33,817.52 $32,065.71 W Deaf Smith #N/A

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 invalid 51231 BC-LARI2 51229 LARIAT2 $13,199.16 $12,515.42 R SPS #N/A

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 invalid 51233 WMULES2 51231 BC-LARI2 $51,877.73 $49,190.37 W Bailey County #N/A

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 invalid 51235 MULECY2 51233 WMULES2 $3,057.30 $2,898.93 R SPS #N/A

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) $165,627.56 $157,047.76 invalid 51241 BC-BAIL2 51235 MULECY2 $11,911.57 $11,294.53 R SPS MULECY2

4/1/2016 69 Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub $517,416.60 $432,144.98 yes 51465 Lamb County 51461 South Littlefield Substation $367,641.76 $307,053.43 #N/A R SPS South Littlefield

Substation

4/1/2016 69 Z-83 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Cox Intg (Z-83) $320,436.87 $296,181.43 yes Cox Substation East Plainview $179,989.61 $166,365.31 $179,989.61 R SPS

4/1/2016 115 V-46 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub #N/A #N/A yes 51664 Allen 51672 Wheelock Substation #N/A #N/A #N/A W LPL #N/A

Page 30: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/26/2016 69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

5/27/2016 69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek

5/27/2016 69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek

5/27/2016 69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

5/27/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82)

5/27/2016 69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82)

4/1/2016 69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

4/1/2016 69 Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub

4/1/2016 69 Z-83 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Cox Intg (Z-83)

4/1/2016 115 V-46 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 2.180 34.516 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 2.180 new row; provides more detail of line

69 0.055 34.516 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.055 new row; provides more detail of line

69 0.067 34.516 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.067 new row; provides more detail of line

69 5.399 34.516 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 5.399 new row; provides more detail of line

69 1.097 34.516 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.097 new row; provides more detail of line

69 4.728 34.516 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.728 corrected segment mileage

69 13.787 26.451 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 13.787 corrected total mileage

69 12.571 26.451 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 12.571 corrected total mileage

69 0.093 26.451 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.093 corrected total mileage

69 6.050 68.305 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 6.050 clarified "To/From" description; invalid because of normally open switch 2827

69 8.117 68.305 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 8.117 clarified "To/From" description and corrected segment mileage; invalid because of normally open switch 2789

69 17.544 22.012 1 1 $270,760.51 $250,155.83 0 $0.00 $0.00 SPS 526 100 17.544 corrected segment mileage Y75 replaced by Z82 and Z84 when Kiser Substation went in service Dec 2014

69 1.169 22.012 1 1 $18,041.44 $16,668.50 0 $0.00 $0.00 SPS 526 100 1.169 corrected segment mileage Y75 replaced by Z82 and Z84 when Kiser Substation went in service Dec 2014

69 2.648 41.000 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 2.648 added row; provides more detail of line

69 2.621 29.200 1 0 $0.00 $0.00 1 $14,866.78 $14,096.65 SPS 526 100 2.621 corrected total mileage to match asset location codes

69 4.050 29.200 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.050 corrected total mileage to match asset location codes

69 5.962 29.200 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 5.962 corrected total mileage to match asset location codes

69 2.327 29.200 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.327 corrected total mileage to match asset location codes

69 9.146 29.200 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 9.146 corrected total mileage to match asset location codes

69 0.539 29.200 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.539 corrected total mileage to match asset location codes

69 2.100 29.200 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.100 corrected total mileage to match asset location codes

69 2.651 3.731 1 0 $0.00 $0.00 1 $367,641.76 $307,053.43 SPS 526 100 2.651 corrected segment mileage

69 5.007 8.914 1 0 $0.00 $0.00 1 $179,989.61 $166,365.31 SPS 526 100 5.007 corrected milegae; total and segment

115 1.949 1.949 1 1 #N/A #N/A 0 #N/A #N/A SPS 526 100 1.949 corrected oversight; changed from SPS retail to LPL wholesale

Page 31: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

4/1/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Shell Western C2 Tap $120,437.75 $57,452.29 yes Shell C2 Tap Structure 37A Shell C2 Substation $120,437.75 $57,452.29 R SPS

4/1/2016 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) #N/A #N/A invalidSouth Plains REC Wolfforth Tap Structure 42

South Plains REC Wolfforth Tap Structure 42

#N/A #N/A #N/A W South Plains

4/1/2016 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) $820,018.42 $766,034.66 yes Spearman City Tap

Structure 82Spearman City Substation $1,044.25 $975.50 $1,447.71 R SPS

4/1/2016 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) $820,018.42 $766,034.66 yes Texas Farms Tap

Structure 248 Texas Farms Substation $403.46 $376.90 R SPS

4/1/2016 115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24) $192,041.11 $189,943.59 invalidRita Blanca REC River Breaks ELK Tap structure 234

Rita Blanca REC River Breaks ELK Substation $0.00 $0.00 W Rita Blanca

4/1/2016 115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) #N/A #N/A yes McClellan Pump Tap

Structure 450AMcClellan Pump Substation #N/A #N/A #N/A R SPS #N/A

4/1/2016 115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) #N/A #N/A yes McLean Rural Tap

Structure 654McLean Rural Substation #N/A #N/A R SPS #REF!

4/1/2016 115 T-67 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int #N/A #N/A invalid Tulia City Tap Structure 90 City of Tulia Substation #N/A #N/A #N/A W Tulia

4/1/2016 115 T-47 Elec Tran-Line OH-TX-115KV-Rita Blanca REC-Houge Sub Tap $0.00 $0.00 yesRita Blanca REC Houge Tap Structure 334

Rita Blanca Houge Substation $0.00 $0.00 $0.00 W Rita Blanca #N/A

4/1/2016 115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 $28,677,110.99 $27,707,185.56 yes Lake Meredith Tap Structure 125

Lake Meredith Substation $6,864.66 $6,632.48 R SPS

4/1/2016 115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42) $1,022,936.37 $873,143.12 yes Rolling Hills Substation Hastings Substation $4,206.67 $3,590.67 $4,206.67 R SPS

4/1/2016 115 T-67 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int #N/A #N/A invalid Tulia City Tap Structure 90 City of Tulia Substation #N/A #N/A #N/A W Tulia

4/1/2016 115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02) $749,918.84 $672,011.15 invalid ASARCO Tap structure 2 ASARCO substation $59,155.28 $53,009.75 $284,989.26 R SPS

4/1/2016 115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02) $749,918.84 $672,011.15 yes 50880 Highland Park Tap Structure 1 50924 Highland Park

Substation $225,833.98 $202,372.51 R SPS #N/A

4/1/2016 115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42) $1,022,936.37 $873,143.12 yes Rolling Hills Substation Hastings Substation $4,206.67 $3,590.67 $4,206.67 R SPS

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $4,002,541.81 yes 50819 Bowers SubstationGreen Belt REC Kellerman Tap Struc 334

$1,480,104.00 $1,406,733.60 $3,965,952.93 W Green Belt #N/A

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $4,002,541.81 invalid 50823Green Belt REC Kellerman Tap Struc 334

Magic City structure 395 $364,404.70 $346,340.76 R SPS #N/A

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $4,002,541.81 invalid 50831 Magic City structure 395

structure 82 (ownership change to WTU Shamrock)

$500,340.62 $475,538.18 R SPS #N/A

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $4,002,541.81 yes 50765 Howard Substation Buffalo Substation $1,621,103.61 $1,540,743.69 R SPS #N/A

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes Carlsbad Interchange Loving S./Crlsbd Water tap (Structure 103) $286,274.06 $209,949.64 $5,378,460.91 R SPS

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes Loving S./Crlsbd Water tap (Structure 103)

Carlsbad Waterfield tap (Structure 127) $88,873.60 $65,178.73 R SPS

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes Loving S./Crlsbd Water tap (Structure 103)

Loving South/Navajo-Malaga Tap Struc 52A $968,065.61 $709,966.61 R SPS

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes 52319 Carlsbad Waterfield tap (Structure 127) 52323 White City $676,327.57 $496,009.76 R SPS #N/A

Page 32: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

4/1/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Shell Western C2 Tap

4/1/2016 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71)

4/1/2016 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29)

4/1/2016 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29)

4/1/2016 115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24)

4/1/2016 115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54)

4/1/2016 115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54)

4/1/2016 115 T-67 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int

4/1/2016 115 T-47 Elec Tran-Line OH-TX-115KV-Rita Blanca REC-Houge Sub Tap

4/1/2016 115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

4/1/2016 115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42)

4/1/2016 115 T-67 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int

4/1/2016 115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02)

4/1/2016 115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02)

4/1/2016 115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42)

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

7/5/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 0.200 0.200 1 0 $0.00 $0.00 1 $120,437.75 $57,452.29 SPS 526 100 0.200 added row; provides more detail of line

115 0.000 6.172 0 1 #N/A #N/A 0 #N/A #N/A SPS 526 100 0.000 added row; provides more detail of line

115 0.044 34.552 1 0 $0.00 $0.00 1 $1,044.25 $975.50 SPS 526 100 0.044 corrected segment mileage

115 0.017 34.552 1 0 $0.00 $0.00 1 $403.46 $376.90 SPS 526 100 0.017 corrected segment mileage

115 0.000 29.368 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 Rita Blanca Tap to Rita Blanca REC Elks Substation installed March 2015

115 0.056 26.495 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.056 new asset location code

115 0.009 26.495 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.009 new asset location code

115 0.000 17.820 0 1 #N/A #N/A 0 #N/A #N/A SPS 526 100 0.000 added row; provides more detail of line

115 0.014 0.014 1 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.014 corrected total mileage to match asset location codes

115 0.010 41.775 1 0 $0.00 $0.00 1 $6,864.66 $6,632.48 SPS 526 100 0.010 added row; provides more detail of line

115 0.047 11.429 1 0 $0.00 $0.00 1 $4,206.67 $3,590.67 SPS 526 100 0.047completion of East Plant-Hastings segment increases total mileage and makes Hastings a tapped substation ISD March 2015

115 0.000 17.820 0 1 #N/A #N/A 0 #N/A #N/A SPS 526 100 0.000 added row; provides more detail of line

115 1.530 19.396 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.530 new asset location code; clarified "To/From" description and corrected segment mileage

115 5.841 19.396 1 0 $0.00 $0.00 1 $225,833.98 $202,372.51 SPS 526 100 5.841 new asset location code

115 0.047 11.429 1 0 $0.00 $0.00 1 $4,206.67 $3,590.67 SPS 526 100 0.047completion of East Plant-Hastings segment increases total mileage and makes Hastings a tapped substation ISD March 2015

69 24.553 69.860 1 1 $1,480,104.00 ########### 0 $0.00 $0.00 SPS 526 100 24.553much of the line was rebuilt double circuit with W-67 from Bowers to Magic City; total mileage increased and tap mileages changed ISD = March 2016

69 6.045 69.860 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 6.045much of the line was rebuilt double circuit with W-67 from Bowers to Magic City; total mileage increased and tap mileages changed ISD = March 2016

69 8.300 69.860 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 8.300much of the line was rebuilt double circuit with W-67 from Bowers to Magic City; total mileage increased and tap mileages changed ISD = March 2016

69 26.892 69.860 1 0 $0.00 $0.00 1 $1,621,103.61 $1,540,743.69 SPS 526 100 26.892much of the line was rebuilt double circuit with W-67 from Bowers to Magic City; total mileage increased and tap mileages changed ISD = March 2016

69 5.608 38.468 1 0 $0.00 $0.00 1 $286,274.06 $209,949.64 SPS 526 100 5.608 corrected total mileage to match asset location codes

69 1.741 38.468 1 0 $0.00 $0.00 1 $88,873.60 $65,178.73 SPS 526 100 1.741 corrected total mileage to match asset location codes

69 5.690 11.542 1 0 $0.00 $0.00 1 $968,065.61 $709,966.61 SPS 526 100 5.690 new asset location code June 2016; corrected total mileage to match asset location codes

69 13.249 38.468 1 0 $0.00 $0.00 1 $676,327.57 $496,009.76 SPS 526 100 13.249 corrected total mileage to match asset location codes

Page 33: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes 52309 Loving South/Navajo-Malaga Tap Struc 52A 52327 Loving South Substation $512,275.14 $375,695.86 R SPS #N/A

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes Loving South/Navajo-Malaga Tap Struc 52A

Navajo-Malaga Substation $483,352.27 $354,484.21 R SPS

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub $1,963,693.02 $1,440,146.68 yes 52319 Carlsbad Waterfield tap (Structure 127) 52321 Carlsbad Waterfield $1,963,693.02 $1,440,146.68 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 invalid 52071 Chaves County Interchange 52079 Price Substation $399,599.65 $349,411.52 $2,187,721.85 R SPS

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 invalid 52079 Price Substation 52081 CVEC Pinelodge $260,529.53 $227,808.06 W CVEC #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 invalid 52085 CVEC Pinelodge RIAC/Price Tap Structure 8 $1,009,438.46 $882,657.00 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes Roswell Interchange RIAC/Price Tap Structure 8 $50,835.03 $44,450.35 R SPS

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes 52085 RIAC/Price Tap Structure 8 52093 RIAC East/West Tap

Structure 5 $137,980.80 $120,650.96 R SPS RIAC East/West Tap Structure 5

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes RIAC East/West Tap Structure 5 TMC Tap Structure 11 $180,555.14 $157,878.13 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes TMC TAP (Structure 11 Z09.3) WEST RIAC $37,944.72 $33,179.01 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes TMC TAP (Structure 11 Z09.3) TMC $1,452.43 $1,270.01 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes RIAC East/West Tap Structure 5

RIAC East/Wherry Housing Tap Struc 4 $7,897.59 $6,905.68 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes RIAC East/Wherry Housing Tap Struc 4

Wherry Housing Tap (Structure 11 Z09.4) $60,457.38 $52,864.17 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes Wherry Housing Tap (Structure 11 Z09.4) WHERRY HOUSING $1,270.88 $1,111.26 R SPS #N/A

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $2,224,849.58 $1,945,417.30 yes Wherry Housing Tap (Structure 11 Z09.4) EAST RIAC $39,760.26 $34,766.53 R SPS #N/A

7/6/2016 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) $5,664,766.92 $4,096,479.49 invalid Atoka Tap structure 112 Atoka Substation $4,128.24 $2,985.34 R SPS

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub #N/A #N/A yes 51928 Allred Tap Structure 8 51926 Allred Substation #N/A #N/A #N/A R SPS Allred Substation

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub #N/A #N/A yes 51928 Allred Tap Structure 8 51926 Allred Substation #N/A #N/A #N/A R SPS #N/A

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub #N/A #N/A yes Shell C2 Tap Structure 37A Shell C2 Substation #N/A #N/A R SPS

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub #N/A #N/A yes Cortez/Apache Roberts Tap Structure 9 Cortez Substation #N/A #N/A R SPS #N/A

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub #N/A #N/A yes Cortez/Apache Roberts Tap Structure 9

Apache Roberts Substation #N/A #N/A R SPS

8/2/2016 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub $563,669.08 $508,294.97 yes North Amarillo Switch Station Cliffside Substation $273,477.66 $246,611.57 $273,477.66 R SPS

8/2/2016 69 Z-34 Elec Tran-Line OH-TX- 69KV-Northwest Intg-Hastings (Z-34) $0.00 -$1.32 yes Northwest Interchange North Amarillo Switch Station $0.00 ($1.10) $0.00 R SPS

7/17/2017 115 U-07 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-OCHOA INT (U-07) $0.00 $0.00 yes Roadrunner Substation Agave Tap (Structure

7A) $0.00 $0.00 $0.00 R SPS

Page 34: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

7/5/2016 69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/5/2016 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

7/6/2016 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524)

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

7/6/2016 115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

8/2/2016 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub

8/2/2016 69 Z-34 Elec Tran-Line OH-TX- 69KV-Northwest Intg-Hastings (Z-34)

7/17/2017 115 U-07 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-OCHOA INT (U-07)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 3.011 11.542 1 0 $0.00 $0.00 1 $512,275.14 $375,695.86 SPS 526 100 3.011 new asset location code June 2016; corrected total mileage to match asset location codes

69 2.841 11.542 1 0 $0.00 $0.00 1 $483,352.27 $354,484.21 SPS 526 100 2.841 new asset location code June 2016; corrected total mileage to match asset location codes

69 6.328 6.328 1 0 $0.00 $0.00 1 $1,963,693.02 $1,440,146.68 SPS 526 100 6.328 new asset location code June 2016; corrected total mileage to match asset location codes

69 4.402 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.402 corrected total mileage to match asset location codes

69 2.870 24.509 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 2.870 corrected total mileage to match asset location codes

69 11.120 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 11.120 corrected total mileage to match asset location codes

69 0.560 24.509 1 0 $0.00 $0.00 1 $50,835.03 $44,450.35 SPS 526 100 0.560 new asset location code; corrected total mileage to match asset location codes

69 1.520 24.509 1 0 $0.00 $0.00 1 $137,980.80 $120,650.96 SPS 526 100 1.520 new asset location code; corrected total mileage to match asset location codes

69 1.989 24.509 1 0 $0.00 $0.00 1 $180,555.14 $157,878.13 SPS 526 100 1.989 new asset location code; corrected total mileage to match asset location codes

69 0.418 24.509 1 0 $0.00 $0.00 1 $37,944.72 $33,179.01 SPS 526 100 0.418 new asset location code; corrected total mileage to match asset location codes

69 0.016 24.509 1 0 $0.00 $0.00 1 $1,452.43 $1,270.01 SPS 526 100 0.016 new asset location code; corrected total mileage to match asset location codes

69 0.087 24.509 1 0 $0.00 $0.00 1 $7,897.59 $6,905.68 SPS 526 100 0.087 new asset location code; corrected total mileage to match asset location codes

69 0.666 24.509 1 0 $0.00 $0.00 1 $60,457.38 $52,864.17 SPS 526 100 0.666 new asset location code; corrected total mileage to match asset location codes

69 0.014 24.509 1 0 $0.00 $0.00 1 $1,270.88 $1,111.26 SPS 526 100 0.014 new asset location code; corrected total mileage to match asset location codes

69 0.438 24.509 1 0 $0.00 $0.00 1 $39,760.26 $34,766.53 SPS 526 100 0.438 new asset location code; corrected total mileage to match asset location codes

115 0.020 27.444 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.020 added row; provides more detail of line

115 0.945 23.652 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.945 asset location changed June 2016; corrected total mileage to match asset location code

115 0.945 23.652 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.945 corrected total mileage to match asset location codes

115 0.200 23.652 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.200 asset location changed June 2016; corrected total mileage to match asset location code

115 2.360 23.652 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 2.360 asset location changed June 2016; corrected total mileage to match asset location code

115 0.034 23.652 1 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.034 asset location changed June 2016; corrected total mileage to match asset location code

69 9.752 20.100 1 0 $0.00 $0.00 1 $273,477.66 $246,611.57 SPS 526 100 9.752 this segment was mistakenly removed from the RLS in 2011; corrected Sept 2016

69 3.090 3.716 1 0 $0.00 $0.00 1 $0.00 -$1.10 SPS 526 100 3.09 breaker 2728 @ N. Amarillo Switch permanetly by-passed; Cliffside fed from Northwest Interchange June 2016

115 0.622 0.921 1 0 $0.00 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS completion of Custer Mountain and other projects caused W94 to be replaced with W95 and U07

Page 35: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

7/17/2017 115 U-07 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-OCHOA INT (U-07) $0.00 $0.00 yes Agave Tap (Structure

7A) Switch 4H893 $0.00 $0.00 R SPS

7/17/2017 115 U-07 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-OCHOA INT (U-07) $0.00 $0.00 yes Agave Tap (Structure

7A) Ochoa $0.00 $0.00 R SPS

7/17/2017 115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98) $3,147,335.27 $2,913,074.25 invalid

Buckeye/CVEC Tap

(Structure 111A)

flying tap to CV-San Andres Sub $652.50 $652.50 $603.93 W SPS

7/20/2017 115 U-03 Elec Tran-Line OH-NM-115KV-NEF Sub-Cardinal Sub (U-03) $322,884.41 $312,088.85 yes Targa Tap (Structure 24) $8,631.38 Clark Sub (Targa) $8,765.14 $8,472.08 R SPS

7/20/2017 115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) $298,438.23 $288,458.82 invalid Jal Flying Tap Structures 1, 370 & 1 Jal Substation $118.21 $114.26 R SPS

7/20/2017 115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) $298,438.23 $288,458.82 yes Teague Flying Tap Structures 84 & 85 Teague $247.17 $238.90 R SPS

7/20/2017 115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) $298,438.23 $288,458.82 invalid Structure 1 @ Jal Dollarhide $39,073.90 $37,767.32 R SPS

8/8/2017 115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) $10,399,945.38 $9,956,444.17 yes Ochiltree Substation Wade Tap Structure 80 $5,846,340.61 $5,597,025.93 $4,790,520.09 R SPS

8/8/2017 115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) $10,399,945.38 $9,956,444.17 yes Wade Tap Structure 80 Wade Substation $799,504.12 $765,409.61 $655,117.59 R SPS

8/8/2017 115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) $10,399,945.38 $9,956,444.17 yes Wade Tap Structure 80 Lipscomb Substation $3,754,100.64 $3,594,008.63 $3,076,128.43 R SPS

8/8/2017 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) $1,882,886.81 $1,769,239.14 yes ENTERPRISE Tap

structure 72

ENTERPRISE Substation (customer owned)

$0.00 $0.00 R SPS

8/8/2017 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) $1,882,886.81 $1,769,239.14 yes BOPCO TAP Structure

81

BOPCO Poker Lake Substation (customer owned)

$0.00 $0.00 R SPS

1/31/2018 115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) $617,521.21 $573,463.30 yes Byrd Tap Structure 126 Byrd Substation $25,597.93 $23,771.61 $25,895.20 R SPS

1/31/2018 115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) $617,521.21 $573,463.30 yes Cooper Ranch Tap

Structure 169ACooper Ranch Substation $297.27 $276.06 R SPS

1/31/2018 115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) $1,664,466.60 $1,531,387.32 yes Ward Flying Tap Structures 70 & 71 Ward Substation $1,183.36 $1,088.74 $2,884.43 R SPS

1/31/2018 115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) $1,664,466.60 $1,531,387.32 invalid Lea Road Flying Tap Structures 210A & 1 Lea Road Substation $1,701.08 $1,565.07 R SPS

1/31/2018 115 T-86 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Spring Draw Sub (T-86) $3,109,701.20 $2,512,381.62 yes Amarillo South Spring Draw $3,109,701.20 $2,512,381.62 $3,109,701.20 R SPS

1/31/2018 115 W-77 Elec Tran-Line OH-TX-115KV-Canyon West Sub-Randall County Intg (W-77) $4,150,455.47 $4,022,754.62 yes Canyon East Tap

Structure #1 Canyon East Substation $164,236.43 $159,183.21 $164,236.43 R SPS

1/31/2018 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) $2,096,334.35 $1,971,165.70 invalid Spearman City Tap

Structure 82Spearman City Substation $2,300.94 $2,163.55 $3,935.81 R SPS

1/31/2018 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) $2,096,334.35 $1,971,165.70 yes Texas Farms Tap

Structure 248 Texas Farms Substation $1,634.88 $1,537.26 R SPS

1/31/2018 115 T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89) $685,980.04 $626,446.16 yes Higg East Tap

structure 264 Higg East Substation $2,414.38 $2,204.85 $2,414.38 R SPS

1/31/2018 115 W-53 Elec Tran-Line OH-TX-115KV-Newhart-Lamton (W-53) $12,941,623.57 $12,016,820.34 yes Hart Industrial Tap Structure 71

Hart Industrial Substation $7,095.71 $6,588.65 $7,095.71 R SPS

1/31/2018 115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) $12,887,485.75 $11,943,274.61 yes North Plainview Tap Structure 17

North Plainview Substation $4,343.43 $4,025.20 $4,343.43 R SPS

1/31/2018 115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) $12,887,485.75 $11,943,274.61 yes Kress Rural Tap Structure 116 Kress Rural Substation $520,668.11 $482,520.97 $520,668.11 R SPS

Page 36: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

7/17/2017 115 U-07 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-OCHOA INT (U-07)

7/17/2017 115 U-07 Elec Tran-Line OH-NM-115KV-ROADRUNNER SUB-OCHOA INT (U-07)

7/17/2017 115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98)

7/20/2017 115 U-03 Elec Tran-Line OH-NM-115KV-NEF Sub-Cardinal Sub (U-03)

7/20/2017 115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04)

7/20/2017 115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04)

7/20/2017 115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04)

8/8/2017 115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50)

8/8/2017 115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50)

8/8/2017 115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50)

8/8/2017 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

8/8/2017 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

1/31/2018 115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26)

1/31/2018 115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26)

1/31/2018 115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27)

1/31/2018 115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27)

1/31/2018 115 T-86 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Spring Draw Sub (T-86)

1/31/2018 115 W-77 Elec Tran-Line OH-TX-115KV-Canyon West Sub-Randall County Intg (W-77)

1/31/2018 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29)

1/31/2018 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29)

1/31/2018 115 T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89)

1/31/2018 115 W-53 Elec Tran-Line OH-TX-115KV-Newhart-Lamton (W-53)

1/31/2018 115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54)

1/31/2018 115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 0.019 0.921 1 0 $0.00 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS completion of Custer Mountain and other projects caused W94 to be replaced with W95 and U07

115 0.280 0.921 1 0 $0.00 1 0 $0.00 $0.00 1 $0.00 $0.00 SPS completion of Custer Mountain and other projects caused W94 to be replaced with W95 and U07

115 0.002 9.647 0 1 $0.00 $0.00 SPS 526 100 0.002 added row; provides more detail of line

115 0.209 7.699 1 0 $0.00 $8,538.03 SPS 526 100 0.209 526 100 10.4 completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 0.011 27.771 0 0 $0.00 completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 0.023 27.771 1 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.100 completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 3.636 27.771 0 0 $0.00 completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 10.976 19.525 1 0 $0.00 $0.00 1 $4,790,520.09 $4,639,517.97 SPS 526 100 10.976

115 1.501 19.525 1 0 $0.00 $0.00 1 $655,117.59 $634,467.61 SPS 526 100 1.501

115 7.048 19.525 1 0 $0.00 $0.00 1 $3,076,128.43 $2,979,165.69 SPS 526 100 7.048

115 0.000 16.613 1 0 $0.00 W84 (China Draw-Wood Draw ISD - 06/05/2017) made W39 a network facility line

115 0.000 16.613 1 0 $0.00 W84 (China Draw-Wood Draw ISD - 06/05/2017) made W39 a network facility line

115 0.775 18.696 1 0 $0.00 $0.00 1 $25,597.93 $23,771.61 SPS 526 100 0.775 corrected milegae; total and segment

115 0.009 18.696 1 0 $0.00 $0.00 1 $297.27 $276.06 SPS 526 100 0.009 corrected milegae; total and segment

115 0.016 22.505 1 0 $0.00 $0.00 1 $1,183.36 $1,088.74 SPS 526 100 0.016 corrected total mileage

115 0.023 22.505 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.023 corrected total mileage

115 7.863 7.863 1 0 $0.00 $0.00 1 $3,109,701.20 $2,512,381.62 SPS 526 100 7.863 corrected total mileage

115 0.907 22.921 1 0 $0.00 $0.00 1 $164,236.43 $159,183.21 SPS 526 100 0.907 new asset location code November 2017; corrected total mileage & tap mileage to match asset location codes

115 0.038 34.621 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.038 corrected milegae; total and segment

115 0.027 34.621 1 0 $0.00 $0.00 1 $1,634.88 $1,537.26 SPS 526 100 0.027 corrected milegae; total and segment

115 0.049 13.922 1 0 $0.00 $0.00 1 $2,414.38 $2,204.85 SPS 526 100 0.049 corrected total mileage

115 0.015 27.358 1 0 $0.00 $0.00 1 $7,095.71 $6,588.65 SPS 526 100 0.015 corrected total mileage

115 0.008 23.737 1 0 $0.00 $0.00 1 $4,343.43 $4,025.20 SPS 526 100 0.008 corrected total mileage

115 0.959 23.737 1 0 $0.00 $0.00 1 $520,668.11 $482,520.97 SPS 526 100 0.959 corrected total mileage

new transmission line. Lipscomb Substation went in-service January 2017. Wade Substation converted to 115 kV operation in March 2017.

Page 37: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

NO Changes (Set to Invalid)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Stanton Sub-Hendrick Sub 589,238.25 353,444.28 invalid 51563 CROSBY2 51557 SP-ACUF2 199481.6992 119655.6156 W South Plains SP-ACUF2

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 4,055,918.72 3,535,530.66 invalid 51517 FLOYD2 51527 LH-HARM2 $47,651.45 $41,537.61 W Lighthouse #N/A

5/25/2016 115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98) #N/A #N/A invalid 52358 Buckeye Tap (Structure 111A) 52370 Buckeye $358,875.17 $332,163.54 $0.00 R SPS #N/A

4/1/2016 115 T-24 Elec Tran-Line OH-NM-115KV-Brasher Sub Tap $587,817.03 $321,665.46 invalid 52086 Brasher Tap Structure 2 52098 Brasher Substation $1,122,135.96 $1,039,254.09 $199,481.70 R SPS #N/A

4/1/2016 115 T-42 Elec Tran-Line OH-NM-115KV-Cochran Sw Sta-Monument Sub #N/A #N/A invalid Monument Flying Tap Structures 29 & 30 Monument Substation $7,645.62 $6,754.93 $47,651.45 R SPS

4/1/2016 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub $1,272,274.22 $896,216.00 invalid Jal Flying Tap Structures 1, 370 & 1 Jal Substation $129.07 $124.89 R SPS

4/1/2016 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub $1,272,274.22 $896,216.00 invalid Structure 1 @ Jal Dollarhide $42,665.09 $41,283.41 R SPS

4/1/2016 115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) $2,321,721.20 $2,008,726.55 invalid Lea Road Flying Tap Structures 210A & 1 Lea Road Substation $1,706.23 $1,607.48 R SPS

4/1/2016 115 W-43 Elec Tran-Line OH-NM-115KV-Pecos Sub-Hopi Sub (W-43) $869,121.95 $778,982.07 invalid Pecos Interchange Hopi Substation $8,028,189.22 $7,436,642.13 $129.07 R SPS

5/27/2016 69 Y-65 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt $869,121.95 $778,982.07 invalid 50711 HUBRCO 2 50707 INDUSTR2 $952.96 $508.04 $42,665.09 R SPS #N/A

5/27/2016 69 Z-49 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt $1,664,466.60 $1,531,387.32 invalid 50707 INDUSTR2 50713 SIDRCH 2 $886.11 $472.41 $1,706.23 R SPS #N/A

5/27/2016 115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) $8,028,189.22 $7,278,268.08 invalid Friona Tap Structures 244/246 flying tap Friona Rural Substation #N/A #N/A $8,028,189.22 R SPS #N/A

5/25/2016 115 V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta $152,413.43 $58,046.62 invalid Rita Blanca REC Sneed Tap Strcuture 180

RIta Blanca Sneed Substation $209.31 $85.32 $1,839.07 W Rita Blanca

5/25/2016 115 V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap $1,839.07 $965.78 invalid 50686 Herring Tap Structure 118 50688 Herring Substation #N/A #N/A R SPS #N/A

5/25/2016 115 V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap #N/A #N/A invalid 51736 Amoco-Cryogenics Tap Structure 10 51738 Amoco-Cryogenics

Substation $296,070.33 $138,023.11 #N/A R SPS #N/A

5/25/2016 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt $840,386.69 $653,459.53 invalidLyntegar REC Levelland Tap Structure 28A

Lyntegar REC Levelland Substation $55.64 $22.36 W Lyntegar #N/A

5/25/2016 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt $840,386.69 $653,459.53 invalid Lyntegar REC Clauene Tap Structure 116

Lyntegar REC Clauene Substation $134.19 $53.94 W Lyntegar #N/A

5/25/2016 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) #N/A #N/A invalid Doud Tap Structure 26 DOUD $145,319.23 $127,510.24 W LPL #N/A

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) $39,831.70 $0.00 invalid Deaf Smith REC #24

Tap Structure 332Deaf Smith REC Substation #24 $0.00 $0.00 $145,509.07 W Deaf Smith

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) $39,831.70 $0.00 invalid Parmer County Flying

TapParmer County Substation $208.27 $0.00 R SPS

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) $39,831.70 $0.00 invalid

Deaf Smith REC #20 Tap Structure(s) 5H47 & 5H48

Deaf Smith REC #20 Substation $219.23 $0.00 W Deaf Smith

4/1/2016 115 T-66 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int $165,962.81 $67,404.96 invalid Palo Duro Tap Structure 198 Palo Duro Substation $7.41 $1.68 $0.00 R SPS #REF!

5/25/2016 115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int $78,402.94 $20,261.03 invalid Hilmar Cheese Tap Structure 412

Hilmar Cheese Substation $2,636.36 $2,557.64 R SPS

Page 38: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

NO Changes (Set to Invalid)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Stanton Sub-Hendrick Sub

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

5/25/2016 115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98)

4/1/2016 115 T-24 Elec Tran-Line OH-NM-115KV-Brasher Sub Tap

4/1/2016 115 T-42 Elec Tran-Line OH-NM-115KV-Cochran Sw Sta-Monument Sub

4/1/2016 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub

4/1/2016 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub

4/1/2016 115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27)

4/1/2016 115 W-43 Elec Tran-Line OH-NM-115KV-Pecos Sub-Hopi Sub (W-43)

5/27/2016 69 Y-65 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt

5/27/2016 69 Z-49 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt

5/27/2016 115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58)

5/25/2016 115 V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta

5/25/2016 115 V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap

5/25/2016 115 V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap

5/25/2016 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt

5/25/2016 115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt

5/25/2016 115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71)

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

4/1/2016 115 T-66 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int

5/25/2016 115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 10.4 30.72 0 1 0 0 0 0 0 SPS 526 100 10.4 Added new asset location. One class chang to invalid due to a NO move TXS6,9

69 1.71 145.549 NO 3702 closed and 3701 changed to NO in January 2011

115 1.100 9.647 0 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.100 changed to invalid; V98 is a radial line feeding Lea County REC substations and SPS retail [original error]

115 1.148 1.148 0 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.148 PFI solar farm connected through distribution bus ISD Nov 2010

115 0.03 9.11 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.03 Sun Edison 4 solar farm connected at Monument ISD Nov 2011

115 0.011 36.55 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.011 Sun Edison 2 solar farm ISD Sept 2011

115 3.636 36.55 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 3.636 Sun Edison 1 solar farm ISD Aug 2011

115 0.023 22.437 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.023 Sun Edison 3 solar farm connected to Lea Road ISD Nov 2011

115 11.019 11.019 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 11.019 Sun Edison 5 solar farm connected to Hopi ISD Aug 2011

69 1.226 2.366 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.226 corrected total mileage to match asset location codes; changed to invalid - generator at Huber ISD April 1982

69 1.140 2.366 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.140 corrected total mileage to match asset location codes; changed to invalid - generator at Sid Richards ISD July 2001

115 0.007 27.174 0 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 0.007 changed to invalid; T58 is a line feeding Deaf Smith REC substations and SPS retail [original error]

115 0.016 37.860 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.016 changed to invalid; V01 is a line feeding Rita Blanca REC substations and SPS retail [original error]

115 4.489 4.489 0 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 4.489 changed to invalid; V01 is a line feeding Rita Blanca REC substations and SPS retail [original error]

115 4.858 4.858 0 0 $0.00 $0.00 #N/A $0.00 $0.00 SPS 526 100 4.858 changed to invalid; V55 is a line feeding Lyntegar REC substations and SPS retail [original error]

115 0.017 20.365 0 1 $0.00 $0.00 #N/A $0.00 $0.00 SPS 526 100 0.017 changed to invalid; V55 is a line feeding Lyntegar REC substations and SPS retail [original error]

115 0.041 20.365 0 1 $0.00 $0.00 #N/A $0.00 $0.00 SPS 526 100 0.041 changed to invalid; V55 is a line feeding Lyntegar REC substations and SPS retail [original error]

115 1.707 6.172 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 1.707 changed to invalid; T71 is a line feeding South Plains REC substations and LPL substations June 2011

115 0.000 29.224 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.000 changed to invalid; T59 is a line feeding Deaf Smith REC substations and SPS retail [original error]

115 0.019 29.224 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.019 changed to invalid; T59 is a line feeding Deaf Smith REC substations and SPS retail [original error]

115 0.020 29.224 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.020 changed to invalid; T59 is a line feeding Deaf Smith REC substations and SPS retail [original error]

115 0.013 37.459 0 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.013 WTAMU wind power ISD Nov 2013

115 0.489 35.603 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.489 changed to invalid; V64 is a line feeding Rita Blanca REC substations and SPS retail June 2010

Page 39: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

7/5/2016 115 T-37 Elec Tran-Line OH-TX-115KV-Nichols Sta-Coulter Int $99,587.73 $0.00 invalid Sunset Substation Puckett West Substation $42,821.60 $0.00 $219.23 R SPS #N/A

7/6/2016 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) #N/A #N/A invalid CVEC Lake Wood Tap Structure 61

Structure # 61A - ownership change $18,355.08 $13,528.29 W CVEC

9/8/2016 69 Z-03 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2 #N/A #N/A invalid 52239 PCA Substation 52245 Central Valley REC Lusk Substation $530,915.29 $278,469.65 $2,636.36 W CVEC #N/A

3/28/2017 115 W-01 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub $217,750.71 $77,802.37 invalid MARTIN CARSON $99,587.73 $0.00 $42,821.60 R SPS #N/A

3/28/2017 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) $1,163,538.49 $966,913.05 invalid Spearman City Tap

Structure 82Spearman City Substation #N/A #N/A #N/A R SPS

8/8/2017 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) $1,448,970.51 $1,373,949.19 invalid BOPCO TAP Structure

81 WOOD DRAW $695,572.13 $659,558.47 R SPS

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid Roswell Interchange RIAC/Price Tap Structure 8 $25,691.87 $19,912.75 R SPS

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid 52085 RIAC/Price Tap Structure 8 52093 RIAC East/West Tap

Structure 5 $69,735.08 $54,048.91 R SPS #N/A

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid RIAC East/West Tap Structure 5 TMC Tap Structure 11 $91,252.02 $70,725.84 R SPS #N/A

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid TMC TAP (Structure 11 Z09.3) WEST RIAC $19,177.15 $14,863.45 R SPS #N/A

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid TMC TAP (Structure 11 Z09.3) TMC $734.05 $568.94 R SPS #N/A

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid RIAC East/West Tap Structure 5

RIAC East/Wherry Housing Tap Struc 4 $3,991.42 $3,093.59 R SPS #N/A

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid RIAC East/Wherry Housing Tap Struc 4

Wherry Housing Tap (Structure 11 Z09.4) $30,554.98 $23,681.95 R SPS #N/A

Page 40: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

7/5/2016 115 T-37 Elec Tran-Line OH-TX-115KV-Nichols Sta-Coulter Int

7/6/2016 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524)

9/8/2016 69 Z-03 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2

3/28/2017 115 W-01 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub

3/28/2017 115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29)

8/8/2017 115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 3.214 3.214 0 0 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 3.214 completion of W71 (Coulter-Puckett West) changed segment to invalid ISD = March 2016

115 0.088 27.444 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.088 changed to invalid; T43 is a line feeding Central Valley REC substations and SPS retail [original error]

69 11.110 14.560 0 1 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 11.110 changed to invalid CVEC has moved all load from Lusk 69 kV substation and will wreck out August 2016

115.0 1.22 1.223 0 0 $0.00 0 0 $0.00 $0.00 1 #VALUE! #VALUE! SPS High Plains Wind 1 ISD Jan 2008

115.0 0.04 34.552 0 0 $0.00 0 1 $0.00 $0.00 0 #VALUE! #VALUE! SPS Exelon 3 ISD Dec 2005

115 7.975 16.613 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 7.975 changed to invalid; W84 (China Draw-Wood Draw ISD - 06/05/2017) made Wood Draw substation a network facility

69 0.560 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.560

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 1.520 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.520

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 1.989 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.989

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 0.418 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.418

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 0.016 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.016

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 0.087 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.087

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 0.666 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.666

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

Page 41: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid Wherry Housing Tap (Structure 11 Z09.4) WHERRY HOUSING $642.30 $497.82 R SPS #N/A

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $1,124,432.30 $871,503.05 invalid Wherry Housing Tap (Structure 11 Z09.4) EAST RIAC $20,094.71 $15,574.62 R SPS #N/A

8/982017 69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub $451,585.68 $327,401.20 invalid 50619 Wade Tap Structure 11/3A 50615 Wade Substation $421.58 $305.65 R SPS #N/A

1/31/2018 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash $175,062.74 $121,558.47 invalid New Mexico Potash Tap structure 21

LIVINGSTONE RIDGE SUBSTATION $83,189.52 $57,764.38 R SPS

1/31/2018 115 W-89 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89) $7,565,642.80 $7,316,649.95 invalid Cardinal Switch Station Sage Brush Substation $7,565,642.80 $7,316,649.95 $7,565,642.80 R SPS

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 4,655,963.05 3,525,998.37 yes 50819 BOWERS2 50823 GB-KELR2 729308.3772 552311.1162 W Green Belt GB-KELR2

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 4,655,963.05 3,525,998.37 yes 50831 MAGICC2 50833 GB-WHEE2 147828.4923 111951.7095 W Green Belt GB-WHEE2

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 4,655,963.05 3,525,998.37 yes 50831 MAGICC2 50765 NP-BRIS2 545157.2189 412851.9588 W North Plains NP-BRIS2

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 4,655,963.05 3,525,998.37 yes 50765 NP-BRIS2 50767 BUFFALO2 126891.4097 96095.88799 R SPS BUFFALO2

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 4,655,963.05 3,525,998.37 yes MAGICC2 HOWARD 701075.0385 530929.7811 R SPS #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 yes 50819 BOWERS2 50823 GB-KELR2 10916.8292 10785.03201 W Green Belt #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 yes 50831 MAGICC2 50833 GB-WHEE2 2212.806614 2186.091743 W Green Belt #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 yes 50831 MAGICC2 50765 NP-BRIS2 8160.317954 8061.799699 W North Plains #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 yes 50765 NP-BRIS2 50767 BUFFALO2 1899.404819 1876.473599 R SPS #N/A

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 36,556.42 36,115.08 yes MAGICC2 HOWARD 10494.21163 10367.51663 R SPS #N/A

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) 174,832.24 173,245.53 yes 51661 IVORY 2 51669 BATTNS2 174832.24 173245.53 R SPS #N/A

69 Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) 88,397.94 87,425.11 yes 51679 LUBS2 51661 IVORY 2 11130.10426 11007.61612 2085941.747 R SPS #N/A

69 Y-85 Elec Tran-Line OH-TX- 69KV-Stanton East (Y-85) 100,037.60 99,129.69 invalid 51687 LUBE2 51685 PLANTRS2 19487.84416 19310.97857 R SPS #N/A

115 Y-64 Elec Tran-Line OH-TX-115KV-Clutter Tap (Y-64) 63,165.32 62,592.06 yes 51687 LUBE2 51691 CLUTTER2 63165.32 62592.06 R SPS #N/A

Deletions

2011 NO Changes (Included in the Direct Assignment Section)

Page 42: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/8/2017 69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

8/982017 69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub

1/31/2018 69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

1/31/2018 115 W-89 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-62 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50)

69 Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64)

69 Y-85 Elec Tran-Line OH-TX- 69KV-Stanton East (Y-85)

115 Y-64 Elec Tran-Line OH-TX-115KV-Clutter Tap (Y-64)

Deletions

2011 NO Changes (Included in the Direct Assignment Section)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 0.014 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.014

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 0.438 24.509 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.438

changed all from "yes" to "invalid". Conversion of Price substation to 115 kV operation necessitated the closing of normally opened switch 4864 to tie CVEC Pine Lodge substation to the southern portion of circuit Z09. This action caused the southern portion of Z09 to become a Network Transmission Facility.

69 0.017 18.210 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.017 changed to invalid; Wade Substation converted to 115 kV operation in March 2017 and taken off Z66.

69 4.014 8.447 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.014 changed to invalid; Livingston Ridge Substation converted to 115 kV operation in November 2017 and taken off Z22.

115 19.236 19.236 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 19.236changed to invalid; completion of W88 (Livingston Ridge-Sage Brush) changed Sage Brush to a network substation November 2017

69 22.99 146.77 1 1 729308.3772 552311.1162 0 0 0 SPS 526 100 22.99 New class change. NO2827 now open resulting in yes.

69 4.66 146.77 1 1 147828.4923 111951.7095 0 0 0 SPS 526 100 4.66 New class change. NO2827 now open resulting in yes.

69 17.185 146.77 1 1 545157.2189 412851.9588 0 0 0 SPS 526 100 17.185 New class change. NO2827 now open resulting in yes.

69 4 146.77 1 0 0 0 1 126891.4097 96095.88799 SPS 526 100 4 New class change. NO2827 now open resulting in yes.

69 22.1 146.77 1 0 0 0 1 701075.0385 530929.7811 SPS 526 100 22.1 New class change. NO2827 now open resulting in yes. TXN15

69 22.99 76.985 1 1 10916.8292 10785.03201 0 0 0 SPS 526 100 22.99 New class change. NO2827 now open resulting in yes. TXN15

69 4.66 76.985 1 1 2212.806614 2186.091743 0 0 0 SPS 526 100 4.66 New class change. NO2827 now open resulting in yes. TXN15

69 17.185 76.985 1 1 8160.317954 8061.799699 0 0 0 SPS 526 100 17.185 New class change. NO2827 now open resulting in yes. TXN15

69 4 76.985 1 0 0 0 1 1899.404819 1876.473599 SPS 526 100 4 New class change. NO2827 now open resulting in yes. TXN15

69 22.1 76.985 1 0 0 0 1 10494.21163 10367.51663 SPS 526 100 22.1 New asset location. No class change. TXS11

69 5.029 5.029 1 0 0 0 1 174832.24 173245.53 SPS 526 100 5.029 New asset location. No class change. TXS12

69 1.108 8.8 1 0 0 0 1 11130.10426 11007.61612 SPS 526 100 1.108 New asset location. No class change. TXS9

69 1.5 7.7 0 0 0 0 1 0 0 SPS 526 100 1.5 New asset location. No class change.

69 2.8 2.8 1 0 0 0 1 63165.32 62592.06 SPS 526 100 2.8

0 1 $0.00 $0.00 0 $0.00 $0.00

Page 43: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

115 T-26 Elec Tran-Line OH-NM- 69KV-Urton Sub Tap - - yes CHAVES URTON 0 0 0 R SPS #N/A

6/30/2011 115 T-53 Elec Tran-Line OH-TX-115KV-Nichols Sta-WTU 6,482,110.95 4,980,747.97 yes YARNELLT YARNELL $222,351.43 $170,851.20 $222,351.43 R SPS #N/A

8/18/2011 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,003,114.93 778,157.87 invalid 51959 DENVRC2 52027 MIDAT2 561129.4244 435291.3756 1003114.93 R SPS #N/A

8/18/2011 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,003,114.93 778,157.87 invalid 52027 MIDAT2 52017 LE_KCM2 64141.2782 49757.05069 W Lea County #N/A

8/18/2011 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,003,114.93 778,157.87 invalid 52017 LE_KCM2 52021 M-AMR&A2 377844.2274 293109.4438 R SPS #N/A

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub 1,382,821.15 929,124.85 yes 50941 NAMSW2 50865 CHN/CFS2 234594.9378 157625.5804 1382821.15 R SPS #N/A

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub 1,382,821.15 929,124.85 yes 50865 CHN/CFS2 50859 CLIFFSD2 283576.2985 190536.4159 R SPS

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub 1,382,821.15 929,124.85 yes 50865 CHN/CFS2 50863 TASCOSA2 498578.692 334997.6622 R SPS #N/A

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub 1,382,821.15 929,124.85 yes 50863 TASCOSA2 50861 CHANING2 366071.2217 245965.1915 R SPS #N/A

9/1/2012 69 Z-01 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #1 & Duval #4 1,824.65 1,365.61 yes 52251 POTJCT2 52257 DUVAL12 $1,824.65 $1,365.61 $1,824.65 R SPS #N/A

7/1/2014 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 1,123,002.94 866,300.94 invalid 51959 DENVRC2 52027 LE_KCM2 $1,060,958.58 $818,439.01 $1,125,209.08 R Lea County #N/A

6/1/2014 69 Z-39 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Pleasant Hill Tap 64,250.50 40,406.32 invalid CROSBY SP-PLEASNT $64,250.50 $40,406.32 W South Plains #N/A

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $4,282,635.00 $3,695,923.92 yes 51345 WESTRID2 51343 PLNVCO2 $232,929.13 $201,018.38 R SPS 69

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $4,282,635.00 $3,695,923.92 yes 51347 PLNVWT2 51345 WESTRID2 $465,858.26 $402,036.76 R SPS 69

69 Z-18 Elec Tran-Line OH-TX- 69KV-Westridge Sub Tap $91,563.77 $32,859.33 yes 51347 PLNVWT2 51345 WESTRID2 $9,960.16 $3,574.39 $9,960.16 R SPS 69

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Zodiac Sub Tap $47,796.61 $36,142.63 invalid Zodiac Tap (Structure 31) ZODIAC $47,796.61 $36,142.63 R SPS #N/A

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-New Mexico Potash #1 Sub Tap $141,070.26 $64,006.43 invalid 52263 KERMAC2 52261 NMPOTA2 $17,911.69 $8,126.90 R SPS #N/A

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) $679,525.89 $594,327.58 invalid North Clovis Tap

(Structure 143) North Clovis Substation $97,284.24 $85,086.83 R SPS #N/A

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) #N/A #N/A invalid East Clovis Tap

(Structure 42) East Clovis #N/A #N/A R SPS

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) #N/A #N/A invalid FEC Holland Tap

(Structure 57A)FEC Holland Substation #N/A #N/A W Farmers

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) #N/A #N/A invalid FEC Clovis #2 Tap

(Structure 7A)FEC Clovis #2 Substation #N/A #N/A W Farmers

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC $25,611.11 $13,607.22 invalid 52346 Enron Tap (Structure 296) 52374 Enron Substation $1,292.21 $686.55 R SPS #N/A

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC $25,611.11 $13,607.22 yes 52346 Maddox Substation 52348 Pearl Substation $10,962.70 $5,824.50 #N/A R SPS #N/A

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC $25,611.11 $13,607.22 yes Pearl Substation Enron Tap (Structure 296) $13,238.20 $7,033.47 R SPS

Page 44: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

115 T-26 Elec Tran-Line OH-NM- 69KV-Urton Sub Tap

6/30/2011 115 T-53 Elec Tran-Line OH-TX-115KV-Nichols Sta-WTU

8/18/2011 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

8/18/2011 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

8/18/2011 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub

9/6/2011 69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub

9/1/2012 69 Z-01 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #1 & Duval #4

7/1/2014 69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

6/1/2014 69 Z-39 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Pleasant Hill Tap

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Z-18 Elec Tran-Line OH-TX- 69KV-Westridge Sub Tap

4/1/2016 69 Z-44 Elec Tran-Line OH-NM- 69KV-Zodiac Sub Tap

4/1/2016 69 Z-22 Elec Tran-Line OH-NM- 69KV-New Mexico Potash #1 Sub Tap

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75)

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75)

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75)

4/1/2016 115 V-75 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75)

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 3.7 3.7 1 0 0 0 1 0 0 SPS 526 100 3.7

115 2.55 74.339 1 0 $0.00 $0.00 1 $222,351.43 $170,851.20 SPS 526 100 2.55 Yarnell sub was removed from service 6/30/2011

69 13.14 23.49 0 0 0 0 1 0 0 SPS 526 100 13.14 Delete. Wrecked out June 2009 as part of Mid America - AmFrac 69KV to 115kV conversion

69 1.502 23.49 0 1 0 0 0 0 0 SPS 526 100 1.502

69 8.848 23.49 0 0 0 0 1 0 0 SPS 526 100 8.848 Delete. Removed 9/6/2011

69 9.1 53.64 1 0 0 0 1 234594.9378 157625.5804 SPS 526 100 9.1 Delete. Removed 9/6/2011

11 53.64 1 0 0 0 1 283576.2985 190536.4159 SPS 526 100 11 Delete. Removed 9/6/2011

69 19.34 53.64 1 0 0 0 1 498578.692 334997.6622 SPS 526 100 19.34 Delete. Removed 9/6/2011

69 14.2 53.64 1 0 0 0 1 366071.2217 245965.1915 SPS 526 100 14.2 Delete. Removed 9/2012

69 2.6 2.6 1 0 $0.00 $0.00 1 $1,824.65 $1,365.61 SPS 526 100 2.6 Delete Sold Effective 7/1/2014

69 17.1 18.1 0 1 $0.00 $0.00 0 $0.00 $0.00 Delete. Wind Farm Began Commercial Op June 2014

69 1 1 0 1 $0.00 $0.00 0 $0.00 $0.00 March 2014 Change - Set to Invalid- Reflected in 2014 True Up

1 $0.00 $0.00 1 $232,929.13 $201,018.38 SPS 526 100 2.000 March 2014 Change - Set to Invalid- Reflected in 2014 True Up

1 $0.00 $0.00 1 $465,858.26 $402,036.76 SPS 526 100 4.000 March 2014 Change - Set to Invalid- Reflected in 2014 True Up

1 $0.00 $0.00 1 $9,960.16 $3,574.39 SPS 526 100 4.000 delete; repeated row

69 0.463 0.463 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 0.463 Zodiac substation was removed from service when Kilgore was constructed

69 2.280 17.957 0 0 $0.00 $0.00 2 $0.00 $0.00 SPS 526 100 2.280 delete row, repeated row; incorrect asset location

115 1.728 12.07 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 1.728 V75 replaced by W64 and W65 when Pleasant Hill was built ISD = February 2015

115 1.495 12.07 0 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 1.495 V75 replaced by W64 and W65 when Pleasant Hill was built ISD = February 2015

115 0.029 12.07 0 1 #N/A #N/A 1 #N/A #N/A SPS 526 100 #N/A V75 replaced by W64 and W65 when Pleasant Hill was built ISD = February 2015

115 0.347 12.07 0 1 #N/A #N/A 1 #N/A #N/A SPS 526 100 #N/A V75 replaced by W64 and W65 when Pleasant Hill was built ISD = February 2015

115 1.807 35.814 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 #N/A delete; repeated row

115 15.33 35.814 1 0 $0.00 $0.00 2 $21,925.41 $11,649.00 SPS 526 100 15.330 completion of Quahada Substation changed V83 to W73 ISD = July 2015

115 18.512 35.814 1 0 $0.00 $0.00 3 $39,714.60 $21,100.42 SPS 526 100 18.512 completion of Quahada Substation changed V83 to W73 ISD = July 2015

Page 45: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC $25,611.11 $13,607.22 yes 52360 Enron Tap (Structure 296) 52372 Enron $1,292.21 $686.55 R SPS #N/A

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC $25,611.11 $13,607.22 yes 52372 Enron Tap (Structure 296) 52346 Lea National Substation $117.99 $62.69 R SPS #N/A

4/1/2016 115 V-84 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub #N/A #N/A yes 52374 Lea National Substation 52380 Zia Substation #N/A #N/A $14,648.41 R SPS #N/A

4/1/2016 115 V-84 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub #N/A #N/A yes Zia Substation Maljamar #2 #N/A #N/A R SPS

4/1/2016 115 V-84 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub #N/A #N/A yes 52380 Zia Tap (Structure 62A) 52376 Maljamar 1 #N/A #N/A R SPS #N/A

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $1,457,446.19 invalid 50831 Magic City structure 395 50765 NP-BRIS2 $1,059,530.08 $366,681.98 W North Plains #N/A

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) $4,211,300.68 $1,457,446.19 invalid MAGICC2 HOWARD $1,362,561.23 $471,554.95 R SPS #N/A

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int $509,580.66 $357,803.78 invalid 51315 KRESS2 51319 SW-KRES2 $218.70 $153.56 W Swisher #N/A

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int $509,580.66 $357,803.78 invalid 51315 KRESS2 51325 KRESRU2 $163,131.42 $114,543.28 R SPS #N/A

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int $509,580.66 $357,803.78 invalid 51325 KRESRU2 51335 LH-PL&M2 $220,366.30 $154,730.94 W Lighthouse #N/A

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int $509,580.66 $357,803.78 invalid 51335 LH-PL&M2 51337 NPLNV2 $47,677.50 $33,476.92 R SPS #N/A

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) $587,172.94 $544,782.60 invalid 51531 TUCO2 51551 SP-NDE2 $80,589.97 $74,771.86 W South Plains #N/A

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) $587,172.94 $544,782.60 invalid 51551 SP-NDE2 51553 WHTE&MN2 $44,463.43 $41,253.44 R SPS #N/A

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) $587,172.94 $544,782.60 invalid 51553 WHTE&MN2 51555 SP-SHLW2 $33,347.57 $30,940.08 W South Plains #N/A

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) $587,172.94 $544,782.60 invalid 51555 SP-SHLW2 51611 SW67872 $50,021.36 $46,410.12 R SPS #N/A

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) $587,172.94 $544,782.60 invalid 51553 WHTE&MN2 51555 SP-SHLW2 $33,347.57 $30,940.08 W South Plains WHTE&MN2

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) $587,172.94 $544,782.60 invalid 51551 SP-NDE2 51553 WHTE&MN2 $44,463.43 $41,253.44 R SPS #N/A

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) $499,621.54 $447,907.82 invalid 52001 SULPHUR2 51999 ADAIR2 $63,850.65 $57,241.74 $613,595.56 R SPS ADAIR2

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) $499,621.54 $447,907.82 invalid 51999 ADAIR2 51993 LG-ASHM2 $43,935.02 $39,387.49 W Lyntegar #N/A

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) $499,621.54 $447,907.82 invalid 51993 LG-ASHM2 51997 CEDARLK2 $91,777.12 $82,277.66 R SPS CEDARLK2

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) $499,621.54 $447,907.82 invalid 52023 LG-SAWY2 51991 OZMAH22 $58,199.81 $52,175.79 R SPS OZMAH22

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) $499,621.54 $447,907.82 invalid 51989 LG-MC&S2 52023 LG-SAWY2 $91,646.01 $82,160.12 W Lyntegar #N/A

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) $499,621.54 $447,907.82 invalid 51981 SEAGRAV2 51989 LG-MC&S2 $136,354.58 $122,241.09 W Lyntegar #N/A

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) #N/A #N/A invalid 52001 SULPHUR2 51999 ADAIR2 #N/A #N/A R SPS #N/A

Page 46: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC

4/1/2016 115 V-83 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC

4/1/2016 115 V-84 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub

4/1/2016 115 V-84 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub

4/1/2016 115 V-84 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

4/1/2016 69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int

4/1/2016 69 Y-75 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

5/27/2016 69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

115 1.807 35.814 1 0 $0.00 $0.00 4 $5,168.85 $2,746.22 SPS 526 100 1.807 completion of Quahada Substation changed V83 to W73 ISD = July 2015

115 0.165 35.814 1 0 $0.00 $0.00 5 $589.97 $313.45 SPS 526 100 0.165 completion of Quahada Substation changed V83 to W73 ISD = July 2015

115 6.602 18.181 1 0 #N/A #N/A 6 #N/A #N/A SPS 526 100 #N/A completion of Quahada Substation changed V84 to W74 ISD = July 2015

115 11.552 18.181 1 0 #N/A #N/A 7 #N/A #N/A SPS 526 100 #N/A completion of Quahada Substation changed V84 to W74 ISD = July 2015

115 0.027 18.181 1 0 #N/A #N/A 8 #N/A #N/A SPS 526 100 #N/A delete; repeated row

69 17.185 68.305 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 17.185 delete row; the mileage one this row is included in the Howard-Buffalo segment

69 22.100 68.305 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 22.100 delete rows; Y75 replaced by Z82 and Z84 when Kiser Substation went in service

69 0.010 23.300 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 0.010 delete rows; Y75 replaced by Z82 and Z84 when Kiser Substation went in service

69 7.459 23.300 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 7.459 delete rows; Y75 replaced by Z82 and Z84 when Kiser Substation went in service

69 10.076 23.300 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 10.076 delete rows; Y75 replaced by Z82 and Z84 when Kiser Substation went in service

69 2.180 23.300 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 2.180 delete row; incorrect asset locations and repeated segment

69 7.250 52.823 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 7.250 moved row; all of y84 grouped together; delete row, repeated row

69 4.000 52.823 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.000 moved row; all of y84 grouped together; delete row, repeated row

69 3.000 52.823 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 3.000 moved row; all of y84 grouped together; delete row, repeated row

69 4.500 52.823 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.500 moved row; all of y84 grouped together; delete row, repeated row

69 3.000 52.823 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 3.000 moved row; all of y84 grouped together; delete row, repeated row

69 4.000 52.823 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.000 moved row; all of y84 grouped together; delete row, repeated row

69 4.870 38.107 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.870 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 3.351 38.107 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 3.351 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 7.000 38.107 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 7.000 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 4.439 38.107 0 0 $0.00 $0.00 1 $0.00 $0.00 SPS 526 100 4.439 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 6.990 38.107 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 6.990 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 10.400 38.107 0 1 $0.00 $0.00 0 $0.00 $0.00 SPS 526 100 10.400 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 4.870 38.107 0 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 4.870 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

Page 47: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location Gross Plant Net Plant Valid ? DETAILS FBUSNAME T_BUS TBUSNAME Gross Net check Wholesale or Retail Customer REPEATS

Direct Assignments (Set status to "yes")

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) #N/A #N/A invalid 51993 LG-ASHM2 51997 CEDARLK2 #N/A #N/A R SPS #N/A

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) #N/A #N/A invalid 52023 LG-SAWY2 51991 OZMAH22 #N/A #N/A R SPS #N/A

7/18/2017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) $5,724,280.78 $4,218,983.25 invalid CVEC Dayton Tap Structure 104

CVEC Dayton Substation $0.00 $0.00 W CVEC

7/18/2017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) $5,724,280.78 $4,218,983.25 invalid CVEC Irish Hills Tap Structure 152

CVEC Irish Hills Substation $0.00 $0.00 W CVEC

7/18/2017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) $5,724,280.78 $4,218,983.25 invalid CVEC Lake Wood Tap Structure 61

Structure #61A - ownership change $18,355.08 $13,528.29 W CVEC

7/2182017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) $5,724,280.78 $4,218,983.25 invalid Atoka Tap structure 112 Atoka Substation $4,171.61 $3,074.61 R SPS

7/18/2017 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94) $5,724,280.78 $4,218,983.25 yes Ochoa Tap (Structure 229A) Ochoa $722.67 $532.63 R SPS

7/18/2017 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94) $5,724,280.78 $4,218,983.25 yes Agave Tap (Structure 213)

Agave Red Hills Substation (customer) $361.34 $266.32 R SPS

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub $5,724,280.78 $4,218,983.25 yes Targa Tap (Structure 24) Clark Sub (Targa) $32,732.55 $24,124.97 R SPS

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub $505,052.28 $488,641.60 invalid Jal Flying Tap Structures1, 370 & 1 Jal Substation $152.00 $147.06 R SPS

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub $505,052.28 $488,641.60 yes Teague Flying Tap Structure 84 & 85 Teague $317.82 $307.49 R SPS

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub $855,056.39 $784,150.26 invalid Structure 1 @ Jal Dollarhide $85,061.15 $78,007.40 R SPS

Page 48: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

In-Service Date kV CkT- # PowerPlant Asset Location

Direct Assignments (Set status to "yes")

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

4/1/2016 69 Z-21 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21)

7/18/2017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524)

7/18/2017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524)

7/18/2017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524)

7/2182017 115 T-43 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524)

7/18/2017 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94)

7/18/2017 115 W-94 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94)

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub

7/20/2017 115 T-85 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub

BSKV Miles Total Miles Valid WS WS Gross Plant $

WS Net Plant $ Retail Rt Gross Plant $ Rt Net Plant $ CA_NAME Area1 %Ownership Miles Comments

69 7.000 38.107 0 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 7.000 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

69 3.439 38.107 0 0 #N/A #N/A 1 #N/A #N/A SPS 526 100 3.439 completion of Diamondback Substation caused Z21 to be replaced by three lines Z85, Z86, Z87 ISD = Aug 2015

115 0.000 27.444 0 1 $0.00 $0.00 0 $0.00 $0.00 0.000 expansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98

115 0.000 27.444 0 1 $0.00 $0.00 0 $0.00 $0.00 0.000 expansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98

115 0.088 27.444 0 1 $0.00 $0.00 0 $0.00 $0.00 0.088 expansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98

115 0.02 27.444 0 1 $0.00 0 0 0 0 0 expansion of the Atoka Sub from a tapped substation to a facility unit caused T43 to be replaced with W97 and W98

115 0.002 15.842 1 0 $0.00 #N/A 1 #N/A #N/A 0.002 completion of Custer Mountain and other projects caused W94 to be replaced with W95 and U07

115 0.001 15.842 1 0 $0.00 #N/A 1 #N/A #N/A 0.001 completion of Custer Mountain and other projects caused W94 to be replaced with W95 and U07

115 0.209 36.55 1 0 $0.00 1 0.209 completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 0.011 36.55 0 0 $0.00 #N/A #N/A completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 0.023 36.55 1 0 $0.00 #N/A #N/A completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

115 3.636 36.55 0 0 $0.00 #N/A #N/A completion of Cardinal Substation caused T85 to be replaced with U03 and U04 ISD - October 2016

Page 49: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Date of Data Update

Line Voltage in kV

Circuit Number Asset Location Actual Installed

Cost of Line Net Book Value of

Line

Valid Radial Line

Segment?From Location To Location

Wholesale or Retail

Customer

Customer Name

Radial Line Segment

Length in miles

Total Line Length in

miles

Retail Installed Plant Value

Retail Net Plant Value Description of Change

Effective Date of Status

Change

01/03/19 115 U-17 Elec Tran-Line OH-TX-115KV-CLTR-OUTP-115-01 (U-17) $ 73,774.56 $ 73,015.42 yes Hillside Tap (Structure

69A) Hillside Substation R SPS 0.030 9.324 $ 237.37 $ 234.93 completion of Outpost Substation caused V52 to be replaced with U16 and U17 ISD - July 2018. No class change

115 U-08Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08)

$ 693,076.34 $ 671,598.03 yes IMC #1 Tap (Structure 50) IMC#1 R SPS 1.013 16.959 $ 41,399.04 $ 40,116.09

115 U-08Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08)

$ 693,076.34 $ 671,598.03 yes Intrepid West Tap Structure 14

Intrepid West Substation (customer) R SPS 1.120 16.959 $ 45,771.89 $ 44,353.43

01/09/19 115 W-61 Elec Tran-Line OH-NM-115KV-Pecos Intg-North Canal Sub (W-61) $ 379,113.01 $ 310,540.97 yes Pecos Interchange North Canal R SPS 2.584 2.584 $ 379,113.01 $ 310,540.97 corrected mileage from 2.577. No class change

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) $ 1,964,172.23 $ 1,943,954.65 yes Pearl Tap structure

132A Pearl Substation R SPS 0.024 40.814 $ 1,155.00 $ 1,143.11

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) $ 1,964,172.23 $ 1,943,954.65 yes Enron Tap (Structure

296) Enron Substation R SPS 1.807 40.814 $ 86,961.81 $ 86,066.69

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) $ 1,964,172.23 $ 1,943,954.65 yes Lea National Tap

structure 299Lea National Substation R SPS 0.026 40.184 $ 1,270.87 $ 1,257.78

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) $ - $ - invalid COX2 AIKENT2 R SPS 3.500 24.924

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) $ - $ - invalid AIKENT2 LOCKNEY2 R SPS 1.500 24.924

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) $ - $ - invalid IRICK2 LH-AIKN2 W Lighthouse 4.900 24.924

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) $ - $ - invalid LH-AIKN2 LOCKNEY2 R SPS 7.700 24.924

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) $ - $ - invalid BARWISE2 IRICK2 R SPS 3.600 24.924

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) $ - $ - invalid FLOYD2 BARWISE2 R SPS 3.340 24.924

01/09/19 115 T-37 Elec Tran-Line OH-TX-115KV-Sunset Sub-Puckett West Sub (T-37) $ 1,404,361.37 $ 1,371,599.60 yes Soncy Tap Structure

#49 Soncy Substation R SPS 1.050 3.323 $ 443,749.45 $ 433,397.41 T37 is now tapped to Soncy to facilitate the conversion of Soncy's distribution transformer from 69kV to 115kV. Class change effective December 2018

Dec-18

01/09/19 69 Y-72 Elec Tran-Line OH-TX- 69KV-Coulter Intg-Soncy (Y-72) $ 636,942.55 $ 609,803.39 invalid Waterfield Tap

Structure 71 Waterfield Substation R SPS 8.160 12.162

load from Waterfield substation was transferred to Outpost Substation. Waterfield is de-energized and scheduled to be wrecked out. This segment of Y72 feeds no customers.

Dec-18

Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $ 3,070,777.64 $ 2,763,712.12 yes CVEC Pinelodge RIAC/Price Tap

Structure 8 W CVEC 11.120 15.717

Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int $ 3,070,777.64 $ 2,763,712.12 yes Roswell Interchange RIAC/Price Tap

Structure 8 W CVEC 0.560 15.717

03/13/19 69 Z-48 Elec Tran-Line OH-NM- 69KV-Mississippi Chem #2 Sub Tap $ 13,784.17 $ 2,952.60 invalid Mississippi Chem #2

Tap (Structure 17)Mississippi Chem #2 Substation R SPS 1.160 1.160

load from Mississippi Chem #2 substation was moved to Interpid West substation. Mississippi Chem #2 is de-energized and serves no customers; the substation will not be placed back into service

Dec-18

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) $ 2,059,461.00 $ 1,933,691.48 yes Northwest Interchange Wildorado/Vega Tap

(Structure 153) R SPS 20.968 39.258 $ 1,099,973.97 $ 1,032,799.50 corrected mileage_segment & total from 20.543/38.944. No class change

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) $ 2,059,461.00 $ 1,933,691.48 yes Wildorado/Vega Tap

(Structure 153) Vega R SPS 15.095 39.258 $ 791,878.44 $ 743,519.10 corrected mileage_segment & total from 14.060/38.944. No class change

Nov-18

In November 2018, switch 4715 was opened, and switch 4702 was closed; this put TMC, Wherry Housing, East & West RIAC substations on Z08. They will be fed fom Z08 until the Sierra Substation is placed in service and the load from these substations are transferred to Sierra. CVEC Pine Lodge is the only customer on Z09; the load is fed from Roswell Interchange. Z09 has been wrecked out from CVEC Pine Lodge, east to Chaves County, and from the RIAC/Price Tap south to the TMC/RIAC tap. Total mileage has been adjusted accordingly.

02/05/19 69 Z-09

01/09/19 New asset location & line number. No class change. U12 replaces W73.

corrected total mileage from 24.540. No class change 01/09/19

03/13/19

New asset location. No class change.01/09/19

CHANGES FROM 10/1/2018 - 12/31/2018 [REFLECTED IN ATRR 2018 TRUE-UP UPDATE]

Page 50: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Date of Data Update

Line Voltage in kV

Circuit Number Asset Location Actual Installed

Cost of Line Net Book Value of

Line

Valid Radial Line

Segment?From Location To Location

Wholesale or Retail

Customer

Customer Name

Radial Line Segment

Length in miles

Total Line Length in

miles

Retail Installed Plant Value

Retail Net Plant Value Description of Change

Effective Date of Status

Change

CHANGES FROM 10/1/2018 - 12/31/2018 [REFLECTED IN ATRR 2018 TRUE-UP UPDATE]

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) $ 2,059,461.00 $ 1,933,691.48 yes Wildorado/Vega Tap

(Structure 153) Wildorado R SPS 1.868 39.258 $ 97,994.63 $ 92,010.18 corrected mileage_segment & total from 1.899/38.944. No class change

115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int $ 3,840,565.70 $ 2,352,459.46 yes Rita Blanca Exum Tap

Structure 222ARita Blanca REC Exum Substation W Rita Blanca 0.000 35.726

115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int $ 3,840,565.70 $ 2,352,459.46 yes Hilmar Cheese Tap

Structure 412Hilmar Cheese Substation R SPS 0.489 35.726 $ 52,567.78 $ 32,199.31

115 W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) $ 9,376,799.70 $ 9,221,150.82 yes Panda Tap Structure

482 Panda Substation R SPS 0.015 26.868 $ 5,234.93 $ 5,148.03

115 W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) $ 9,376,799.70 $ 9,221,150.82 yes Dawn Flying Tap Dawn Substation R SPS 0.010 26.868 $ 3,489.95 $ 3,432.02

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 invalid WESTRID2 PLNVCO2 R SPS 2.000 36.772

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 invalid WPLNV2 NO 3724 R SPS 3.100 36.772

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 invalid PLNVWT2 NO3890 R SPS 4.900 36.772

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 invalid PLNVWT2 WESTRID2 R SPS 4.000 36.772

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 yes Kiser Substation West Plainview R SPS 2.483 30.810 $ 516,064.94 $ 432,603.07 corrected mileage_segment & total from 2.472/36.772.

No class change

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 yes Hale County Substation Westridge R SPS 8.473 30.810 $ 1,761,022.25 $ 1,476,216.61 corrected mileage_segment & total from 8.487/36.772.

No class change

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 invalid Hale Center Substation Lighthouse REC Hale

Center Substation W Lighthouse 0.268 30.810 corrected mileage_segment & total from 0.268/36.772. No class change

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview $ 6,403,528.32 $ 5,367,902.00 invalid TUCO Hale Center

Substation R SPS 13.485 30.810 corrected mileage_segment & total from 13.000/36.772. No class change

69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub $ 1,199,480.44 $ 1,085,335.02 yes North Amarillo Switch

Station Cliffside Substation R SPS 9.752 21.321 $ 548,629.67 $ 496,420.76 corrected mileage_total from 20.100 to 21.321. No class change

115 U-11 Elec Tran-Line OH-TX-115KV-East Sta-Rolling Hills Sub (U-11) $ - $ - yes Hasting Tap Hastings Substation R SPS 0.047 11.429 $ - $ -

115 W-42Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42)

$ 4,070,452.54 $ 3,698,213.71 invalid Rolling Hills Substation Hastings Substation R SPS 0.047 11.429

New asset location & line number. No class change. U11 replaces W42 & W4803/25/19

deleted rows_addition of Kiser Substation changed the topology of Z18; these rows were not relevant to the Radial Line Study and do not add to or take away from any amount from the ATRR

03/18/19

corrected mileage_total from 35.603 to 35.726. No class change 03/13/19

corrected mileage_total from 26.583 to 26.868. No class change 03/14/19

Page 51: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

69 Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop 859,217.69$ 556,544.97$ yes Curry County West Clovis R

69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis Loop 859,217.69$ 556,544.97$ invalid Curry County Switch 4625 R

69 Z-03 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2 695,780.98$ 359,343.04$ invalid PCA Substation Central Valley REC Lusk Substation W

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Carlsbad Interchange Loving S./Crlsbd Water tap (Structure 103) R

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Loving S./Crlsbd Water tap (Structure 103) Carlsbad Waterfield tap (Structure 127) R

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Loving S./Crlsbd Water tap (Structure 103) Loving South/Navajo-Malaga Tap Struc 52A R

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Carlsbad Waterfield tap (Structure 127) White City R

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Loving South/Navajo-Malaga Tap Struc 52A Loving South Substation R

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Loving South/Navajo-Malaga Tap Struc 52A Navajo-Malaga Substation R

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47$ 1,463,811.57$ yes Carlsbad Waterfield tap (Structure 127) Carlsbad Waterfield R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Roswell Interchange Orchard Park Tap structure 68 W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Orchard Park Tap structure 68 CVEC ORCHARD PARK W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Orchard Park Tap structure 68 Dexter Tap structure 27 R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Dexter Tap structure 27 YO REC Tap structure 123 R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Dexter Tap structure 27 CVEC Dexter W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid CVEC Dexter Dexter Substation R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid YO REC Tap structure 123 Switch 4743 (to CVEC Y-O) W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid YO REC Tap structure 123 HAGERMAN TAP (Structure 135) W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid HAGERMAN TAP (Structure 135) CVEC Hagerman W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid HAGERMAN TAP (Structure 135) LAKE ARTHUR TAP (Structure 208) W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid LAKE ARTHUR TAP (Structure 208) CVEC LAKE ARTHUR W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid LAKE ARTHUR TAP (Structure 208) COTTONWOOD TAP (Structure 252) W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid COTTONWOOD TAP (Structure 252) Switch 4788 (to CVEC Cottonwood) W

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid COTTONWOOD TAP (Structure 252) Cottonwood Substation R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid COTTONWOOD TAP (Structure 252) Artesia Smith Tap structure 309 R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Artesia Smith Tap structure 309 Artesia Smith Substation R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Artesia Smith Tap structure 309 Artesia Interchange R

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73$ 1,547,421.92$ invalid Orchard Park Tap structure 68 Switch 4702 R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid Chaves County Interchange Price Substation R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid Price Substation CVEC Pinelodge R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ yes CVEC Pinelodge RIAC/Price Tap Structure 8 W

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ yes Roswell Interchange RIAC/Price Tap Structure 8 W

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid RIAC/Price Tap Structure 8 RIAC East/West Tap Structure 5 R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid RIAC East/West Tap Structure 5 TMC Tap Structure 11 R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid TMC TAP (Structure 11 Z09.3) WEST RIAC R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid TMC TAP (Structure 11 Z09.3) TMC R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid RIAC East/West Tap Structure 5 RIAC East/Wherry Housing Tap Struc 4 R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid RIAC East/Wherry Housing Tap Struc 4 Wherry Housing Tap (Structure 11 Z09.4) R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid Wherry Housing Tap (Structure 11 Z09.4) WHERRY HOUSING R

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64$ 2,763,712.12$ invalid Wherry Housing Tap (Structure 11 Z09.4) EAST RIAC R

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 503,987.66$ 323,955.37$ yes Potash Junction Interchange Kermac Tap structure 89 R

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash 174,970.45$ 116,936.90$ yes Kermac Tap structure 89 NM POTASH #1 (KERMAC) R

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash 174,970.45$ 116,936.90$ yes Kermac Tap structure 89 New Mexico Potash Tap structure 21 R

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash 174,970.45$ 116,936.90$ yes New Mexico Potash Tap structure 21 NM POTASH #2 (MISS EAST #2) R

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash 174,970.45$ 116,936.90$ invalid New Mexico Potash Tap structure 21 LIVINGSTONE RIDGE SUBSTATION R

69 Z-24 Elec Tran-Line OH-NM- 69KV-Clovis East Sub Tap 225,990.69$ 195,770.55$ yes Portales Interchange Portales #1 R

69 Z-24 Elec Tran-Line OH-NM- 69KV-Industrial Sub-Ethanol Plant Sub 119,801.22$ 37,302.77$ yes Portales #2 Market Street R

69 Z-24 Elec Tran-Line OH-NM- 69KV-Portales Grain Alcohol 473,070.61$ 301,497.05$ yes Market Street Portales EFDC R

69 Z-24 Elec Tran-Line OH-NM- 69KV-Cherry Sub Tap 19,775.51$ 4,037.99$ yes Portales #1 Portales #2 R

Page 52: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub 344,980.25$ 193,812.10$ invalid PORTALES Zodiac Tap (Structure 31) R

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub 344,980.25$ 193,812.10$ invalid Portales South Tap (Structure 75) Portales South Substation R

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub 344,980.25$ 193,812.10$ invalid Zodiac Tap (Structure 31) Portales South Tap (Structure 75) R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes Potash Junction Mississippi Chem #2 Tap (Structure 17) R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Mississippi Chem #2 Sub Tap 13,784.17$ 2,952.60$ invalid Mississippi Chem #2 Tap (Structure 17) Mississippi Chem #2 Substation R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes Mississippi Chem #2 Tap (Structure 17) IMC #2 Tap (Structure 55) R

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #2 Sub Tap 119,761.12$ 80,275.83$ yes IMC #2 Tap (Structure 55) IMC #2 Substation R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes IMC #2 Tap (Structure 55) United Salt Flying Tap (Structures 60-61 & 60A) R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes United Salt Flying Tap (Structures 60-61 & 60A) United Salt Substation R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes United Salt Flying Tap (Structures 60-61 & 60A) IMC #3/Strata/Duval/Borehole Tap-Structure 98 R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes IMC #3/Strata/Duval/Borehole Tap (Structure 98) IMC #3/Strata Tap (Structure 8A) R

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap 60,910.57$ 22,338.14$ yes IMC #3/Strata Tap (Structure 8A) Strata R

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap 60,910.57$ 22,338.14$ yes IMC #3/Strata Tap (Structure 8A) IMC #3 R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes IMC #3/Strata/Duval/Borehole Tap (Structure 98) Duval #3/IMC #4/Borehole Tap-Structure 122A R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole 379,643.21$ 228,300.23$ yes Duval #3/IMC #4/Borehole Tap (Structure 122A) Borehole Substation R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole 379,643.21$ 228,300.23$ yes Duval #3/IMC #4/Borehole Tap (Structure 122A) Duval #3/IMC corner structure 123 R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89$ 184,986.37$ yes Duval #3/IMC corner structure 123 Duval #3 Substation R

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole 379,643.21$ 228,300.23$ yes Duval #3/IMC corner structure 123 IMC #4 Substation R

69 Z-50 Elec Tran-Line OH-NM- 69KV-Curry Co Int-TX St Line 157,248.93$ 101,596.01$ yes Curry County TX/NM State Line R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Atoka Artesia South Tap structure 60 R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia South Tap structure 60 Artesia South Substation R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia South Tap structure 60 Artesia Country Club Tap structure 45 R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia Country Club Tap structure 45 Artesia Country Club substation R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia Country Club Substation Switch 4699 (feeds CV-West Artesia) W

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia Country Club Tap structure 45 Artesia 13th Street R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia 13th Street Artesia REC Tap structure 302 R

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia REC Tap structure 302 CV-Artesia W

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41$ 121,150.51$ invalid Artesia REC Tap structure 302 Artesia Interchnage R

69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98$ 104,383.41$ yes Eagle Creek 1st Street Tap (Structure 17) R

69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98$ 104,383.41$ yes 1st Street Tap (Structure 17) Navajo#1 R

69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98$ 104,383.41$ yes 1st Street Tap (Structure 17) ARTESIA TOWN R

115 T-05 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Fiesta Sub 272,613.42$ 119,042.74$ yes Carlsbad Fiesta Substation R

115 T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) 19,265.15$ 18,317.98$ yes flying tap structures 128 & 130 Hobbs South Hobbs South Substation R

115 T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) 19,265.15$ 18,317.98$ yes flying tap structures 232 & 121 East Sanger East Sanger Substation R

115 T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) 19,265.15$ 18,317.98$ yes 3-way Switch Tap Structure 116 slack span to OXY S. Hobbs RCF line R

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) -$ -$ yes Oxy Permian Tap (Structure 63) Oxy Permian Substation R

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) -$ -$ yes Oxy North Tap (Structure 64A) Switch 4J02 [OXY North] R

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) -$ -$ yes West Bender Flying Tap West Bender Substation R

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14) -$ -$ yes West Bender Substation North Hobbs Substation R

115 T-24 Elec Tran-Line OH-NM-115KV-Brasher Sub Tap 1,152,352.04$ 1,033,060.08$ invalid Brasher Tap Structure 2 Brasher Substation R

115 T-26 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell City (T-26) 2,248,603.47$ 1,522,841.67$ yes Urton Sub Tap (Structure 75) URTON R

115 T-42 Elec Tran-Line OH-NM-115KV-Cochran Sw Sta-Monument Sub 2,319,436.25$ 1,973,357.75$ invalid Monument Flying Tap Structures 29 & 30 Monument Substation R

115 T-45 Elec Tran-Line OH-NM-115KV-Curry Co Int-Oasis Int 740,289.93$ 641,552.38$ yes FEC Cheese Tap Structure 77 FEC Cheese Substation W

115 T-45 Elec Tran-Line OH-NM-115KV-Norris St Tap 5,642,204.40$ 3,261,577.75$ yes Norris Tap Structure 3 Norris Substation R

115 T-84 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub 248,975.91$ 235,777.68$ yes Drinkard/NEF Tap (Structure 19) Drinkard R

115 T-84 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub 248,975.91$ 235,777.68$ yes Drinkard/Eunice Tap (Structure 182) Eunice R

115 T-97 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97) 475,132.08$ 407,633.95$ yes Millen Tap Structures 139 & 1 Millen Substation R

115 T-97 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97) 475,132.08$ 407,633.95$ yes Northeast Hobbs Flying Tap Structures 36 & 37 Northeast Hobbs Substation R

115 T-98 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Higg Sub (T-98) 394,920.79$ 382,920.89$ yes Bensing Tap Structure 114A Bensing Substation R

115 U-03 Elec Tran-Line OH-NM-115KV-NEF Sub-Cardinal Sub (U-03) 1,599,271.69$ 1,570,467.63$ yes Targa Tap (Structure 24) Clark Sub (Targa) R

Page 53: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) 425,655.41$ 409,102.74$ invalid Jal Flying Tap Structures 1, 370 & 1 Jal Substation R

115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) 425,655.41$ 409,102.74$ yes Teague Flying Tap Structures 84 & 85 Teague R

115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) 425,655.41$ 409,102.74$ invalid Structure 1 @ Jal Dollarhide R

115 U-06 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Agave Sub #2 (U-06) 434,542.90$ 422,711.73$ yes Roadrunner Substation Agave Substation #2 R

115 U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) 204,462.10$ 198,162.73$ yes Roadrunner Substation Agave Tap (Structure 7A) R

115 U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) 204,462.10$ 198,162.73$ yes Agave Tap (Structure 7A) Switch 4H893 R

115 U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) 204,462.10$ 198,162.73$ yes Agave Tap (Structure 7A) Ochoa R

115 U-08 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08) 693,076.34$ 671,598.03$ yes IMC #1 Tap (Structure 50) IMC#1 R

115 U-08 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08) 693,076.34$ 671,598.03$ yes Intrepid West Tap Structure 14 Intrepid West Substation (customer) R

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) 1,964,172.23$ 1,943,954.65$ yes Pearl Tap structure 132A Pearl Substation R

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) 1,964,172.23$ 1,943,954.65$ yes Enron Tap (Structure 296) Enron Substation R

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) 1,964,172.23$ 1,943,954.65$ yes Lea National Tap structure 299 Lea National Substation R

115 V-26 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Roswell Int 6,058,841.86$ 4,683,856.45$ yes Tweedy Tap Structure 447 Tweedy Substation R

115 V-77 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell Int 1,062,989.01$ 723,097.42$ yes Samson Flying Tap Structure 338 Samson Substation R

115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98) 3,147,335.27$ 2,798,833.22$ invalid Buckeye/CVEC Tap (Structure 111A) Buckeye R

115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98) 3,147,335.27$ 2,798,833.22$ invalid Buckeye/CVEC Tap (Structure 111A) flying tap to CV-San Andres Sub W115 W-22 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 4&5 (W-22) -$ (0.97)$ yes Eagle Creek Navajo 4 & 5 R

115 W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) 335,413.83$ 283,973.42$ yes Eagle Creek Navajo No. 2&3 Tap (Structure 89) R

115 W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) 335,413.83$ 283,973.42$ yes Navajo No. 2&3 Tap (Structure 89) Navajo No. 2 R

115 W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) 335,413.83$ 283,973.42$ yes Navajo No. 2&3 Tap (Structure 89) Navajo No. 3 R

115 W-25 Elec Tran-Line OH-NM-115KV-Pecos Intg-Ocotillo Sub (W-25) 1,853,699.71$ 1,636,823.42$ yes PECOS OCOTILLO R

115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) 3,809,773.66$ 3,709,331.71$ yes Byrd Tap Structure 126 Byrd Substation R

115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) 3,809,773.66$ 3,709,331.71$ yes Cooper Ranch Tap Structure 169A Cooper Ranch Substation R

115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) 1,664,277.98$ 1,504,330.05$ yes Ward Flying Tap Structures 70 & 71 Ward Substation R

115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) 1,664,277.98$ 1,504,330.05$ invalid Lea Road Flying Tap Structures 210A & 1 Lea Road Substation R

115 W-32 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32) 571,861.70$ 492,694.81$ yes Canon AFB Tap (Structure 89) Canon AFB R

115 W-32 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32) 571,861.70$ 492,694.81$ yes West Clovis Tap (Structure 143) West Clovis R

115 W-38 Elec Tran-Line OH-NM-115KV-Wipp Sub-Red Bluff Sub (W-38) 61,350.70$ 43,666.91$ yes Sand Dunes Tap (Structure 131) Sand Dunes R

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) 1,883,927.96$ 1,738,085.67$ yes ENTERPRISE Tap structure 72 ENTERPRISE Substation (customer owned) R

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) 1,883,927.96$ 1,738,085.67$ yes BOPCO TAP Structure 81 BOPCO Poker Lake Substn-customer owned R

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) 1,883,927.96$ 1,738,085.67$ invalid BOPCO TAP Structure 81 WOOD DRAW R

115 W-43 Elec Tran-Line OH-NM-115KV-Pecos Sub-Hopi Sub (W-43) 8,028,189.22$ 7,145,058.41$ invalid Pecos Interchange Hopi Substation R

115 W-49 Elec Tran-Line OH-NM-115KV-Roswell Intg-Capitan (W-49) 6,571,159.55$ 5,973,314.91$ invalid Roswell Interchange Capitan Substation R

115 W-58 Elec Tran-Line OH-NM-115KV-Norton Sw Sta-Lopez Int (W-58) 725,203.20$ 697,548.07$ invalid FEC Tucumcari Tap Structure 639A FEC Tucumcari Substation W

115 W-59 Elec Tran-Line OH-NM-115KV-Lopez Int-Campbell St Sub (W-59) -$ -$ invalid Lopez Campbell R

115 W-61 Elec Tran-Line OH-NM-115KV-Pecos Intg-North Canal Sub (W-61) 379,113.01$ 310,540.97$ yes Pecos Interchange North Canal R

115 W-62 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-62) 1,294,678.45$ 1,238,702.52$ yes East Clovis Tap (Structure 42) East Clovis R

115 W-64 Elec Tran-Line OH-NM-115KV-FEC Intg-Pleasant Hill Sub (W-64) 1,793,962.90$ 1,650,778.18$ yes North Clovis Tap (Structure 143) North Clovis Substation R

115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) 518,207.80$ 482,919.63$ yes FEC Holland Tap (Structure 57A) FEC Holland Substation W

115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) 518,207.80$ 482,919.63$ yes FEC Clovis #2 Tap (Structure 7A) FEC Clovis #2 Substation W

115 W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66) 15,103,028.80$ 14,554,986.58$ yes Kilgore Tap (structure #44) Kilgore Substation R

115 W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66) 15,103,028.80$ 14,554,986.58$ yes Portales South Tap (structure #75) Portales South Substation R

115 W-70 Elec Tran-Line OH-NM-115KV-Hopi Sub-North Loving Sub (W-70) 6,670,377.95$ 6,202,078.73$ invalid Hopi Substation North Loving Substation R

115 W-72 Elec Tran-Line OH-NM-115KV-North Loving Sub-China Draw Sub (W-72) 9,344,878.61$ 8,697,741.58$ invalid North Loving Substation China Draw Substation R

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) 432,370.75$ 401,269.79$ yes Quahada Substation Zia Substation #2 Tap structure number 1 R

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) 432,370.75$ 401,269.79$ yes Zia Substation #2 Tap structure number 1 Zia Substation #2 R

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) 432,370.75$ 401,269.79$ yes Zia Substation #2 Tap structure number 1 Zia Substation #1 R

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) 432,370.75$ 401,269.79$ yes Zia Substation #1 Maljamar #2 R

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) 432,370.75$ 401,269.79$ yes Maljamar #2 Maljamar R

115 W-79 Elec Tran-Line OH-NM-115KV-Battle Axe Sub-Roadrunner Sub (W-79) 9,000,997.03$ 8,397,846.46$ yes Roadrunner Substation Battle Axe Substation R

Page 54: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

115 W-81 Elec Tran-Line OH-NM-115KV-Ponderosa Sub-Custer Mt Sw Sta (W-81) 5,716,030.98$ 5,531,940.14$ yes Custer Mountain Switch Station Ponderosa Substation R

115 W-89 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89) 7,572,071.13$ 7,189,310.54$ invalid Cardinal Switch Station Sage Brush Substation R

115 W-97 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (W-97) 148,386.45$ 140,747.39$ yes CVEC Dayton Tap Structure 104 CVEC Dayton Substation W

115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) 339,773.40$ 322,353.25$ yes CVEC Irish Hills Tap Structure 152 CVEC Irish Hills Substation W

115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) 339,773.40$ 322,353.25$ yes CVEC Lake Wood Tap Structure 61 Structure # 61A - ownership change W

115 W-99 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Capitan Sub (W-99) 10,329,741.51$ 9,999,957.35$ yes Price Tap (structure 28) Price Substation R

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) 174,832.24$ 155,135.33$ yes Lubbock South Ivory/Batton Tap Structure 145 W

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) 174,832.24$ 155,135.33$ yes Ivory/Batton Tap Structure 145 Ivory Substation W

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) 174,832.24$ 155,135.33$ yes Ivory/Batton Tap Structure 145 Batton Substation-South W

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) 174,832.24$ 155,135.33$ yes Carlisle Substation Batton Substation-North W

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89$ 2,493,481.73$ yes Gray County Damron Tap Structure 244 R

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89$ 2,493,481.73$ yes Damron Tap Structure 244 Damron Substation R

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89$ 2,493,481.73$ yes Hutchinson County CRMWA #22 Tap Structure 7 R

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89$ 2,493,481.73$ yes CRMWA #22 Tap Structure 7 CRMWA #22 Substation R

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89$ 2,493,481.73$ yes CRMWA #22 Tap Structure 7 Burnett Substation R

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89$ 2,493,481.73$ yes Burnett Substation Roxana Substation R

69 Y-59 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub 1,844,333.73$ 1,296,598.94$ yes Riverview Rocky Point Substation R

69 Y-59 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub 1,844,333.73$ 1,296,598.94$ yes Kingsmill Springcreek Substation R

69 Y-60 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Bowers Sub (Y-60) 1,656,663.10$ 1,539,482.98$ yes McCullough Tap Structure 41 McCullough Substation R

69 Y-61 Elec Tran-Line OH-TX- 69KV-Borger Loop 714,734.04$ 368,536.54$ yes Weatherly Tap (structures 109/110) Weatherly Substation R

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 4,199,042.93$ 3,920,920.35$ yes Bowers Substation Green Belt REC Kellerman Tap Struc 334 W

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 4,199,042.93$ 3,920,920.35$ invalid Green Belt REC Kellerman Tap Struc 334 Magic City structure 395 R

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 4,199,042.93$ 3,920,920.35$ invalid Magic City structure 395 structure 82 -ownership chng to WTU Shamrock R

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 4,199,042.93$ 3,920,920.35$ yes Howard Substation Buffalo Substation R

69 Y-63 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Intg-Industrial Sub (Y-63) -$ -$ yes Hutchinson County Camex Transpetco Substation R

69 Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) 13,956.44$ 12,819.98$ yes Lubbock East Clutter W

69 Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) 13,956.44$ 12,819.98$ yes Lubbock South Acco W

69 Y-65 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt 1,839.07$ 946.83$ invalid HUBRCO 2 INDUSTR2 R

69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub 1,199,480.44$ 1,085,335.02$ yes North Amarillo Switch Station Cliffside Substation R

69 Y-67 Elec Tran-Line OH-TX- 69KV-Castro Co REC Sub Tap 149,986.28$ 56,423.52$ yes Castro County Interchange Structure # 53 - ownership change W

69 Y-72 Elec Tran-Line OH-TX- 69KV-Coulter Intg-Soncy (Y-72) 636,942.55$ 609,803.39$ invalid Waterfield Tap Structure 71 Waterfield Substation R

69 Y-74 Elec Tran-Line OH-TX- 69KV-Hale Co Int-Plainview South Sub 99,807.20$ 32,640.82$ yes Hale County Substation South Plainview Substation R

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) -$ -$ invalid COX2 AIKENT2 R

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) -$ -$ invalid AIKENT2 LOCKNEY2 R

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) -$ -$ invalid IRICK2 LH-AIKN2 W

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) -$ -$ invalid LH-AIKN2 LOCKNEY2 R

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) -$ -$ invalid BARWISE2 IRICK2 R

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77) -$ -$ invalid FLOYD2 BARWISE2 R

69 Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub 530,249.08$ 436,111.33$ yes Lamb County South Littlefield Substation R

69 Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub 530,249.08$ 436,111.33$ yes South Littlefield Substation Littlefield City Substation R

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid LAMBCO2 LC-LTTL2 W

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid LC-LTTL2 WANTNTP2 R

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid WANTNTP2 LC-SP&H2 W

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid WANTNTP2 BAINER2 R

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid BAINER2 WANTON2 R

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid SP-ABRN2 COUNTL2 R

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33$ 4,492,587.82$ invalid TUCO2 SP-ABRN2 W

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47$ 31,637.96$ invalid LAMBCO2 WLTTLF2 R

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47$ 31,637.96$ invalid WLTTLF2 AMHERST2 R

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47$ 31,637.96$ invalid AMHERST2 LC-SNDH2 W

Page 55: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47$ 31,637.96$ invalid LC-SNDH2 SUDNRU2 R

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47$ 31,637.96$ invalid MULE-V2 BAILYP2 R

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47$ 31,637.96$ invalid BAILYP2 LC-BECK2 W

69 Y-80 Elec Tran-Line OH-TX- 69KV-Muleshoe Sub Tap 201,096.92$ 162,362.67$ invalid BC-BAIL2 MULE-V2 R

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid CROSBY2 SP-ACUF2 W

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid NO6888 SW67462 R

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid SW67462 SP-HETL2 W

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid SP-HETL2 SP-IDAL2 W

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid SP-IDAL2 VICKER2 R

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid SP-ACUF2 NO6754 W

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid TUCO2 SP-NDE2 W

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid SP-NDE2 WHTE&MN2 R

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid WHTE&MN2 SP-SHLW2 W

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86$ 520,131.02$ invalid SP-SHLW2 SW67872 R

69 Y-85 Elec Tran-Line OH-TX- 69KV-Stanton East (Y-85) -$ -$ invalid LUBE2 PLANTRS2 R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Lamb County Lamb County REC Lums Chapel W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Lamb County REC Lums Chapel Hobgood Tap Structure 144 R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Hobgood Tap Structure 144 Hobgood R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Hobgood Tap Structure 144 Yellowhouse Tap Structure 132 R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Yellowhouse Tap Structure 132 Yellowhouse R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Yellowhouse Phillips Pump #2 R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Yellowhouse Tap Structure 132 Mid-America #2 Tap Structure 106A R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Mid-America #2 Tap Structure 106A Mid-America #2 R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Mid-America #2 Tap Structure 106A Whitharral Tap Structure 96 R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Whitharral Tap Structure 96 Whitharral R

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Whitharral Tap Structure 96 Lamb County REC Hodge Tap structure 71 W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Lamb County REC Hodge Tap structure 71 Switch 6776 W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Lamb County REC Hodge Tap structure 71 LC-Whitharral Tap Structure 70 W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid LC-Whitharral Tap Structure 70 Lamb County REC Whitharral W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid LC-Whitharral Tap Structure 70 LC-Levelland #2 Tap Structure 14 W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid LC-Levelland #2 Tap Structure 14 Lamb County REC Levelland #2 W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid LC-Levelland #2 Tap Structure 14 Hockley County Substation W

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48$ 208,730.75$ invalid Ellwood Tap Structure 59 Elwood R

69 Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta 735,793.48$ 655,810.21$ yes Happy Interchange Happy City Tap Structure 14 R

69 Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta 735,793.48$ 655,810.21$ yes Happy City Tap Structure 14 Happy City Substation R

69 Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta 735,793.48$ 655,810.21$ yes Happy City Tap Structure 14 Shamrock Pump Substation R

69 Y-92 Elec Tran-Line OH-TX- 69KV-East Sta-Van Buren Sub 187,162.03$ 104,725.34$ yes East Plant Van Buren North R

69 Y-93 Elec Tran-Line OH-TX- 69KV-East Plant Intg-Van Buren Sub (Y-93) 12,503.35$ 10,571.28$ yes East Plant Van Buren South R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid LY-Seagraves Tap Structure 67 Lyntegar REC Seagraves W

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid LY-Seagraves Tap Structure 68 3-WAY Switch Tap Structure 90 R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid 3-WAY Switch Tap Structure 90 Kinney Tap Structure 68 R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Kinney Tap Structure 68 Kinney Substation R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Kinney Tap Structure 69 Tokio Tap Structure 174 R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Tokio Tap Structure 174 Tokio Substation R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Tokio Tap Structure 174 Lyntegar REC Tokio W

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid 3-WAY Switch Tap Structure 90 Seagraves Tap structure 132 R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Seagraves Tap Structure 132 Moss Substation R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Seagraves Tap Structure 133 Seagraves Substation R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid Denver City Substation JayBee Tap Structure 51 R

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid JayBee Tap Structure 51 JayBee Substation R

Page 56: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97$ 1,353,367.86$ invalid JayBee Tap Structure 51 LY-Seagraves Tap Structure 67 W

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ invalid LH-SLVR2 BRISCOE2 R

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ invalid LH-SPL2 LH-SLVR2 W

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ invalid LH-LST2 LH-SPL2 W

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ invalid LH-CDRH2 LH-LST2 W

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 372,386.36$ 309,692.26$ invalid Denver City Substation KCM Tap Structure 40A R

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 372,386.36$ 309,692.26$ yes Gaines County Substation RILEY R

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34$ 3,070,397.15$ yes Denver City Substation Denver City East Tap Structure 170 R

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34$ 3,070,397.15$ yes Denver City East Tap Structure 170 Denver City East R

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34$ 3,070,397.15$ yes Denver City East Tap Structure 170 Oxy Tap Structure 114 R

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34$ 3,070,397.15$ yes Oxy Tap Structure 114 Phillips Pump #1 R

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34$ 3,070,397.15$ yes Denver City Substation Wasson R

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34$ 3,070,397.15$ invalid WASSON2 SW78142 R

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ yes Kiser Substation West Plainview R

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ yes Hale County Substation Westridge R

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ invalid Hale Center Substation Lighthouse REC Hale Center Substation W

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32$ 5,367,902.00$ invalid TUCO Hale Center Substation R

69 Z-20 Elec Tran-Line OH-TX- 69KV-Cochran Co Int-Sundown REC 392,625.74$ 261,133.97$ yes Cochran Substation Lyntegar REC Sundown Substation W

69 Z-23 Elec Tran-Line UG-TX- 69KV-South Georgia Int-Lawrence Park Sub 271,182.71$ 72,427.94$ invalid GEORGIA2 LAWPK12 R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Hockley County Substation Levelland City Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ invalid Levelland East Tap Structure 193 Levelland East Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Cochran Substation Middleton Tap Structure 48 R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Middleton Tap Structure 48 Middleton Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Middleton Tap Structure 48 Mallet Tap Structure 23 R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Mallet Tap Structure 23 Mallet Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Mallet Tap Structure 23 Texaco Tap Structure 43 R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Texaco Tap Structure 43 Texaco Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Texaco Tap Structure 43 Zavalla Tap Structure 98 R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ yes Zavalla Tap Structure 98 Zavalla Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ invalid Slaughter Tap Slaughter Substation R

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ invalid LY-Clauene Tap Structure 116 Lyntegar REC Clauene Substation W

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ invalid LY-Meadow Tap Structure 54 Lyntegar REC Meadow Substation W

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82$ 1,055,958.02$ invalid LY-Doc Webber Tap Structure 25 Lyntegar REC Doc Webber Substation W

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) 2,059,461.00$ 1,933,691.48$ yes Northwest Interchange Wildorado/Vega Tap (Structure 153) R

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) 2,059,461.00$ 1,933,691.48$ yes Wildorado/Vega Tap (Structure 153) Vega R

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) 2,059,461.00$ 1,933,691.48$ yes Wildorado/Vega Tap (Structure 153) Wildorado R

69 Z-34 Elec Tran-Line OH-TX- 69KV-Northwest Intg-Hastings (Z-34) -$ (1.60)$ yes Northwest Interchange North Amarillo Switch Station R

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36) -$ -$ invalid FLOYD2 LH-HARM2 W

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36) -$ -$ invalid Lighthouse REC Wilson Tap Structure 96 Lighthouse REC Wilson Substation W

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36) -$ -$ invalid SP REC Becton Tap Structure 116 Switch 8857 W

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36) -$ -$ invalid SP-BECT2 ALLMON2 R

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36) -$ -$ invalid ALLMON2 LH-PTRS2 W

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36) -$ -$ invalid LH-PTRS2 LH-HARM2 W

69 Z-38 Elec Tran-Line OH-TX- 69KV-Floydada Sub Tap 248,472.67$ 146,547.99$ invalid FLYDAT2 SFLOYD2 R

69 Z-39 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Pleasant Hill Tap 75,157.02$ 47,202.57$ invalid CROSBY SP-PLEASNT W

69 Z-40 Elec Tran-Line UG-TX- 69KV-Lawrence Park Sub-Soncy Sub 481,331.75$ 104,545.73$ invalid SONCY2 LAWPK22 R

69 Z-41 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Hendrick Sub 762,120.86$ 728,718.87$ invalid CROSBY2 LH-CROS2 W

69 Z-41 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Hendrick Sub 762,120.86$ 728,718.87$ invalid LH-CROS2 HENDRIC2 R

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid Brownfield City Tap Structure 214 Brownfield City Substation R

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid Goodpasture Tap Structure Goodpasture R

Page 57: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid LY-Jess Smith Tap Structure 151 Lyntegar REC Jess Smith W

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid Wellman Tap Structure 69 Wellman Substation R

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid LY-Wellman Tap Structure 58 Lyntegar REC Wellman W

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid Union Tx Tap Structure 44 Union Texas R

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10$ 1,868,259.85$ invalid LY-Foster Tap Structure 32 Lyntegar REC Foster W

69 Z-47 Elec Tran-Line OH-TX- 69KV-Miami NE Brk Sta-Canadian Sub (Z-47) 16,699,288.75$ 15,474,509.44$ invalid NE Miami Breaker Station Canadian Substation R

69 Z-49 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt 1,839.07$ 946.83$ invalid INDUSTR2 SIDRCH 2 R

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ yes TX/NM State Line Farwell R

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ invalid FARWELL2 NO 3718 R

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ invalid LARIAT2 DS-#102 W

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ invalid BC-LARI2 LARIAT2 R

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ invalid WMULES2 BC-LARI2 W

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ invalid MULECY2 WMULES2 R

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93$ 149,679.81$ invalid BC-BAIL2 MULECY2 R

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 1,468,394.89$ 1,171,568.52$ yes Hereford Interchange Deaf Smith REC #4 Tap Structure 83 W

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 1,468,394.89$ 1,171,568.52$ yes Deaf Smith REC #4 Tap Structure 83 Deaf Smith REC #4 Substation W

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 1,468,394.89$ 1,171,568.52$ yes Deaf Smith REC #4 Tap Structure 83 Deaf Smith REC #8 Substation W

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 1,468,394.89$ 1,171,568.52$ invalid DS-#32 Dimmitt East & South R

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 1,468,394.89$ 1,171,568.52$ invalid CASTRC2 Deaf Smith REC #3 Substation W

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52) 366,885.38$ 311,039.21$ invalid TERRYC2 LG-BRWN2 W

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52) 366,885.38$ 311,039.21$ invalid LG-BRWN2 BROWNFI2 R

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52) 366,885.38$ 311,039.21$ invalid LY-Brownfield Tap Structure 115 Lyntegar REC Brownfield W

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co 3,696,110.96$ 2,824,840.17$ yes Lynn County Substation Switch 6855 Lyntegar New Home Tap W

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co 3,696,110.96$ 2,824,840.17$ yes Switch 6855 Lyntegar New Home Tap Switch 6833 Lyntegar New Moore Tap W

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co 3,696,110.96$ 2,824,840.17$ invalid flying tap Lakeview Switching Station W

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co 3,696,110.96$ 2,824,840.17$ invalid Lakeview Switching Station Switch 6847 Lyntegar Lakeview Tap W

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co 3,696,110.96$ 2,824,840.17$ invalid Z53 Structure 250 Lyntegar Dixon Substation W

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ yes Lubbock East Slaton Substation R

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ invalid NO 6854 SP-SLAT2 W

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ invalid SOUTHLN2 SP-SLAT2 W

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ invalid LG-HCKB2 SOUTHLN2 R

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ invalid DIEKEMP2 LG-HCKB2 W

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ invalid LG-TWD2 DIEKEMP2 R

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09$ 2,562,839.85$ invalid GRAHAM2 LG-TWD2 W

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ invalid LG-DRAW2 LG-CNTR2 W

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ invalid LYNNCO2 LG-DRAW2 W

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ invalid GARZA2 YANCYT2 R

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ invalid BG-YNT2 YANCY2 R

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ invalid YANCYT2 BG-YNT2 W

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ invalid LG-CNTR2 YANCYT2 R

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69$ 724,853.27$ yes Graham Substation Garza Substation R

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ yes Castro County Interchange Deaf Smith 12 15 19 Tap Structure 75 W

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ yes Deaf Smith 12 15 19 Tap Structure 75 Switch 8720 to DS 15 & 19 W

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ yes Deaf Smith 12 15 19 Tap Structure 75 Deaf Smith REC #12 Substation W

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ invalid HART2 BC-Sunnyside W

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ invalid LC-HART2 Hart #1 R

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ invalid LAMTON2 LC-Hart W

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33$ 1,652,470.52$ invalid LC-HART2 LC-North Olton W

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner 573,558.85$ 491,432.12$ invalid LAMTON CORNER R

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner 573,558.85$ 491,432.12$ invalid LAMTON2 NO8861 R

Page 58: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner 573,558.85$ 491,432.12$ invalid SP-HALF2 CORNER2 R

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner 573,558.85$ 491,432.12$ yes Hale County Interchange Switch 8811 to SP-Halfway W

69 Z-64 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64) 503,109.55$ 472,929.19$ invalid LC-OLTN2 OLTON2 R

69 Z-64 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64) 503,109.55$ 472,929.19$ invalid LAMTON2 LC-OLTN2 W

69 Z-64 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64) 503,109.55$ 472,929.19$ invalid OLTON2 SPRINGL2 R

69 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg 1,559,421.15$ 802,085.44$ yes Graham Substation Justiceburg Corner W

69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub 484,612.85$ 355,100.42$ invalid Perryton Interchange Wade Tap Structure 11/3A R

69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub 484,612.85$ 355,100.42$ invalid Wade Tap Structure 11/3A Booker Substation R

69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub 484,612.85$ 355,100.42$ invalid Wade Tap Structure 11/3A Wade Substation R

69 Z-69 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap 4,328,102.72$ 3,856,767.55$ yes Gray County KITE R

69 Z-69 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap 4,328,102.72$ 3,856,767.55$ yes Bowers Lyons R

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap 10,990,397.17$ 10,022,587.04$ invalid Bowers Roberts County Tap Structure 77 W

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap 10,990,397.17$ 10,022,587.04$ invalid Roberts County Tap Structure 77 Roberts County R

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap 10,990,397.17$ 10,022,587.04$ invalid Roberts County Tap Structure 78 NP-REC Tap (SW-Miami) Structure 137 R

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap 10,990,397.17$ 10,022,587.04$ invalid NP-REC Tap (SW-Miami) Structure 137 NE Miami Breaker Station R

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) 212,063.63$ 202,450.81$ invalid Northeast Hereford Centre Street Substation R

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) 212,063.63$ 202,450.81$ yes Hereford Interchange Deaf Smith #9&13 Tap Structure 41 W

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) 212,063.63$ 202,450.81$ yes Deaf Smith #9&13 Tap Structure 41 Deaf Smith #5&11 Tap Structure 78 W

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) 212,063.63$ 202,450.81$ yes Deaf Smith #5&11 Tap Structure 78 Switch 5783 to DS-#11 W

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) 212,063.63$ 202,450.81$ yes Deaf Smith #5&11 Tap Structure 78 Deaf Smith REC #5 Substation W

69 Z-73 Elec Tran-Line OH-TX- 69KV-Hereford NE Sub-Deaf Smith Rec Meter Sta (Z-73) -$ -$ yes Northeast Hereford Deaf Smith REC Metering Station W

69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek 7,443,339.61$ 5,620,126.64$ yes GRAY COUNTY CRMWA #23 Tap Structure 119 A R

69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek 7,443,339.61$ 5,620,126.64$ yes CRMWA #23 Tap Structure 119 A CRMWA #23 R

69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek 7,443,339.61$ 5,620,126.64$ yes CRMWA #23 Tap Structure 119 A ADOBE CREEK R

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77) 360,668.03$ 301,965.66$ invalid LEGACY BOARDMAN R

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77) 360,668.03$ 301,965.66$ invalid BOARDMAN FLANN-LYN(FLOREY) R

69 Z-80 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Legacy Sub (Z-80) 221,421.99$ 192,337.05$ yes Gaines County Substation TENNECO R

69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) 348,943.05$ 317,477.09$ yes Kress Interchnage Lighthouse REC MBPXL Tap Structure 60 W

69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) 348,943.05$ 317,477.09$ yes Lighthouse REC MBPXL Tap Structure 60 Lighthouse REC Plainview Substation W

69 Z-83 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Cox Intg (Z-83) 320,436.87$ 290,972.95$ yes Cox Substation East Plainview R

69 Z-84 Elec Tran-Line OH-TX- 69KV-Plainview City-Kiser Sub (Z-84) 156,561.12$ 142,228.12$ invalid Kiser Substation Plainview City R

69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) 380,568.75$ 354,649.36$ yes Sulphur Springs Substation Adair Substation R

69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) 380,568.75$ 354,649.36$ yes Diamondback Substation Lyntegar REC Ashmore Substation W

69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) 621,851.97$ 588,978.93$ yes Diamondback Substation OXY Cedar Lake Tap (structure 132A) R

69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) 621,851.97$ 588,978.93$ yes OXY Cedar Lake Tap (structure 132A) OXY Cedar Lake substation R

69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) 621,851.97$ 588,978.93$ yes OXY Cedar Lake Tap (structure 132A) Cedar Lake Substation R

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39$ 555,128.46$ yes Seagraves Substation Lyntegar REC McConnal Tap structr no. 68 W

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39$ 555,128.46$ yes Lyntegar REC McConnal Tap structure 68 corner structure number 118 W

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39$ 555,128.46$ yes corner structure number 118 Lyntegar REC McConnal Substation W

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39$ 555,128.46$ invalid Diamondback Substation Ozark Mahoning#2 Tap struture number 107 R

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39$ 555,128.46$ invalid Ozark Mahoning#2 Tap struture number 107 Ozark Mahoning#2 Substation R

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39$ 555,128.46$ invalid Ozark Mahoning#2 Tap struture number 107 Lyntegar REC Sawyer Flat Tap structure 69A W

115 T-04 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Castro Co Intg (T-04) 527,506.38$ 482,854.00$ yes Deaf Smith REC #21 Tap Structure 216A Deaf Smith REC Substation #21 W

115 T-25 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dumas Int 1,241,841.12$ 959,965.65$ yes RB-Stokes Sheldon Tap (structure 37) Rita Blanca Stokes Sheldon substation W

115 T-27 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int 5,735,451.81$ 4,974,080.70$ yes Exell Tap Structure 233 Exell Substation R

115 T-27 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int 5,735,451.81$ 4,974,080.70$ yes Fain Tap Structure 171 Fain Substation R

115 T-28 Elec Tran-Line OH-TX-115KV-Plant X Sta-Lamton Intg (T-28) 656,320.56$ 592,531.29$ yes Lamb County REC Tap Structure 124 Lamb County REC South Olton Substation W

115 T-31 Elec Tran-Line OH-TX-115KV-Sundown Int Tap North Ckt 435,815.05$ 295,411.77$ yes Lamb County REC Tap Structure 179 Lamb County REC Opdyke Substation W

115 T-37 Elec Tran-Line OH-TX-115KV-Sunset Sub-Puckett West Sub (T-37) 1,404,361.37$ 1,371,599.60$ yes Soncy Tap Structure #49 Soncy Substation R

115 T-47 Elec Tran-Line OH-TX-115KV-Rita Blanca REC-Houge Sub Tap -$ -$ yes Rita Blanca REC Houge Tap Structure 334 Rita Blanca Houge Substation W

Page 59: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

115 T-49 Elec Tran-Line OH-TX-115KV-Pringle-Phillips Cogen (T-49) 3,343,680.81$ 3,182,493.42$ yes Ryton/Quench Tap Structure 102A Ryton/Quench Substation R

115 T-53 Elec Tran-Line OH-TX-115KV-Nichols Sta-WTU 6,462,165.26$ 4,536,859.22$ yes Conway Tap Structure 216 CONWAY R

115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) 142,635.27$ 139,583.70$ yes McClellan Pump Tap Structure 450A McClellan Pump Substation R

115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) 142,635.27$ 139,583.70$ yes McLean Rural Tap Structure 654 McLean Rural Substation R

115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) 2,151,070.67$ 2,050,508.09$ yes Friona Tap Structures 244/246 flying tap Friona Rural Substation R

115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) 2,151,070.67$ 2,050,508.09$ yes Deaf Smith REC #6 Tap Structure 76 Deaf Smith REC #6 Substation W

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) 1,550,323.05$ 1,458,085.32$ yes Deaf Smith REC #24 Tap Structure 332 Deaf Smith REC Substation #24 W

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) 1,550,323.05$ 1,458,085.32$ yes Parmer County Flying Tap Parmer County Substation R

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) 1,550,323.05$ 1,458,085.32$ yes Deaf Smith REC #20 Tap Structure(s) 5H47 & 5H48 Deaf Smith REC #20 Substation W

115 T-64 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub 2,306,252.97$ 1,423,294.14$ yes Southeast Amarillo Pullman R

115 T-64 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub 2,306,252.97$ 1,423,294.14$ yes Randall County Interchange Southeast R

115 T-66 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int 10,882,085.19$ 9,474,337.77$ invalid Palo Duro Tap Structure 198 Palo Duro Substation R

115 T-67 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int 5,578,127.46$ 4,848,024.67$ invalid Tulia City Tap Structure 90 City of Tulia Substation W

115 T-70 Elec Tran-Line OH-TX-115KV-Coulter Intg-South Georgia Intg (T-70) 518,330.10$ 513,224.14$ yes 34th Street Tap (Structure 13) 34THST R

115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) 525,430.76$ 444,619.13$ yes South Plains REC Wolfforth Tap Structure 42 South Plains REC Wolfforth Tap Structure 42 W

115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) 525,430.76$ 444,619.13$ yes Doud Tap Structure 26 DOUD W

115 T-73 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73) 193,111.33$ 187,414.76$ yes Farmer's Tap Structure 16 Farmers Substation R

115 T-73 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73) 193,111.33$ 187,414.76$ yes Crouse Hind's Tap Structure Crouse Hinds Substation R

115 T-75 Elec Tran-Line OH-TX-115KV-Arrowhead Sub Tap 637,271.81$ 457,028.37$ yes Arrowhead Tap Structure 109 Arrowhead Substation R

115 T-83 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int 370,748.22$ 229,443.57$ yes SP-Quaker tap structures 185A & 185B South Plains REC Quaker Substation W

115 T-86 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Spring Draw Sub (T-86) 3,109,701.20$ 2,469,171.22$ yes Amarillo South Spring Draw R

115 T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89) 635,646.08$ 572,945.49$ yes Higg East Tap structure 264 Higg East Substation R

115 T-91 Elec Tran-Line OH-TX-115KV-Russell Pool Substation-Higg Substation (T-91) (6,495.82)$ (4,327.14)$ yes HIGG Russell Pool R

115 U-11 Elec Tran-Line OH-TX-115KV-East Sta-Rolling Hills Sub (U-11) -$ -$ yes Hasting Tap Hastings Substation R

115 U-17 Elec Tran-Line OH-TX-115KV-CLTR-OUTP-115-01 (U-17) 73,774.56$ 73,015.42$ yes Hillside Tap (Structure 69A) Hillside Substation R

115 V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta 2,899,740.42$ 1,742,756.70$ yes Rita Blanca REC Sneed Tap Strcuture 180 RIta Blanca #14 (Sneed) Substation W

115 V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap 194,147.07$ 129,889.28$ yes Herring Tap Structure 118 Herring Substation R

115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02) 532,738.77$ 521,278.65$ invalid ASARCO Tap structure 2 ASARCO substation R

115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02) 532,738.77$ 521,278.65$ yes Highland Park Tap Structure 1 Highland Park Substation R

115 V-03 Elec Tran-Line OH-TX-115KV-East Sta-Nichols Sta 669,802.86$ 414,463.92$ yes Whitaker Tap(s) Structures 27 & 28 Whitaker Substation R

115 V-04 Elec Tran-Line OH-TX-115KV-Randall Co Int-East Sta 1,627,159.48$ 1,291,677.15$ yes Manhattan Tap(s) Structures 27 & 28 Manhattan Substation R

115 V-12 Elec Tran-Line OH-TX-115KV-Plant X Sta-Bailey Co Int 2,220,368.31$ 1,773,312.66$ yes Muleshoe Valley Tap structure 86 Muleshoe Valley substation R115 V-33 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int 1,408,504.21$ 1,065,758.45$ yes SP-Woodrow tap structures 52A & 52AA Woodrow Substation W

115 V-35 Elec Tran-Line OH-TX-115KV-Hutchinson Co Int-Gray Co Int 1,214,839.37$ 827,196.29$ invalid Hutchinson County Gray County R

Gray County Sub-Tran-TX 894,034.16$ 431,832.24$ invalid Gray County Substation R

115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int 3,226,619.73$ 2,301,092.01$ yes Lyntegar REC Plains Tap Structure 568A Lyntegar REC Plains Substation W

115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int 3,226,619.73$ 2,301,092.01$ yes Lehman Tap Structure 321 Lehman Substation R

115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) 968,297.73$ 892,201.01$ yes BC-Kelly Tap structure 123A Bailey County REC Kelly Substation W

115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) 968,297.73$ 892,201.01$ yes BC-Earth Tap structure 95B Bailey County REC Earth Substation W

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89$ 1,058,511.53$ yes CRMWA #4 Tap Structure 80 CRMWA #4 Substation R

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89$ 1,058,511.53$ yes CRMWA #3 Tap Structure 51 CRMWA #3 Substation R

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89$ 1,058,511.53$ yes Fritch Tap Structure 104A Fritch Rural Substation R

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89$ 1,058,511.53$ yes CRMWA #2 Tap Structure 125 CRMWA #2 Substation R

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89$ 1,058,511.53$ yes CRMWA #1 Tap Structure 128 CRMWA #1 Substation R

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89$ 1,058,511.53$ yes Lake Meredith Tap Structure 125 Lake Meredith Substation R

115 V-43 Elec Tran-Line OH-TX-115KV-Osage Int Tap 268,243.65$ 240,400.21$ yes Pierce Street Tap Structure 13 Pierce Street Substation R

115 V-44 Elec Tran-Line OH-TX-115KV-Estacado Sub Tap 165,962.81$ 63,822.27$ yes Estacado Tap Structure 25 Estacado Substation R

115 V-46 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub 1,226,344.53$ 671,486.88$ yes Allen Wheelock Substation W

115 V-49 Elec Tran-Line OH-TX-115KV-ODC Sub Tap 229,095.90$ 182,909.09$ yes Bennett Tap Structure 50A Bennett Substation R

115 V-49 Elec Tran-Line OH-TX-115KV-ODC Sub Tap 229,095.90$ 182,909.09$ yes ODC Tap Structure 50 ODC Substation R

Page 60: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

Actual Installed Cost of Line 12/31/2018

Net Book Value of Line

12/31/2018

Valid Radial Line

SegmentFrom Location To Location

Wholesale or Retail

Customer

115 V-49 Elec Tran-Line OH-TX-115KV-Arco Sub Tap 95,714.37$ 76,227.65$ yes Arco Willard Tap Structure 51A Arco Willard & OXY Membrane Substations R

115 V-50 Elec Tran-Line OH-TX-115KV-Northwest Int-Bush Sub 198,059.50$ 108,260.73$ yes Northwest Interchange Bush Substation R

115 V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap 309,691.33$ 149,683.11$ yes Amoco-Cryogenics Tap Structure 10 Amoco-Cryogenics Substation R

115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt 1,053,983.06$ 826,236.49$ yes Lyntegar REC Levelland Tap Structure 28A Lyntegar REC Levelland Substation W

115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt 1,053,983.06$ 826,236.49$ yes Lyntegar REC Clauene Tap Structure 116 Lyntegar REC Clauene Substation W

115 V-56 Elec Tran-Line OH-TX-115KV-Sundown Int-Cochran Co Int 464,383.61$ 320,839.66$ yes Pacific Tap Structure 19A PACIFIC R

115 V-62 Elec Tran-Line OH-TX-115KV-Denver City Sta-Tuco Int 4,379,384.19$ 2,931,577.84$ yes Erskine Tap structure 43 South Plains REC Erskine Substation W

115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int 3,840,565.70$ 2,352,459.46$ yes Rita Blanca Exum Tap Structure 222A Rita Blanca REC Exum Substation W

115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int 3,840,565.70$ 2,352,459.46$ yes Hilmar Cheese Tap Structure 412 Hilmar Cheese Substation R

115 V-66 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int 1,203,103.55$ 762,865.51$ yes LY-Pleasant Hill Tap Structure 146 Lyntegar REC Pleasant Hill Substation W

115 V-79 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int 2,035,021.25$ 1,658,127.20$ yes Borger West Tap Structure 44 Borger West Substation R

115 V-79 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int 2,035,021.25$ 1,658,127.20$ yes Camex/Transpetco Tap structure 13A Camex/Transpetco 115 kV sub R

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub 2,468,186.93$ 1,854,684.82$ yes Allred Tap Structure 8 Allred Substation R

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub 2,468,186.93$ 1,854,684.82$ yes Shell C3 Tap Structure 59 Shell C3 Substation R

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub 2,468,186.93$ 1,854,684.82$ yes Shell C2 Tap Structure 37A Shell C2 Substation R

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub 2,468,186.93$ 1,854,684.82$ yes Cortez/Apache Roberts Tap Structure 9 Cortez Substation R

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub 2,468,186.93$ 1,854,684.82$ yes Cortez/Apache Roberts Tap Structure 9 Apache Roberts Substation R

115 V-95 Elec Tran-Line OH-TX-115KV-El Paso Shell Tap 442,624.89$ 344,998.45$ yes El Paso Tap Structure 34 El Paso Substation R

115 W-01 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub 125,514.80$ 98,578.64$ invalid MARTIN CARSON R

115 W-05 Elec Tran-Line OH-TX-115KV-Dallum Co Int-Sherman Co Sw Sta (W-05) 12,007,972.67$ 10,229,159.83$ invalid Sherman Tap Structure 304 Sherman County Substation R

115 W-11 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Seminole Interchange (W-11) 883,720.22$ 758,977.31$ yes San Andres Tap Structure 157 San Andres Substation R

115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24) 1,066,299.90$ 972,900.06$ yes Rita Blanca REC Spurlock Tap Structure 108 Rita Blanca REC Spurlock Substation W

115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24) 1,066,299.90$ 972,900.06$ yes Rita Blanca REC River Breaks ELK Tap structr 234 Rita Blanca REC River Breaks ELK Substation W

115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchg-Ochiltree County Interchg (W-29) -$ -$ invalid Spearman City Tap Structure 82 Spearman City Substation R

115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchg-Ochiltree County Interchg (W-29) -$ -$ yes Texas Farms Tap Structure 248 Texas Farms Substation R

115 W-34 Elec Tran-Line OH-TX-115KV-AMFRAC-Johnson Draw (W-34) 108,702.59$ 94,807.31$ yes JOHNSON DRAW AMFRAC & Mid-America #1 R

115 W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) 9,376,799.70$ 9,221,150.82$ yes Panda Tap Structure 482 Panda Substation R

115 W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) 9,376,799.70$ 9,221,150.82$ yes Dawn Flying Tap Dawn Substation R

115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42) 4,070,452.54$ 3,698,213.71$ invalid Rolling Hills Substation Hastings Substation R

115 W-47 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Cherry Street Sub (W-47) 160,424.96$ 146,160.77$ yes Rolling Hills Substation Cherry Street Substation R

115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) 10,262,195.49$ 9,637,792.19$ yes Ochiltree Substation Wade Tap Structure 80 R

115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) 10,262,195.49$ 9,637,792.19$ yes Wade Tap Structure 80 Wade Substation R

115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) 10,262,195.49$ 9,637,792.19$ yes Wade Tap Structure 80 Lipscomb Substation R

115 W-53 Elec Tran-Line OH-TX-115KV-Newhart-Lamton (W-53) 12,657,993.07$ 11,536,337.89$ yes Hart Industrial Tap Structure 71 Hart Industrial Substation R

115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) 12,887,485.75$ 11,764,215.06$ yes North Plainview Tap Structure 17 North Plainview Substation R

115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) 12,887,485.75$ 11,764,215.06$ yes Kress Rural Tap Structure 116 Kress Rural Substation R

115 W-77 Elec Tran-Line OH-TX-115KV-Canyon West Sub-Randall County Intg (W-77) 4,152,872.58$ 3,951,369.44$ yes Canyon East Tap Structure #1 Canyon East Substation R

115 W-78 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-Coburn Creek Sub (W-78) 7,164,598.90$ 6,908,130.28$ yes Wheeler County Interchange Coburn Creek Substation R115 W-82 Elec Tran-Line OH-TX-115KV-Hereford Northeast Int-New Centre Street Sub (W-82) 4,968,384.14$ 4,908,639.63$ yes Northeast Hereford Substation La Plata Substation R

115 T-01 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int 2,979,710.73$ 2,147,955.00$ yes Tri-Co McMurry Tap Structure 39 Tri-Co REC McMurry Substation W115 T-01 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int 2,979,710.73$ 2,147,955.00$ yes Tri-Co Aggie Tap Structure 311 Tri-Co REC Aggie Substation W

Abbreviations:W = WholesaleR = RetailTX = TexasNM = New MexicoOK = Oklahoma

Page 61: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

69 Y-83 Elec Tran-Line OH-NM- 69KV-Clovis Loop

69 Y-97 Elec Tran-Line OH-NM- 69KV-Clovis Loop

69 Z-03 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-05 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-08 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-09 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

69 Z-22 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash

69 Z-24 Elec Tran-Line OH-NM- 69KV-Clovis East Sub Tap

69 Z-24 Elec Tran-Line OH-NM- 69KV-Industrial Sub-Ethanol Plant Sub

69 Z-24 Elec Tran-Line OH-NM- 69KV-Portales Grain Alcohol

69 Z-24 Elec Tran-Line OH-NM- 69KV-Cherry Sub Tap

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 7.783 17.802 375,648.31$ 243,320.39$

SPS 10.019 17.802

CVEC 11.110 14.560

SPS 5.608 38.468 293,058.16$ 213,399.59$

SPS 1.741 38.468 90,979.72$ 66,249.76$

SPS 5.690 38.468 297,343.25$ 216,519.91$

SPS 13.249 38.468 692,355.13$ 504,160.33$

SPS 3.011 38.468 157,346.31$ 114,576.70$

SPS 2.841 38.468 148,462.59$ 108,107.74$

SPS 6.328 38.468 330,683.31$ 240,797.54$ 493

CVEC 11.080 45.102

CVEC 0.024 45.102

SPS 4.290 45.102

SPS 2.514 45.102

CVEC 1.970 45.102

SPS 1.910 45.102

CVEC 0.074 45.102

CVEC 1.493 45.102

CVEC 0.007 45.102

CVEC 9.000 45.102

CVEC 0.011 45.102

CVEC 5.470 45.102

CVEC 0.066 45.102

SPS 1.521 45.102

SPS 5.820 45.102

SPS 0.005 45.102

SPS 0.012 45.102

SPS 0.100 45.102

SPS 4.402 24.509

SPS 2.870 24.509

CVEC 11.120 15.717 2,172,618.65$ 1,955,365.45$

CVEC 0.560 15.717 109,412.45$ 98,471.64$

SPS 1.520 15.717

SPS 1.989 15.717

SPS 0.418 15.717

SPS 0.016 15.717

SPS 0.087 15.717

SPS 0.666 15.717

SPS 0.014 15.717

SPS 0.438 15.717

SPS 9.510 9.510 503,987.66$ 323,955.37$

SPS 1.001 8.447 20,734.63$ 13,857.44$

SPS 2.280 8.447 47,227.73$ 31,563.41$

SPS 1.152 8.447 23,862.43$ 15,947.83$

SPS 4.014 8.447 408

SPS 2.190 2.190 225,990.69$ 195,770.55$

SPS 1.664 1.664 119,801.22$ 37,302.77$

SPS 0.148 0.148 473,070.61$ 301,497.05$

SPS 1.180 1.180 19,775.51$ 4,037.99$

Page 62: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

69 Z-44 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Mississippi Chem #2 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #2 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap

69 Z-48 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole

69 Z-50 Elec Tran-Line OH-NM- 69KV-Curry Co Int-TX St Line

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-56 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56)

69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76)

69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76)

69 Z-76 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76)

115 T-05 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Fiesta Sub

115 T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13)

115 T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13)

115 T-13 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13)

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

115 T-14 ELEC TRAN-LINE OH-NM-115KV-MADDOX STA-TAYLOR SW STA (T-14)

115 T-24 Elec Tran-Line OH-NM-115KV-Brasher Sub Tap

115 T-26 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell City (T-26)

115 T-42 Elec Tran-Line OH-NM-115KV-Cochran Sw Sta-Monument Sub

115 T-45 Elec Tran-Line OH-NM-115KV-Curry Co Int-Oasis Int

115 T-45 Elec Tran-Line OH-NM-115KV-Norris St Tap

115 T-84 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub

115 T-84 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub

115 T-97 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97)

115 T-97 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97)

115 T-98 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Higg Sub (T-98)

115 U-03 Elec Tran-Line OH-NM-115KV-NEF Sub-Cardinal Sub (U-03)

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 2.241 6.557 494

SPS 0.010 6.557 495

SPS 2.397 6.557 496

SPS 1.940 13.694 37,409.66$ 26,206.63$

SPS 1.160 1.160 546

SPS 2.790 13.694 53,800.48$ 37,688.91$

SPS 0.893 0.893 119,761.12$ 80,275.83$

SPS 1.684 13.694 32,473.12$ 22,748.43$

SPS 0.280 13.694 5,399.33$ 3,782.40$

SPS 4.100 13.694 79,061.64$ 55,385.14$

SPS 0.870 13.694 16,776.50$ 11,752.46$

SPS 0.029 0.950 1,859.38$ 681.90$

SPS 0.022 0.950 1,410.56$ 517.30$

SPS 0.028 13.694 539.93$ 378.24$

SPS 1.005 3.856 98,947.47$ 59,502.52$

SPS 0.026 3.856 2,559.83$ 1,539.37$

SPS 0.042 13.694 809.90$ 567.36$

SPS 2.851 3.856 280,695.74$ 168,797.71$

SPS 8.147 8.147 157,248.93$ 101,596.01$

SPS 4.047 11.581

SPS 1.009 11.581

SPS 0.800 11.581

SPS 2.251 11.581

CVEC 0.011 11.581

SPS 1.560 11.581

SPS 1.190 11.581

CVEC 0.262 11.581

SPS 0.451 11.581

SPS 1.309 1.651 97,536.74$ 82,760.68$

SPS 0.017 1.651 1,266.71$ 1,074.81$

SPS 0.325 1.651 24,216.53$ 20,547.92$

SPS 1.100 1.100 272,613.42$ 119,042.74$

SPS 0.012 13.529 17.09$ 16.25$

SPS 0.025 13.529 35.60$ 33.85$

SPS 0.029 13.529 41.30$ 39.27$ 508

SPS 0.028 16.280 -$ -$

SPS 0.021 16.280 -$ -$ 509

SPS 0.017 16.280 -$ -$

SPS 2.730 16.280 -$ -$

SPS 1.148 1.148

SPS 0.014 6.873 4,580.31$ 3,101.96$

SPS 0.030 16.280

Farmers 0.000 16.270 -$ -$

SPS 0.589 0.589 5,642,204.40$ 3,261,577.75$

SPS 0.007 24.882 70.04$ 66.33$

SPS 2.970 24.882 29,718.61$ 28,143.22$

SPS 0.019 15.990 564.57$ 484.37$ 504

SPS 0.005 15.990 148.57$ 127.47$ 505

SPS 0.068 28.121 954.97$ 925.95$ 506

SPS 0.209 7.699 43,414.44$ 42,632.52$

Page 63: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04)

115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04)

115 U-04 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04)

115 U-06 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Agave Sub #2 (U-06)

115 U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07)

115 U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07)

115 U-07 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07)

115 U-08 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08)

115 U-08 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08)

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12)

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12)

115 U-12 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12)

115 V-26 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Roswell Int

115 V-77 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell Int

115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98)

115 V-98 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98)115 W-22 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 4&5 (W-22)

115 W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23)

115 W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23)

115 W-23 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23)

115 W-25 Elec Tran-Line OH-NM-115KV-Pecos Intg-Ocotillo Sub (W-25)

115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26)

115 W-26 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26)

115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27)

115 W-27 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27)

115 W-32 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32)

115 W-32 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32)

115 W-38 Elec Tran-Line OH-NM-115KV-Wipp Sub-Red Bluff Sub (W-38)

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

115 W-39 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39)

115 W-43 Elec Tran-Line OH-NM-115KV-Pecos Sub-Hopi Sub (W-43)

115 W-49 Elec Tran-Line OH-NM-115KV-Roswell Intg-Capitan (W-49)

115 W-58 Elec Tran-Line OH-NM-115KV-Norton Sw Sta-Lopez Int (W-58)

115 W-59 Elec Tran-Line OH-NM-115KV-Lopez Int-Campbell St Sub (W-59)

115 W-61 Elec Tran-Line OH-NM-115KV-Pecos Intg-North Canal Sub (W-61)

115 W-62 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-62)

115 W-64 Elec Tran-Line OH-NM-115KV-FEC Intg-Pleasant Hill Sub (W-64)

115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65)

115 W-65 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65)

115 W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66)

115 W-66 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66)

115 W-70 Elec Tran-Line OH-NM-115KV-Hopi Sub-North Loving Sub (W-70)

115 W-72 Elec Tran-Line OH-NM-115KV-North Loving Sub-China Draw Sub (W-72)

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

115 W-74 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74)

115 W-79 Elec Tran-Line OH-NM-115KV-Battle Axe Sub-Roadrunner Sub (W-79)

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 0.011 27.771

SPS 0.023 27.771 352.53$ 338.82$

SPS 3.636 27.771

SPS 0.383 0.383 434,542.90$ 422,711.73$ yes 5/2017

SPS 0.622 0.921 138,084.07$ 133,829.77$ NTC-200257, UID:50709

SPS 0.019 0.921 4,218.00$ 4,088.05$ NTC-200257, UID:50709

SPS 0.280 0.921 62,160.03$ 60,244.91$

SPS 1.013 16.959 41,399.04$ 40,116.09$ 530

SPS 1.120 16.959 45,771.89$ 44,353.43$ 531

SPS 0.024 40.814 1,155.00$ 1,143.11$ 533 NTC-200256, UID:50693

SPS 1.807 40.814 86,961.81$ 86,066.69$ 534 NTC-200256, UID:50693

SPS 0.026 40.184 1,270.87$ 1,257.78$ 535 NTC-200256, UID:50693

SPS 0.018 47.346 2,303.45$ 1,780.71$

SPS 0.009 11.001 869.64$ 591.57$

SPS 1.100 9.647

Lea Co. 0.002 9.647SPS 0.630 0.630 -$ (0.97)$ NTC-20031, UID 10826

SPS 0.507 0.743 228,875.92$ 193,774.59$ NTC-20031, UID:10825

SPS 0.136 0.743 61,394.73$ 51,978.98$ NTC-20031, UID:10825

SPS 0.100 0.743 45,143.18$ 38,219.84$ NTC-20031, UID:10825

SPS 5.818 5.818 1,853,699.71$ 1,636,823.42$

SPS 0.775 18.696 157,925.47$ 153,761.88$ 352

SPS 0.009 18.696 1,833.97$ 1,785.62$ 353

SPS 0.016 22.505 1,183.22$ 1,069.51$ 354

SPS 0.023 22.505 355

SPS 0.887 15.832 32,038.99$ 27,603.61$

SPS 0.029 15.832 1,047.50$ 902.49$

SPS 0.023 12.683 111.26$ 79.19$

SPS 0.000 16.613 -$ -$

SPS 0.000 16.613 -$ -$

SPS 7.975 16.613

SPS 11.019 11.019

SPS 9.090 9.090 512

Farmers 0.000 18.557

SPS 0.051 0.051

SPS 2.584 2.584 379,113.01$ 310,540.97$

SPS 1.495 9.849 196,521.91$ 188,025.21$ NTC-20088, UID:11102

SPS 1.728 9.744 318,141.20$ 292,748.84$ NTC-20031, UID:10183

Farmers 0.029 9.391 1,600.26$ 1,491.29$ NTC-20088, UID:11102

Farmers 0.347 9.391 19,147.92$ 17,844.01$ NTC-20088, UID:11102

SPS 0.880 13.726 968,283.94$ 933,147.91$ 514 NTC-20084, UID:11101

SPS 0.346 13.726 380,711.64$ 366,896.79$ 515

SPS 9.525 9.525 NTC-200309, UID:50870

SPS 18.340 18.340 NTC-200309, UID:50883

SPS 2.380 15.407 66,790.57$ 61,986.25$ NTC-200256, UID:50693

SPS 0.663 15.407 18,605.95$ 17,267.60$ NTC-200256, UID:50693

SPS 0.783 15.407 21,973.54$ 20,392.95$ NTC-200256, UID:50693

SPS 11.557 15.407 324,327.17$ 300,997.92$ NTC-200256, UID:50693

SPS 0.024 15.407 673.52$ 625.07$ NTC-200256, UID:50693

SPS 19.728 19.728 9,000,997.03$ 8,397,846.46$ NTC-200282, UID:50873

Page 64: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

115 W-81 Elec Tran-Line OH-NM-115KV-Ponderosa Sub-Custer Mt Sw Sta (W-81)

115 W-89 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89)

115 W-97 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (W-97)

115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98)

115 W-98 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98)

115 W-99 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Capitan Sub (W-99)

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50)

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50)

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50)

69 Y-50 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50)

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-58 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line

69 Y-59 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub

69 Y-59 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub

69 Y-60 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Bowers Sub (Y-60)

69 Y-61 Elec Tran-Line OH-TX- 69KV-Borger Loop

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-62 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62)

69 Y-63 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Intg-Industrial Sub (Y-63)

69 Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64)

69 Y-64 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64)

69 Y-65 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt

69 Y-66 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub

69 Y-67 Elec Tran-Line OH-TX- 69KV-Castro Co REC Sub Tap

69 Y-72 Elec Tran-Line OH-TX- 69KV-Coulter Intg-Soncy (Y-72)

69 Y-74 Elec Tran-Line OH-TX- 69KV-Hale Co Int-Plainview South Sub

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77)

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77)

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77)

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77)

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77)

69 Y-77 Elec Tran-Line OH-TX- 69KV-Floyd Co Intg-Cox Intg (Y-77)

69 Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub

69 Y-78 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-79 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80)

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80)

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80)

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 10.747 10.747 5,716,030.98$ 5,531,940.14$ yes 5/2017 NTC-200474, UID:50879

SPS 19.236 19.236 409NTC-200283, UID: 50925, 50927, 52967

CVEC 0.000 12.992 -$ -$ replaces T43

CVEC 0.000 16.090 -$ -$ replaces T43

CVEC 0.088 16.090 1,858.30$ 1,763.03$ replaces T43

SPS 1.842 15.311 1,242,726.40$ 1,203,051.49$ 513 yes 7/2017NTC-200256, UID:50723, 50724

LPL 1.108 13.617 14,225.90$ 12,623.19$

LPL 0.009 13.617 115.55$ 102.53$

LPL 5.029 13.617 64,568.65$ 57,294.23$

LPL 7.480 13.617 96,037.68$ 85,217.91$

SPS 5.536 27.968 746,541.10$ 493,561.03$

SPS 1.245 27.968 167,890.84$ 110,997.74$

SPS 1.170 27.968 157,776.93$ 104,311.13$

SPS 0.418 27.968 56,368.17$ 37,266.71$

SPS 3.757 27.968 506,639.25$ 334,954.62$

SPS 12.439 27.968 1,677,424.99$ 1,108,996.68$ 519

SPS 3.521 30.420 213,474.66$ 150,076.43$

SPS 22.134 30.420 1,341,961.96$ 943,422.78$

SPS 3.120 13.659 378,416.35$ 351,649.97$

SPS 0.022 8.092 1,943.17$ 1,001.95$ 516

Green Belt 24.553 69.860 1,475,795.89$ 1,378,046.91$

SPS 6.045 69.860

SPS 8.300 69.860

SPS 26.892 69.860 1,616,385.09$ 1,509,324.22$

SPS 0.415 3.283 -$ -$ 517

LPL 2.710 8.718 4,338.37$ 3,985.11$

LPL 3.708 8.718 5,936.05$ 5,452.68$

SPS 1.226 2.366

SPS 9.752 21.321 548,629.67$ 496,420.76$ 562

Deaf Smith 5.115 5.115 149,986.28$ 56,423.52$

SPS 8.160 12.162 543

SPS 10.082 10.082 99,807.20$ 32,640.82$

SPS 3.500 24.924

SPS 1.500 24.924

Lighthouse 4.900 24.924

SPS 7.700 24.924

SPS 3.600 24.924

SPS 3.340 24.924

SPS 2.651 3.731 376,759.67$ 309,871.65$

SPS 1.080 3.731 153,489.41$ 126,239.68$

Lamb County 1.665 44.264

SPS 2.025 44.264

Lamb County 6.598 44.264

SPS 1.831 44.264

SPS 5.906 44.264

SPS 6.052 44.264

South Plains 5.888 44.264

SPS 7.040 40.097

SPS 4.866 40.097

Lamb County 2.643 40.097

Page 65: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80)

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80)

69 Y-80 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80)

69 Y-80 Elec Tran-Line OH-TX- 69KV-Muleshoe Sub Tap

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-84 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84)

69 Y-85 Elec Tran-Line OH-TX- 69KV-Stanton East (Y-85)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-89 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89)

69 Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta

69 Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta

69 Y-91 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta

69 Y-92 Elec Tran-Line OH-TX- 69KV-East Sta-Van Buren Sub

69 Y-93 Elec Tran-Line OH-TX- 69KV-East Plant Intg-Van Buren Sub (Y-93)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 4.098 40.097

SPS 6.455 40.097

Lamb County 7.709 40.097

SPS 1.833 40.097

South Plains 10.400 52.823

SPS 4.530 52.823

South Plains 3.370 52.823

South Plains 5.630 52.823

SPS 1.340 52.823

South Plains 1.100 52.823

South Plains 7.250 52.823

SPS 4.000 52.823

South Plains 3.000 52.823

SPS 4.500 52.823

SPS 1.500 7.700

Lamb County 2.100 34.516

SPS 3.270 34.516

SPS 0.072 34.516

SPS 1.108 34.516

SPS 6.887 34.516

SPS 4.113 34.516

SPS 2.412 34.516

SPS 0.028 34.516

SPS 0.778 34.516

SPS 0.206 34.516

Lamb County 2.180 34.516

Lamb County 0.055 34.516

Lamb County 0.067 34.516

Lamb County 0.023 34.516

Lamb County 5.399 34.516

Lamb County 0.015 34.516

Lamb County 1.097 34.516

SPS 4.728 34.516

SPS 1.013 11.184 66,645.10$ 59,400.55$

SPS 6.913 11.184 454,805.11$ 405,366.24$

SPS 3.158 11.184 207,764.29$ 185,179.60$

SPS 3.234 3.234 187,162.03$ 104,725.34$

SPS 2.080 2.080 12,503.35$ 10,571.28$

Lyntegar 0.021 30.384

SPS 2.634 30.384

SPS 5.986 30.384

SPS 0.485 30.384

SPS 9.056 30.384

SPS 0.010 30.384

Lyntegar 0.135 30.384

SPS 4.684 30.384

SPS 0.010 30.384

SPS 0.019 30.384

SPS 5.489 30.384

SPS 0.007 30.384

Page 66: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

69 Y-95 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95)

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Y-96 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

69 Y-98 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop

69 Y-99 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Z-18 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview

69 Z-20 Elec Tran-Line OH-TX- 69KV-Cochran Co Int-Sundown REC

69 Z-23 Elec Tran-Line UG-TX- 69KV-South Georgia Int-Lawrence Park Sub

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-25 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33)

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33)

69 Z-33 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33)

69 Z-34 Elec Tran-Line OH-TX- 69KV-Northwest Intg-Hastings (Z-34)

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36)

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36)

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36)

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36)

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36)

69 Z-36 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Floyd Co Intg (Z-36)

69 Z-38 Elec Tran-Line OH-TX- 69KV-Floydada Sub Tap

69 Z-39 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Pleasant Hill Tap

69 Z-40 Elec Tran-Line UG-TX- 69KV-Lawrence Park Sub-Soncy Sub

69 Z-41 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Hendrick Sub

69 Z-41 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Hendrick Sub

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

Lyntegar 1.848 30.384

SPS 6.100 27.470

Lighthouse 10.000 27.470

Lighthouse 6.000 27.470

Lighthouse 4.270 27.470

SPS 17.156 23.659

SPS 0.913 23.659 14,370.38$ 11,951.01$

SPS 2.000 44.817 156,365.41$ 137,019.31$

SPS 0.012 44.817 938.19$ 822.12$

SPS 2.602 44.817 203,431.40$ 178,262.12$

SPS 10.359 44.817 809,894.65$ 709,691.50$

SPS 2.404 44.817 187,951.23$ 164,697.21$

SPS 6.690 44.817

SPS 2.483 30.810 516,064.94$ 432,603.07$ 558

SPS 8.473 30.810 1,761,022.25$ 1,476,216.61$ 559

Lighthouse 0.268 30.810 560

SPS 13.485 30.810 561

Lyntegar 9.590 9.590 392,625.74$ 261,133.97$

SPS 1.905 1.905

SPS 3.233 45.320 87,077.19$ 75,329.04$

SPS 0.212 45.320

SPS 5.500 45.320 148,136.26$ 128,150.25$

SPS 0.032 45.320 861.88$ 745.60$

SPS 2.620 45.320 70,566.73$ 61,046.12$

SPS 0.007 45.320 188.54$ 163.10$

SPS 2.420 45.320 65,179.96$ 56,386.11$

SPS 0.045 45.320 1,212.02$ 1,048.50$

SPS 6.440 45.320 173,454.10$ 150,052.29$

SPS 0.027 45.320 727.21$ 629.10$

SPS 0.031 45.320

Lyntegar 0.015 45.320

Lyntegar 0.046 45.320

Lyntegar 0.052 45.320

SPS 20.968 39.258 1,099,973.97$ 1,032,799.50$ 547

SPS 15.095 39.258 791,878.44$ 743,519.10$ 548

SPS 1.868 39.258 97,994.63$ 92,010.18$ 549

SPS 3.090 3.716 -$ (1.33)$

Lighthouse 1.710 25.337

Lighthouse 0.156 25.337

South Plains 0.007 25.337

SPS 5.014 25.337

Lighthouse 0.021 25.337

Lighthouse 7.600 25.337

SPS 9.060 9.090

South Plains 1.041 1.041

SPS 3.240 3.240

Lighthouse 4.250 4.350

SPS 0.100 4.350

SPS 0.499 31.904

SPS 0.006 31.904

Page 67: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

69 Z-46 Elec Tran-Line OH-TX- 69KV-Union Texas Tap

69 Z-47 Elec Tran-Line OH-TX- 69KV-Miami NE Brk Sta-Canadian Sub (Z-47)

69 Z-49 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-50 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-51 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51)

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52)

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52)

69 Z-52 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52)

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co

69 Z-53 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-60 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-61 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61)

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-62 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

Lyntegar 0.009 31.904

SPS 0.058 31.904

Lyntegar 0.023 31.904

SPS 0.016 31.904

Lyntegar 0.000 31.904

SPS 23.756 31.154

SPS 1.140 2.366

SPS 2.621 29.200 14,395.93$ 13,435.30$

SPS 4.050 29.200

Deaf Smith 5.962 29.200

SPS 2.327 29.200

Bailey County 9.146 29.200

SPS 0.539 29.200

SPS 2.100 29.200

Deaf Smith 4.561 34.370 194,860.32$ 155,470.59$

Deaf Smith 1.025 34.370 43,791.24$ 34,939.13$

Deaf Smith 11.682 34.370 499,091.91$ 398,203.77$

SPS 0.863 34.370

Deaf Smith 8.400 34.370

Lyntegar 5.930 7.930

SPS 2.000 7.930

Lyntegar 0.163 7.930

Lyntegar 5.067 34.560 541,903.77$ 414,162.76$

Lyntegar 9.116 34.560 974,934.82$ 745,116.98$

Lyntegar 3.000 34.560

Lyntegar 10.960 34.560

Lyntegar 11.725 34.560

SPS 14.382 36.183 1,248,207.63$ 1,018,676.25$

South Plains 3.100 36.183

South Plains 4.500 36.183

SPS 4.800 36.183

Lyntegar 10.800 36.183

SPS 1.000 36.183

Lyntegar 2.475 36.183

Lyntegar 4.103 27.705

Lyntegar 7.615 27.705

SPS 0.300 27.705

SPS 1.682 27.705

Big Country 1.318 27.705

SPS 11.725 27.705

SPS 1.050 27.705 29,745.21$ 27,471.43$

Deaf Smith 7.111 41.000 341,806.58$ 286,602.87$

Deaf Smith 0.022 41.000 1,057.48$ 886.69$

Deaf Smith 6.029 41.000 289,797.76$ 242,993.77$

Bailey County 9.140 41.000

SPS 5.000 41.000

Lamb County 8.560 41.000

Lamb County 2.648 41.000

SPS 14.400 20.624

SPS 14.400 20.624

Page 68: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner

69 Z-63 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner

69 Z-64 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64)

69 Z-64 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64)

69 Z-64 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64)

69 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg

69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub

69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub

69 Z-66 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub

69 Z-69 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap

69 Z-69 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap

69 Z-70 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71)

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71)

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71)

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71)

69 Z-71 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71)

69 Z-73 Elec Tran-Line OH-TX- 69KV-Hereford NE Sub-Deaf Smith Rec Meter Sta (Z-73)

69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek

69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek

69 Z-74 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77)

69 Z-77 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77)

69 Z-80 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Legacy Sub (Z-80)

69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82)

69 Z-82 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82)

69 Z-83 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Cox Intg (Z-83)

69 Z-84 Elec Tran-Line OH-TX- 69KV-Plainview City-Kiser Sub (Z-84)

69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85)

69 Z-85 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85)

69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86)

69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86)

69 Z-86 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86)

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

69 Z-87 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87)

115 T-04 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Castro Co Intg (T-04)

115 T-25 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dumas Int

115 T-27 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int

115 T-27 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int

115 T-28 Elec Tran-Line OH-TX-115KV-Plant X Sta-Lamton Intg (T-28)

115 T-31 Elec Tran-Line OH-TX-115KV-Sundown Int Tap North Ckt

115 T-37 Elec Tran-Line OH-TX-115KV-Sunset Sub-Puckett West Sub (T-37)

115 T-47 Elec Tran-Line OH-TX-115KV-Rita Blanca REC-Houge Sub Tap

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 4.400 20.624

South Plains 1.022 20.624 28,422.09$ 24,352.39$

SPS 0.729 14.100

Lamb County 1.500 14.100

SPS 10.471 14.100

Big Country 15.412 15.412 1,559,421.15$ 802,085.44$

SPS 9.903 18.210 500

SPS 8.290 18.210 501

SPS 0.017 18.210

SPS 3.461 24.845 602,920.65$ 537,261.92$

SPS 17.864 24.845 3,111,983.38$ 2,773,084.95$

North Plains 18.773 25.185

SPS 0.005 25.185

SPS 6.370 25.185

SPS 0.037 25.185

SPS 4.870 14.067 498

Deaf Smith 4.105 14.067 61,883.93$ 59,078.74$

Deaf Smith 2.585 14.067 38,969.54$ 37,203.05$

Deaf Smith 0.019 14.067 286.43$ 273.45$

Deaf Smith 0.027 14.067 407.03$ 388.58$

Deaf Smith 0.752 0.752 -$ -$

SPS 13.787 26.451 3,879,676.50$ 2,929,366.98$

SPS 12.571 26.451 3,537,492.81$ 2,670,999.66$ No NTC

SPS 0.093 26.451 26,170.30$ 19,760.00$

SPS 6.400 12.157

SPS 5.100 12.157

SPS 3.478 5.738 134,211.52$ 116,582.13$

Lighthouse 17.544 22.012 278,114.52$ 253,035.53$ NTC-200166, UID:50450

Lighthouse 1.169 22.012 18,531.46$ 16,860.38$ NTC-200166, UID:50450

SPS 5.007 8.914 179,989.61$ 163,439.71$

SPS 0.818 0.818 497 NTC-200166, UID:50450

SPS 4.855 11.822 156,290.08$ 145,645.63$ NTC-200166, UID:50407

Lyntegar 4.043 11.822 130,150.52$ 121,286.36$ NTC-200166, UID:50407

SPS 2.140 2.219 599,713.03$ 568,010.32$ 520 NTC-200166, UID:50407

SPS 0.018 2.219 5,044.32$ 4,777.66$ 521

SPS 0.061 2.219 17,094.62$ 16,190.95$ 522

Lyntegar 10.173 25.399 238,396.98$ 222,344.26$ NTC-200166, UID:50407

Lyntegar 1.605 25.399 37,612.03$ 35,079.38$ NTC-200166, UID:50407

Lyntegar 0.059 25.399 1,382.62$ 1,289.52$ NTC-200166, UID:50407

SPS 1.122 25.399 NTC-200166, UID:50407

SPS 1.400 25.399 NTC-200166, UID:50407

Lyntegar 4.053 25.399 NTC-200166, UID:50407

Deaf Smith 0.040 22.560 935.30$ 856.12$

Rita Blanca 0.000 12.903 -$ -$ 523

SPS 2.496 46.141 310,259.59$ 269,073.18$

SPS 0.009 46.141 1,118.72$ 970.22$

Lamb County 0.023 22.020 685.53$ 618.90$

Lamb County 0.021 17.220 531.48$ 360.26$

SPS 1.050 3.323 443,749.45$ 433,397.41$ 542 NTC-20130, UID:11372

Rita Blanca 0.014 0.014 -$ -$

Page 69: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

115 T-49 Elec Tran-Line OH-TX-115KV-Pringle-Phillips Cogen (T-49)

115 T-53 Elec Tran-Line OH-TX-115KV-Nichols Sta-WTU

115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54)

115 T-54 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54)

115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58)

115 T-58 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58)

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

115 T-59 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59)

115 T-64 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub

115 T-64 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub

115 T-66 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int

115 T-67 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int

115 T-70 Elec Tran-Line OH-TX-115KV-Coulter Intg-South Georgia Intg (T-70)

115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71)

115 T-71 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71)

115 T-73 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73)

115 T-73 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73)

115 T-75 Elec Tran-Line OH-TX-115KV-Arrowhead Sub Tap

115 T-83 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int

115 T-86 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Spring Draw Sub (T-86)

115 T-89 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89)

115 T-91 Elec Tran-Line OH-TX-115KV-Russell Pool Substation-Higg Substation (T-91)

115 U-11 Elec Tran-Line OH-TX-115KV-East Sta-Rolling Hills Sub (U-11)

115 U-17 Elec Tran-Line OH-TX-115KV-CLTR-OUTP-115-01 (U-17)

115 V-01 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta

115 V-01 Elec Tran-Line OH-TX-115KV-Herring Sub Tap

115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02)

115 V-02 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02)

115 V-03 Elec Tran-Line OH-TX-115KV-East Sta-Nichols Sta

115 V-04 Elec Tran-Line OH-TX-115KV-Randall Co Int-East Sta

115 V-12 Elec Tran-Line OH-TX-115KV-Plant X Sta-Bailey Co Int115 V-33 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int

115 V-35 Elec Tran-Line OH-TX-115KV-Hutchinson Co Int-Gray Co Int

Gray County Sub-Tran-TX

115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int

115 V-36 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int

115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37)

115 V-37 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37)

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

115 V-38 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1

115 V-43 Elec Tran-Line OH-TX-115KV-Osage Int Tap

115 V-44 Elec Tran-Line OH-TX-115KV-Estacado Sub Tap

115 V-46 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub

115 V-49 Elec Tran-Line OH-TX-115KV-ODC Sub Tap

115 V-49 Elec Tran-Line OH-TX-115KV-ODC Sub Tap

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 0.085 27.844 10,207.33$ 9,715.27$

SPS 0.006 50.480 768.09$ 539.25$

SPS 0.056 26.495 301.47$ 295.02$

SPS 0.009 26.495 48.45$ 47.41$

SPS 0.007 27.174 554.11$ 528.21$

Deaf Smith 0.000 27.174 -$ -$

Deaf Smith 0.000 29.224 -$ -$

SPS 0.019 29.224 1,007.94$ 947.97$

Deaf Smith 0.020 29.224 1,060.99$ 997.87$

SPS 4.200 7.657 1,265,020.57$ 780,702.02$

SPS 3.457 7.657 1,041,232.40$ 642,592.12$

SPS 0.013 37.459

Tulia 0.000 17.820

SPS 1.202 4.515 137,991.76$ 136,632.43$

South Plains 0.000 6.172 -$ -$

LPL 1.707 6.172 145,319.23$ 122,969.03$

SPS 0.027 5.129 1,016.57$ 986.59$

SPS 0.750 5.129 28,238.16$ 27,405.16$

SPS 0.016 0.016 637,271.81$ 457,028.37$

South Plains 0.023 5.585 1,526.81$ 944.89$

SPS 7.863 7.863 3,109,701.20$ 2,469,171.22$

SPS 0.049 13.922 2,237.23$ 2,016.54$

SPS 1.000 1.000 (6,495.82)$ (4,327.14)$

SPS 0.047 11.429 -$ -$ 563

SPS 0.030 9.324 237.37$ 234.93$ 529

Rita Blanca 0.016 34.250 1,354.62$ 814.13$

SPS 4.489 4.489 194,147.07$ 129,889.28$

SPS 1.530 19.396

SPS 5.841 19.396 160,431.39$ 156,980.23$

SPS 0.026 7.357 2,367.12$ 1,464.74$

SPS 0.040 6.702 9,711.49$ 7,709.20$

SPS 0.967 21.940 97,862.18$ 78,158.31$ NTC-200166, UID:11104South Plains 0.026 24.042 1,523.21$ 1,152.55$

SPS 25.300 25.300 502

SPS 1.000 1.000 503

Lyntegar 0.019 38.367 1,597.88$ 1,139.54$

SPS 2.570 38.367 216,133.99$ 154,137.84$

Bailey County 0.000 25.106 -$ -$

Bailey County 0.010 25.106 385.68$ 355.37$

SPS 0.238 41.775 8,715.64$ 6,030.54$

SPS 0.100 41.775 3,662.03$ 2,533.84$

SPS 0.013 41.775 476.06$ 329.40$

SPS 0.103 41.775 3,771.89$ 2,609.85$

SPS 2.078 41.775 76,097.03$ 52,653.19$

SPS 0.010 41.775 366.20$ 253.38$

SPS 2.015 7.018 77,017.80$ 69,023.43$

SPS 0.826 0.826 165,962.81$ 63,822.27$

LPL 1.949 1.949 1,226,344.53$ 671,486.88$

SPS 0.017 15.257 255.27$ 203.81$

SPS 2.040 15.257 30,632.21$ 24,456.61$

Page 70: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

Line Voltage

in kV

Circuit No. Asset Location

115 V-49 Elec Tran-Line OH-TX-115KV-Arco Sub Tap

115 V-50 Elec Tran-Line OH-TX-115KV-Northwest Int-Bush Sub

115 V-55 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap

115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt

115 V-55 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt

115 V-56 Elec Tran-Line OH-TX-115KV-Sundown Int-Cochran Co Int

115 V-62 Elec Tran-Line OH-TX-115KV-Denver City Sta-Tuco Int

115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int

115 V-64 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int

115 V-66 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int

115 V-79 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int

115 V-79 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

115 V-80 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub

115 V-95 Elec Tran-Line OH-TX-115KV-El Paso Shell Tap

115 W-01 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub

115 W-05 Elec Tran-Line OH-TX-115KV-Dallum Co Int-Sherman Co Sw Sta (W-05)

115 W-11 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Seminole Interchange (W-11)

115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24)

115 W-24 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24)

115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchg-Ochiltree County Interchg (W-29)

115 W-29 Elec Tran-Line OH-TX-115KV-Spearman Interchg-Ochiltree County Interchg (W-29)

115 W-34 Elec Tran-Line OH-TX-115KV-AMFRAC-Johnson Draw (W-34)

115 W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40)

115 W-40 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40)

115 W-42 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42)

115 W-47 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Cherry Street Sub (W-47)

115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50)

115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50)

115 W-50 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50)

115 W-53 Elec Tran-Line OH-TX-115KV-Newhart-Lamton (W-53)

115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54)

115 W-54 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54)

115 W-77 Elec Tran-Line OH-TX-115KV-Canyon West Sub-Randall County Intg (W-77)

115 W-78 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-Coburn Creek Sub (W-78)115 W-82 Elec Tran-Line OH-TX-115KV-Hereford Northeast Int-New Centre Street Sub (W-82)

115 T-01 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int115 T-01 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int

Abbreviations:W = WholesaleR = RetailTX = TexasNM = New MexicoOK = Oklahoma

Customer Name

Radial Line Segment Length in

miles

Total Line Length in

miles

Wholesale Installed Plant

Value

Wholesale Net Plant Value

Retail Installed Plant Value

Retail Net Plant Value

Row No.Ref on Radial Line

Changes Tab New Line? NTC Base Plan

SPS 1.560 15.257 9,786.62$ 7,794.14$

SPS 4.315 4.315 198,059.50$ 108,260.73$

SPS 4.858 4.858 309,691.33$ 149,683.11$

Lyntegar 0.017 20.365 879.83$ 689.71$

Lyntegar 0.041 20.365 2,121.94$ 1,663.43$

SPS 0.036 9.582 1,744.71$ 1,205.41$

South Plains 0.010 6.060 7,226.71$ 4,837.59$

Rita Blanca 0.000 35.726 -$ -$ 550

SPS 0.489 35.726 52,567.78$ 32,199.31$ 551

Lyntegar 0.017 23.447 872.30$ 553.11$

SPS 1.800 9.259 395,619.21$ 322,348.95$ 524

SPS 0.399 9.259 87,695.59$ 71,454.02$ 525

SPS 0.945 23.652 98,614.77$ 74,102.70$

SPS 0.750 23.652 78,265.69$ 58,811.67$

SPS 0.200 23.652 20,870.85$ 15,683.11$

SPS 2.360 23.652 246,276.05$ 185,060.72$

SPS 0.034 23.652 3,548.04$ 2,666.13$

SPS 0.010 4.593 963.69$ 751.14$

SPS 1.223 1.223

SPS 0.039 48.890 507

SPS 2.000 18.351 96,313.03$ 82,717.81$

Rita Blanca 0.000 29.368 -$ -$

Rita Blanca 0.000 29.368 -$ -$

SPS 0.038 34.621

SPS 0.027 34.621 -$ -$

SPS 0.977 0.977 108,702.59$ 94,807.31$

SPS 0.015 26.868 5,234.93$ 5,148.03$ 552

SPS 0.010 26.868 3,489.95$ 3,432.02$ 553

SPS 0.047 11.429 563

SPS 0.156 0.156 160,424.96$ 146,160.77$

SPS 10.976 19.525 5,768,904.36$ 5,417,895.37$ yes 12/2016

SPS 1.501 19.525 788,914.49$ 740,912.99$ yes 12/2016

SPS 7.048 19.525 3,704,376.64$ 3,478,983.83$ yes 12/2016

SPS 0.015 27.358 6,940.20$ 6,325.21$

SPS 0.008 23.737 4,343.43$ 3,964.85$ NTC-20130, UID:11383

SPS 0.959 23.737 520,668.11$ 475,286.78$ NTC-20130, UID:11384

SPS 0.907 22.921 164,332.07$ 156,358.45$

SPS 11.050 11.050 7,164,598.90$ 6,908,130.28$ yes 5/2017

SPS 7.337 7.337 4,968,384.14$ 4,908,639.63$ 499 yes 5/2018 NTC-200256, UID:11127

Tri County 0.020 38.050 1,566.21$ 1,129.02$ Tri County 0.000 38.050 -$ -$ 526

11,183,022.12$ 8,597,437.52$ 94,367,725.70$ 80,061,867.24$

Page 71: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

NBV as of 12.31.2018

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Allen Metering Sub-Tran-TX 281,304.57 31,692.27 249,612.30 Allen Sub-Tran-TX 273,434.08 114,146.80 159,287.28 Amarillo North Sw Sta-Tran-TX 63,930.98 40,970.49 22,960.49 Amarillo South Sub-Tran-TX 9,258,531.72 1,635,194.02 7,623,337.70 Amerada-Hess CO2 Sub-Tran-TX 1,706,718.78 403,317.05 1,303,401.73 Amoco Sw Sta-Tran-TX 2,560,857.79 52,581.76 2,508,276.03 Amoco Wasson Sub-Tran-TX 2,552,906.17 608,306.09 1,944,600.08 Andrews County Sub-Tran-TX 11,915,663.50 461,999.63 11,453,663.87 Artesia Sub-Tran-NM 1,497,392.04 731,865.31 765,526.73 Atoka Sub-Tran-NM 5,332,113.04 301,095.48 5,031,017.56 Bailey County REC Earth Sub-Tran-TX 2,701,251.70 471,174.32 2,230,077.38 Bailey County Sub-Tran-TX 7,031,934.36 778,816.59 6,253,117.77 Battle Axe Sub-Tran-NM 1,384,010.35 72,765.02 1,311,245.33 Batton Sub-Tran-TX 95,195.92 15,710.42 79,485.50 Beaver County Metering Sub-Tran-OK 1,403.71 263.57 1,140.14 Beker Sub-Tran-NM 8,436.31 4,492.42 3,943.89 Bensing Sub-Tran-NM 267,708.49 6,032.16 261,676.33 Blackhawk Sub-Tran-TX 2,016,349.99 544,078.11 1,472,271.88 Blanco Switching Station-Tran-TX (1,345,792.14) (10,394.58) (1,335,397.56) Border Sub-Tran-OK 1,437,635.99 97,179.97 1,340,456.02 Bowers Sub-Tran-TX 6,376,861.25 384,793.85 5,992,067.40 Brownfield Sub-Tran-TX 365,582.44 141,328.26 224,254.18 BRU Sub-Tran-TX 3,391,287.84 280,183.59 3,111,104.25 Bushland Sub-Tran-TX 3,277,650.83 739,322.79 2,538,328.04 Camex Sub-Tran-TX 563,423.39 21,158.76 542,264.63 Canyon West Sub-Tran-TX 2,003,445.55 105,924.77 1,897,520.78 Capitan Sub-Tran-NM 2,156,742.86 42,258.72 2,114,484.14 Cardinal Sub-Tran-NM 4,874,894.64 188,966.60 4,685,928.04 Cargill Sub-Tran-TX 2,037,008.28 23,713.98 2,013,294.30 Carlisle Sub-Tran-TX 16,529,459.30 1,549,909.42 14,979,549.88 Carlsbad Sub-Tran-NM 3,665,545.52 1,143,803.70 2,521,741.82 Castro County Sub-Tran-TX 8,946,226.40 1,480,351.56 7,465,874.84 Celanese CZ-2 Sw Sta-Tran-TX 600,246.21 401,765.25 198,480.96 Channing Sub-Tran-TX 3,300,598.75 172,360.57 3,128,238.18 Chaves County Sub-Tran-NM 19,486,416.48 2,953,412.63 16,533,003.85 China Draw Sub-Tran-NM 42,382,661.69 1,252,759.38 41,129,902.31 Cirrus Sub-Tran-TX - (0.00) 0.00 Clovis East Sub-Tran-NM 233,929.20 19,326.91 214,602.29 Clovis North Sub-Tran-NM 217,234.52 27,737.23 189,497.29 Clovis Sub-Tran-NM 93,696.98 55,474.22 38,222.76 Clovis West Sub-Tran-NM 4,083.97 3,094.19 989.78 Clutter Metering Sub-Tran-TX 63,165.32 7,116.32 56,049.00 Clutter Sub-Tran-TX 94,788.27 23,707.09 71,081.18 Coburn Creek Sub-Tran-TX 2,496,713.43 56,310.58 2,440,402.85 Cochran County Sub-Tran-TX 7,022,762.11 861,798.87 6,160,963.24 Cochran Sw Sta-Tran-NM 88,965.62 48,017.80 40,947.82 Cole Sub-Tran-OK 2,763,948.06 360,046.79 2,403,901.27 Cottonwood Sub-Tran-NM 554,587.50 87,473.14 467,114.36 Coulter Sub-Tran-TX 1,859,021.66 645,050.38 1,213,971.28 Cox Sub-Tran-TX 4,362,406.22 808,077.38 3,554,328.84 CRMWA #23 Sub-Tran-TX 104,461.49 13,337.99 91,123.50 Crosby County Sub-Tran-TX 7,064,727.12 796,715.35 6,268,011.77 Crossroads Sub-Tran-NM 97,399.48 938.79 96,460.69 Cunningham Sub-Tran-NM 12,438,742.47 3,126,833.07 9,311,909.40 Curry County Sub-Tran-NM 16,484,475.94 1,564,228.83 14,920,247.11 Custer Mt Sub-Tran-NM 4,513,855.95 100,010.11 4,413,845.84 Dalhart Sub-Tran-TX 856,484.37 362,056.78 494,427.59 Dallam County Sub-Tran-TX 2,859,338.24 621,742.26 2,237,595.98 Dawn Sub-Tran-TX 275,477.04 2,073.00 273,404.04 Deaf Smith Electric Cooperative Sub-Tran-TX 9,561.12 646.30 8,914.82 Deaf Smith Sub-Tran-TX 13,342,791.25 2,037,996.36 11,304,794.89 Denver City Sub-230KV-Tran-TX 10,521,617.26 2,708,571.74 7,813,045.52 Dexter Sub-Tran-NM 581,872.76 91,776.75 490,096.01 Diamondback Sub-Tran-TX 7,225,562.63 380,633.99 6,844,928.64 Doss Sub-Tran-TX 3,953,969.11 779,044.01 3,174,925.10 Draw Tap REC Sw Sta-Tran-TX 59,411.26 34,234.07 25,177.19 Drinkard Sub-Tran-NM 1,357,516.24 73,308.19 1,284,208.05 Dumas 19th St Sub-Tran-TX 681,164.22 121,927.11 559,237.11 Eagle Creek Metering Sub-Tran-NM 612,145.88 68,965.44 543,180.44 Eagle Creek Sub-Tran-NM 8,950,598.36 823,318.24 8,127,280.12 East Sanger Sub-Tran-NM 40,938.29 20,437.30 20,500.99 East Station Sub-230KV-Tran-TX 7,985,786.62 2,110,519.32 5,875,267.30 Eddy County Sub-Tran-NM 37,351,477.19 8,989,365.19 28,362,112.00 Elec Tran-Line OH-KS-345KV-Finney Sw Sta-Carpenter Sub (J-25) 1,759,239.69 18,106.20 1,741,133.49 Elec Tran-Line OH-KS-345KV-Hitchland Intg-Finney Sw Sta (J-07) 1,107,439.29 138,468.27 968,971.02 Elec Tran-Line OH-KS-345KV-Kansas St Line-Carpenter Sub (J-26) 746,300.85 7,678.49 738,622.36 Elec Tran-Line OH-KS-345KV-SPS Tie Holcomb CO-Finney Sw Sta (J-04) 2,428,690.32 724,270.70 1,704,419.62 Elec Tran-Line OH-KS-345KV-SPS/PSCO Tie Holcomb-CO St Line 21,319,528.80 6,283,285.29 15,036,243.51

Page 72: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-KS-345KV-SPS/PSCO Tie Holcomb-OK St Line 24,397,372.92 7,870,355.60 16,527,017.32 Elec Tran-Line OH-NM- 69KV-Amex #2 Tap 180,452.00 94,844.26 85,607.74 Elec Tran-Line OH-NM- 69KV-Artesia Country Club Sub Tap 31,836.10 21,496.01 10,340.09 Elec Tran-Line OH-NM- 69KV-Artesia Int-Artesia City Sub 36,793.95 10,595.52 26,198.43 Elec Tran-Line OH-NM- 69KV-Artesia Int-Carlsbad Sta 2,152,248.01 1,028,542.59 1,123,705.42 Elec Tran-Line OH-NM- 69KV-Artesia Int-Eagle Creek Sub (Z-75) 99.26 2.93 96.33 Elec Tran-Line OH-NM- 69KV-Artesia South Rural Sub Tap 211,109.12 19,673.77 191,435.35 Elec Tran-Line OH-NM- 69KV-Artesia South-Artesia Town (Z-12) 4,696,021.32 338,328.16 4,357,693.16 Elec Tran-Line OH-NM- 69KV-Atoka Intg-Artesia Intg (Z-56) 127,714.41 6,563.90 121,150.51 Elec Tran-Line OH-NM- 69KV-Cannon AFB Sub Tap 126,876.55 67,992.79 58,883.76 Elec Tran-Line OH-NM- 69KV-Carlsbad Sta-White Sub 2,010,228.47 546,416.90 1,463,811.57 Elec Tran-Line OH-NM- 69KV-Carlsbad Waterfield Sub Tap 91,887.26 62,712.08 29,175.18 Elec Tran-Line OH-NM- 69KV-Cherry Sub Tap 19,775.51 15,737.52 4,037.99 Elec Tran-Line OH-NM- 69KV-Clovis East Sub Tap 225,990.69 30,220.14 195,770.55 Elec Tran-Line OH-NM- 69KV-Clovis Loop 859,217.69 302,672.72 556,544.97 Elec Tran-Line OH-NM- 69KV-Cottonwood Sub Tap 48,167.80 24,833.38 23,334.42 Elec Tran-Line OH-NM- 69KV-Curry Co Int-Roosevelt Co Int 13,155.74 7,258.60 5,897.14 Elec Tran-Line OH-NM- 69KV-Curry Co Int-TX St Line 157,248.93 55,652.92 101,596.01 Elec Tran-Line OH-NM- 69KV-Dexter Sub Tap 34,086.35 21,971.36 12,114.99 Elec Tran-Line OH-NM- 69KV-Duval #3 Sub Tap 264,065.89 79,079.52 184,986.37 Elec Tran-Line OH-NM- 69KV-Duval-IMC #4 Bore Hole 379,643.21 151,342.98 228,300.23 Elec Tran-Line OH-NM- 69KV-Eagle Creek-Artesia Town (Z-76) 123,019.98 18,636.57 104,383.41 Elec Tran-Line OH-NM- 69KV-FEC Tap 1,512,154.64 575,458.66 936,695.98 Elec Tran-Line OH-NM- 69KV-IMC #2 Sub Tap 119,761.12 39,485.29 80,275.83 Elec Tran-Line OH-NM- 69KV-IMC #3 Sub Tap 60,910.57 38,572.43 22,338.14 Elec Tran-Line OH-NM- 69KV-Industrial Sub-Ethanol Plant Sub 119,801.22 82,498.45 37,302.77 Elec Tran-Line OH-NM- 69KV-Loving Sub Tap 124,608.15 86,557.26 38,050.89 Elec Tran-Line OH-NM- 69KV-Mississippi Chem #2 Sub Tap 13,784.17 10,831.57 2,952.60 Elec Tran-Line OH-NM- 69KV-Navajo #4 Sub Tap 150,803.66 95,381.42 55,422.24 Elec Tran-Line OH-NM- 69KV-Navajo Ref #2 & #3 Sub Tap 25,611.11 12,319.12 13,291.99 Elec Tran-Line OH-NM- 69KV-New Mexico Potash #1 Sub Tap 141,070.26 78,870.75 62,199.51 Elec Tran-Line OH-NM- 69KV-North Clovis Sub Tap 26,246.68 18,988.04 7,258.64 Elec Tran-Line OH-NM- 69KV-Ocotillo Sub Tap (Z-57) 15,839.62 13,508.45 2,331.17 Elec Tran-Line OH-NM- 69KV-Portales Grain Alcohol 473,070.61 171,573.56 301,497.05 Elec Tran-Line OH-NM- 69KV-Portales Sw Sta-Portales South Sub 344,980.25 151,168.15 193,812.10 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #1 & Duval #4 517.12 211.16 305.96 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Duval #2 695,780.98 336,437.94 359,343.04 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-IMC #1 Sub 88,444.44 41,731.83 46,712.61 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-IMC #4 Sub (Z-48) 7,339.21 75.76 7,263.45 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Kermac 503,987.66 180,032.29 323,955.37 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-Mississippi East Sub (Z-22) 63,706.46 1,961.13 61,745.33 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-National Potash 174,970.45 58,033.55 116,936.90 Elec Tran-Line OH-NM- 69KV-Potash Jct Sub-PCA 2 Sub (Z-02) 20,510.87 1,045.48 19,465.39 Elec Tran-Line OH-NM- 69KV-REC Sub Tap 24,568.15 10,436.88 14,131.27 Elec Tran-Line OH-NM- 69KV-Roosevelt Co Int-Portales City Sub 1,574,860.37 642,245.87 932,614.50 Elec Tran-Line OH-NM- 69KV-Roosevelt Co Int-Portales Sw Sta 165,098.39 99,508.53 65,589.86 Elec Tran-Line OH-NM- 69KV-Roswell Int-Artesia Int 2,221,226.73 673,804.81 1,547,421.92 Elec Tran-Line OH-NM- 69KV-Roswell Int-Chaves Co Int 3,070,777.64 307,065.52 2,763,712.12 Elec Tran-Line OH-NM- 69KV-Roswell Int-Roswell Sta (25,891.40) (9,099.81) (16,791.59) Elec Tran-Line OH-NM- 69KV-Roswell/Chaves-Walker AFB West Sub 59,385.14 35,561.61 23,823.53 Elec Tran-Line OH-NM- 69KV-Walker AFB East Sub Tap 14,756.43 13,054.52 1,701.91 Elec Tran-Line OH-NM- 69KV-WIPP Sub Tap 513,459.76 286,647.79 226,811.97 Elec Tran-Line OH-NM- 69KV-WIPP Sub-Sand Dunes Sub 478,811.88 237,794.79 241,017.09 Elec Tran-Line OH-NM- 69KV-Zodiac Sub Tap 47,796.61 12,215.52 35,581.09 Elec Tran-Line OH-NM-115KV-Artesia Intg-Eagle Creek Intg (W-20) 1,996,799.63 218,587.42 1,778,212.21 Elec Tran-Line OH-NM-115KV-Atoka Sub-Seven Rivers Sub 342,606.37 134,377.01 208,229.36 Elec Tran-Line OH-NM-115KV-Battle Axe Sub-Roadrunner Sub (W-79) 9,000,997.03 603,150.57 8,397,846.46 Elec Tran-Line OH-NM-115KV-Brasher Sub Tap 1,152,352.04 119,291.96 1,033,060.08 Elec Tran-Line OH-NM-115KV-Cannon AFB Sub Tap 90,313.11 11,289.41 79,023.70 Elec Tran-Line OH-NM-115KV-Cardinal Sub-Sage Brush Sub (W-89) 7,572,071.13 382,760.59 7,189,310.54 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Cunningham Sta #2 4,092,332.49 1,496,530.68 2,595,801.81 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Fiesta Sub 272,613.42 153,570.68 119,042.74 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Potash Jct Sub 3,027,573.93 393,954.51 2,633,619.42 Elec Tran-Line OH-NM-115KV-Carlsbad Sta-Roswell Int 6,058,841.86 1,374,985.41 4,683,856.45 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Capitan Sub (W-99) 10,329,741.51 329,784.16 9,999,957.35 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell City (T-26) 2,248,603.47 725,761.80 1,522,841.67 Elec Tran-Line OH-NM-115KV-Chaves Co Int-Roswell Int 1,062,989.01 339,891.59 723,097.42 Elec Tran-Line OH-NM-115KV-China Draw Sub-Wood Draw Sub (W-84) 8,153,469.41 269,942.79 7,883,526.62 Elec Tran-Line OH-NM-115KV-Cochran Sw Sta-Monument Sub 2,319,436.25 346,078.50 1,973,357.75 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Buckeye Sub (V-98) 3,147,335.27 348,502.05 2,798,833.22 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Maddox Sta 1,218,682.33 463,437.48 755,244.85 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Oil Center Sub (W-26) 3,809,773.66 100,441.95 3,709,331.71 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Quahada Sub (W-75) 721,440.64 51,938.26 669,502.38 Elec Tran-Line OH-NM-115KV-Cunningham Sta-Taylor Sw Sta 1,242,033.59 446,711.66 795,321.93 Elec Tran-Line OH-NM-115KV-Cunningham Sta-TX St Line 1,737,820.36 610,831.42 1,126,988.94 Elec Tran-Line OH-NM-115KV-Curry Co Int-FEC Clovis #3 Int (V-75) 679,525.89 95,184.69 584,341.20 Elec Tran-Line OH-NM-115KV-Curry Co Int-NM State Line (W-69) 5,866,395.18 292,638.80 5,573,756.38 Elec Tran-Line OH-NM-115KV-Curry Co Int-Norton Sw Sta (T-76) 1,101,088.08 155,056.08 946,032.00 Elec Tran-Line OH-NM-115KV-Curry Co Int-Oasis Int 740,289.93 98,737.55 641,552.38 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-62) 1,294,678.45 55,975.93 1,238,702.52 Elec Tran-Line OH-NM-115KV-Curry Co Int-Pleasant Hill Sub (W-65) 518,207.80 35,288.17 482,919.63 Elec Tran-Line OH-NM-115KV-Curry Co Int-Roosevelt Co Int #1 1,334,870.61 226,687.69 1,108,182.92

Page 73: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-NM-115KV-Curry Co Int-Roosevelt Co Int #2 168,780.09 124,311.98 44,468.11 Elec Tran-Line OH-NM-115KV-Curry Co Int-Tucumcari 3,134,845.06 1,767,199.83 1,367,645.23 Elec Tran-Line OH-NM-115KV-Curry Co Int-TX St Line 764,270.30 154,246.16 610,024.14 Elec Tran-Line OH-NM-115KV-Custer Mountain Sub-Whitten Sub (W-96) 1,773,743.98 57,200.95 1,716,543.03 Elec Tran-Line OH-NM-115KV-Drinkard Sub Tap 136,861.76 79,018.52 57,843.24 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 3 (W-23) 335,413.83 51,440.41 283,973.42 Elec Tran-Line OH-NM-115KV-Eagle Creek Intg-Navajo 4&5 (W-22) - 0.97 (0.97) Elec Tran-Line OH-NM-115KV-Eagle Creek Sub-Atoka Sub (W-92) 15,580,733.96 195,464.21 15,385,269.75 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Artesia Int 586,909.49 219,116.20 367,793.29 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (01524) 5,664,766.92 1,635,621.76 4,029,145.16 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Atoka Sub (W-97) 148,386.45 7,639.06 140,747.39 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Eagle Creek Int (W-21) 1,044,342.74 102,244.14 942,098.60 Elec Tran-Line OH-NM-115KV-Eddy Co Int-Roswell Intg (V-26) 18,303.11 899.87 17,403.24 Elec Tran-Line OH-NM-115KV-Eunice Sub-Cardinal Sub (U-05) 271,755.60 13,900.72 257,854.88 Elec Tran-Line OH-NM-115KV-FEC Intg-Pleasant Hill Sub (W-64) 1,793,962.90 143,184.72 1,650,778.18 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Cunningham Sta (T-96) 34,738.20 4,652.16 30,086.04 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Higg Sub (T-98) 394,920.79 11,999.90 382,920.89 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Maddox Sta (T-94) 94,431.10 8,747.15 85,683.95 Elec Tran-Line OH-NM-115KV-Hobbs Gen Sub-Taylor Sw Sta (T-97) 475,132.08 67,498.13 407,633.95 Elec Tran-Line OH-NM-115KV-Hobbs Loop 662,558.69 350,043.94 312,514.75 Elec Tran-Line OH-NM-115KV-Hobbs North Sub Tap 31,454.56 21,271.20 10,183.36 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-NEF Sub 248,975.91 13,198.23 235,777.68 Elec Tran-Line OH-NM-115KV-Hobbs West Sw Sta-Taylor Sw Sta (T-13) 19,265.15 947.17 18,317.98 Elec Tran-Line OH-NM-115KV-Hopi Sub-North Loving Sub (W-70) 6,670,377.95 468,299.22 6,202,078.73 Elec Tran-Line OH-NM-115KV-Jal Sub-Dollarhide Sub 968,165.59 326,136.17 642,029.42 Elec Tran-Line OH-NM-115KV-Jal-Hobbs Loop 4,572,177.45 1,714,219.88 2,857,957.57 Elec Tran-Line OH-NM-115KV-Lea National Potash Sub-Quahada Sub (W-73) 1,145,453.31 78,948.24 1,066,505.07 Elec Tran-Line OH-NM-115KV-Livingston Ridge Sub-Sage Brush Sub (W-88) 11,983,420.01 379,115.20 11,604,304.81 Elec Tran-Line OH-NM-115KV-Livingston Ridge Sub-Wipp Sub (U-09) 244,409.56 7,546.10 236,863.46 Elec Tran-Line OH-NM-115KV-LOSO-NOLO-115-01 702,158.43 5,861.21 696,297.22 Elec Tran-Line OH-NM-115KV-Maddox Sta-Buckeye Sub 643,291.80 234,966.22 408,325.58 Elec Tran-Line OH-NM-115KV-Maddox Sta-Hobbs Loop 4,418,957.87 460,265.87 3,958,692.00 Elec Tran-Line OH-NM-115KV-Maddox Sta-Jal 1,531,594.43 719,287.46 812,306.97 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea Co REC 1,585,744.24 237,749.63 1,347,994.61 Elec Tran-Line OH-NM-115KV-Maddox Sta-Lea National Potash Sub (V-83) 718,436.11 50,866.79 667,569.32 Elec Tran-Line OH-NM-115KV-Maddox Sta-Maljamar Sub 2,175,904.38 742,767.96 1,433,136.42 Elec Tran-Line OH-NM-115KV-Maddox Sta-Quahada Sub (U-12) 1,964,172.23 20,217.58 1,943,954.65 Elec Tran-Line OH-NM-115KV-Navajo Ref #3 Sub Tap 75,206.01 29,848.73 45,357.28 Elec Tran-Line OH-NM-115KV-NEF Sub-Cardinal Sub (U-03) 1,599,271.69 28,804.06 1,570,467.63 Elec Tran-Line OH-NM-115KV-New Mexico St Line-NEF Sub (W-83) 1,729,791.61 118,371.06 1,611,420.55 Elec Tran-Line OH-NM-115KV-Norris St Tap 5,642,204.40 2,380,626.65 3,261,577.75 Elec Tran-Line OH-NM-115KV-North Canal Sub Tap 716.44 509.25 207.19 Elec Tran-Line OH-NM-115KV-North Loving Sub-China Draw Sub (W-72) 9,344,878.61 647,137.03 8,697,741.58 Elec Tran-Line OH-NM-115KV-Norton Sw Sta-Campbell St Sub (T-77) 10,065.25 1,090.43 8,974.82 Elec Tran-Line OH-NM-115KV-Norton Sw Sta-Lopez Int (W-58) 725,203.20 27,655.13 697,548.07 Elec Tran-Line OH-NM-115KV-Oasis Intg-Perimeter Sub (W-31) 34,326.32 3,056.75 31,269.57 Elec Tran-Line OH-NM-115KV-Ochoa Int-Sand Dunes Sub 1,203,065.91 196,968.37 1,006,097.54 Elec Tran-Line OH-NM-115KV-Pecos Intg-North Canal Sub (W-61) 379,113.01 68,572.04 310,540.97 Elec Tran-Line OH-NM-115KV-Pecos Intg-Ocotillo Sub (W-25) 1,853,699.71 216,876.29 1,636,823.42 Elec Tran-Line OH-NM-115KV-Pecos Int-Seven Rivers Int (T-62) 886,402.46 124,082.62 762,319.84 Elec Tran-Line OH-NM-115KV-Pecos Sub-Hopi Sub (W-43) 8,028,189.22 883,130.81 7,145,058.41 Elec Tran-Line OH-NM-115KV-Perimeter Sub-FEC Intg (W-32) 571,861.70 79,166.89 492,694.81 Elec Tran-Line OH-NM-115KV-Pleasant Hill Sub-Norton Sw Sta (W-63) 2,505,558.57 99,099.19 2,406,459.38 Elec Tran-Line OH-NM-115KV-Ponderosa Sub-Custer Mt Sw Sta (W-81) 5,716,030.98 184,090.84 5,531,940.14 Elec Tran-Line OH-NM-115KV-Portales Intg-Greyhound Sub (U-02) 5,243,280.85 70,627.52 5,172,653.33 Elec Tran-Line OH-NM-115KV-Portales Intg-Kilgore Sub (W-66) 15,103,028.80 548,042.22 14,554,986.58 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Kiowa Sub (U-10) 659,473.55 6,671.33 652,802.22 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-Livingston Ridge Sub (U-08) 693,076.34 21,478.31 671,598.03 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-PCA Sub 4,051,727.60 1,688,364.72 2,363,362.88 Elec Tran-Line OH-NM-115KV-Potash Jct Sub-WIPP Sub 3,097,684.10 1,107,452.50 1,990,231.60 Elec Tran-Line OH-NM-115KV-Quahada Sub-Maljamar Sub (W-74) 432,370.75 31,100.96 401,269.79 Elec Tran-Line OH-NM-115KV-Quahada Sub-PCA Sub (W-76) 7,104,457.35 233,390.31 6,871,067.04 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Roadrunner Sub (W-93) 728,373.60 52,095.40 676,278.20 Elec Tran-Line OH-NM-115KV-Red Bluff Sub-Wood Draw Sub (W-39) 1,883,927.96 145,842.29 1,738,085.67 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Agave Sub #2 (U-06) 434,542.90 11,831.17 422,711.73 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Custer Mountain Sub (W-95) 5,178,019.63 84,187.82 5,093,831.81 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Ochoa Intg (U-07) 204,462.10 6,299.37 198,162.73 Elec Tran-Line OH-NM-115KV-Roadrunner Sub-Whitten Sub (W-94) 505,052.28 36,418.25 468,634.03 Elec Tran-Line OH-NM-115KV-Roosevelt Co Intg-Portales Intg (T-33) 147,946.11 4,569.30 143,376.81 Elec Tran-Line OH-NM-115KV-Roswell Intg-Capitan (W-49) 6,571,159.55 597,844.64 5,973,314.91 Elec Tran-Line OH-NM-115KV-Roswell Intg-Sierra Sub (U-13) 2,247,396.29 26,640.89 2,220,755.40 Elec Tran-Line OH-NM-115KV-Roswell-Roswell City (T-24) 1,010,177.75 368,984.85 641,192.90 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Atoka Sub (W-98) 339,773.40 17,420.15 322,353.25 Elec Tran-Line OH-NM-115KV-Seven Rivers Interchange-Eagle Creek Sub (W-17) 10,607,784.59 1,563,043.09 9,044,741.50 Elec Tran-Line OH-NM-115KV-Taylor Sw Sta-Tx St Line (T-16) 38,445.40 19,157.27 19,288.13 Elec Tran-Line OH-NM-115KV-Taylor Sw Sta-Tx St Line (W-36) 106,767.73 4,285.55 102,482.18 Elec Tran-Line OH-NM-115KV-Whitten Sub-Cardinal Sub (U-04) 425,655.41 16,552.67 409,102.74 Elec Tran-Line OH-NM-115KV-Whitten Sub-NEF Sub 869,121.95 103,567.75 765,554.20 Elec Tran-Line OH-NM-115KV-Whitten Sub-Ochoa 391,488.01 185,701.59 205,786.42 Elec Tran-Line OH-NM-115KV-Whitten Sub-Oil Center Sub (W-27) 1,664,277.98 159,947.93 1,504,330.05 Elec Tran-Line OH-NM-115KV-Whitten Sub-Red Bluff Sub (W-37) 208,189.54 27,400.92 180,788.62 Elec Tran-Line OH-NM-115KV-Wipp Sub-Red Bluff Sub (W-38) 61,350.70 17,683.79 43,666.91

Page 74: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-NM-115KV-Yeso Hills Sub-China Draw Sub (W-87) 758,064.66 30,311.09 727,753.57 Elec Tran-Line OH-NM-230KV-Chaves Co Int-Eddy Co Int 5,538,133.22 2,552,150.62 2,985,982.60 Elec Tran-Line OH-NM-230KV-Chaves Co Int-San Juan Wind Farm Sub (K-66) 1,524,820.25 207,316.40 1,317,503.85 Elec Tran-Line OH-NM-230KV-Cunningham Sta-Eddy Co Int 6,830,049.98 1,405,671.09 5,424,378.89 Elec Tran-Line OH-NM-230KV-Cunningham Sta-Hobb Sta (K-92) 305,377.73 27,483.25 277,894.48 Elec Tran-Line OH-NM-230KV-Cunningham Sta-Potash Jct Sub 7,231,045.30 2,770,640.67 4,460,404.63 Elec Tran-Line OH-NM-230KV-Cunningham Sta-TX St Line 572,140.72 296,498.97 275,641.75 Elec Tran-Line OH-NM-230KV-Eddy Co to Seven Rivers 6,654,335.86 1,800,710.84 4,853,625.02 Elec Tran-Line OH-NM-230KV-Hobbs Sta-Lea County Intg (K-72) 52,023.41 10,182.55 41,840.86 Elec Tran-Line OH-NM-230KV-Hobbs Sta-Midland County Intg (K-71) 868,711.90 94,346.21 774,365.69 Elec Tran-Line OH-NM-230KV-Hobbs Sta-Yoakum (K-93) 185,887.59 15,962.96 169,924.63 Elec Tran-Line OH-NM-230KV-Lea Co Sub-TX St Line (K-49) 6,072,297.76 2,027,126.36 4,045,171.40 Elec Tran-Line OH-NM-230KV-NM St Line-Lea County Int (K-20) 33,574.30 3,110.28 30,464.02 Elec Tran-Line OH-NM-230KV-Pecos Int-Potash Jct Int 5,809,404.15 1,072,007.45 4,737,396.70 Elec Tran-Line OH-NM-230KV-Pleasant Hill Intg-Oasis Intg (K-83) 14,866,650.28 1,228,981.84 13,637,668.44 Elec Tran-Line OH-NM-230KV-Pleasant Hill Intg-Roosevelt Co Intg (K-84) 13,911,778.36 994,325.90 12,917,452.46 Elec Tran-Line OH-NM-230KV-Roosevelt Co Int-Chaves Co Int 8,867,711.04 4,390,654.88 4,477,056.16 Elec Tran-Line OH-NM-230KV-San Juan Mesa Wind Farm Sub-Oasis Intg (K-65) 589,225.75 79,593.72 509,632.03 Elec Tran-Line OH-NM-230KV-Seven Rivers-Pecos INT 7,641,271.07 1,460,196.11 6,181,074.96 Elec Tran-Line OH-NM-230KV-TX St Line-Roosevelt Co Int #1 (K-18) 521,016.31 212,988.52 308,027.79 Elec Tran-Line OH-NM-230KV-TX St Line-Roosevelt Co Int #2 (K-30) 734,848.61 445,478.44 289,370.17 Elec Tran-Line OH-NM-345KV-Crossroads Sub-NM St Line (J-15) 2,666,232.90 1,354,999.48 1,311,233.42 Elec Tran-Line OH-NM-345KV-Eddy Co Int-Crossroads Sub (J-14) 16,610,708.92 8,268,443.63 8,342,265.29 Elec Tran-Line OH-NM-345KV-Eddy Co Int-Kiowa Sub (J-24) 9,644.73 401.87 9,242.86 Elec Tran-Line OH-NM-345KV-Eddy Co Int-TX St Line 75,272.58 5,418.89 69,853.69 Elec Tran-Line OH-NM-345KV-Hobbs Sta-Kiowa Sub (J-20) 50,013,217.83 655,884.81 49,357,333.02 Elec Tran-Line OH-NM-345KV-Kiowa Sub-North Loving Sub (J-21) 23,990,207.84 313,431.57 23,676,776.27 Elec Tran-Line OH-NM-345KV-Kiowa Sub-Roadrunner Sub (J-23) 581,824.62 5,767.48 576,057.14 Elec Tran-Line OH-NM-345KV-NM St Line-Hobbs Sta (J-18) 2,429,940.23 61,041.45 2,368,898.78 Elec Tran-Line OH-NM-345KV-North Loving Sub-China Draw Sub (J-22) 20,813,884.69 318,603.56 20,495,281.13 Elec Tran-Line OH-NM-345KV-Potash Junction Sub-Roadrunner Sub (J-16) 45,302,479.15 3,223,661.49 42,078,817.66 Elec Tran-Line OH-OK-115KV-Cole Intg-Ochiltree County Intg (W-28) 5,891,144.40 420,873.92 5,470,270.48 Elec Tran-Line OH-OK-115KV-Hitchland Intg-Texas County Intg (W-07) 4,330,781.90 654,739.28 3,676,042.62 Elec Tran-Line OH-OK-115KV-Hitchland Intg-Texas County Intg (W-09) 326,988.25 40,183.13 286,805.12 Elec Tran-Line OH-OK-115KV-Lasley Sub-Hitchland Intg (W-08) 828,352.69 127,366.73 700,985.96 Elec Tran-Line OH-OK-115KV-Perryton Tap 150,027.93 49,711.07 100,316.86 Elec Tran-Line OH-OK-115KV-Texas Co Int-Beaver Co Int 2,979,710.73 831,755.73 2,147,955.00 Elec Tran-Line OH-OK-115KV-Texas Co Int-KS St Line 4,415,301.35 649,567.23 3,765,734.12 Elec Tran-Line OH-OK-115KV-Texas Co Int-TX St Line #1 639,514.75 368,360.46 271,154.29 Elec Tran-Line OH-OK-115KV-Texas Co Int-TX St Line #2 1,772,574.51 738,109.20 1,034,465.31 Elec Tran-Line OH-OK-115KV-Texas Co Int-TX St Line (T88) 1,406.28 318.04 1,088.24 Elec Tran-Line OH-OK-345KV-Oklahoma State Line-Border (J-11) 4,978,474.38 448,196.81 4,530,277.57 Elec Tran-Line OH-OK-345KV-SPS/PSCO Tie TX St Line-KS St Line 11,150,583.79 3,579,114.71 7,571,469.08 Elec Tran-Line OH-OK-345KV-Texas State Line-Beaver Co Line (J-12) 42,004,606.44 3,904,324.49 38,100,281.95 Elec Tran-Line OH-OK-345KV-Texas State Line-Beaver Co Line (J-13) 7,018,157.89 618,549.50 6,399,608.39 Elec Tran-Line OH-TX- 69KV-34th Street Sub Tap 173,403.00 136,511.93 36,891.07 Elec Tran-Line OH-TX- 69KV-Adair Sub Tap 153,964.02 97,558.70 56,405.32 Elec Tran-Line OH-TX- 69KV-Amarillo Loop 2,034,255.08 854,367.41 1,179,887.67 Elec Tran-Line OH-TX- 69KV-Am-Frac Sub Tap 166,850.62 51,534.74 115,315.88 Elec Tran-Line OH-TX- 69KV-Amherst Sub Tap 22,734.21 17,253.85 5,480.36 Elec Tran-Line OH-TX- 69KV-Amoco Co Line Sub Tap 147,270.06 93,092.25 54,177.81 Elec Tran-Line OH-TX- 69KV-Amoco Garza Co Tap 75,190.99 49,895.67 25,295.32 Elec Tran-Line OH-TX- 69KV-Anton Sub Tap 117,147.70 71,959.50 45,188.20 Elec Tran-Line OH-TX- 69KV-Batton Tap (Y-50) 174,832.24 19,696.91 155,135.33 Elec Tran-Line OH-TX- 69KV-Boardman Sub/Flanagan Sub Tap 644,927.46 283,536.55 361,390.91 Elec Tran-Line OH-TX- 69KV-Borger Loop 714,734.04 346,197.50 368,536.54 Elec Tran-Line OH-TX- 69KV-Bowers Sub Tap 990,489.49 171,957.66 818,531.83 Elec Tran-Line OH-TX- 69KV-Bowers Sub-Howard Sub (Y-62) 4,199,042.93 278,122.58 3,920,920.35 Elec Tran-Line OH-TX- 69KV-Brownfield Sub-Garza Co 3,696,110.96 871,270.79 2,824,840.17 Elec Tran-Line OH-TX- 69KV-Canadian Sub Tap 1,496,179.13 933,215.75 562,963.38 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap 1,970,759.33 318,288.81 1,652,470.52 Elec Tran-Line OH-TX- 69KV-Castro Co Int Tap Underbuild 115,593.75 75,496.98 40,096.77 Elec Tran-Line OH-TX- 69KV-Castro Co REC Sub Tap 149,986.28 93,562.76 56,423.52 Elec Tran-Line OH-TX- 69KV-Cedar Lake Sub Tap 657,014.76 326,365.68 330,649.08 Elec Tran-Line OH-TX- 69KV-Cochran Co Int-Sundown REC 392,625.74 131,491.77 261,133.97 Elec Tran-Line OH-TX- 69KV-Cochran Co Int-Whiteface Sub 43,719.54 26,462.39 17,257.15 Elec Tran-Line OH-TX- 69KV-Coulter Intg-Soncy (Y-72) 636,942.55 27,139.16 609,803.39 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Hendrick Sub 762,120.86 33,401.99 728,718.87 Elec Tran-Line OH-TX- 69KV-Crosby Co Int-Pleasant Hill Tap 75,157.02 27,954.45 47,202.57 Elec Tran-Line OH-TX- 69KV-Dallam Co Int-Rita Blanca REC 842,652.85 359,356.57 483,296.28 Elec Tran-Line OH-TX- 69KV-Deaf Smith Co Co-op Sub #4 Tap 23,249.35 9,953.20 13,296.15 Elec Tran-Line OH-TX- 69KV-Denver City Intg-Seagraves Intg (Y-95) 1,472,050.97 118,683.11 1,353,367.86 Elec Tran-Line OH-TX- 69KV-Denver City Sta Loop 3,503,914.34 433,517.19 3,070,397.15 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Doss Sub 372,386.36 62,694.10 309,692.26 Elec Tran-Line OH-TX- 69KV-Denver City Sta-Lamb Co Int 1,759,967.07 778,480.26 981,486.81 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Cedar Lake Sub (Z-86) 621,851.97 32,873.04 588,978.93 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Seagraves Sub (Z-87) 595,207.39 40,078.93 555,128.46 Elec Tran-Line OH-TX- 69KV-Diamondback Sub-Sulphur Springs Sub (Z-85) 380,568.75 25,919.39 354,649.36 Elec Tran-Line OH-TX- 69KV-Dimmitt South Sub Tap 19,687.28 16,815.06 2,872.22 Elec Tran-Line OH-TX- 69KV-East Plant Intg-Van Buren Sub (Y-93) 12,503.35 1,932.07 10,571.28 Elec Tran-Line OH-TX- 69KV-East Sta-Van Buren Sub 187,162.03 82,436.69 104,725.34 Elec Tran-Line OH-TX- 69KV-Farwell Sub Tap 241,293.23 40,404.09 200,889.14

Page 75: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-TX- 69KV-Floyd Co REC Tap 6,728.99 5,802.70 926.29 Elec Tran-Line OH-TX- 69KV-Floydada Sub Tap 248,472.67 101,924.68 146,547.99 Elec Tran-Line OH-TX- 69KV-Gaines Co Int Tap 430,308.73 81,630.77 348,677.96 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Doss Sub 167,543.25 105,911.60 61,631.65 Elec Tran-Line OH-TX- 69KV-Gaines Co Int-Legacy Sub (Z-80) 221,421.99 29,084.94 192,337.05 Elec Tran-Line OH-TX- 69KV-Goodpasture Sub #2 Tap 14,982.06 10,550.10 4,431.96 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg 1,559,421.15 757,335.71 802,085.44 Elec Tran-Line OH-TX- 69KV-Grave Sub Tap 117,425.08 57,182.93 60,242.15 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Adobe Creek 7,443,339.61 1,823,212.97 5,620,126.64 Elec Tran-Line OH-TX- 69KV-Gray Co Int-Kingsmill Int (Z-17) 40,187.42 4,346.77 35,840.65 Elec Tran-Line OH-TX- 69KV-Hale Co Int Tap Underbuild #1 180,203.09 41,384.86 138,818.23 Elec Tran-Line OH-TX- 69KV-Hale Co Int Tap Underbuild #2 517,413.40 121,530.02 395,883.38 Elec Tran-Line OH-TX- 69KV-Hale Co Int-Plainview South Sub 99,807.20 67,166.38 32,640.82 Elec Tran-Line OH-TX- 69KV-Happy Int-Shamrock Pumping Sta 735,793.48 79,983.27 655,810.21 Elec Tran-Line OH-TX- 69KV-Happy Sub Tap 82,684.36 52,057.08 30,627.28 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Castro Co Sub (Z-51) 1,468,394.89 296,826.37 1,171,568.52 Elec Tran-Line OH-TX- 69KV-Hereford Intg South-Hereford NE Sub (Z-71) 212,063.63 9,612.82 202,450.81 Elec Tran-Line OH-TX- 69KV-Hereford Loop 2,719,380.40 953,542.20 1,765,838.20 Elec Tran-Line OH-TX- 69KV-Hockley County-Lamb County Intg (Y-89) 232,311.48 23,580.73 208,730.75 Elec Tran-Line OH-TX- 69KV-Hodge Sub-Elwood Sub 191,032.56 120,846.10 70,186.46 Elec Tran-Line OH-TX- 69KV-Hutchinson Co Int-OK St Line 3,771,542.89 1,278,061.16 2,493,481.73 Elec Tran-Line OH-TX- 69KV-Industrial Sub-Huber Co-Gen Plt 1,839.07 892.24 946.83 Elec Tran-Line OH-TX- 69KV-Ivory Tap (Y-64) 13,956.44 1,136.46 12,819.98 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Bowers Sub (Y-60) 1,656,663.10 117,180.12 1,539,482.98 Elec Tran-Line OH-TX- 69KV-Kingsmill Sub-Celanese Sta (23,130.15) (11,339.97) (11,790.18) Elec Tran-Line OH-TX- 69KV-Kinney Sub Tap 8,034.81 6,678.66 1,356.15 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Cox Intg (Z-83) 320,436.87 29,463.92 290,972.95 Elec Tran-Line OH-TX- 69KV-Kiser Sub-Kress Intg (Z-82) 348,943.05 31,465.96 317,477.09 Elec Tran-Line OH-TX- 69KV-Kress Int-Kress Rural Sub 318,704.95 228,180.84 90,524.11 Elec Tran-Line OH-TX- 69KV-Lamb Co Intg-Bailey Co Intg (Y-80) 33,073.47 1,435.51 31,637.96 Elec Tran-Line OH-TX- 69KV-Lamb Co Int-Littlefield Sub 530,249.08 94,137.75 436,111.33 Elec Tran-Line OH-TX- 69KV-Lambton-7 Mile Corner 573,558.85 82,126.73 491,432.12 Elec Tran-Line OH-TX- 69KV-Lamton Intg-Springlake Sub (Z-64) 503,109.55 30,180.36 472,929.19 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Doss Sub (Z-78) 68,211.26 10,071.67 58,139.59 Elec Tran-Line OH-TX- 69KV-Legacy Sub-Flannagan Sub (Z-77) 360,668.03 58,702.37 301,965.66 Elec Tran-Line OH-TX- 69KV-Levelland East Sub Tap 1,220,642.82 164,684.80 1,055,958.02 Elec Tran-Line OH-TX- 69KV-Levelland Sub Tap 65,439.53 33,604.15 31,835.38 Elec Tran-Line OH-TX- 69KV-Littlefield Sub Tap 37,268.24 24,112.26 13,155.98 Elec Tran-Line OH-TX- 69KV-Littlefield West Sub Tap 116,051.99 29,327.00 86,724.99 Elec Tran-Line OH-TX- 69KV-Lockney Sub Tap 42,099.04 28,579.58 13,519.46 Elec Tran-Line OH-TX- 69KV-Lone Star REC Sub Tap 69,169.96 44,710.07 24,459.89 Elec Tran-Line OH-TX- 69KV-Lubbock East Int-Garza Post 3,140,307.09 577,467.24 2,562,839.85 Elec Tran-Line OH-TX- 69KV-Lubbock Loop 1,015,595.13 461,972.26 553,622.87 Elec Tran-Line OH-TX- 69KV-Lynn Co Intg-Graham Intg (Z-61) 784,848.69 59,995.42 724,853.27 Elec Tran-Line OH-TX- 69KV-Lyons Sub Tap 4,328,102.72 471,335.17 3,856,767.55 Elec Tran-Line OH-TX- 69KV-Mallet Sub-East Tap 373,008.85 256,377.87 116,630.98 Elec Tran-Line OH-TX- 69KV-Mallet Sub-West Tap 80,885.16 54,796.81 26,088.35 Elec Tran-Line OH-TX- 69KV-McCullough Sub Tap 25,858.71 21,052.34 4,806.37 Elec Tran-Line OH-TX- 69KV-Miami NE Brk Sta-Canadian Sub (Z-47) 16,699,288.75 1,224,779.31 15,474,509.44 Elec Tran-Line OH-TX- 69KV-Mid-American #1 Tap 130,660.74 81,764.40 48,896.34 Elec Tran-Line OH-TX- 69KV-Mid-American #4 Tap 24,346.72 16,205.07 8,141.65 Elec Tran-Line OH-TX- 69KV-Middleton Sub-Cochran Co Int 120,593.81 75,910.07 44,683.74 Elec Tran-Line OH-TX- 69KV-Moore Co Sta-Dalhart Sub 727,959.41 400,475.09 327,484.32 Elec Tran-Line OH-TX- 69KV-Moore Co Sta-Shamrock-McKee Loop 492,269.93 225,268.57 267,001.36 Elec Tran-Line OH-TX- 69KV-Morton Sub Tap 2,876,118.73 288,365.86 2,587,752.87 Elec Tran-Line OH-TX- 69KV-Muleshoe East Sub Tap 195,209.99 33,330.76 161,879.23 Elec Tran-Line OH-TX- 69KV-Muleshoe Sub Tap 201,096.92 38,734.25 162,362.67 Elec Tran-Line OH-TX- 69KV-N Amarillo Sw Sta-Channing Sub 1,199,480.44 114,145.42 1,085,335.02 Elec Tran-Line OH-TX- 69KV-North Plains REC Tap 435,033.44 275,187.15 159,846.29 Elec Tran-Line OH-TX- 69KV-Northwest Intg-Hastings (Z-34) - 1.60 (1.60) Elec Tran-Line OH-TX- 69KV-Olton Sub Tap 26,270.44 15,488.09 10,782.35 Elec Tran-Line OH-TX- 69KV-Ozark-Mahoning #1 Sub Tap 56,994.79 33,065.84 23,928.95 Elec Tran-Line OH-TX- 69KV-Ozark-Mahoning #2 Sub Tap 2,354,102.71 415,368.68 1,938,734.03 Elec Tran-Line OH-TX- 69KV-Perryton Sub-Booker Sub 484,612.85 129,512.43 355,100.42 Elec Tran-Line OH-TX- 69KV-Phillips Pump St #1 Tap 136,014.67 89,488.63 46,526.04 Elec Tran-Line OH-TX- 69KV-Phillips Pump St #2 Tap 93,097.85 52,592.14 40,505.71 Elec Tran-Line OH-TX- 69KV-Plainview City-Kiser Sub (Z-84) 156,561.12 14,333.00 142,228.12 Elec Tran-Line OH-TX- 69KV-Plainview Sub-Kress Int 508,813.26 158,572.42 350,240.84 Elec Tran-Line OH-TX- 69KV-Plainview Tap 436,035.03 144,120.21 291,914.82 Elec Tran-Line OH-TX- 69KV-Prentice Sub Tap 285,661.77 173,068.72 112,593.05 Elec Tran-Line OH-TX- 69KV-REC Lariat Tap 18,078.23 14,805.06 3,273.17 Elec Tran-Line OH-TX- 69KV-REC Lighthouse Sub-Briscoe Co Sub 1,044,479.14 144,475.08 900,004.06 Elec Tran-Line OH-TX- 69KV-REC McConal Tap 210,476.15 97,595.28 112,880.87 Elec Tran-Line OH-TX- 69KV-Riverview Intg-Phillips #1 Sub (Y-56) 50,245.24 517.42 49,727.82 Elec Tran-Line OH-TX- 69KV-Riverview Sta-Kingsmill Sub 1,844,333.73 547,734.79 1,296,598.94 Elec Tran-Line OH-TX- 69KV-Roberts Co Sub Tap 10,990,397.17 967,810.13 10,022,587.04 Elec Tran-Line OH-TX- 69KV-Russell Oil Field Tap #1 78,292.42 42,704.53 35,587.89 Elec Tran-Line OH-TX- 69KV-Russell Oil Field Tap #2 152,871.30 102,446.18 50,425.12 Elec Tran-Line OH-TX- 69KV-Seagraves Interchange Sub (Z-21) 462,188.73 53,720.91 408,467.82 Elec Tran-Line OH-TX- 69KV-Soncy-Northwest Interchange (Z-33) 2,059,461.00 125,769.52 1,933,691.48 Elec Tran-Line OH-TX- 69KV-South Plains REC Shallowater Tap 77,172.55 47,950.26 29,222.29 Elec Tran-Line OH-TX- 69KV-Springlake Sub Tap 351,481.73 125,074.65 226,407.08

Page 76: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-TX- 69KV-Stanton Sub-Hendrick Sub 580,346.55 265,340.32 315,006.23 Elec Tran-Line OH-TX- 69KV-Structure #465-Bailey Co Sub (TX Portion) (Z-50) 160,381.93 10,702.12 149,679.81 Elec Tran-Line OH-TX- 69KV-Sulfur Spgs-Adair Sub 421,904.35 196,240.48 225,663.87 Elec Tran-Line OH-TX- 69KV-Sulfur Spgs-Union Petroleum 315,531.77 150,182.92 165,348.85 Elec Tran-Line OH-TX- 69KV-Tenneco Sub Tap 65,826.11 37,481.49 28,344.62 Elec Tran-Line OH-TX- 69KV-Terry County Intg-Brownfield Sw Sta (Z-52) 366,885.38 55,846.17 311,039.21 Elec Tran-Line OH-TX- 69KV-Transpecto Tap 16,614.81 11,801.25 4,813.56 Elec Tran-Line OH-TX- 69KV-Tuco Intg-Crosby Co Intg (Y-84) 569,876.86 49,745.84 520,131.02 Elec Tran-Line OH-TX- 69KV-Tuco Int-Hereford Int 3,288,040.07 1,658,926.66 1,629,113.41 Elec Tran-Line OH-TX- 69KV-Tuco Int-NM St Line 7,262,567.33 2,769,979.51 4,492,587.82 Elec Tran-Line OH-TX- 69KV-Tuco Int-Plainview 6,403,528.32 1,035,626.32 5,367,902.00 Elec Tran-Line OH-TX- 69KV-Tuco Int-Stanton Sub 1,755,128.00 425,665.50 1,329,462.50 Elec Tran-Line OH-TX- 69KV-Union Texas Tap 2,126,189.10 257,929.25 1,868,259.85 Elec Tran-Line OH-TX- 69KV-Vega Sub Tap 235,318.69 147,746.00 87,572.69 Elec Tran-Line OH-TX- 69KV-Waterfield Sub Tap 124,938.09 78,731.36 46,206.73 Elec Tran-Line OH-TX- 69KV-Waterfield/Wildorado Tap 514,650.06 193,242.00 321,408.06 Elec Tran-Line OH-TX- 69KV-West Texas Utility Magic City Tap 236,672.34 81,720.99 154,951.35 Elec Tran-Line OH-TX- 69KV-Westridge Sub Tap 91,563.77 62,859.24 28,704.53 Elec Tran-Line OH-TX- 69KV-Whitehead Sub Tap 32,940.83 22,152.39 10,788.44 Elec Tran-Line OH-TX- 69KV-Whitharral Sub Tap 2,933.32 2,569.40 363.92 Elec Tran-Line OH-TX- 69KV-Wildorado Sub Tap 103,142.04 68,763.23 34,378.81 Elec Tran-Line OH-TX-115KV-Allen Sub Tap 295,911.79 220,040.98 75,870.81 Elec Tran-Line OH-TX-115KV-Allen Sub-Lubbock South Sub (V-45) 95,875.29 2,828.21 93,047.08 Elec Tran-Line OH-TX-115KV-Allen Sub-Wheelock Sub 1,226,344.53 554,857.65 671,486.88 Elec Tran-Line OH-TX-115KV-Allred Sub Tap 78,402.94 60,579.15 17,823.79 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Osage Sub (T-75) 325,466.66 13,899.45 311,567.21 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-South Georgia Sub (T-73) 193,111.33 5,696.57 187,414.76 Elec Tran-Line OH-TX-115KV-Amarillo South Intg-Spring Draw Sub (T-86) 3,109,701.20 640,529.98 2,469,171.22 Elec Tran-Line OH-TX-115KV-Amerada-Hess #1 Tap 893,057.69 301,690.79 591,366.90 Elec Tran-Line OH-TX-115KV-Amerada-Hess #2 Tap 37,478.22 9,621.64 27,856.58 Elec Tran-Line OH-TX-115KV-Amerada-Hess CO2 Plant to Doss 1,475,167.58 365,611.75 1,109,555.83 Elec Tran-Line OH-TX-115KV-Amerada-Hess CO2 Plant to ROZ Substation (W-15) 126,882.24 9,809.70 117,072.54 Elec Tran-Line OH-TX-115KV-AMFRAC-Johnson Draw (W-34) 108,702.59 13,895.28 94,807.31 Elec Tran-Line OH-TX-115KV-Amoco Cryogenics Plant Tap 309,691.33 160,008.22 149,683.11 Elec Tran-Line OH-TX-115KV-Andrews Co Sub-Texas St Line (W-83) 577,589.02 41,265.74 536,323.28 Elec Tran-Line OH-TX-115KV-Arco Sub Tap 95,714.37 19,486.72 76,227.65 Elec Tran-Line OH-TX-115KV-Arrowhead Sub Tap 637,271.81 180,243.44 457,028.37 Elec Tran-Line OH-TX-115KV-Blanco Sw Sta-Crosby Co Intg (W-90) 445,859.95 4,594.54 441,265.41 Elec Tran-Line OH-TX-115KV-Blanco Sw Sta-Floyd Co Intg (W-91) 246,166.78 2,536.15 243,630.63 Elec Tran-Line OH-TX-115KV-Borger West Tap 217,750.71 147,045.15 70,705.56 Elec Tran-Line OH-TX-115KV-Bowers Sub-Howard Sub (W-67) 28,508,906.91 1,501,329.51 27,007,577.40 Elec Tran-Line OH-TX-115KV-BULD-OUTP-115-01 (U-16) 75,156.96 773.36 74,383.60 Elec Tran-Line OH-TX-115KV-Bushland Int-Coulter Int 1,023,677.81 313,416.71 710,261.10 Elec Tran-Line OH-TX-115KV-Canyon East Sub Tap 1,079,026.63 155,259.24 923,767.39 Elec Tran-Line OH-TX-115KV-Canyon Sub-Rockwell Sub 185,812.48 71,256.36 114,556.12 Elec Tran-Line OH-TX-115KV-Canyon West Sub-Randall County Intg (W-77) 4,152,872.58 201,503.14 3,951,369.44 Elec Tran-Line OH-TX-115KV-Cargill Sub-Curry Co Intg (Texas Portion) (T-59) 1,550,323.05 92,237.73 1,458,085.32 Elec Tran-Line OH-TX-115KV-Carlisle Int-Lubbock South Int 370,748.22 141,304.65 229,443.57 Elec Tran-Line OH-TX-115KV-Carlisle Int-Yuma Sub (T-71) 525,430.76 80,811.63 444,619.13 Elec Tran-Line OH-TX-115KV-Carson Co Pump Sta Tap 17,360.75 11,376.23 5,984.52 Elec Tran-Line OH-TX-115KV-Castro Co Intg-Deaf Smith #22 217,059.25 24,518.22 192,541.03 Elec Tran-Line OH-TX-115KV-Channing Sub-Northwest Int (W-03) 27,012,478.52 3,570,118.79 23,442,359.73 Elec Tran-Line OH-TX-115KV-Cherry St Intg-Hasting Sub (W-42) 348,588.14 31,954.68 316,633.46 Elec Tran-Line OH-TX-115KV-CLTR-OUTP-115-01 (U-17) 73,774.56 759.14 73,015.42 Elec Tran-Line OH-TX-115KV-Cochran County-Lea County Plains (V-36) 118,532.73 8,059.15 110,473.58 Elec Tran-Line OH-TX-115KV-COCO-LTDW-115-01 (U-20) 349,803.25 3,303.05 346,500.20 Elec Tran-Line OH-TX-115KV-Cole Intg-Ochiltree County Intg (W-28) 3,808,269.24 269,917.55 3,538,351.69 Elec Tran-Line OH-TX-115KV-Coulter Intg-South Georgia Intg (T-70) 518,330.10 5,105.96 513,224.14 Elec Tran-Line OH-TX-115KV-Cox-Floyd 9,364,773.23 1,782,473.06 7,582,300.17 Elec Tran-Line OH-TX-115KV-Dallum Co Int-Channing Sub (W-04) 14,754,614.16 2,041,559.90 12,713,054.26 Elec Tran-Line OH-TX-115KV-Dallum Co Int-Sherman Co Sw Sta (W-05) 12,007,972.67 1,778,812.84 10,229,159.83 Elec Tran-Line OH-TX-115KV-Deaf Smith Co Intg-Hereford Intg (V-51) 271,600.20 14,909.78 256,690.42 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Canyon West (W-40) 9,376,799.70 155,648.88 9,221,150.82 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Castro Co Intg (T-04) 527,506.38 44,652.38 482,854.00 Elec Tran-Line OH-TX-115KV-Deaf Smith Intg-Hereford (W-41) 1,972,135.99 187,385.96 1,784,750.03 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Higg Subst (T-89) 635,646.08 62,700.59 572,945.49 Elec Tran-Line OH-TX-115KV-Denver City Interchange-Seminole Interchange (W-11) 883,720.22 124,742.91 758,977.31 Elec Tran-Line OH-TX-115KV-Denver City Sta-Cochran Co Int 3,226,619.73 925,527.72 2,301,092.01 Elec Tran-Line OH-TX-115KV-Denver City Sta-NM St Line #1 880,557.75 418,664.63 461,893.12 Elec Tran-Line OH-TX-115KV-Denver City Sta-NM St Line #2 615,647.20 278,854.74 336,792.46 Elec Tran-Line OH-TX-115KV-Denver City Sta-Tuco Int 4,379,384.19 1,447,806.35 2,931,577.84 Elec Tran-Line OH-TX-115KV-Denver City Sta-Waits Sub 2,468,186.93 613,502.11 1,854,684.82 Elec Tran-Line OH-TX-115KV-Doud Sub Tap 654,147.75 236,929.85 417,217.90 Elec Tran-Line OH-TX-115KV-East Sta Intg-Osage Intg (V-43) 86,801.74 5,990.80 80,810.94 Elec Tran-Line OH-TX-115KV-East Sta West-NM St Line 3,086,026.80 1,098,141.56 1,987,885.24 Elec Tran-Line OH-TX-115KV-East Sta-Nichols Sta 669,802.86 255,338.94 414,463.92 Elec Tran-Line OH-TX-115KV-El Paso Shell Tap 442,624.89 97,626.44 344,998.45 Elec Tran-Line OH-TX-115KV-Estacado Sub Tap 165,962.81 102,140.54 63,822.27 Elec Tran-Line OH-TX-115KV-Etter Rural Sub-Dallam County Intg (V-64) 1,271,306.28 146,265.66 1,125,040.62 Elec Tran-Line OH-TX-115KV-Etter Sub-Pringle Int 531,314.45 194,022.63 337,291.82 Elec Tran-Line OH-TX-115KV-Exell Tap 46,471.61 32,394.95 14,076.66 Elec Tran-Line OH-TX-115KV-Farmers Sub Tap 39,101.03 19,152.31 19,948.72

Page 77: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-TX-115KV-Farmers Sub-Crouse-Hinds 244,042.60 200,706.46 43,336.14 Elec Tran-Line OH-TX-115KV-Floyd Co Int Tap 152,413.43 101,441.25 50,972.18 Elec Tran-Line OH-TX-115KV-Floyd Co Int-Crosby Co Int 3,089,998.11 113,620.81 2,976,377.30 Elec Tran-Line OH-TX-115KV-Gaines County Interchange-Seminole Interchange (W-14) 1,022,936.37 163,993.73 858,942.64 Elec Tran-Line OH-TX-115KV-Gaines County Intg-Johnson Draw (W-35) 3,256,712.82 413,918.15 2,842,794.67 Elec Tran-Line OH-TX-115KV-Gaines County Sub-Legacy Sub (W-18) 2,358,033.85 345,893.86 2,012,139.99 Elec Tran-Line OH-TX-115KV-Grapevine Interchange to Bowers Interchange (T-51) 2,074,991.91 116,189.44 1,958,802.47 Elec Tran-Line OH-TX-115KV-Grapevine Interchange to Kirby Switching Station (T-50) 70,439.39 7,980.74 62,458.65 Elec Tran-Line OH-TX-115KV-Grapevine Sub-Jericho Int 1,670,780.89 690,254.72 980,526.17 Elec Tran-Line OH-TX-115KV-Grassland Int-Graham Int 1,831,270.89 711,333.75 1,119,937.14 Elec Tran-Line OH-TX-115KV-Hale Co Intg-Cox Sub 731,913.62 250,408.79 481,504.83 Elec Tran-Line OH-TX-115KV-Hale Co Intg-Kress Intg (V-72) 578,831.48 45,484.90 533,346.58 Elec Tran-Line OH-TX-115KV-Hale Co Intg-Lamton Intg (T-29) 321,575.11 33,629.14 287,945.97 Elec Tran-Line OH-TX-115KV-Hansford Switching Station-Hitchland Intg (W-10) 562,753.76 84,967.36 477,786.40 Elec Tran-Line OH-TX-115KV-Happy Int-Kress Int 5,578,127.46 730,102.79 4,848,024.67 Elec Tran-Line OH-TX-115KV-Hastings Sub-East Plant Sub (W-48) 3,343,054.79 236,682.83 3,106,371.96 Elec Tran-Line OH-TX-115KV-Hereford Northeast Int-Deaf Smith Co Int (T-63) 697,539.64 89,596.49 607,943.15 Elec Tran-Line OH-TX-115KV-Hereford Northeast Int-Hereford Sub #2 East Loop (W-57) 820,018.42 66,207.92 753,810.50 Elec Tran-Line OH-TX-115KV-Hereford Northeast Int-New Centre Street Sub (W-82) 4,968,384.14 59,744.51 4,908,639.63 Elec Tran-Line OH-TX-115KV-Hereford Sub-Cargill Sub (T-58) 2,151,070.67 100,562.58 2,050,508.09 Elec Tran-Line OH-TX-115KV-Herring Sub Tap 194,147.07 64,257.79 129,889.28 Elec Tran-Line OH-TX-115KV-Higg Intg-Johnson Draw (W-33) 560,053.65 69,104.53 490,949.12 Elec Tran-Line OH-TX-115KV-Highland Park Sub Tap 81,513.08 24,260.49 57,252.59 Elec Tran-Line OH-TX-115KV-Hitchland Intg-Texas County Intg (W-07) 657,015.47 91,793.83 565,221.64 Elec Tran-Line OH-TX-115KV-Hitchland Intg-Texas County Intg (W-09) 63,404.06 7,181.53 56,222.53 Elec Tran-Line OH-TX-115KV-Hobbs Generation Sub-Higg Sub (T-98) 513,687.17 58,207.74 455,479.43 Elec Tran-Line OH-TX-115KV-Hockley Co Int Tap 840,869.70 197,456.27 643,413.43 Elec Tran-Line OH-TX-115KV-Hutchinson Co Int-Gray Co Int 1,214,839.37 387,643.08 827,196.29 Elec Tran-Line OH-TX-115KV-Hutchinson Co Int-Phillips Cogen 3,012,572.46 1,225,606.33 1,786,966.13 Elec Tran-Line OH-TX-115KV-Hutchinson Co Int-Riverview Sta 458,199.32 252,573.60 205,625.72 Elec Tran-Line OH-TX-115KV-Hutchinson Co Int-Spearman Int 1,464,298.84 706,163.52 758,135.32 Elec Tran-Line OH-TX-115KV-Indiana Tap (V-15/V-62) 68,597.14 7,728.28 60,868.86 Elec Tran-Line OH-TX-115KV-Kirby Switch Station-WTU Shamrock Str 691 (W-54) 142,635.27 3,051.57 139,583.70 Elec Tran-Line OH-TX-115KV-Kirby Switching Station to Jericho WTU (T-52) 84,523.58 6,095.09 78,428.49 Elec Tran-Line OH-TX-115KV-Kiser-Cox (W-55) 6,163,950.16 553,527.10 5,610,423.06 Elec Tran-Line OH-TX-115KV-Kiser-Kress (W-54) 12,887,485.75 1,123,270.69 11,764,215.06 Elec Tran-Line OH-TX-115KV-Lamb Co Int-Terry Co Int 847,378.86 480,225.69 367,153.17 Elec Tran-Line OH-TX-115KV-Lasley Sub-Hitchland Intg (W-08) 1,582,887.91 216,838.21 1,366,049.70 Elec Tran-Line OH-TX-115KV-Legacy Sub-Doss Interchange (W-19) 1,905,955.60 266,113.64 1,639,841.96 Elec Tran-Line OH-TX-115KV-Lehman Sub Tap 30,507.83 22,367.19 8,140.64 Elec Tran-Line OH-TX-115KV-LESS-LTDW-115-01 (U-19) 673,397.01 5,713.00 667,684.01 Elec Tran-Line OH-TX-115KV-Littlefield West Sub Tap (V-13) 10,033.98 585.33 9,448.65 Elec Tran-Line OH-TX-115KV-Lubbock East Int-Crosby Co Int 6,331,036.54 1,541,008.70 4,790,027.84 Elec Tran-Line OH-TX-115KV-Lubbock East Int-Lubbock South Int 433,734.63 150,129.71 283,604.92 Elec Tran-Line OH-TX-115KV-Lubbock South Int-Lynn Co Int 1,408,504.21 342,745.76 1,065,758.45 Elec Tran-Line OH-TX-115KV-Lynn Co Int-Grassland Int 3,252,188.19 1,333,081.37 1,919,106.82 Elec Tran-Line OH-TX-115KV-Martin Sub-Carson County Sub (W-01) 65,843.00 4,745.52 61,097.48 Elec Tran-Line OH-TX-115KV-Mechanics School Tap 72,904.35 48,788.31 24,116.04 Elec Tran-Line OH-TX-115KV-Mid American Pipeline/Amfrac-Higg Substation (T-92) 1,070.76 (3,841.07) 4,911.83 Elec Tran-Line OH-TX-115KV-Moore Co Intg-Dalhart Intg (T-47) 1,826,214.62 18,817.76 1,807,396.86 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dallam Co Int 3,840,565.70 1,488,106.24 2,352,459.46 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Dumas Int 1,241,841.12 281,875.47 959,965.65 Elec Tran-Line OH-TX-115KV-Moore Co Sta-Lasley Sub (W-24) 1,066,299.90 93,399.84 972,900.06 Elec Tran-Line OH-TX-115KV-Moore Co Sta-OK St Line 2,444,035.28 642,024.19 1,802,011.09 Elec Tran-Line OH-TX-115KV-Muleshoe East Sub Tap (V12.1) 16,631.11 1,247.36 15,383.75 Elec Tran-Line OH-TX-115KV-Mustang Interchange-Seagrave Interchange T-57 209,606.22 17,858.16 191,748.06 Elec Tran-Line OH-TX-115KV-Mustang Interchange-Shell CO2 GCP Sub (U-01) 724,724.80 24,096.55 700,628.25 Elec Tran-Line OH-TX-115KV-Mustang-Denver City #1 227,278.27 86,868.80 140,409.47 Elec Tran-Line OH-TX-115KV-Mustang-Denver City #2 4,378,438.33 1,560,068.69 2,818,369.64 Elec Tran-Line OH-TX-115KV-Mustang-Denver City #3 483,697.15 181,290.97 302,406.18 Elec Tran-Line OH-TX-115KV-Mustang-Seagrave #3 5,463.15 2,095.04 3,368.11 Elec Tran-Line OH-TX-115KV-Newhart-Castro (W-51) 9,530,318.13 852,573.53 8,677,744.60 Elec Tran-Line OH-TX-115KV-Newhart-Kress (W-52) 9,182,962.82 813,010.35 8,369,952.47 Elec Tran-Line OH-TX-115KV-Newhart-Lamton (W-53) 12,657,993.07 1,121,655.18 11,536,337.89 Elec Tran-Line OH-TX-115KV-Nichols Sta-Coulter Int 1,220,328.71 440,402.31 779,926.40 Elec Tran-Line OH-TX-115KV-Nichols Sta-CRMWA #1 1,529,813.89 471,302.36 1,058,511.53 Elec Tran-Line OH-TX-115KV-Nichols Sta-Dumas Int 5,735,451.81 761,371.11 4,974,080.70 Elec Tran-Line OH-TX-115KV-Nichols Sta-Hutchinson Co Int 2,991,937.56 611,420.51 2,380,517.05 Elec Tran-Line OH-TX-115KV-Nichols Sta-Kingsmill Sub 8,364,996.32 1,012,546.35 7,352,449.97 Elec Tran-Line OH-TX-115KV-Nichols Sta-Kirby Sw Sta (T-53) 750,353.35 13,232.07 737,121.28 Elec Tran-Line OH-TX-115KV-Nichols Sta-Pantex South Sub (V-02) 532,738.77 11,460.12 521,278.65 Elec Tran-Line OH-TX-115KV-Nichols Sta-Rolling Hills Sub 425,602.83 37,398.52 388,204.31 Elec Tran-Line OH-TX-115KV-Nichols Sta-WTU 6,462,165.26 1,925,306.04 4,536,859.22 Elec Tran-Line OH-TX-115KV-Northwest Int-Bush Sub 198,059.50 89,798.77 108,260.73 Elec Tran-Line OH-TX-115KV-Ochiltree-Lipscomb (W-50) 10,262,195.49 624,403.30 9,637,792.19 Elec Tran-Line OH-TX-115KV-Ochiltree-Perryton South (W-44) 222,470.44 24,763.53 197,706.91 Elec Tran-Line OH-TX-115KV-ODC Sub Tap 229,095.90 46,186.81 182,909.09 Elec Tran-Line OH-TX-115KV-Osage Int Tap 268,243.65 27,843.44 240,400.21 Elec Tran-Line OH-TX-115KV-Osage Int-Coulter Int 553,051.00 214,952.02 338,098.98 Elec Tran-Line OH-TX-115KV-Osage Int-South Georgia Int 389,414.11 296,267.73 93,146.38 Elec Tran-Line OH-TX-115KV-Owens-Corning Steel Pole Tap 21,344.02 16,536.28 4,807.74 Elec Tran-Line OH-TX-115KV-Owens-Corning Sub-Coulter Intg (V-44) 344,322.68 10,129.75 334,192.93

Page 78: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-TX-115KV-Owens-Corning Tap 8,459.71 5,737.52 2,722.19 Elec Tran-Line OH-TX-115KV-Owens-Corning-South Georgia Int 890,555.63 286,099.74 604,455.89 Elec Tran-Line OH-TX-115KV-Pantex North Sub Tap (1,186.96) (782.97) (403.99) Elec Tran-Line OH-TX-115KV-Perryton Intg-Ochiltree County Intg (W-30) 208,334.50 23,551.64 184,782.86 Elec Tran-Line OH-TX-115KV-Perryton Sub-OK St Line 128,465.22 59,421.30 69,043.92 Elec Tran-Line OH-TX-115KV-Pierce Sub Tap 495,290.72 298,393.91 196,896.81 Elec Tran-Line OH-TX-115KV-Plant X Sta-Bailey Co Int 2,220,368.31 447,055.65 1,773,312.66 Elec Tran-Line OH-TX-115KV-Plant X Sta-Castro Co Intg (V-37) 968,297.73 76,096.72 892,201.01 Elec Tran-Line OH-TX-115KV-Plant X Sta-Hale Co Int North Ckt 2,093,972.59 935,727.10 1,158,245.49 Elec Tran-Line OH-TX-115KV-Plant X Sta-Hale Co Int South Ckt 3,507,968.26 668,563.70 2,839,404.56 Elec Tran-Line OH-TX-115KV-Plant X Sta-Hereford Int 2,432,766.90 585,392.03 1,847,374.87 Elec Tran-Line OH-TX-115KV-Plant X Sta-Lamb Co Int 1,271,080.37 342,030.11 929,050.26 Elec Tran-Line OH-TX-115KV-Plant X Sta-Lamton Intg (T-28) 656,320.56 63,789.27 592,531.29 Elec Tran-Line OH-TX-115KV-Pringle Int Tap 530,420.77 288,841.16 241,579.61 Elec Tran-Line OH-TX-115KV-Pringle Int-Riverview Power Plant (T-7) 1,710,456.06 109,112.00 1,601,344.06 Elec Tran-Line OH-TX-115KV-Pringle-Phillips Cogen (T-49) 3,343,680.81 161,187.39 3,182,493.42 Elec Tran-Line OH-TX-115KV-Puckett West Sub-Coulter Intg (W-71) 416,844.81 21,417.65 395,427.16 Elec Tran-Line OH-TX-115KV-Randall Co Int-East Sta 1,627,159.48 335,482.33 1,291,677.15 Elec Tran-Line OH-TX-115KV-Randall Co Int-Happy Int 10,882,085.19 1,407,747.42 9,474,337.77 Elec Tran-Line OH-TX-115KV-Randall Co Int-Osage Int 932,205.64 280,648.05 651,557.59 Elec Tran-Line OH-TX-115KV-Randall Co Int-South Georgia Int (V-70) 3,757,342.42 114,794.16 3,642,548.26 Elec Tran-Line OH-TX-115KV-Randall Co Int-Southeast Sub 2,306,252.97 882,958.83 1,423,294.14 Elec Tran-Line OH-TX-115KV-Rita Blanca REC-Houge Sub Tap 152,273.15 14,084.45 138,188.70 Elec Tran-Line OH-TX-115KV-Riverview Sta Tap 178,237.36 122,425.86 55,811.50 Elec Tran-Line OH-TX-115KV-Riverview Sta-Hutchinson Co Int 2,035,021.25 376,894.05 1,658,127.20 Elec Tran-Line OH-TX-115KV-Riverview Sta-Moore Co Sta 2,899,740.42 1,156,983.72 1,742,756.70 Elec Tran-Line OH-TX-115KV-Riverview Sta-OK St Line 2,055,897.75 1,158,499.40 897,398.35 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Cherry Street Sub (W-47) 160,424.96 14,264.19 146,160.77 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Hastings Sub (W-42) 4,070,452.54 372,238.83 3,698,213.71 Elec Tran-Line OH-TX-115KV-Rolling Hills Sub-Northwest Sub (W-46) 70,972.28 6,280.81 64,691.47 Elec Tran-Line OH-TX-115KV-Russell Oil Field Tap 40,513.64 27,837.35 12,676.29 Elec Tran-Line OH-TX-115KV-Russell Pool Substation-Higg Substation (T-91) (6,495.82) (2,168.68) (4,327.14) Elec Tran-Line OH-TX-115KV-San Andres Sub Tap 66,655.02 39,701.93 26,953.09 Elec Tran-Line OH-TX-115KV-Seminole Interchange-Amerada Hess CO2 Sub W-16 241,702.52 45,156.36 196,546.16 Elec Tran-Line OH-TX-115KV-Seminole Interchange-Doss Interchange W-12 1,471,957.04 286,807.91 1,185,149.13 Elec Tran-Line OH-TX-115KV-Seminole Interchange-ROZ Substation W-13 647,205.07 120,710.64 526,494.43 Elec Tran-Line OH-TX-115KV-Shell Condition Plt #2 Tap (111,410.10) (75,947.68) (35,462.42) Elec Tran-Line OH-TX-115KV-Shell Cortez Pump St Tap 155,277.31 102,460.16 52,817.15 Elec Tran-Line OH-TX-115KV-Shell Western C2 Tap 120,437.75 66,991.82 53,445.93 Elec Tran-Line OH-TX-115KV-Sherman Co Sub Tap 176,215.34 104,781.51 71,433.83 Elec Tran-Line OH-TX-115KV-Soncy Tap 622,026.89 25,918.46 596,108.43 Elec Tran-Line OH-TX-115KV-South Plains Elec Coop-Quaker Sub Tap 59,815.00 25,786.10 34,028.90 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Hansford Substation (T-87) 16,229.88 1,838.27 14,391.61 Elec Tran-Line OH-TX-115KV-Spearman Interchange-Ochiltree County Interchange (W-29) 2,048,890.18 147,697.51 1,901,192.67 Elec Tran-Line OH-TX-115KV-Spearman-Perryton (V-92) 1,889,527.14 856,774.24 1,032,752.90 Elec Tran-Line OH-TX-115KV-Spearman-Pringle (T-6) 1,487,903.52 84,838.66 1,403,064.86 Elec Tran-Line OH-TX-115KV-Spearman-Pringle (T-8) 1,189,241.32 61,225.83 1,128,015.49 Elec Tran-Line OH-TX-115KV-Spearman's Interchange-Texas County Int 162,997.78 41,832.35 121,165.43 Elec Tran-Line OH-TX-115KV-Sulphur Springs Sub-Diamondback Sub (W-68) 6,414,155.93 452,375.38 5,961,780.55 Elec Tran-Line OH-TX-115KV-Sulphur Springs-Seagraves Int 993,634.95 438,021.43 555,613.52 Elec Tran-Line OH-TX-115KV-Sulphur Springs-Terry Co Int 2,805,770.80 1,354,558.95 1,451,211.85 Elec Tran-Line OH-TX-115KV-Sundown Int Tap North Ckt 435,815.05 140,403.28 295,411.77 Elec Tran-Line OH-TX-115KV-Sundown Int Tap South Ckt 1,053,983.06 227,746.57 826,236.49 Elec Tran-Line OH-TX-115KV-Sundown Int-Cochran Co Int 464,383.61 143,543.95 320,839.66 Elec Tran-Line OH-TX-115KV-Sunset Sub-Puckett West Sub (T-37) 1,404,361.37 32,761.77 1,371,599.60 Elec Tran-Line OH-TX-115KV-Swisher Co Int-Kress Int 719,913.42 180,305.69 539,607.73 Elec Tran-Line OH-TX-115KV-T93-Martin Sub to Hutchinson County Sub 5,080,899.70 1,048,506.57 4,032,393.13 Elec Tran-Line OH-TX-115KV-Taylor-Johnson Draw (W-36) 1,221,494.53 127,131.69 1,094,362.84 Elec Tran-Line OH-TX-115KV-Terry Co Int-Denver City Int (V-16) 30,163.05 889.78 29,273.27 Elec Tran-Line OH-TX-115KV-Texas County Int-Hansford Sub (T-88) 366,159.82 50,694.60 315,465.22 Elec Tran-Line OH-TX-115KV-Texas State Line-Bailey Co Sub (W-69) 11,749,387.61 604,129.06 11,145,258.55 Elec Tran-Line OH-TX-115KV-Tuco Int-Crosby Co Int 3,033,560.52 1,067,864.79 1,965,695.73 Elec Tran-Line OH-TX-115KV-Tuco Int-Floyd Co Int 535,416.84 82,734.68 452,682.16 Elec Tran-Line OH-TX-115KV-Tuco Int-Indiana Sub (V-15) 67,058.69 1,690.21 65,368.48 Elec Tran-Line OH-TX-115KV-Tuco Int-Lubbock East Int 974,494.93 470,217.31 504,277.62 Elec Tran-Line OH-TX-115KV-Tuco Int-Randall Co Int 3,292,557.00 830,204.98 2,462,352.02 Elec Tran-Line OH-TX-115KV-W01-Martin Sub to Carson County Sub 125,514.80 26,936.16 98,578.64 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-Coburn Creek Sub (W-78) 7,164,598.90 256,468.62 6,908,130.28 Elec Tran-Line OH-TX-115KV-Wheeler Co Int-New Grave Sub (W-06) 3,754,588.57 636,570.44 3,118,018.13 Elec Tran-Line OH-TX-115KV-Wolfforth Int-Yuma Int (T-72) 349,313.63 50,436.79 298,876.84 Elec Tran-Line OH-TX-115KV-WTU Jericho Tap 313,326.79 173,072.31 140,254.48 Elec Tran-Line OH-TX-115KV-XIT Sub-Dallam Co Intg (W-80) 271,810.31 13,833.33 257,976.98 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Seagraves Int 1,203,103.55 440,238.04 762,865.51 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Shell CO2 GCP (V-49) 528,670.72 8,153.03 520,517.69 Elec Tran-Line OH-TX-115KV-Yoakum Co Int-Terry Co Int 5,575,251.62 2,317,045.65 3,258,205.97 Elec Tran-Line OH-TX-115KV-Yuma Tap (5,861.95) (2,106.63) (3,755.32) Elec Tran-Line OH-TX-230KV-Amarillo South Intg-Swisher County Int (K-63) 3,954,344.65 215,768.05 3,738,576.60 Elec Tran-Line OH-TX-230KV-Bushland Intg-Potter County Sw Sta (K-59) 151,795.03 3,070.32 148,724.71 Elec Tran-Line OH-TX-230KV-Carlisle Int-LP&L 620,613.58 7,598.45 613,015.13 Elec Tran-Line OH-TX-230KV-Carlisle Int-Wolfforth Int (K-99) 11,643,760.50 367,219.45 11,276,541.05 Elec Tran-Line OH-TX-230KV-Channing Sub-XIT Sub (K-98) 660,389.41 47,111.18 613,278.23 Elec Tran-Line OH-TX-230KV-Deaf Smith Sub-Bushland Intg (K-11) 1,256,372.70 74,230.83 1,182,141.87

Page 79: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Elec Tran-Line OH-TX-230KV-Grapevine Int-Wheeler Co Int (K-73) 2,390,352.51 113,982.75 2,276,369.76 Elec Tran-Line OH-TX-230KV-Grassland Int-Borden Int (4,931.03) 30,442.42 (35,373.45) Elec Tran-Line OH-TX-230KV-Happy Whiteface Wind Sub-Potter Co Sub (K-80) 2,431,077.32 1,315,775.35 1,115,301.97 Elec Tran-Line OH-TX-230KV-Harrington Sta-East Sta 1,893,048.78 1,120,095.18 772,953.60 Elec Tran-Line OH-TX-230KV-Harrington Sta-Plant X Sta (K-41) 685,333.67 111,646.35 573,687.32 Elec Tran-Line OH-TX-230KV-Harrington Sta-Potter Co Sw Sta (K-32) 574,370.05 270,103.90 304,266.15 Elec Tran-Line OH-TX-230KV-Harrington Sta-Pringle Int 6,158,258.64 2,291,667.43 3,866,591.21 Elec Tran-Line OH-TX-230KV-Harrington Sta-Randall Co Int 740,857.02 355,965.39 384,891.63 Elec Tran-Line OH-TX-230KV-Hitchland Int-Moore Co Int (K-75) 31,511,448.77 4,126,621.37 27,384,827.40 Elec Tran-Line OH-TX-230KV-Hitchland-Ochiltree (K-76) 20,242,090.71 2,278,207.66 17,963,883.05 Elec Tran-Line OH-TX-230KV-Hobbs Sta-Midland County Intg (K-71) 2,257,785.93 361,421.22 1,896,364.71 Elec Tran-Line OH-TX-230KV-Hobbs Sta-Seminole Intg (K-70) 49,053.91 9,249.24 39,804.67 Elec Tran-Line OH-TX-230KV-Jones Sta-Grassland Int 5,018,283.94 2,354,302.38 2,663,981.56 Elec Tran-Line OH-TX-230KV-Jones Sta-Lubbock East Int 762,667.18 216,321.99 546,345.19 Elec Tran-Line OH-TX-230KV-Jones Sta-Lubbock South Int L#1 (K-08) 1,329,834.69 568,610.53 761,224.16 Elec Tran-Line OH-TX-230KV-Jones Sta-Lubbock South Int L#2 (K-14) 281,392.79 24,902.31 256,490.48 Elec Tran-Line OH-TX-230KV-Jones Sta-Tuco Int 2,766,252.05 1,110,886.78 1,655,365.27 Elec Tran-Line OH-TX-230KV-Mustang (K-36) 713,657.64 241,743.73 471,913.91 Elec Tran-Line OH-TX-230KV-Mustang Intg-Amoco Wasson Oxy CO2 Switching Station (K-55) 80,689.55 15,707.46 64,982.09 Elec Tran-Line OH-TX-230KV-Mustang Intg-Yoakum Co Intg (K-56) 186,407.14 1,921.64 184,485.50 Elec Tran-Line OH-TX-230KV-Mustang-Seminole Int (K-69) 9,264,590.69 1,749,233.33 7,515,357.36 Elec Tran-Line OH-TX-230KV-Mustang-Wasson #5 36,833.17 14,124.98 22,708.19 Elec Tran-Line OH-TX-230KV-Needmore Sub-Yoakum Co Intg (R-06) 630,761.81 5,717.55 625,044.26 Elec Tran-Line OH-TX-230KV-Newhart Intg-Happy-Whiteface Wind Sub (K-90) 3,459,090.24 275,630.11 3,183,460.13 Elec Tran-Line OH-TX-230KV-Newhart Intg-Plant X Sta (K-91) 1,987,219.77 126,723.27 1,860,496.50 Elec Tran-Line OH-TX-230KV-Newhart-Swisher (K-88) 11,807,347.17 1,095,899.83 10,711,447.34 Elec Tran-Line OH-TX-230KV-Nichols Intg-Amarillo South Int (K-62) 768,502.22 96,257.79 672,244.43 Elec Tran-Line OH-TX-230KV-Nichols Sta-Harrington Sta #1 121,547.47 49,962.68 71,584.79 Elec Tran-Line OH-TX-230KV-Nichols Sta-Harrington Sta #2 41,452.19 30,770.23 10,681.96 Elec Tran-Line OH-TX-230KV-Nichols Sta-Hutchinson Co Int 3,688,691.56 752,190.61 2,936,500.95 Elec Tran-Line OH-TX-230KV-Nichols Sta-OK St Line 5,745,383.60 2,295,027.88 3,450,355.72 Elec Tran-Line OH-TX-230KV-Plant X Sta-Deaf Smith Sub (K-21) 5,850,068.69 128,703.75 5,721,364.94 Elec Tran-Line OH-TX-230KV-Plant X Sta-Happy Whiteface Wind Sub (K-81) 3,440,123.67 1,839,757.82 1,600,365.85 Elec Tran-Line OH-TX-230KV-Plant X Sta-Harrington Sta (K-04) 6,940,411.49 2,001,785.56 4,938,625.93 Elec Tran-Line OH-TX-230KV-Plant X Sta-Sundown Corner #1 4,981,291.51 1,364,146.98 3,617,144.53 Elec Tran-Line OH-TX-230KV-Plant X Sta-Tolk Sta 3,892,778.59 223,776.78 3,669,001.81 Elec Tran-Line OH-TX-230KV-Potter Co Sw Sta-Moore Co Sta 4,958,068.99 2,601,793.91 2,356,275.08 Elec Tran-Line OH-TX-230KV-Potter Co Sw Sta-Rolling Hills Sub (K-85) 1,802,349.01 155,208.04 1,647,140.97 Elec Tran-Line OH-TX-230KV-Potter County Intg-Channing Sub (K-97) 853,828.43 56,760.03 797,068.40 Elec Tran-Line OH-TX-230KV-Randall-Amarillo South (K-87) 8,237,143.50 922,062.71 7,315,080.79 Elec Tran-Line OH-TX-230KV-Rolling Hills Sub-Harrington Sta (K-86) 1,138,598.71 103,374.87 1,035,223.84 Elec Tran-Line OH-TX-230KV-Sundown Corner-Lubbock South Int 4,712,719.62 1,044,908.22 3,667,811.40 Elec Tran-Line OH-TX-230KV-Sundown Int-Amoco Sw Sta (K-03) 17,093.96 223.65 16,870.31 Elec Tran-Line OH-TX-230KV-Sundown Int-NM St Line 4,188,859.82 1,061,872.17 3,126,987.65 Elec Tran-Line OH-TX-230KV-Sundown Int-Wolfforth Int (K-02) 260,012.83 8,771.69 251,241.14 Elec Tran-Line OH-TX-230KV-Tolk Sta-Lamb Co Int 4,693,624.07 1,965,381.84 2,728,242.23 Elec Tran-Line OH-TX-230KV-Tolk Sta-Needmore Sub (R-05) 684,128.82 6,991.16 677,137.66 Elec Tran-Line OH-TX-230KV-Tolk Sta-NM St Line #1 3,825,139.16 560,641.94 3,264,497.22 Elec Tran-Line OH-TX-230KV-Tolk Sta-NM St Line #2 5,232,842.37 2,076,576.86 3,156,265.51 Elec Tran-Line OH-TX-230KV-Tolk Sta-Plant X Sta (8,522,901.51) (140,170.32) (8,382,731.19) Elec Tran-Line OH-TX-230KV-Tolk Sta-Tuco Int 4,962,649.90 1,055,806.02 3,906,843.88 Elec Tran-Line OH-TX-230KV-Tolk Sta-Yoakum Co Int 11,733,085.64 3,982,486.30 7,750,599.34 Elec Tran-Line OH-TX-230KV-Tuco Int-Carlisle Int 4,450,492.72 1,674,344.27 2,776,148.45 Elec Tran-Line OH-TX-230KV-Tuco Int-Nichols Sta 13,518,912.18 4,519,259.85 8,999,652.33 Elec Tran-Line OH-TX-230KV-TX St Line-Andrews Co Sub (R-04) 869,369.22 60,631.19 808,738.03 Elec Tran-Line OH-TX-230KV-TX St Line-Midland (K-49) 4,144,477.40 1,979,540.12 2,164,937.28 Elec Tran-Line OH-TX-230KV-Wheeler Co Int-OK St Line (K-74) 1,150,502.67 90,166.28 1,060,336.39 Elec Tran-Line OH-TX-230KV-Wolfforth Int-Lubbock South Int (K-10) 458,270.07 15,143.53 443,126.54 Elec Tran-Line OH-TX-230KV-Yoakum Co Int-Amoco Sw Sta (K-33) 374,027.18 39,457.71 334,569.47 Elec Tran-Line OH-TX-230KV-Yoakum Co Int-Amoco Wasson Sub (K-40) 2,922,254.04 968,692.72 1,953,561.32 Elec Tran-Line OH-TX-230KV-Yoakum Co Int-Denver City Sta 2,614,913.21 867,054.48 1,747,858.73 Elec Tran-Line OH-TX-230KV-Yoakum Co Int-TX St Line (K-20) 665,703.89 64,610.38 601,093.51 Elec Tran-Line OH-TX-345KV-Amarillo-Frio Draw Int 215,843.97 93,481.28 122,362.69 Elec Tran-Line OH-TX-345KV-Hitchland Intg-Finney Sw Sta (J-07) 688,470.06 92,200.39 596,269.67 Elec Tran-Line OH-TX-345KV-Hitchland Intg-Texas State Line (J-12) 1,777,397.97 156,260.30 1,621,137.67 Elec Tran-Line OH-TX-345KV-Hitchland Intg-Texas State Line (J-13) 150,186.13 13,290.96 136,895.17 Elec Tran-Line OH-TX-345KV-Potter County Intg-Hitchland Intg (J-06) 6,113,824.57 488,161.74 5,625,662.83 Elec Tran-Line OH-TX-345KV-Pre Construction (1,074.41) (137.34) (937.07) Elec Tran-Line OH-TX-345KV-SPS/PSCO Tie Amarillo-OK St Line 33,565,092.11 11,436,831.51 22,128,260.60 Elec Tran-Line OH-TX-345KV-Tolk Sta-TX St Line (J-15) 4,694,563.43 2,319,329.14 2,375,234.29 Elec Tran-Line OH-TX-345KV-Tuco Intg-Oklahoma State Line (J-11) 193,646,201.90 18,112,412.41 175,533,789.49 Elec Tran-Line OH-TX-345KV-Tuco Int-Oklaunion 28,321,588.85 13,549,068.52 14,772,520.33 Elec Tran-Line OH-TX-345KV-Tuco Int-Yoakum Co Intg (J-17) 8,367,407.58 133,605.42 8,233,802.16 Elec Tran-Line OH-TX-345KV-Yoakum Co Intg-Texas State Line (J-18) 1,670,557.09 41,765.06 1,628,792.03 Elec Tran-Line UG-TX- 69KV-Lawrence Park Sub-Soncy Sub 481,331.75 376,786.02 104,545.73 Elec Tran-Line UG-TX- 69KV-South Georgia Int-Lawrence Park Sub 271,182.71 198,754.77 72,427.94 Elec Tran-Sub-NM-115KV-National Enrichment Facility (4,421.57) (763.82) (3,657.75) Etter Sub-Tran-TX 1,307,329.17 272,416.74 1,034,912.43 Eunice Sub-Tran-NM 1,176,244.47 114,848.76 1,061,395.71 FEC Sw Sta-Tran-NM 1,264,915.05 339,999.27 924,915.78 Finney Sw Sta-Tran-KS 6,848,150.54 1,284,421.24 5,563,729.30 Floyd County Sub-Tran-TX 5,902,938.68 896,170.29 5,006,768.39

Page 80: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Floydada South Sub-Tran-TX 33,555.48 22,494.91 11,060.57 Frio Draw Sub-Tran-NM 61,649.98 14.68 61,635.30 Gaines County Sub-Tran-TX 3,309,313.87 856,571.88 2,452,741.99 Garza And Post Sub-Tran-TX 153,891.63 85,897.54 67,994.09 Graham Sub-Tran-TX 7,901,867.89 509,401.50 7,392,466.39 Grapevine Sub-Tran-TX 3,369,855.43 739,228.94 2,630,626.49 Grassland Sub-Tran-TX 6,741,667.91 1,041,718.75 5,699,949.16 Gray County Sub-Tran-TX 894,034.16 462,201.92 431,832.24 Greyhound Sub-Tran-NM 1,525,218.27 11,456.62 1,513,761.65 GS Elec Coop Opdyke Sub-Tran-TX 3,044.84 480.25 2,564.59 Guymon Metering Sub-Tran-OK 1,057.04 198.48 858.56 Hale Center Sub-Tran-TX 187,407.05 15,483.32 171,923.73 Hale County Sub-Tran-TX 4,116,405.56 1,016,329.49 3,100,076.07 Haley Sub-Tran-TX - 0.00 (0.00) Hansford Sub-Tran-TX 1,982,099.71 353,003.39 1,629,096.32 Happy Interchange Sub-Tran-TX 5,222,946.56 700,739.06 4,522,207.50 Harrington Sub-Tran-TX 12,225,108.60 5,936,288.78 6,288,819.82 Hart #1 Sub-Tran-TX 243,192.42 16,439.09 226,753.33 Hastings Sub-Tran-TX 1,119,491.38 98,749.39 1,020,741.99 Hereford Northeast-Tran-TX 9,692,539.32 365,411.44 9,327,127.88 Hereford Sub-Tran-TX 3,383,695.76 691,193.01 2,692,502.75 Herring Sub-Tran-TX 45,982.06 2,319.72 43,662.34 Higg East Sub-Tran-TX 524,756.33 27,587.19 497,169.14 Higg Sw Sta-Tran-TX 2,332,650.71 360,211.03 1,972,439.68 Hillside Sub-Tran-TX 403,798.55 39,426.98 364,371.57 Hitchland Sub-Tran-TX 35,794,147.72 2,892,131.15 32,902,016.57 Hobbs Generation Plant Sub-Tran-NM 34,306,341.65 2,357,881.61 31,948,460.04 Hobbs South Sub-Tran-NM 11,787.05 5,590.73 6,196.32 Hobbs West Sw Sta-Tran-NM 814,620.92 248,580.56 566,040.36 Hockley County Sub-Tran-TX 3,295,559.15 826,618.39 2,468,940.76 Hopi Sub-Tran-NM 2,302,952.90 117,395.02 2,185,557.88 Hovey Tap Sw Sta-Tran-OK 21,436.62 18,415.32 3,021.30 Howard Sub-Tran-TX 7,603,687.37 540,915.65 7,062,771.72 Hutchinson County Sub-Tran-TX 8,192,570.11 3,177,081.20 5,015,488.91 Indiana Sub-Tran-TX 587,969.18 219,721.56 368,247.62 Industrial Sub-Tran-TX 226,398.43 69,186.44 157,211.99 Ink Basin Sub-Tran-TX 163,971.46 - 163,971.46 IPP-Llano Wind Energy-Tran-TX (33,850.94) (7,881.66) (25,969.28) Ivory Metering Sub-Tran-TX 88,397.94 9,959.07 78,438.87 Ivory Sub-Tran-TX 65,867.93 8,902.91 56,965.02 Jal Sub-Tran-NM 164,182.69 57,614.35 106,568.34 Johnson Draw Sub-Tran-TX 3,827,372.28 375,023.19 3,452,349.09 Jones Sub-Tran-TX 18,926,148.59 3,522,186.24 15,403,962.35 Kilgore Sub-Tran-NM 476,616.87 25,058.37 451,558.50 Kingsmill Sub-Tran-TX 6,874,906.57 1,373,878.23 5,501,028.34 Kiowa Sub-Tran-NM 21,548,959.17 166,322.15 21,382,637.02 Kirby Sw Sta-Tran-TX 1,425,153.40 397,248.81 1,027,904.59 Kiser Sub-Tran-TX 8,909,550.21 549,995.89 8,359,554.32 Kite Sub-Tran-TX 560,439.11 7,912.06 552,527.05 Kress Rural Sub-Tran-TX 450,109.34 30,426.07 419,683.27 Kress Sub-Tran-TX 8,857,185.70 1,019,008.01 7,838,177.69 La Plata Sub-Tran-TX 889,867.28 6,684.48 883,182.80 Lake Meredith Sub-Tran-TX 153,938.40 17,342.97 136,595.43 Lakeview REC Sw Sta-Tran-TX 417,659.83 129,675.09 287,984.74 Lamb County Sub-Tran-TX 4,566,817.14 1,834,516.90 2,732,300.24 Lamton Sub-Tran-TX 4,840,800.62 560,866.67 4,279,933.95 Lawrence Park Sub-Tran-TX 38,824.93 29,038.14 9,786.79 Lea County Electric Cooperative North Sub-Tran-NM 88,230.72 3,313.41 84,917.31 Lea County Sub-Tran-NM 3,239.08 941.68 2,297.40 Lea National Potash Sub-Tran-NM 420,113.39 64,109.43 356,003.96 Legacy Sub-Tran-TX 4,259,783.29 479,373.68 3,780,409.61 Lighthouse Metering Sw Sta-Tran-TX 9,439.44 1,063.46 8,375.98 Lighthouse Sw Sta-Tran-TX 36,411.59 28,266.91 8,144.68 Lipscomb County Sub-Tran-TX 786,411.69 29,532.84 756,878.85 Livingston Ridge Sub-Tran-NM 4,408,604.91 99,500.95 4,309,103.96 Lockney Rural Sub-Tran-TX 17,518.49 10,551.84 6,966.65 Lopez Sub-Tran-NM 3,488,651.24 364,462.71 3,124,188.53 Lost Draw Sub-Tran-TX (1,562,373.31) (11,916.27) (1,550,457.04) Lubbock East Sub-Tran-TX 7,681,937.14 1,611,663.69 6,070,273.45 Lubbock South Sub-Tran-TX 11,319,812.76 2,254,939.29 9,064,873.47 Lynn County Sub-Tran-TX 9,842,108.98 1,214,679.23 8,627,429.75 Lyntegar REC Sw Sta-Tran-TX 8,876.71 7,555.81 1,320.90 Maddox Sub-Tran-NM 5,792,968.72 1,647,306.01 4,145,662.71 Majestic Wind Farm Sub-Tran-TX (224,574.40) (35,421.33) (189,153.07) Manhattan Sub-Tran-TX 78,267.98 10,410.54 67,857.44 Martin Sub-Tran-TX 2,518,721.41 388,212.20 2,130,509.21 Miami Sw Sta-Tran-TX 306,671.78 91,643.78 215,028.00 Midland Sub-Tran-TX 86,314.09 4,538.01 81,776.08 Millen Sub-Tran-NM 13,649.07 7,037.96 6,611.11 Moore County Metering Sub-Tran-TX 43,246.30 4,872.20 38,374.10 Moore County Sub-Tran-TX 13,327,060.94 2,728,719.07 10,598,341.87 Mosaic Sub-Tran-NM 21,893.55 3,124.32 18,769.23

Page 81: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Muleshoe Valley Sub-Tran-TX 129,169.77 6,791.16 122,378.61 Muleshoe West Sub-Tran-TX 176,804.63 9,295.59 167,509.04 Murphy Sub-Tran-TX 811,222.68 103,883.33 707,339.35 Mustang Sub-Tran-TX 11,320,739.67 2,505,689.34 8,815,050.33 National Enrichment Facility Sub-Tran-NM 3,397,305.19 210,807.67 3,186,497.52 Navajo Refinery#2 Sub-Tran-NM 166,464.86 18,754.23 147,710.63 Navajo Refinery#5 Sub-Tran-NM 252,133.37 35,980.67 216,152.70 Needmore Sub-Tran-TX (1,885,130.24) (14,597.90) (1,870,532.34) New Grave Sub-Tran-TX 2,561,515.43 320,378.95 2,241,136.48 New Moore Tap Sub-Tran-TX 18,397.33 10,389.53 8,007.80 Newhart Sub-Tran-TX 18,777,413.29 1,010,164.29 17,767,249.00 Nichols Sub-Tran-TX 21,073,004.03 5,229,328.00 15,843,676.03 Noble Sub-Tran-TX 6,292,809.16 1,014,300.38 5,278,508.78 North Loving Sub-Tran-NM 17,847,045.46 300,796.22 17,546,249.24 Northwest Sub-Tran-TX 2,288,101.34 805,892.87 1,482,208.47 Norton Sub-Tran-NM 1,920,199.59 379,314.22 1,540,885.37 Oasis Sub-Tran-NM 7,712,220.47 1,315,656.86 6,396,563.61 Ochiltree Sub-Tran-TX 9,083,652.33 701,554.59 8,382,097.74 Ochoa Sub-Tran-NM 473,487.46 25,159.69 448,327.77 Ocotillo Sub-Tran-NM 233,012.79 22,751.42 210,261.37 Oil Center Sub-Tran-NM 9,406.58 1,208.23 8,198.35 Olton Metering Sub-Tran-TX 11,103.56 1,250.95 9,852.61 Optima Sub-Tran-OK 354,688.65 - 354,688.65 Osage Sub-Tran-TX 1,066,937.04 482,434.91 584,502.13 Outpost Sub-Tran-TX 1,430,750.38 10,757.28 1,419,993.10 Owens-Corning Sub-Tran-TX 448,454.96 145,079.91 303,375.05 Pantex North Sub-Tran-TX 24,426.61 183.80 24,242.81 Pantex South Sub-Tran-TX 162,790.92 7,894.63 154,896.29 Parmer County Sub-Tran-TX 1,037,459.90 99,924.56 937,535.34 PCA Sub-Tran-NM 5,412,307.24 689,362.82 4,722,944.42 Pearl Sub-Tran-NM 1,462,964.86 76,916.09 1,386,048.77 Pecos Sub-Tran-NM 10,588,403.40 1,095,461.29 9,492,942.11 Perimeter Sub-Tran-NM 974,992.06 109,844.33 865,147.73 Perryton North Sub-Tran-TX 764,269.76 152,468.83 611,800.93 Perryton South Sub-Tran-TX 840,374.82 94,151.15 746,223.67 Phillips Refinery #1 Sub-Tran-TX 2,113,481.90 695,870.23 1,417,611.67 Phillips Refinery #2 Sub-Tran-TX 3,200,489.23 986,656.96 2,213,832.27 Plains Sw Sta-Tran-TX 2,709,461.19 362,310.70 2,347,150.49 Plainview East Sub-Tran-TX 55,304.26 8,722.95 46,581.31 Plainview North Sub-Tran-TX 286,971.11 19,630.86 267,340.25 Plainview Sub-Tran-TX 318,080.56 46,815.71 271,264.85 Plant X Station Sub-Tran-TX 10,952,301.80 4,025,104.10 6,927,197.70 Planters Metering Sub-Tran-TX 96,837.19 10,909.85 85,927.34 Pleasant Hill Sub-Tran-NM 12,489,228.57 628,336.71 11,860,891.86 Ponderosa Sub-Tran-NM 1,108,503.57 24,976.99 1,083,526.58 Portable Circuit Breaker-Tran-TX 346,822.80 28,654.03 318,168.77 Portable Oil Cooler-Tran-TX 970,374.68 234,616.64 735,758.04 Portable Transformer 40MVA-Tran-TX 23,071.12 2,599.23 20,471.89 Portable Transformer 56MVA-Tran-TX 2,022,094.62 106,308.78 1,915,785.84 Portales Sub-Tran-NM 12,513,934.41 1,234,442.43 11,279,491.98 Portales Sw Sta-Tran-NM 129,348.82 111,967.82 17,381.00 Potash Junction Sub-Tran-NM 19,449,560.40 1,806,522.66 17,643,037.74 Potter County Sw Sta-Tran-TX 16,509,492.83 3,561,832.60 12,947,660.23 Prentice Sub-Tran-TX 30,118.16 10,343.87 19,774.29 Price Sub-Tran-NM 195,361.87 22,009.81 173,352.06 Pringle Sub-Tran-TX 11,080,788.65 1,665,989.62 9,414,799.03 Puckett West Sub-Tran-TX 1,553,817.96 58,351.96 1,495,466.00 Quahada Sub-Tran-NM 4,284,286.04 214,129.54 4,070,156.50 Randall County Sub-Tran-TX 18,281,782.17 1,776,165.20 16,505,616.97 Red Bluff Switch Station-Tran-NM 4,503,544.96 414,216.22 4,089,328.74 Retired Sub-29121-Tran-TX 61.54 25.13 36.41 Retired Sub-42117-Tran-TX 494.45 201.91 292.54 Retired Sub-43111-Tran-TX 170.33 69.55 100.78 Retired Sub-62160-Tran-NM 2,398.76 - 2,398.76 Riverview Sub-Tran-TX 3,915,515.23 1,339,400.08 2,576,115.15 Roadrunner Sub-Tran-NM 52,743,696.85 1,845,542.66 50,898,154.19 Rocky Point Sub-Tran-TX 61,808.17 1,392.68 60,415.49 Rolling Hills Sub-Tran-TX 9,790,370.63 674,515.66 9,115,854.97 Roosevelt County Sub-Tran-NM 20,857,200.37 3,164,209.98 17,692,990.39 Roswell City Sub-Tran-NM 714,312.14 143,462.35 570,849.79 Roswell Sub-Tran-NM 5,462,363.41 1,062,064.53 4,400,298.88 ROZ Sub-Tran-TX 300,934.77 43,426.30 257,508.47 Sage Brush Sub-Tran-NM 2,671,360.99 92,932.53 2,578,428.46 San Juan Mesa Wind Farm-Tran-NM 2,310,688.60 455,517.58 1,855,171.02 Sand Dunes Sub-Tran-NM 210,225.12 14,210.60 196,014.52 Seagraves Interchange Sub-Tran-TX 2,619,766.70 965,546.05 1,654,220.65 Seminole Interchange Sub-Tran-TX 11,765,562.40 1,277,289.99 10,488,272.41 Seven Rivers Sub-Tran-NM 7,320,249.72 1,491,561.69 5,828,688.03 Shell Sub-Tran-TX 329,046.40 39,217.63 289,828.77 Sherman County Sw Sta-Tran-TX 2,511,539.50 285,765.06 2,225,774.44 Soncy Sub-Tran-TX 1,042,278.16 79,861.02 962,417.14 South Georgia Sub-Tran-TX 2,366,575.96 712,456.04 1,654,119.92

Page 82: Home | Transmission | Xcel Energy - Wholesale Customer ......W Bailey County $ 385.68 $ 355.37 Z-65 Elec Tran-Line OH-TX- 69KV-Graham-Justiceburg W Big Country $ 1,559,421.15 $ 802,085.44

SPS Radial Line StudyEOY 2018 Plant Balances

Asset Location Sum of Actual Installed Costs

Sum of Allocated Reserves

Sum of Net Book Value

Southeast Sub-Tran-TX 110,889.08 35,359.68 75,529.40 Spearman Dist Sub-115KV-Tran-TX 155,591.64 35,079.85 120,511.79 Spearman Interchange Sub-115KV-Tran-TX 3,403,336.59 658,271.58 2,745,065.01 Spring Draw Sub-Tran-TX 288,511.60 45,505.92 243,005.68 Stanton Metering Sub-Tran-TX 214,802.82 24,200.07 190,602.75 Stanton Sub-Tran-TX 129,136.39 63,060.86 66,075.53 Station Transformer in Reserve-Tran-NM 5,294,324.60 991,033.92 4,303,290.68 Station Transformer in Reserve-Tran-TX 13,655,651.85 1,576,308.94 12,079,342.91 Stevens County Sub-Tran-KS 11,935,615.87 89,826.37 11,845,789.50 Strata Sub-Tran-NM 319,930.10 26,432.19 293,497.91 Sulphur Springs Sub-Tran-TX 3,251,566.57 779,528.24 2,472,038.33 Sundown Sub-Tran-TX 4,432,050.83 1,295,402.65 3,136,648.18 Sunset Sub-Tran-TX 1,513,592.13 283,532.07 1,230,060.06 Swisher County Sub-Tran-TX 11,622,491.07 1,223,398.40 10,399,092.67 System Control Center-S.W.-Tran-TX 66,732.09 32,578.67 34,153.42

Targa Sub-Tran-NM 951.88 64.34 887.54 Tascosa Sub-Tran-TX 8,592.87 5,863.79 2,729.08 Taylor Sw Sta-Tran-NM 1,640,084.01 394,262.19 1,245,821.82 Terry County Sub-Tran-TX 4,971,339.13 1,260,537.36 3,710,801.77 Texas County Sub-Tran-OK 3,185,270.93 751,641.88 2,433,629.05 Tolk Sub-Tran-TX 17,407,639.99 6,193,996.80 11,213,643.19 Tuco Sub-Tran-TX 50,616,679.92 8,497,696.81 42,118,983.11 Tucumcari Sub-Tran-NM 302,533.17 163,253.78 139,279.39 Van Buren Sub-Tran-TX 15,348.25 12,787.18 2,561.07 Wade Sub-Tran-TX 643,794.24 24,176.62 619,617.62 West Bender Sub-Tran-NM 292,418.11 10,981.45 281,436.66 Western Cotton Oil Mill (a.k.a. ACCO) Metering Sub-Tran-TX 57,344.92 6,460.58 50,884.34 Wheeler Co Interchange Sub-Tran-TX 10,002,859.18 955,447.33 9,047,411.85 Whitaker Sub-Tran-TX 57,087.65 13,693.17 43,394.48 Whitten Sub-Tran-NM 1,447,585.88 239,023.64 1,208,562.24 Wildorado Tap Sw Sta-Tran-TX 17,699.13 11,544.21 6,154.92 Wilson Sw Sta-Tran-TX (7,776.41) (1,343.36) (6,433.05) Wipp Sub-Tran-NM 1,161,374.54 79,420.21 1,081,954.33 Wolfforth Metering Sub-230KV-Tran-TX 25,201.91 2,839.29 22,362.62 Wolfforth Sub-230KV-Tran-TX 7,817,254.28 830,259.35 6,986,994.93 Wood Draw Sub-Tran-NM 4,319,869.95 175,130.67 4,144,739.28 Woodrow Sw Sta-Tran-TX (21,599.93) 15,725.67 (37,325.60) XIT Sub-Tran-TX 7,041,122.35 362,378.04 6,678,744.31 Yoakum County Sub-Tran-TX 16,285,825.08 2,333,861.94 13,951,963.14 Yuma Sub-Tran-TX 92,954.11 17,596.49 75,357.62 Grand Total 2,986,237,899.62 478,975,832.96 2,507,262,066.66