holiday - tools to grow, inc. | pediatric occupational
TRANSCRIPT
Time Awareness Worksheets
Holiday time
management
Time AwarenessWorksheets
Includes: 2 Levels of Difficulty
www.toolstogrowot.com Copyright ©2014 Tools to Grow, Inc. All rights reserved.
Graphics by Krista Wallden http://www.teacherspayteachers.com/Store/Krista-Wallden
management
How Much Time?
Draw a line from the time span on the left to the activity on the right that usually needs that period of time to complete.
Section 1: Directions:
5 minutes Watch “Frosty the Snowman”
10 seconds Wrap one small present
30 minutes Pour a glass of milk
Place the activity or event in order according to which activity or event that needs the least time, to the activity or event that requires the most time.
1 = The activity or event that requires the least amount of time.
2 = The activity or even that is the middle amount of time.
3 =The activity or event that requires the most time.
1. ___________________________________________________________ 2. ___________________________________________________________ 3. ___________________________________________________________
Pour a glass of milk Wrap one small present
Watch “Frosty the Snowman”
Section 2: Directions:
Holiday Time Management
www.toolstogrowot.com Copyright ©2014 Tools to Grow, Inc. All rights reserved.
Time Awareness 1
Place the activity or event in order according to which activity or event that needs the least time, to the activity or event that requires the most time.
Place the activity or event in order according to which activity or event that needs the least time, to the activity or event that requires the most time.
Place the activity or event in order according to which activity or event that
Pour a glass of milk Wrap one small present
Draw a line from the time span on the left to the activity
on the right that usually needs that period of time to complete.
Holiday Time Management
www.toolstogrowot.com Copyright ©2014 Tools to Grow, Inc. All rights reserved.
Time Awareness 2
5 Hours Crack an egg
30 minutes Frost two cookies
2 minutes Christmas Day
10 seconds Watch “Rudolph the Red Nosed Reindeer”
24 hours Time needed to roast a large turkey
Place the activity or event in order according to which activity or event that needs the least time, to the activity or event that requires the most time.
The activity or event that requires the least amount of time will be number 1.
The activity or event that requires the most time will be number 5.
1. ____________________________________________________ 2. ____________________________________________________ 3. _____________________________________________________ 4. _____________________________________________________ 5. ______________________________________________________
Crack an egg Christmas Day Roast a large turkey
Watch “Rudolph the Red Nosed Reindeer” Frost two cookies
Section 1: Directions:
Section 2: Directions:
____________________________________________________
Watch “Rudolph the Red Nosed Reindeer” Frost two cookies