holiday homework : class 11 summer vacation, 2018 … · prepare a venn diagram showing the...

31
Head of the Department / HOLIDAY Sum SUBJECT : Accoun Time to be Spent (1 Hours day for 6 Days) : Work Specification : Solve th Materials / Resources Required : Double black-in Instructions / Guidelines : 1. A 2. U 3. U 4. W 5. S l 6. A Any Other Information: Date of submission: 19-6-2 / Subject Coordinator He Y HOMEWORK : Class 11 mmer Vacation, 2018 nts s per 6 hrs. he worksheet given below e entry book keeping-XI course book,A-4 S nk pen, scale, stick-file Assignment must be hand written. Use one side A-4 sheets. Use only black ink pen. Write only on one side of the paper. Standard left margin space on each page left. Assignment must be compiled in a stick f 2018 ead of Shikhar Sheets, pencil, e should be file

Upload: dinhkhanh

Post on 13-Jun-2018

236 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Accounts

Time to be Spent (1 Hours perday for 6 Days) : 6 hrs.

WorkSpecification : Solve the worksheet given below

Materials /ResourcesRequired :

Double entry book keeping-XI course book,A-4 Sheets, pencil,black-ink pen, scale, stick-file

Instructions /Guidelines :

1. Assignment must be hand written.2. Use one side A-4 sheets.3. Use only black ink pen.4. Write only on one side of the paper.5. Standard left margin space on each page should be

left.6. Assignment must be compiled in a stick file

Any Other Information:

Date of submission: 19-6-2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Accounts

Time to be Spent (1 Hours perday for 6 Days) : 6 hrs.

WorkSpecification : Solve the worksheet given below

Materials /ResourcesRequired :

Double entry book keeping-XI course book,A-4 Sheets, pencil,black-ink pen, scale, stick-file

Instructions /Guidelines :

1. Assignment must be hand written.2. Use one side A-4 sheets.3. Use only black ink pen.4. Write only on one side of the paper.5. Standard left margin space on each page should be

left.6. Assignment must be compiled in a stick file

Any Other Information:

Date of submission: 19-6-2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Accounts

Time to be Spent (1 Hours perday for 6 Days) : 6 hrs.

WorkSpecification : Solve the worksheet given below

Materials /ResourcesRequired :

Double entry book keeping-XI course book,A-4 Sheets, pencil,black-ink pen, scale, stick-file

Instructions /Guidelines :

1. Assignment must be hand written.2. Use one side A-4 sheets.3. Use only black ink pen.4. Write only on one side of the paper.5. Standard left margin space on each page should be

left.6. Assignment must be compiled in a stick file

Any Other Information:

Date of submission: 19-6-2018

Page 2: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

Answer the following questions: -

1. What is Book-keeping?2. What do you understand by Accounting?3. Prepare a Venn diagram showing the similarities and differences between Book keeping

and Accounting.4. Diagrammatically explain the process of Accounting.5. Business is considered to be separate even in case of sole proprietorship. Which

Accounting concept is applicable?6. ’X’ has purchased a business asset. He has not recorded it in the books on the basis that

amount has not been paid. Should he record the transaction? Give reason in support ofyour answer.

7. Why is it important to adopt a consistent basis for the preparation of financialstatements? Explain.

8. Which accounting concepts are described using the phrase “Do not anticipate a profit butprovide for all possible losses.

9. ’Business unit last indefinitely’. Mention &explain the Accounting concept on which thisstatement is based.

10. Why is manpower quality not recorded in the books of Accounts?11. `An item should be regarded as material if there is a reason to believe that knowledge of

it would influence the decision of an informed investor’. Name the concept and explain it.12. John Brothers started a business of manufacturing bicycles at Bhopal on April 1, 2016.

They have made an investment of Rs. 15,00,000 as capital. On the same date theypurchased a machine for Rs. 2,00,000. The Auditors of the firm found that the accountantof John Traders keeps on changing the method of depreciation on Machine. Identifywhich accounting concept has not been followed by the accountant and explain thatconcept.

13. Collect 15 bills from the Retail Shops/Malls. Write down in your note book the pointswhich you will be finding common in all the bills (for example, date, amount coloumnetc.). Identify the accounting concept which states that `record the transactions inaccounting books supported by the documents’. Explain the utility of the concept withthe reference/help of the points you have noted through observation of bills.

14. Read the items of Group 1 and Group 2 of the given `Concept Grid’ and use thecombination coloumn to write down the serial numbers with appropriate match.

Page 3: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

CONCEPT GRID

S.NoItems of Group 1

Combinationof Group 1and 2

Items of Group 2S.No

1 Capital Irrecoverable amount fromDebtors

1

2 Example of Internal Liability Current Liabilities 2

3 Fictitious Assets Initial investment by theProprietor

3

4 Bad Debts Assets held by the business forlong term

4

5 Drawings Capital expenditure 5

6 Liabilities to be dischargedwithin one year

Unreal and intangible innature, basicallyexpenditure atincorporation stage of thebusiness

6

7 Non-current assets Non trading goods 7

8 Expenditure incurred to acquireassets

Return Inward 8

9 Not to be recorded under thehead `Purchases’

Withdrawal of cash or goodsfor personal use by theproprietor

9

10 Return of goods by thedebtors before settlingpayment

Accumulated Profits 10

Page 4: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

Q15. Complete the table given below with the help of information through internet/relevantsites:-

S.No Title Name Role (in brief)1 Finance Minister

2 Comptroller andAuditor General ofIndia (C&AG)

3 Accountant General(AG) of MadhyaPradesh

4 Chief Economic Advisorof India

5 Controller General ofAccounts (CGA)

6 President of TheInstitute of CharteredAccountants of India

7 Finance Secretary(Government of India)

8 Governor of theReserve bank of India

9 President of IndianBanking Association

10 President of TheInstitute of CompanySecretaries of India

Page 5: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Art

Time to be Spent (___ Hours perday for ___ Days) : One hour for 20 days

WorkSpecification :

Still lifeCompositionNature

Materials /ResourcesRequired :

Poster colour, brush,paper and pencil.

Instructions /Guidelines :

Make two paintings on each specification. Five sketching

Any Other Information:

Date of submission:25/6/2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Art

Time to be Spent (___ Hours perday for ___ Days) : One hour for 20 days

WorkSpecification :

Still lifeCompositionNature

Materials /ResourcesRequired :

Poster colour, brush,paper and pencil.

Instructions /Guidelines :

Make two paintings on each specification. Five sketching

Any Other Information:

Date of submission:25/6/2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Art

Time to be Spent (___ Hours perday for ___ Days) : One hour for 20 days

WorkSpecification :

Still lifeCompositionNature

Materials /ResourcesRequired :

Poster colour, brush,paper and pencil.

Instructions /Guidelines :

Make two paintings on each specification. Five sketching

Any Other Information:

Date of submission:25/6/2018

Page 6: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : BUSINESS STUDIES

Time to be Spent (___ Hours perday for ___ Days) :

1 hour per day for 14 days

WorkSpecification :

Study the important changes in the business environment.ORSWOT analysis

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file, internet, and NewsPapers.

Instructions /Guidelines :

Follow I.S.C. – Guidelines from Scope of Syllabus – 2020 page number117

Any Other Information:1) Use A – 4 size Plain white paper.

2) Draw Outer Margin (4 sides Border) before writing.

3) Write your name, class, section, topic of the project and subject on the first cover page.

4) Use Stick-file for submitting the project-work. (Do not do spiral binding now.)

5) Use only Black-ink.

6) Decoration or fancy-work is not required.

7) Before starting the project-work, write introduction part for the topic. Project – work must not be less

than 20 pages.

8) As required, paste pictures, relevant content, articles etc.

9) The project must end with a conclusion and Bibliography.

Date of submission: 11 June 2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : BUSINESS STUDIES

Time to be Spent (___ Hours perday for ___ Days) :

1 hour per day for 14 days

WorkSpecification :

Study the important changes in the business environment.ORSWOT analysis

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file, internet, and NewsPapers.

Instructions /Guidelines :

Follow I.S.C. – Guidelines from Scope of Syllabus – 2020 page number117

Any Other Information:1) Use A – 4 size Plain white paper.

2) Draw Outer Margin (4 sides Border) before writing.

3) Write your name, class, section, topic of the project and subject on the first cover page.

4) Use Stick-file for submitting the project-work. (Do not do spiral binding now.)

5) Use only Black-ink.

6) Decoration or fancy-work is not required.

7) Before starting the project-work, write introduction part for the topic. Project – work must not be less

than 20 pages.

8) As required, paste pictures, relevant content, articles etc.

9) The project must end with a conclusion and Bibliography.

Date of submission: 11 June 2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : BUSINESS STUDIES

Time to be Spent (___ Hours perday for ___ Days) :

1 hour per day for 14 days

WorkSpecification :

Study the important changes in the business environment.ORSWOT analysis

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file, internet, and NewsPapers.

Instructions /Guidelines :

Follow I.S.C. – Guidelines from Scope of Syllabus – 2020 page number117

Any Other Information:1) Use A – 4 size Plain white paper.

2) Draw Outer Margin (4 sides Border) before writing.

3) Write your name, class, section, topic of the project and subject on the first cover page.

4) Use Stick-file for submitting the project-work. (Do not do spiral binding now.)

5) Use only Black-ink.

6) Decoration or fancy-work is not required.

7) Before starting the project-work, write introduction part for the topic. Project – work must not be less

than 20 pages.

8) As required, paste pictures, relevant content, articles etc.

9) The project must end with a conclusion and Bibliography.

Date of submission: 11 June 2018

Page 7: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : CHEMISTRY

Time to be Spent (___ Hours perday for ___ Days) : 3hrs for project

WorkSpecification : Project

Materials /ResourcesRequired :

Stationary

Instructions /Guidelines :

Select one of the project from curriculum and do the projectas directed.

Any Other Information:

Date of submission: 19 th JUNE 2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : CHEMISTRY

Time to be Spent (___ Hours perday for ___ Days) : 3hrs for project

WorkSpecification : Project

Materials /ResourcesRequired :

Stationary

Instructions /Guidelines :

Select one of the project from curriculum and do the projectas directed.

Any Other Information:

Date of submission: 19 th JUNE 2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : CHEMISTRY

Time to be Spent (___ Hours perday for ___ Days) : 3hrs for project

WorkSpecification : Project

Materials /ResourcesRequired :

Stationary

Instructions /Guidelines :

Select one of the project from curriculum and do the projectas directed.

Any Other Information:

Date of submission: 19 th JUNE 2018

Page 8: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : COMMERCE

Time to be Spent (___ Hours perday for ___ Days) :

Half an Hour per day for ten days.

WorkSpecification :

Project work- Do project no. 9 ( Contact an insurance agent and collectinformation…….)from the list of suggested projects from Commerce Booki.e. C.B Gupta, Page no. (viii)

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file.

Instructions /Guidelines :

Follow the instructions given in the book.

Any Other Information:Date of submission:11thJune, 2018.Please Note:

1) Use A – 4 size Plain white paper.

2) Draw Outer Margin (4 sides Border) before writing.

3) Write your name, class, section,subject and topic of the project on the first cover page.

4) Use Stick-file for submitting the project-work. (Don’t do spiral binding now.)

5) Use only Black-ink.

6) Decoration or fancy-work is not required.

7) Before starting the project-work, write introduction part for the topic.

8) Project work must be for 12 - 15 pages.

9) As required, paste pictures , blank forms etc.

10) Don’t forget to put conclusion at the end.

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : COMMERCE

Time to be Spent (___ Hours perday for ___ Days) :

Half an Hour per day for ten days.

WorkSpecification :

Project work- Do project no. 9 ( Contact an insurance agent and collectinformation…….)from the list of suggested projects from Commerce Booki.e. C.B Gupta, Page no. (viii)

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file.

Instructions /Guidelines :

Follow the instructions given in the book.

Any Other Information:Date of submission:11thJune, 2018.Please Note:

1) Use A – 4 size Plain white paper.

2) Draw Outer Margin (4 sides Border) before writing.

3) Write your name, class, section,subject and topic of the project on the first cover page.

4) Use Stick-file for submitting the project-work. (Don’t do spiral binding now.)

5) Use only Black-ink.

6) Decoration or fancy-work is not required.

7) Before starting the project-work, write introduction part for the topic.

8) Project work must be for 12 - 15 pages.

9) As required, paste pictures , blank forms etc.

10) Don’t forget to put conclusion at the end.

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : COMMERCE

Time to be Spent (___ Hours perday for ___ Days) :

Half an Hour per day for ten days.

WorkSpecification :

Project work- Do project no. 9 ( Contact an insurance agent and collectinformation…….)from the list of suggested projects from Commerce Booki.e. C.B Gupta, Page no. (viii)

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file.

Instructions /Guidelines :

Follow the instructions given in the book.

Any Other Information:Date of submission:11thJune, 2018.Please Note:

1) Use A – 4 size Plain white paper.

2) Draw Outer Margin (4 sides Border) before writing.

3) Write your name, class, section,subject and topic of the project on the first cover page.

4) Use Stick-file for submitting the project-work. (Don’t do spiral binding now.)

5) Use only Black-ink.

6) Decoration or fancy-work is not required.

7) Before starting the project-work, write introduction part for the topic.

8) Project work must be for 12 - 15 pages.

9) As required, paste pictures , blank forms etc.

10) Don’t forget to put conclusion at the end.

Page 9: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : COMPUTER SCIENCE

Time to be Spent(Hours per day for ___ Days) : 2 hours for 6 days

WorkSpecification:

You are required to complete the following 2 tasks.1) To complete 5 assignments in the Practical File.2) To design PowerPoint Presentation of Social Context and Ethical

issues.

Materials/ResourcesRequired :

Ring file, A4 size paper, A4 size Ruled sheets, Computer,Printer (Blank and White)

Instructions /Guidelines :

1) You have to complete 5 Assignment in the practical file.For every assignment you need to do the following:

a) Page 1: Assignment Statement Hand-written/Printout.

b) Page 2: Write algorithm (hand-written/Printout) for the assignment

c) Page 3: solution/coding in Java black and white printout. When youtake printout of the coding, paste the code in Notepad/WordPad. Putyour name, class/TSVS/2018-2019/Assignment number as footer.

For e.g. Sonia Wadhwa/11 Sc/TSVS/2018-2019/Assignment 1

d) Page 4: Variable description table of the program (Hand-written)/Printout in the format given below:

Name ofvariable

Data_type Scope Responsibility/Purpose

Scope can be global or local to a specific method.

e) Page 5: Printout of sample Input Output Screen of the program.2) PowerPoint Presentation: Make a detailed presentation on the topic-Social and ethical issues in Computing

Page 10: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

The following topics should be covered-Intellectual property (laws and rights) , software as intellectual property,Difference between Software Copyright and patents; trademarks,Software Licensing and Privacy, Free software foundation and its positionon software, Open source software and type of licensing (e.g. GPL BSDetc)Cyber Security, netiquettes, spam, security issues Plagiarism, Phishingand list at least five points on social impact and ethical issues.Note:- Use master slide to insert for school logo as header and yourname, id no, slide number , XI 2018-2019 as footer.

1)

Date of Submission : 18-06-2018

Assignment 1:

A Smith number is a computer, the sum of whose digits is the sum of the digits of its prime factorsobtained as a result of prime factorization (excluding 1). The first few such numbers are 4, 22, 27,58, 85, 94,121…

Page 11: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

Example:

666

Prime factors are 2, 3, 3 and 37

Sum of the digit are (6+6+6)=18

Sum of the digits of the factors (2+3+3+(3+7))=18

4937775

Prime factors are 3, 5, 5, 65837

Sum of the digits are (4 + 9 + 3 + 7 + 7 +7 +7 + 5)=42

Sum of the digits of the factors (3+5+5+(6+5+8+3+7))=42

Sample data:

Input 94 Output Smith Number

Input 102 Output Not a Smith Number

Input 666 Output Smith Number

Output 999 Output Not a Smith Number

Assignment 2:

Write a program to find L.C.M. of two numbers. The L.C.M. of two natural numbers can be foundby the following method:

If the larger number is a multiple of the smaller number, it is the L.C.M. of the two numbers,otherwise the next multiple of the larger number can be found and it can be checked if it is amultiple of the smaller number.

The two numbers should be accepted from the user and LCM should be printed using mainmethod however LCM must be found using method calcLcm(int a, int b )

Example

Let the two numbers be 3 and 5. The larger number is not the multiple of 3 (i.e. it is not divisibleby 3). Therefore next multiple of 5 i.e. 10 is found. Number 10 is still not the multiple of 3.

Page 12: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

Therefore next multiple of 5 i.e. 15 is found. Now, because 15 is the multiple of 3, the L.C.M. of 3and 5 is 15.

Sample Input:

Enter Number 1: 4

Enter Number 2: 5

Sample Output

LCM of the given numbers is : 20

Assignment 3

A class called Number has been defined to find the frequency of each digit present in it and thesum of the digits and to display the result. Some of the members of the class Number are givebelow:

Class name: Number

Data members num-long integer type

Member functions / methods :

Number( ) Constructor to assign 0 to num

Number(long n) Constructor to assign n to num

void digitFrequency( ) to find the frequency of each digit and to display it.

int sumDigits( ) to return the sum of digits of the number

Specify the class Number giving the details of the two constructor and functions voiddigitfrequency( ) and int sumDigits( ).

Sample Input through constructor is:

121

Output

Digit 1- frequency 2 time

Digit 2- frequency 1 time

Page 13: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

Sum of digits = 4

Assignment 4:Twin Primes are consecutive prime numbers whose difference is 2 For example, (3, 5), (11, 13), (1

7, 19) are all twin primes. We define the distance of any twin prime pair from n as :

minimum(abs(m-pl), abs(n-p2)), where abs( ) returns the absolute value of its argument and

minimum( ) returns the smaller of its two arguments.

Write a program that reads in a positive integer n and prints out the twin prime pair that has the

least

distance from m

For example if n is 30 the pair is (29, 31) , if n is 13 the pair is (11, 13), if n is 49 the pair is (41,

43), if n is 54 the pair is (59, 61).

Sample Data

Input:

Give the number: 34

Output:

Number read in is: 34

p1: 29 p2: 31

Input:

Give the number: 60

Output:

Number read in is: 60

p1: 59 p2: 61

Assignment 5: Write a program to print perfect numbers between m and n. Where m and n are

input by the user such that m<n and m,n>0 and <=10000.

A perfect number is a number which is equal to the sum of its factors. E.g 6=1+2+3

Page 14: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

Sample Data

Input:

Enter m:1

Enter n: 100

Output:

6

28

Page 15: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: ECONOMICS

Time to be Spent (_1__ Hours perday for _20__ Days) : 20 hrs.

WorkSpecification :

Project on topics mentioned in the scope of the syllabus or anyother relevant topic.

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file, internet, andaccounts book

Instructions /Guidelines:

It should be hand written project, preferably in blackink.

Project and student name should be on the cover page Acknowledgment, certificate and content should be

included. Clearly mention the objectives of the project The project should be divided into chapters with

headings The project should be analytical, well supported by

statistics, graphs and empirical data. Graphs and tables should be well explained and always

well labelled Use statistical techniques where ever possible. Avoid pasting pictures and decorating it unnecessarily. Draw inferences from the analysis done. Conclusion should be clearly written summarizing the

findings of the projectBibliography should comprise of the list of references.

Date of submission: June 20, 2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: ECONOMICS

Time to be Spent (_1__ Hours perday for _20__ Days) : 20 hrs.

WorkSpecification :

Project on topics mentioned in the scope of the syllabus or anyother relevant topic.

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file, internet, andaccounts book

Instructions /Guidelines:

It should be hand written project, preferably in blackink.

Project and student name should be on the cover page Acknowledgment, certificate and content should be

included. Clearly mention the objectives of the project The project should be divided into chapters with

headings The project should be analytical, well supported by

statistics, graphs and empirical data. Graphs and tables should be well explained and always

well labelled Use statistical techniques where ever possible. Avoid pasting pictures and decorating it unnecessarily. Draw inferences from the analysis done. Conclusion should be clearly written summarizing the

findings of the projectBibliography should comprise of the list of references.

Date of submission: June 20, 2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: ECONOMICS

Time to be Spent (_1__ Hours perday for _20__ Days) : 20 hrs.

WorkSpecification :

Project on topics mentioned in the scope of the syllabus or anyother relevant topic.

Materials /ResourcesRequired :

A-4 Sheets, pencil, black-ink pen, scale, stick-file, internet, andaccounts book

Instructions /Guidelines:

It should be hand written project, preferably in blackink.

Project and student name should be on the cover page Acknowledgment, certificate and content should be

included. Clearly mention the objectives of the project The project should be divided into chapters with

headings The project should be analytical, well supported by

statistics, graphs and empirical data. Graphs and tables should be well explained and always

well labelled Use statistical techniques where ever possible. Avoid pasting pictures and decorating it unnecessarily. Draw inferences from the analysis done. Conclusion should be clearly written summarizing the

findings of the projectBibliography should comprise of the list of references.

Date of submission: June 20, 2018

Page 16: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : ENGLISH LANGUAGE

Time to be Spent (___ Hours perday for ___ Days) : Half an hour per day for 10 days.

WorkSpecification :

1. Write a Book Review for any book of your choice as per theISC guidelines.2. Solve Q no 3 (all parts) from Specimen Papers 2,3 & 4 inTotal English.

Materials /ResourcesRequired :

A story book of one’s choice.Total English

Instructions /Guidelines :

Original Book Review to be written and should NOT be copiedfrom elsewhere.The written work must be done in the prescribed register.

DATE OF SUBMISSION: June 18 , 2018

Page 17: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : ENGLISH LITERATURE

Time to be Spent (___ Hours perday for ___ Days) : Half an hour everyday for 10 days.

WorkSpecification :

I. Define: Dialogue, Monologue, Aside, Soliloquy ,Irony( allkinds), Conflict, Simile, Metaphor, Personification, Hyperboleand Alliteration.

II. Answer the following questions from the prescribedtextbook ‘The Tempest’:

1. Act One, Scene i shows the "tempest" of the play's title. Howdo the different characters react to crisis?

2. Who is Miranda? What is her reaction to the scene she hasjust witnessed?

3. Who is Prospero? How does he know that everyone hassurvived the storm?

4. How did Prospero and Miranda come to be on the island?

5. Who is Ariel? Why should he be grateful to Prospero, and justdo what he's told?

6. Who was Sycorax? How does Prospero feel about her? Arethere any parallels between Sycorax's story and Prospero's?

7. Who is Caliban? What is his attitude towards Prospero'scontrol of the island?

8. What event led Prospero to start treating Caliban as his slave?

Page 18: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

9. Who taught Caliban to speak? How does he tend to uselanguage? Why?

10. Why does Miranda think that Ferdinand might be a "spirit"?

Materials /ResourcesRequired :

Internet & the textbooks

Instructions /Guidelines :

The written work should be done in the prescribed register sothat it can be used for future reference.

DATE OF SUBMISSION: June 18, 2018

Page 19: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : ENVIRONMENTAL SCIENCE

Time to be Spent (___ Hours perday for ___ Days) :

1 Hour per day for 10 Days.

WorkSpecification :

Number of PROJECT to be completed – 01(For further details on project topics refer to ISC syllabus/Rules andRegulation booklet)

Materials /ResourcesRequired :

Transparent file, sheets, print out material, photographs,statistics, graphs, cutouts, tables etc.

Instructions /Guidelines :

General guidelines for completing projectProject work could take one of the following forms:

1. Address a current environmental problem.2. Design and conduct an environmental impact assessment.3. Field work and training in an environmental organization for not

less than one month.4. Conduct a study on the density and population of plants

FOR COVER PAGE:

* ACKOWLEDGEMENT – 1 PAGE* INDEX WITH PAGE NUMBER – 1 PAGE* INTRODUCTION OR PROJECT OVERVIEW – 1 PAGE

THE SANSKAAR VALLEY SCHOOLPROJECT

NAME OF THE TOPIC:NAME OF THE STUDENT:STUDENT ID NUMBER:CLASS & SECTION:SESSION:

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : ENVIRONMENTAL SCIENCE

Time to be Spent (___ Hours perday for ___ Days) :

1 Hour per day for 10 Days.

WorkSpecification :

Number of PROJECT to be completed – 01(For further details on project topics refer to ISC syllabus/Rules andRegulation booklet)

Materials /ResourcesRequired :

Transparent file, sheets, print out material, photographs,statistics, graphs, cutouts, tables etc.

Instructions /Guidelines :

General guidelines for completing projectProject work could take one of the following forms:

1. Address a current environmental problem.2. Design and conduct an environmental impact assessment.3. Field work and training in an environmental organization for not

less than one month.4. Conduct a study on the density and population of plants

FOR COVER PAGE:

* ACKOWLEDGEMENT – 1 PAGE* INDEX WITH PAGE NUMBER – 1 PAGE* INTRODUCTION OR PROJECT OVERVIEW – 1 PAGE

THE SANSKAAR VALLEY SCHOOLPROJECT

NAME OF THE TOPIC:NAME OF THE STUDENT:STUDENT ID NUMBER:CLASS & SECTION:SESSION:

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : ENVIRONMENTAL SCIENCE

Time to be Spent (___ Hours perday for ___ Days) :

1 Hour per day for 10 Days.

WorkSpecification :

Number of PROJECT to be completed – 01(For further details on project topics refer to ISC syllabus/Rules andRegulation booklet)

Materials /ResourcesRequired :

Transparent file, sheets, print out material, photographs,statistics, graphs, cutouts, tables etc.

Instructions /Guidelines :

General guidelines for completing projectProject work could take one of the following forms:

1. Address a current environmental problem.2. Design and conduct an environmental impact assessment.3. Field work and training in an environmental organization for not

less than one month.4. Conduct a study on the density and population of plants

FOR COVER PAGE:

* ACKOWLEDGEMENT – 1 PAGE* INDEX WITH PAGE NUMBER – 1 PAGE* INTRODUCTION OR PROJECT OVERVIEW – 1 PAGE

THE SANSKAAR VALLEY SCHOOLPROJECT

NAME OF THE TOPIC:NAME OF THE STUDENT:STUDENT ID NUMBER:CLASS & SECTION:SESSION:

Page 20: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

* CONTENT OR BODY FOR PROJECT- 30 PAGES OR MINIMUM3000 WORDS WITH HEADINGS, SUBHEADINGS.* CONCLUSION – 1 PAGE* BIBLIOGRAPHY – MENTION COMPLETE LINKS WITH SITES- 1PAGE* ATTACH PRINT OUT MATERIAL IF TAKEN AFTERBIBLIOGRAPHY.* STICK PHOTOGRAPHS WHERE EVER NECESSARY.* SUPPORT YOUR PROJECT WITH STATISTICS,GRAPHS, CUTOUTS, TABLES ETC* USE BLACK INK TO WRITE. USE PROJECT SHEETS TOWRITE. PUNCHTHEM AND DO SPIRAL BINDING.

Any Other Information: Neatness and accuracy should be maintained while organizing theproject file.The quality of the project work is more important than the volume of the assignment.

Date of submission: 19/06/18

Page 21: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11

Summer Vacation, 2018

SUBJECT :

HINDI

Time to be Spent (___ Hours per day for ___ Days) :

1Hours per day for 15 Days

Work Specification :

Writing of Question and Answers , Composition,Comprehension ,Grammar & Reading Text Books.

Materials / Resources Required :

Books , Internet & Handouts

Instructions / Guidelines :

Ysk[ku x`gdk;Z dkWih esa djsaA

1 - O;kdj.k %&

¼v½ O;kdj.k eatw"kk &fdUgha 100 eqgkojksa dk vFkZ fy[kdj okD;ksa esa iz;ksx djsaA

¼vk½ O;kdj.k eatw"kk &okD; 'kks/ku djsa ¼vH;kl i`"B Øekad 229 ls 231 rdA½

¼b½ fuEufyf[kr fo"k; ij 400 ’kCnksa esa fuca/k fy[ksa &

• Hkkjr esa c<+rs vijk/k ds fy, flusek ft+EesnkjA

• ß[ksy ds fcuk f’k{kk v/kwjh gS A^^ ds i{k ;k foi{k ij fyf[k,A

• ßnwljksa ij g¡luk ljy gS vius ij g¡luk dfBu Aß

• ns’k esa lks’ky ehfM;k lkekftd o jktuhfrd {ks= esa gh ugha fct+usl esa

Hkh ØkfUr yk jgk gSA

2 lkjk vkdk’k %&

¼v½ miU;kl dk okpu djsaA

Page 22: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

3 +dkO; eatjh %&

¼v½ lk[kh dfork dk dsUnzh; Hkko D;k gS \

4 + x| ladyu %&

¼v½ ^xkSjh^ dgkuh dk mn~ns’; Li"V dhft,A

¼vk½ xkSjh dk pfj= fp=.k djsaA

Any Other Information: fu/kkZfjr frfFk ij gh x`g dk;Z tek djsa vU;Fkk vad ugha fn, tk,xsaA

Date of submission : 19 &06 &2018

Page 23: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: HISTORY

WorkSpecification:

Each student will decide a topic in History for their project.They can choose any topic from the history.

Suggestive List (The students shall decide their topic)

Materials /ResourcesRequired:

Spiral File, photographs, black pens.

Instructions /Guidelines:

COMMON INSTRUCTIONS

Thewrittenoutcomeoftheproject,intheformof a2000-wordessay,shouldbestructuredasgiven below:

A. Theresearch question

B. Abstract: it must contain the following information: Reason for choosing the topic. Hypothesis: the conclusion the student is hoping to draw.

C. Main essay: it must follow the structure given below: Background and context – to be discussed very briefly.

Explanation of the theme and specific issue of the

Any Other Information: Project should be handwritten.

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: HISTORY

WorkSpecification:

Each student will decide a topic in History for their project.They can choose any topic from the history.

Suggestive List (The students shall decide their topic)

Materials /ResourcesRequired:

Spiral File, photographs, black pens.

Instructions /Guidelines:

COMMON INSTRUCTIONS

Thewrittenoutcomeoftheproject,intheformof a2000-wordessay,shouldbestructuredasgiven below:

A. Theresearch question

B. Abstract: it must contain the following information: Reason for choosing the topic. Hypothesis: the conclusion the student is hoping to draw.

C. Main essay: it must follow the structure given below: Background and context – to be discussed very briefly.

Explanation of the theme and specific issue of the

Any Other Information: Project should be handwritten.

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: HISTORY

WorkSpecification:

Each student will decide a topic in History for their project.They can choose any topic from the history.

Suggestive List (The students shall decide their topic)

Materials /ResourcesRequired:

Spiral File, photographs, black pens.

Instructions /Guidelines:

COMMON INSTRUCTIONS

Thewrittenoutcomeoftheproject,intheformof a2000-wordessay,shouldbestructuredasgiven below:

A. Theresearch question

B. Abstract: it must contain the following information: Reason for choosing the topic. Hypothesis: the conclusion the student is hoping to draw.

C. Main essay: it must follow the structure given below: Background and context – to be discussed very briefly.

Explanation of the theme and specific issue of the

Any Other Information: Project should be handwritten.

Page 24: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: Mathematics

Time to be Spent (___ Hours perday for ___ Days): 1 hour every day.

WorkSpecification: Please do the questions given below.

Materials /ResourcesRequired:

Mathematics textbook, note book, writing material.

Instructions /Guidelines:

Do it every day for one hour.Refer to your book & class notes. You may share yourdifficulties with your friends or with your teachers.

Any Other Information:Along with the questions mentioned below, practice all thechapters taught so far.

Date of submission:21/06/2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: Mathematics

Time to be Spent (___ Hours perday for ___ Days): 1 hour every day.

WorkSpecification: Please do the questions given below.

Materials /ResourcesRequired:

Mathematics textbook, note book, writing material.

Instructions /Guidelines:

Do it every day for one hour.Refer to your book & class notes. You may share yourdifficulties with your friends or with your teachers.

Any Other Information:Along with the questions mentioned below, practice all thechapters taught so far.

Date of submission:21/06/2018

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT: Mathematics

Time to be Spent (___ Hours perday for ___ Days): 1 hour every day.

WorkSpecification: Please do the questions given below.

Materials /ResourcesRequired:

Mathematics textbook, note book, writing material.

Instructions /Guidelines:

Do it every day for one hour.Refer to your book & class notes. You may share yourdifficulties with your friends or with your teachers.

Any Other Information:Along with the questions mentioned below, practice all thechapters taught so far.

Date of submission:21/06/2018

Page 25: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

S.No. Page No. Question No.1 Ch 10-3 2, 7, 92 Ch 10-5 7, 8, 11, 143 Ch 10-10 5, 6, 8, 9, 10, 124 Ch 10-11 15, 18, 20, 26, 275 Ch 10-15 2, 6, 76 Ch 10-16 9, 11, 12,7 Ch 10-21 2, 4(iii), 4(vi), 4(vii)8 Ch 10-28 1 (b), 1(d), 4, 6(ii), 8

Page 26: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : PHYSICAL EDUCATION

Time to be Spent (An Hour perday for 50 Days) :

Half an hour to 1 hour per day for 50 days.

Time to be Spent(Hours per day for 20 Days) :

1 Hours per day for 20 Days.

WorkSpecification (50days) :

Do fitness exercise for your physical efficiency and for being physically fit.

WorkSpecification (20days) :

Project work

Materials /ResourcesRequired :

One file/spiral notebook for Project, Text Book, Writing & DrawingMaterials, Internet & Library support, Covering Material, ReferenceBooks, Photographs, where applicable

Instructions /Guidelines :

Select one Project of your choice, in consultation with your teacher.Organize your writing material.Write in your own handwriting in the file; computer print-outs are notallowed.Sub-headings : Title, Acknowledgement, Index, Content (if applicable)Write rules and regulations of the game, cups, trophies, tournamentsand famous player’s name.Cover the File.Write the project title, your name, Name of the School & year – noexcessive decoration is required.

Any other Information: Neatness and accuracy should be maintained while organizing the practicalfile.The quality of the project work is more important than the volume of the assignment.

DATE OF SUBMISSION: 22 June 2018

Page 27: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : PHYSICS

Time to be Spent (___ Hours perday for ___ Days) : 1 hour per day for 10 days )

WorkSpecification : Project work

Materials /ResourcesRequired :

One Project file , Text Book, Writing & Drawing Materials,Internet & Library support, Covering Material, ReferenceBooks, Newsprints , Photographs, Graphs, where applicable

Instructions /Guidelines :

You are required to prepare a technical report formally written, includingan abstract, some theoretical discussion, experimental set up,observation and data collected, analysis and discussion of the result,conclusion e.t.c the project can be a theoretical one as well on any of thetopic related to physics.You will be assessed on:

a) Conceptual clarity /understandingb) Computations (if any)c) Presentation (No extra credit shall be given for type-written

material / decorative cover. e.t.cYou can work on any topic of your choice from the list given below orany topic related to the physics syllabus of class XI.

1) Role of physics in technology2) Application of vectors and scalar quantities and its significant.3) Rocket propulsion and application of Newton’s ‘ Law4) Simple Harmonic motion5) Center of mass M .I rand related topic.6) Friction advantages , disadvantages in day to day life its law

and application.7) Bernoulli’s principle and its application.

Pascal law

DATE OF SUBMISSION: 18th June 2018

Page 28: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK: Class 11Summer Vacation, 2018

SUBJECT : Political Science

Time to be Spent (__ Hours perday for __ Days) :

1 Hour per day for 10 days.

WorkSpecification :

Each Student will decide a topic for Political Science Project. They canchoose any topic from the current political scenario in the InternationalOrder.Some suggested topics are listed below:

1. Truth of Independence and Legacy of Partition.2. The Kashmir Dispute.3. INDIA: A great example of ‘Unity in Diversity’.4. Naxal Violence- The Biggest internal security threat.5. Governance Reforms.6. Significant Political Developments.7. Uniform Civil Code.8. Demographic dividend.9. Right to freedom and role of Media.10. U.S. dominance in world politics in the post-cold war era.

Materials /ResourcesRequired :

Internet, Libraries, newspaper, and magazines.

Instructions /Guidelines :

COMMON INSTRUCTIONS :

1.Acknowledgement:

People who have helped and inspired you in the making of the project.

2.Cover Page

3. Index

4. Introduction:

Brief outline of the topic chosen

Reason for choosing the topic

Page 29: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

5.Content: 20 pages

6. The project should be handwritten.

7. Pictures ( to support your content):

To be pasted or drawn neatly.

8. Conclusion:

Your deductions and suggestions.

9. Bibliography:

Mention the sources of reference.

Evaluation

Evaluation Criteria Distribution of Marks

Process 5

Understanding, application of knowledge andAnalysis

5

Presentation 5

Viva 5

Total 20

DATE OF SUBMISSION: 19-06-18.

Page 30: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Psychology

Time to be Spent (__1_ Hours perday for _15__ Days) :

WorkSpecification :

Prepare one class teaching on the topic Attention & Perception (from thesyllabus).

Read /See on You tube-

10 Exercises That'll Make You Smarter In a Week

4 Exercises to Test How Fast Your Brain Is

Learning Disabilities, What Are the Different Types

Alzheimer's disease - causes, symptoms & pathology

Materials /ResourcesRequired :

Psychology book, inter net

Instructions /Guidelines :

As given in the class

Any Other Information: no

Date of submission: 20/6/18

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Psychology

Time to be Spent (__1_ Hours perday for _15__ Days) :

WorkSpecification :

Prepare one class teaching on the topic Attention & Perception (from thesyllabus).

Read /See on You tube-

10 Exercises That'll Make You Smarter In a Week

4 Exercises to Test How Fast Your Brain Is

Learning Disabilities, What Are the Different Types

Alzheimer's disease - causes, symptoms & pathology

Materials /ResourcesRequired :

Psychology book, inter net

Instructions /Guidelines :

As given in the class

Any Other Information: no

Date of submission: 20/6/18

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : Psychology

Time to be Spent (__1_ Hours perday for _15__ Days) :

WorkSpecification :

Prepare one class teaching on the topic Attention & Perception (from thesyllabus).

Read /See on You tube-

10 Exercises That'll Make You Smarter In a Week

4 Exercises to Test How Fast Your Brain Is

Learning Disabilities, What Are the Different Types

Alzheimer's disease - causes, symptoms & pathology

Materials /ResourcesRequired :

Psychology book, inter net

Instructions /Guidelines :

As given in the class

Any Other Information: no

Date of submission: 20/6/18

Page 31: HOLIDAY HOMEWORK : Class 11 Summer Vacation, 2018 … · Prepare a Venn diagram showing the similarities and differences between Book ... Business is considered to be separate

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : SOCIOLOGY

Time to be Spent (___ Hours perday for ___ Days) : 1 hour per day for 10 days

WorkSpecification :

Project work on ANY ONE topic (field view) out of the list of suggestedprojects given in your syllabus.

MaterialsRequired :

File, Ruled coloured papers, colors, markers, fevicol, internet, referencebooks, magazines, newspapers etc.

Instructions /Guidelines :

Following instructions need to be followed while making the Project;

1. Write the projects in your own handwriting.2. Add pictures, photographs, press release wherever necessary.3. Numbering should be done on each page.4. The following sequence must be followed:

Title page- Topic of the Project, Subject, Student’s nameand Class.

Acknowledgement. Index Statement of purpose. Hypothesis Choice of technique Collection and Analysis of data Limitation Conclusion Bibliography.

Date of submission: 19th June18

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : SOCIOLOGY

Time to be Spent (___ Hours perday for ___ Days) : 1 hour per day for 10 days

WorkSpecification :

Project work on ANY ONE topic (field view) out of the list of suggestedprojects given in your syllabus.

MaterialsRequired :

File, Ruled coloured papers, colors, markers, fevicol, internet, referencebooks, magazines, newspapers etc.

Instructions /Guidelines :

Following instructions need to be followed while making the Project;

1. Write the projects in your own handwriting.2. Add pictures, photographs, press release wherever necessary.3. Numbering should be done on each page.4. The following sequence must be followed:

Title page- Topic of the Project, Subject, Student’s nameand Class.

Acknowledgement. Index Statement of purpose. Hypothesis Choice of technique Collection and Analysis of data Limitation Conclusion Bibliography.

Date of submission: 19th June18

Head of the Department / Subject Coordinator Head of Shikhar

HOLIDAY HOMEWORK : Class 11Summer Vacation, 2018

SUBJECT : SOCIOLOGY

Time to be Spent (___ Hours perday for ___ Days) : 1 hour per day for 10 days

WorkSpecification :

Project work on ANY ONE topic (field view) out of the list of suggestedprojects given in your syllabus.

MaterialsRequired :

File, Ruled coloured papers, colors, markers, fevicol, internet, referencebooks, magazines, newspapers etc.

Instructions /Guidelines :

Following instructions need to be followed while making the Project;

1. Write the projects in your own handwriting.2. Add pictures, photographs, press release wherever necessary.3. Numbering should be done on each page.4. The following sequence must be followed:

Title page- Topic of the Project, Subject, Student’s nameand Class.

Acknowledgement. Index Statement of purpose. Hypothesis Choice of technique Collection and Analysis of data Limitation Conclusion Bibliography.

Date of submission: 19th June18