hoja de datos bomba principal
TRANSCRIPT
-
8/11/2019 Hoja de Datos Bomba Principal
1/6
Rev.
A
DISCIPLINA EQUIPOS
APROBADOPOR
FIRMA DEAPROBACIN
FECHA DESCRIPCINREVISADO
PORELABORADO
POR
VEPICA
BOMBA PRINCIPAL
AGO.14 EMISIN INICIAL A. D.
-
8/11/2019 Hoja de Datos Bomba Principal
2/6
-
8/11/2019 Hoja de Datos Bomba Principal
3/6
1
2
3 Item N : Data Sheet N :
4 Requisition N : P&ID N:
5 CENTRIFUGAL PUMP Purchaser Order: N/A6 DATA SHEET Attachment:7
8 Applicable Standard: Shaft Diameter Between Bearings (in.):
9 API 610 11th Edition Span Between Bearing Centers (in.):
10 Other See Remarks Span Between Bearing & Impellers (in.):
11 ( ) Pump Type: Remarks:
12 OH2 BB3 VS313 OH3 BB4 VS4 Couplings: Driver-Pump
14 OH6 BB5 VS5 Make
15 BB1 VS1 VS6 ( ) Model
16 BB2 VS2 VS7 Rating
17 Other: Lubrication
18 Nozzle Connections: ( ) Limited End Float Required
19 Flange ( ) Spacer Length (in)
20 Size (in) Rating (lbs) Facing Position ( ) Service Factor
21 Suction 3 Note 4 300# RF Centerline
22 Discharge 2 Note 4 300# RF Tangential Driver Half Coupling Mounted By:
23 Balance Pump Manufacturer Driver Manufacturer
24 Drum Purchaser Coupling per API 671
25 Baseplates:
26 Pressure Casing Connections: ANSI Baseplate Number
27 N. Size (NPS) Type
28 Drain 1 1/2 Note 4 300# RF Non-Grout (Construction):
29 Vent Remarks:
30 Pressure
31 Gauge
32 Temp. Gauge
33 Warm-up
34 Balance / Leak Off
35 Cylindrical Threads Required: Appendix H Class: S-6
36 Casing Mounting: (See Separate Sheet for Verticals) MIN Design Metal Temperature:
37 Centerline Near Centerline Barrel / Case: Carbon Steel Impeller 12% Cr
38 Foot Separate Mounting Plate Shaft:
39 In-Line Diffusers:40 Casing Split: Coupling Spacer / Hubs
41 Single Volute Multiple Volute Diffuser Coupling Diaphragms (Disk)
42 ( ) Overhung Between Bearings Barrel Remarks:
43 Case Pressure Rating:
44 Max. Allowable Working Pressure (Psig)
45 @ (F)
46 Hidrotest Pressure: (Psig)
47 Bearing (Type / Number):
48 Suction Press., Regions must be Designed for MAWP: Radial /
49 MAWP=Allowable Max. Operating Press. (Psig) Thrust /
50 Review and Approve Thrust Bearing Size
51 Rotation: (Viewed from Coupling End) Lubrication:
52 CW CCW ( ) Grease Flood Ring Oil Flinger
53 Impellers Individually Secured Purge Oil Mist Pure Oil Mist
54 Remarks:
55 Constant Level Oiler Preference (See Remarks)
56 Bolt OH3 Pump to Pad / Foundation Pres. Lube Sys:
57 Shaft: API-610 API-614
58 Shaft Diameter at Coupling (in.)
59 ( ) Oil Visc. Iso Grade
60
61
62 REVISION
63 DATE
64 PREPARED
65 CHECKED
66 APPROVED
0
MATERIAL Note 3
BEARINGS AND LUBRICATION
CONSTRUCTION CONSTRUCTION (CONT.)
By Mfg
Sheet 3 of 6
4140 alloy steel
N/A
NON-LUBE
N :
0
AGO.14
A. D.
A
0
Yes No
Project/ Proposal
-
8/11/2019 Hoja de Datos Bomba Principal
4/6
1
2
3 Item N : Data Sheet N :
4 Requisition N : P&ID N:
5 CENTRIFUGAL PUMP Purchaser Order: N/A6 DATA SHEET Attachment:7
8 ( ) Oil Heater Required:
9 Electric Steam Vapor Pressure (Psig): @ (F)
10
11 Oil Press to be Greather than Coolant Press Flow Rate MAX / MIN (gpm) : /
12 Remarks: Press. Req. MAX / MIN (Psig) /13 ( ) Temp. Req. MAX / MIN (F): /
14 Quench Fluid:
15 Name of Fluid
16 Seal Data: According with API-682: Flow Rate (gpm):
17 See Attached API-682 Data Sheet
18 Non-API-682 Seal Seal Flush Piping:
19 Appendix H Seal Code Seal Flush Piping Plan:
20 ( ) Seal Manufacturer: Tubing Carbon Steel
21 ( ) Size and Type: Pipe Stainless Steel
22 ( ) Manufacturer Code: Auxiliary Flush Plan:
23 ( ) Seal Chamber Data: Tubing Carbon Steel
24 Temperature (F) Pipe Stainless Steel
25 Pressure (Psig) Piping Assembly:
26 Flow (gpm) Threaded Unions
27 Seal Chamber Size: Socket Welded Flanged
28 Total Length (in.): Pressure Switch Type
29 Clear Length (in.): Pressure Gauge:
30 Seal Construction: ( ) Level Switch Type:
31 Sleeve Material Level Gauge Temp. Indicator
32 Gland Material Heat Exchanger
33 Aux. Seal Device Remarks:
34 ( ) Jacket Required:
35 ( ) Gland Taps: Packing Data:
36 Manufacturer
37 Type
38 Size
39 N of Rings40 Packing Injection Required
41 Seal Fluids Requirement and Available Flush Liquid: Flow (gpm): @ (F)
42 Note : If Flush Liquid is Pumpage, Following Flush Liquid Data is Lantern Ring
43 Not Required.
44 Supply Temperature MAX / MIN (F): / ( ) Cooling Water Piping Plan:
45 Relative Density (Spec. Gravity): @ (F) Cooling Water Requirements:
46 Name of Fluid: Seal Jacket / BRG HSG (gpm)
47 Specific Heat (Cp) (Btu/lb F) : @ (Psig)
48 Vapor Pressure (Psia): @ (F)
49 Hazardous Flammable Seal Heat Exchager (gpm)
50 Other: @ (Psig)
51 Flow Rate MAX / MIN (gpm): /
52 Press. Req. MAX / MIN (Psig): / Quench (gpm) @ (Psig)
53 Temp. Req. MAX / MIN (F): /
54 Total Cooling Water (gpm)
55 Barrier / Buffer Fluid:
56 Supply Temp. MAX / MIN (F): / Steam Piping:
57 Relative Density: @ (F) Remarks:
58
59
60
61
62 REVISION
63 DATE
64 PREPARED
65 CHECKED
66 APPROVED
STEAM AND COOLING WATER PIPING
MECHANICAL SEAL OR PACKING
MECHANICAL SEAL OR PACKING (CONT.)BEARINGS AND LUBRICATION (CONT.)
A. D.
0
Sheet 4 of 6
N/A
0
A
AGO.14
N :
API Plan N 11
API Plan N 52
0
Yes No
Project/ Proposal
Hazardous Flammable Other
Tubing Pipe
Flush (F)
Heating (H)
Quench (Q)
Balance Fluid (E)
Drain (D)
Cooling (C)
Leakage
Ext. Fluid Injection (X)
Barrier/Buffer (B)
Pumped Fluid (P)
Lubrication (G)
-
8/11/2019 Hoja de Datos Bomba Principal
5/6
-
8/11/2019 Hoja de Datos Bomba Principal
6/6
1
2
3 Item N : Data Sheet N :
4 Requisition N : P&ID N:
5 CENTRIFUGAL PUMP Purchaser Order: N/A6 DATA SHEET Attachment:7
8
9 Rigging Device Req. for Type OH3 Pum Additional Inspection Required for:
10 Hidrodynamic Thrust BRG Size Review Req.
11 ( ) Lateral Analysis Required
12 ( ) Rotor Dynamic Balance13 ( ) Mount Seal Reservoir Off Baseplate
14 ( ) Installation List in Proposal
15 Spare Rotor Vertical Storage Alternative Acceptance Criteria (See Remarks)
16 Torsional Analysis / Report Hardness Test Required for:
17 Progress Reports Required
18
19 Remarks: Wetting Agent Hydrotest
20 Vendor Submit Test Procedures
21 Record Final Assembly Running Clearances
22 Inspection Check-List
23 Review Vendors QA Program
24 Performance Curve Approval Remarks:
25 Shop Inspection
26
27 ( ) Test with Substitute Seal
28
29 Test Non-Wit Wit Observe
30 Hidrostatic X
31 Performance X X Note 6
32 NPSH
33 Complete Unit Test
34 Cleanliness Prior to X
35 Final Assembly
36 Nozzle Load Test
37 BRG HSG
38 Resonance Test
39 Remove / Inspect40 Hydrodinamic
41 Bearings After Test
42 Auxiliary Equipment ppm
43 Test ppm
44 ppm
45 ppm
46 ppm
47 mg/l
48 Material Certification Required S/cm
49
50
51
52 Casting Repair Procedure Approval Req.
53
54 Inspection Required for Connections Welds
55
56
57
58 Inspection Required for Castings
59
60
61
62 REVISION
63 DATE
64 PREPARED
65 CHECKED
66 APPROVED
TOTAL HARDNESS 6.000 - 11.000
CONDUCTIVITY 50 - 100
2 - 15
TSS 2 - 150
TDS 40.000 - 75.000
IRON 15 - 25
N/A
NOTE 1: REFERRED ALTITUDE TO BE MEASURED ABOVE SEA LEVEL.
0
N : Sheet 6 of 6
GENERAL NOTES
0
0
AGO.14
A. D.
A
QA INSPECTION AND TEST
OTHER PURCHASER REQUIREMENTS(CONT.) QA INSPECTION AND TEST (CONT.)
NOTE 2: ALL DATA NOT FILLED IN BY PURCHASER, SHALL BE FILLED OUT
BY MANUFACTURER ACCORDINGLY .
NOTE 3: THESE MATERIALS REPRESENT PREFERENCES, HOWEVER
MANUFACTURER IS FREE TO PROVIDE HIS OWN OPTIONS ACCORDING
TO HIS STANDARDS.
NOTE 4: REFERENCIAL SIZE THAT MAY CHANGE ACCORDING TO PUMP'S
MANUFACTURER SELECTION AND/OR NOMENCLATURE.
NOTE 5: REFERENCE VALUE TO BE CONFIRMED BY MFG. PUMP SELECTION/DESIGN.NOTE 6: WITNESS TEST FOR ONE UNIT ONLY.
NOTE 7:THE COMPOSITION OF THE FLUID IS:
CHLORIDE 34.000 - 40.000
FATS AND OIL
Yes No
Project/ Proposal
Mag Particle
Casing
RadiographicLiquid PenetrantUltrasonic
Other:
Impeller Shaft
Mag Particle
Mag Particle
Radiographic
Radiographic
Liquid Penetrant
Liquid Penetrant
Ultrasonic
Ultrasonic