Page 1: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

F b 2012February 2012

TRANSIT DIVISIONTRANSIT DIVISIONTRANSIT DIVISIONTRANSIT DIVISION

Page 2: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Balfour Beatty Rail, Inc. The Transit Division of Balfour Beatty Rail has safelyThe Transit Division of Balfour Beatty Rail has safely delivered complex transit projects, proving expertise in track construction, electrification, signaling, communications and asset management.

2

Page 3: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

RTD Eagle P3 ProjectRTD West Corridor ProjectRTD On-Call Services Contract

Transit Division

WAMT

ME

RTD On-Call Services ContractDenver

NH

WY RICT

OHNJNE

SD

ND

NV

ORME

NY

MI

VT

MA

IA

MN

WIID

PABARTSan Francisco

DEMDUT OH

NM OK

KS

NE

AZ

NV

KYVAWV

IL

SCAR

MO

IN

TN

GA

MTA Gold LineSCRRA-Metro Link

CA CO

NC TPGGoldsboro

TX LAGA

NM SCALMS

LA

GAMTA EXPO TrackTransit Division OfficeWest Covina

FLCorporate OfficeAtlanta

3

Page 4: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Mid-City Exposition LRT ProjectPROJECT START DATEPROJECT START DATE

January 2009PROJECT COMPLETION DATE

March 2011 (Forecast) ( )OWNER

Exposition Line Construction AuthorityPROJECT VALUE

$35 illi$35 millionPROJECT SCOPE

Installation of new direct fixation, embedded, and ballasted track for 7 mile LRT extension. Refurbish existing embedded track and tie in to the existing Metro Blue Line.

4

Page 5: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Metrolink Communication and Signal ProjectPROJECT START DATE

February 2009PROJECT COMPLETION DATE

February 2012 (Forecast) with 2 one-year optionsp

OWNER

Southern California Regional Rail Authority (SCRRA)

P VPROJECT VALUE

$45 millionPROJECT SCOPE

Install, modify, and test wayside electrical , y, ypower services and local distribution, wayside signal system, highway-rail guard crossing warning systems and pedestrian devices, wayside hazard detectors, and monitoring devices, communicationsmonitoring devices, communications systems.

5

Page 6: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Denver On-Call ProjectPROJECT START DATE

March 2009PROJECT COMPLETION DATE

July 2013 OWNEROWNER

Denver Regional Transportation District (RTD)

PROJECT VALUE

$56 millionPROJECT SCOPE

Retrofit the TREX project to install new traction power substations for 4 car trainstraction power substations for 4 car trains, upgrade the Elati Yard traction power substation and system plc upgrade.

6

Page 7: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Denver West Corridor ProjectPROJECT START DATE

September 2009PROJECT COMPLETION DATE

December 2012(Forecast) ( )OWNER

Denver Regional Transportation District (RTD)

PROJECT VALUEPROJECT VALUE

$62 millionPROJECT SCOPE

Provide ten (10) new 1500kW tractionProvide ten (10) new 1500kW traction power substations, catenary, signals and communication system for the West Corridor Project.

7

Page 8: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

BART Walnut Creek ProjectPROJECT START DATEOJ C S

August 24, 2009PROJECT COMPLETION DATE

December 23, 2010OWNEROWNER

Bay Area Rapid Transit (BART)JV PROJECT VALUE

$28 millionPROJECT SCOPE

Track, system & signal work includes installing owner furnished special track work, train control equipment, 2 No. gap breaker stations complete with DC switchgear, 1000Vd f d d t ti 34 5KV EPR bl1000Vdc feeder and traction power 34.5KV EPR cables and raceways, contact rail system, modifications of existing train control rooms.

8

Page 9: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Eagle P3 ProjectPROJECT START DATE

SEPTEMBER 2010PROJECT COMPLETED (D/B)

JUNE 2016JUNE 2016OWNER

REGIONAL TRANSIT DISTRICT

Estimated P3 Project Value

$ 3.0 Billion for Design/Build and Operations and Maintenance for 40 years.Maintenance for 40 years.

BBRI is in a 50/50 Joint Venture with Fluor for the Design/Build and also holds 1/3 equity in the O & M Joint Venture.M Joint Venture.

9

Page 10: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Expo Mid-City/Exposition Corridor Light Rail Transit Project

C-5 Track/Train Power, Control & Communications

Farmdale Station/Parking Lot & Street Improvements

No. XP8901-841

Contract Between:Contract Between:• Exposition Metro Line Construction Authority• Balfour Beatty Joint Venture

Other Important Agencies: Culver City, City of Los Angeles

10

Page 11: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Project DescriptionJoint Venture with BBII and BBRI for StationsJoint Venture with BBII and BBRI for Stations3400’ of track, traction power, overhead catenary system, & communication systems for Culver City Station

11

Install TPSS8Building

Hanging OCS Wires Pouring Plinths

Page 12: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Project DescriptionFarmdale station: construct at-grade station g

Hotel DemolitionBefore After

Farmdale Platform

12

Page 13: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Project Description Option 1 - Bike Path (Complete May 1, 2012)

Construction of 180’ retaining wall2575” of bike path that includes 250 tons aggregate basePortland cement concrete (500 tons)( )IrrigationTrees Lightingg g

13Current Conditions at Bike Path Location

Page 14: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Project DescriptionOption 2 – Culver City Lot A (Complete May 1, 2012)p y ( p y , )

Clean up existing lotAdd concrete gutter and fencing

14

Current Conditions at Lot A

Page 15: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Project DescriptionOption 3 – Culver City Lot B

Construction of 30,000SF lot that consists of drainage, placement of “mix seal” (noplacement of mix seal (no asphalt), irrigation, landscape and lighting

15

Current Conditions at Lot B

Page 16: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Project DescriptionOption 4 – Street Improvements on Washington & National

Includes widening roadway with new underground drainageElectrical Lights and traffic signalsNew asphalt concreteNew asphalt concretePCC structural sections

16

Current Conditions on National Current Conditions on Washington

Page 17: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Expo Mid-City/Exposition Corridor Light Rail Transit Project

C-6 Venice Blvd Underpass: Bridge & Street Improvements

No. XP8901-828

Design Build Contract Between:• Exposition Metro Line Construction Authorityp y• Balfour Beatty Infrastructure, Inc.

Other Important Agencies• Culver City• City of Los Angeles• Cal trans

17

Page 18: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

Additional Work for Expo AuthorityVenice Blvd Underpass: $15.7 Million, additional bridge over Venice Blvd –p gapproximately 500’Complete Date 2013

Location of Proposed Frame 6

18

Page 19: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

19

Page 20: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

20

Page 21: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

21

Page 22: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

22

Page 23: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

23

Page 24: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

24

Page 25: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

25

Page 26: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

26

Page 27: HNTBPDF-PS, Job 30 - IEEE-SAgrouper.ieee.org/groups/railtransit/ocs/Archives...TX LA GA AL MS LA MTA EXPO Track Transit Division Office West Covina FL Corporate Office Atlanta 3 Mid-City

27