hnlms karel doorman a833 · 5/1/2018  · zr. ms. karel doorman 15 february 2018 •support ops...

12
15 February 2018 HNLMS Karel Doorman A833 JOINT SUPPORT SHIP Capability Brief

Upload: others

Post on 14-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

15 February 2018

HNLMS Karel DoormanA833

JOINT SUPPORT SHIP

Capability Brief

Page 2: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine2

15 February 2018Zr. Ms. Karel Doorman

Capt S.L.(Sim)Schot

HNLMS Karel Doorman

Page 3: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine3

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman

Flexible and versatile

Length 204,7 mWidth 35,0 mDraught 7,8 mTonnage 27000 tonAccommodation 300 bedsCrew 159 > 129

ReplenishmentStrategical TransportSeabasingRole 2+ hospitalSelf Defense

Page 4: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine4

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman

Platform

• Diesel Electric:+/- 25 MW• 5 Diesel generators• 2 Main Engines: 9.8 Mw• 2 Shafts / 2 rudders• 2 Bow thruster• 1 Stern thruster• Dynamic Positioning system• Tanks

-Diesel 7700 m3-Avcat 1200 m3-Water 400 m3 (production cap 150 m3 daily)

Page 5: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine5

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman

Replenishment•Port and Starboard•Special small boat equip (crane)•Diesel•Avcat (aviation fuel)•Water•Stores

Page 6: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine6

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman

Strategical Transport• Stern Ramp: 100 ton• Main Crane: 40 ton • Small Crane: 1.5 ton• Big lift: 40 ton • Ammo lift: 12 ton• Max Loading Capacity

10600T (incl 8000T fuel)• Vehicle Deck

1900m2 / 650 LIM• Helicopter Deck + Hangar

3800m2 / 1300 LIM

Page 7: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine7

15 February 2018Zr. Ms. Karel Doorman

•Support Ops•Logistic/Ops Support cell•Limited staff capabilities

• Two LCVP’s (or FRISC)•Off/on load vehicles•Stern beach (up to LCU)

• Two Heli spots•Hangar •Workshops / offices forembarked crew

HNLMS Karel Doorman

Sea basing

•OSG:• 1 Cougar helicopter• 3 FRISC (2 in davit, 1 on deck)

Page 8: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine8

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman

Role 2+•2 Operating rooms

•Medium care beds (10),•Intensive care beds (3), •Recovery beds (2)•Quarantine (3)

• Radiological facility• 3 laboratories• Dentist facility

Page 9: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine9

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman

Self Defense•Thales Integrated Mast

•SMILE medium range radar•SEASTAR short range radar•Gatekeeper video surveillance•IFF•SHF satcom + UHF/VHF (ICAS)•Nav Radars (I-Band, F-Band, SCOUT•CCTV

•2 Goalkeeper CIWS•2 Marlin (air/surface)•4 Hitroles(air/surface)•4 SRBOC launchers•6 MAG machine guns

Page 10: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine10

15 February 2018Zr. Ms. Karel Doorman

Communications Infrastructure

Networks

-TITAAN/NLSWAN (incl MMHS)/NSWAN/INTERNET

Radio communications

-6 X T/RX(L)MF/HF

-8 X RX(L) LF/MF/HF

-2 X T/RX V/UHF

-10 X T/RX(L) UHF

-2 X NIMCIS VHF

-2 X VHF

-3 X IRRIDIUM TELEPHONE (1 X FIXED, 2 X MOBILE)

HNLMS Karel Doorman

Page 11: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine11

15 February 2018Zr. Ms. Karel Doorman

• CTG duties can be done by ship’s crew supported by(already planned) embarked enablers.

• Intell, Aircontrol, Planning, Current Ops

• C4I fit sufficient for focussed ops CTG task

• Tasking and employment (embarked) SOMTG as part of TG 440.03

• Long endurance, capable of replenishing TG

CTG duty

Page 12: HNLMS Karel Doorman A833 · 5/1/2018  · Zr. Ms. Karel Doorman 15 February 2018 •Support Ops •Logistic/Ops Support cell •Limited staff capabilities •Two LCVP’s(or FRISC)

Koninklijke Marine12

15 February 2018Zr. Ms. Karel Doorman

HNLMS Karel Doorman