HMA Pavement Construction IssuesHMA Pavement Construction Issues
• Presented by:
Robert Sauber
Supervising EngineerEngineer
Bureau of Materials
![Page 2: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/2.jpg)
Develop a Strategy
4 0
5 0
6 0
7 0
8 0
fici
ent
Sm
oo
thn
4 0
5 0
6 0
7 0
8 0
fici
ent
Sm
oo
thn
0
1 0
2 0
3 0
1 9 9 6 1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 1 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5
F i s c a l Y e a r%
Wit
h D
ef
R e d u c e F u n d in g b y 3 3 %C o n tin u e C u r re n t F u n d in gIn c re a s e F u n d in g b y $ 1 0 0 M /Y rR e d u c e H a lf D e fic ie n t B a c k lo g U s in g $ 2 9 0 M /Y rH is to ry
0
1 0
2 0
3 0
1 9 9 6 1 9 9 7 1 9 9 8 1 9 9 9 2 0 0 1 2 0 0 3 2 0 0 4 2 0 0 5 2 0 0 6 2 0 0 7 2 0 0 8 2 0 0 9 2 0 1 0 2 0 1 1 2 0 1 2 2 0 1 3 2 0 1 4 2 0 1 5
F i s c a l Y e a r%
Wit
h D
ef
R e d u c e F u n d in g b y 3 3 %C o n tin u e C u r re n t F u n d in gIn c re a s e F u n d in g b y $ 1 0 0 M /Y rR e d u c e H a lf D e fic ie n t B a c k lo g U s in g $ 2 9 0 M /Y rH is to ry
![Page 3: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/3.jpg)
Construction requirementsConstruction requirements
• Lane closure hours and environmentalLane closure hours and environmental regulations often limit treatment selection
• Select a buildable treatment that provides• Select a buildable treatment that provides the largest agency and user benefitC t ti t d i i htti• Constructing pavements during nighttime lane closures reduces quality
• Poor working conditions resulting in loss of talented workers
![Page 4: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/4.jpg)
Considerations with Full Road Closure
• Not amendable to all construction situationssituations– The availability of adequate alternate routes
• A solid management plan• A solid management plan– Done on an accelerated schedule
Scheduled on a 24 hr work basis potential for• Scheduled on a 24-hr. work basis, potential for impacts to local residents are concerned.
• Ensure all the needs to be met throughout project g p jduration
– Balance the increased load on the network • Increased traffic densities on alternate routes must
be assessed, planned for, and managed.
![Page 5: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/5.jpg)
Benefits of Full ClosureBenefits of Full Closure• Reduced project duration • Increased worker productivity• Increased worker productivity • Improved safety
I d d t lit• Improved product quality • Positive public sentiment • Increased workspace and flexibility • Reduced impact on construction p
travelers • Cost savingsg
![Page 6: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/6.jpg)
Full Road Closure Time Savings
![Page 7: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/7.jpg)
Milling and Profile MillingMilling and Profile Milling
• Milling is used to remove worn out surfaceMilling is used to remove worn out surface material and fix cross slope and profile– 2007 Specs eliminates 20+ milling itemsp g– Ranges now specified; 0-3”, >3”-6”, >6”– Plans should indicate grade control pointsg p
• Profile milling is used to remove ruts and corrugation and/or improve smoothnessg– Normally included for bridge undercuts where
lane closure time is limited, thick lifts placed
![Page 8: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/8.jpg)
Paver Production Rates (approx )Paver Production Rates (approx.)
• Microsurfacing- up to 7 lane miles/shiftMicrosurfacing up to 7 lane miles/shift• Novachip- up to 5 lane miles/shift
HMA t 3 l il / hift• HMA- up to 3 lane miles/shift• Plant production outpaces paver placement• Number of haul trucks is critical• MTV helps to reduce the number of trucksMTV helps to reduce the number of trucks
![Page 9: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/9.jpg)
Material Transfer VehicleMaterial Transfer Vehicle
• Helps to maintain consistent paver speedHelps to maintain consistent paver speed• Helps mixture and temperature
segregation by remixing the materialsegregation by remixing the material• Prevents haul trucks from bumping paver• Stores 1½ loads of material on site
But…
• Extremely heavy when loaded• Material loses 20oF in the processMaterial loses 20 F in the process
![Page 10: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/10.jpg)
Weather LimitationsWeather Limitations
• Microsurfacing the most sensitive to coldMicrosurfacing the most sensitive to cold temperatures or heavy rain
• Open Graded Friction Course and• Open Graded Friction Course and Novachip sensitive to cold weather T k C t 64 22 ill t dh h• Tack Coat 64-22 will not adhere when surface is damp from rain or milling
• Thicker lifts of HMA should be placed in cool weather
![Page 11: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/11.jpg)
Milling Machineg
![Page 12: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/12.jpg)
Cutting DrumCutting Drum
![Page 13: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/13.jpg)
Scabs after milling
![Page 14: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/14.jpg)
Proper Tack Coat Coveragep g
![Page 15: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/15.jpg)
Poor Tack Coat Coverage
![Page 16: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/16.jpg)
Good/Bad Tack Coat Coverageg
![Page 17: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/17.jpg)
Paver Augerg
![Page 18: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/18.jpg)
Screed Extension
![Page 19: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/19.jpg)
Paver HopperPaver Hopper
![Page 20: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/20.jpg)
Hopper Insert for MTVHopper Insert for MTV
![Page 21: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/21.jpg)
Paver Push Roller & Hitch
![Page 22: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/22.jpg)
Paver Gearbox
![Page 23: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/23.jpg)
Gear Box StreakGear Box Streak
![Page 24: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/24.jpg)
Gearbox Streak
![Page 25: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/25.jpg)
Echelon PavingEchelon Paving
![Page 26: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/26.jpg)
Bad Longitudinal Joint
![Page 27: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/27.jpg)
Notch Wedge Apparatus
![Page 28: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/28.jpg)
Notch Wedge Joint
![Page 29: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/29.jpg)
Ski used for grade controlg
![Page 30: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/30.jpg)
MTV: Blaw Knox MC 30
![Page 31: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/31.jpg)
MTV- Shuttlebuggyggy
![Page 32: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/32.jpg)
Shuttlebuggy Auger
![Page 33: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/33.jpg)
Steel Wheel Roller- Vibratoryy
![Page 34: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/34.jpg)
Pneumatic tire roller
![Page 35: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/35.jpg)
Pneumatic tires
![Page 36: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/36.jpg)
Nuclear Density Gauge: QCy g
![Page 37: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/37.jpg)
Fat Spots- Bleeding or FlushingFat Spots Bleeding or Flushing
![Page 38: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/38.jpg)
Roller Marks
![Page 39: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/39.jpg)
Poor Longitudinal JointPoor Longitudinal Joint
![Page 40: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/40.jpg)
Patched Longitudinal Jointg
![Page 41: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/41.jpg)
Poor Texture
![Page 42: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/42.jpg)
Ravelingg
![Page 43: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/43.jpg)
Freshly Placed HMAFreshly Placed HMA
![Page 44: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/44.jpg)
Mat Temp at Transverse JointMat Temp. at Transverse Joint
![Page 45: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/45.jpg)
Nuclear Density TestingNuclear Density Testing
![Page 46: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/46.jpg)
Temperature SegregationTemperature Segregation
![Page 47: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/47.jpg)
Temperature SegregationTemperature Segregation
![Page 48: HMA Pavement Construction Issues.ppt](https://reader034.vdocuments.us/reader034/viewer/2022052302/5879e6c61a28ab89618b46b8/html5/thumbnails/48.jpg)
MTV Dumping into PaverMTV Dumping into Paver