h&m survey
TRANSCRIPT
AIM Control, Email: [email protected] - 1 -
“H&M DAMAGE SURVEY” PHOTOGRAPHS
PHOTOGRAPH DESCRIPTION
M.V “ISTRIAN
EXPRESS” AT BENGOT
ANCHORAGE ZONE,
HAIPHONG CITY,
VIETNAM
MAIN ENGINE.
AIM Control, Email: [email protected] - 3 -
LOWER BEARING SHELL
NO.6:
MATERIAL ON WOKING
SURFACE WAS PEEL OFF
LOWER BEARING SHELL
NO.5, NO.3, NO.2, NO.1
WERE SAME
CONDITION:
MATERIAL ON WOKING
SURFACE WAS PEEL OFF
AT SAME POSITION.
AIM Control, Email: [email protected] - 4 -
UPPER BEARING SHELL
NO.6:.
LUBRICATING GASH
WAS PITTED AND PEEL
OFF
AIM Control, Email: [email protected] - 5 -
UPPER BEARING SHELL
NO.1, NO.2, NO.3, NO.4,
NO.5:
CONDITION WERE THE
SAME: LUBRICATING
GASH WAS PITTED AND
PEEL OFF
NEW CRANK BEARING
SETS WERE SUPLIED BY
OWNER FOR REPAIR.
AIM Control, Email: [email protected] - 6 -
NEW UPPER BEARING
SHELL
LUBRICATING CAVITIES
WERE MADE THE
REDUCE/ RELEASE
PRESSURE GASH