hl structural detailing cc. a3hldetailing.co.za/wp-content/uploads/2015/07/emma... · 2015. 7....

1
2 ø 18 BR4 ( wBR3 ) 45 2 ø 18 35 L70*70*6 x 7088 70 6 873 70 Back View Bottom View FABRICATION QUALITY CONTROL Date: ................................ End Date: ........................ SUP CHK: ....................... INSP CHK: ...................... Name: ............................. Clock NO: ........................ Release for Welding by: .............................................. Start Date: ...................... All profile notches to have 11mm radius unless noted otherwise All steelwork to comply with SANS 2001:CS1 & SANS 1921-3 General Notes: wBR3 45.2 L70*70*6 2.0 7088 S355JR 2.0 7088 45.2 Profile Mark Grade Length Mass Paint Area Material list for 1 part named 'Bracing' Total for 1 part Qty Phase name 1 Phase 1 The part shown is required for the following assemblies:- required for 1 'Bracing' assembly marked BR4 1 ©Copyright. All rights reserved. HL Structural Detailing CC. 0 W [wBR.3] 14.07.2015 Issued Revised MX Steel EMMA PRIMARY SCHOOL STRUCTURAL ROOF SHELTER Fax: 086 579 3950 [email protected] Scale Drawn JHL 1:2.5 Project Number BBD00735 Drawing Rev Angle Checked by: Approved by: Cel : 082 806 7600 JHL A3 Date Revision Description Mark Rev

Upload: others

Post on 04-Aug-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HL Structural Detailing CC. A3hldetailing.co.za/wp-content/uploads/2015/07/Emma... · 2015. 7. 28. · All steelwork to comply with SANS 2001:CS1 & SANS 1921-3 General Notes: wBR3L70*70*6

2 ø 18BR4 ( wBR3 )

45

2 ø 18

35

L70*70*6 x 7088

706 87370

Back View

Bottom View

FABRICATION QUALITY CONTROL

Date: ................................

End Date: ........................

SUP CHK: ....................... INSP CHK: ......................

Name: ............................. Clock NO: ........................

Release for Welding by: ..............................................

Start Date: ......................

All profile notches to have 11mm radius unless noted otherwiseAll steelwork to comply with SANS 2001:CS1 & SANS 1921-3General Notes:

wBR3 45.2L70*70*6 2.07088S355JR2.07088 45.2

ProfileMark Grade Length MassPaint AreaMaterial list for 1 part named 'Bracing'

Total for 1 part

QtyPhase name

1Phase 1

The part shown is required for the following assemblies:- required for 1 'Bracing' assembly marked BR41

©Copyright. All rights reserved.HL Structural Detailing CC.

0W [wBR.3]

14.07.2015IssuedRevised

MX SteelEMMA PRIMARY SCHOOLSTRUCTURAL ROOF SHELTER

Fax: 086 579 3950

[email protected]

ScaleDrawn JHL

1:2.5

Project Number

BBD00735Drawing Rev

Angle

Checked by:

Approved by:

Cel : 082 806 7600 JHL

A3

DateRevision DescriptionMarkRev